Browse City of Pensacola civic records
Every published record for City of Pensacola, newest first. Filter by board, year, or industry to jump straight to the records you want, and page through to reach the full archive.
2,590 records
f: 850-470-6397
A new single-family residence is planned for 671 Centros Street in Pensacola. The project proposes a two-story, wood-framed home totaling 1,435 square feet. This item is currently under review by the Planning Board. The project would involve site preparation, foundation work, framing, roofing, and the installation of electrical, plumbing, and HVAC systems, followed by interior and exterior finishes. Local contractors, trades, suppliers, and service providers are encouraged to engage early, before final site plans, bids, and permits are established, to explore potential opportunities in this residential construction project.
- Board:
- Planning Board Meeting
- Date:
- 2026-06-09
- Type:
- Agenda_item
- Address:
- 671 Centros St, Pensacola, FL 32502
f: 850-470-6397
A new single-family residence is planned for 671 Centros Street in Pensacola. The project involves the construction of a home, including site preparation, foundation, framing, roofing, and interior and exterior finishes. This project is currently under review by the Planning Board. The scope of work will likely include site clearing and grading, followed by underground utility connections, concrete and foundation work, framing, installation of electrical, plumbing, and HVAC systems, and finally interior and exterior finishing, including landscaping. Local contractors, trades, suppliers, and service providers are encouraged to engage early, before final site plans and permits are issued, to understand the project's needs and potential opportunities. This early engagement can provide a competitive advantage as the project moves through its review process.
- Board:
- Planning Board Meeting
- Date:
- 2026-06-09
- Type:
- Agenda_item
- Address:
- 671 Centros St, Pensacola, FL 32502
- Applicant:
- MacBeth Residence
f: 850-470-6397
A new single-family residence is planned for 671 Centros Street in Pensacola. The proposed home will have a total building area of 1,435 square feet, with 1,060 square feet on the first level and 375 square feet on the second level. This project is currently under review by the Planning Board. The construction process will likely involve site preparation, foundation work, framing, roofing, and the installation of electrical, plumbing, and HVAC systems. Interior and exterior finishes, along with landscaping, will complete the project. Local contractors, trades, suppliers, and service providers are encouraged to engage early, as this project is in its initial review phase, offering an opportunity to influence bids and secure work before final plans and permits are issued.
- Board:
- Planning Board Meeting
- Date:
- 2026-06-09
- Type:
- Agenda_item
- Address:
- 671 Centros St, Pensacola, FL 32502
f: 850-470-6397
A new single-family residence is planned for 671 Centros St in Pensacola, Florida. The project involves the construction of a two-story home. This item is currently under review by the Planning Board. The scope of work will likely include site preparation, foundation, framing, roofing, installation of windows and doors, plumbing, electrical, HVAC systems, interior and exterior finishes, and landscaping. Local contractors, trades, suppliers, and service providers are encouraged to engage early in the process. Understanding the project details before final site plans, bids, and permits are established can provide a competitive advantage for securing future work.
- Board:
- Planning Board Meeting
- Date:
- 2026-06-09
- Type:
- Agenda_item
- Address:
- 671 Centros St, Pensacola, FL 32502
f: 850-470-6397
A new single-family residence is planned for 671 Centros Street in Pensacola. The project involves the construction of a two-level home with a carport. This item is currently under review by the Planning Board. The project will likely involve site preparation, foundation work, framing, roofing, and the installation of electrical, plumbing, and HVAC systems, followed by interior and exterior finishes and landscaping. Contractors, suppliers, and service providers are encouraged to engage early to understand the project scope and potential opportunities before final plans and permits are issued.
- Board:
- Planning Board Meeting
- Date:
- 2026-06-09
- Type:
- Agenda_item
- Address:
- 671 Centros St, Pensacola, FL 32502
- Applicant:
- MacBeth Residence
f: 850-470-6397
A new single-family residence is planned for 671 Centros St in Pensacola. The project involves the construction of a two-level home, including foundation work, framing, roofing, and interior finishes. The construction set details include specific requirements for exterior flashing, window and door installation standards, and various building materials like brick veneer, asphalt shingles, and gypsum board. The project is currently in the planning stages, indicated by the "CONSTRUCTION SET" document. This development will likely involve site preparation, concrete and foundation work, framing for walls and roof, installation of roofing and siding, plumbing, electrical, and HVAC systems, as well as interior finishing trades. Local contractors, trades, suppliers, and service providers are encouraged to engage early to understand the project scope and potential opportunities before final bids and permits are issued.
- Board:
- Planning Board Meeting
- Date:
- 2026-06-09
- Type:
- Agenda_item
- Address:
- 671 Centros St, Pensacola, FL 32502
- Applicant:
- MacBeth Residence
f: 850-470-6397
A new single-family residence is planned for 671 Centros Street in Pensacola. The project involves the construction of a new home, as indicated by architectural drawings for wall sections. This project is currently under review by the Planning Board. The scope of work will likely include site preparation, foundation, framing, roofing, and the installation of electrical, plumbing, and HVAC systems, followed by interior and exterior finishes. Local contractors, trades, suppliers, and service providers are encouraged to engage early, before final plans and permits are issued, to explore potential opportunities in this residential construction project.
- Board:
- Planning Board Meeting
- Date:
- 2026-06-09
- Type:
- Agenda_item
- Address:
- 671 Centros St, Pensacola, FL 32502
f: 850-470-6397
A project is planned for the MacBeth Residence at 671 Centros Street in Pensacola. This project involves interior elevations and construction details for a residence. The plans show detailed specifications for windows, doors, interior trim, and exterior finishes, including brick veneer and specific flashing processes. This item is currently under review by the Planning Board. The scope of work would likely involve site preparation, framing, installation of windows and doors, exterior and interior finishing trades, and potentially landscaping. Contractors, suppliers, and service providers are encouraged to reach out early to learn more about this residential construction opportunity before final bids and permits are issued.
- Board:
- Planning Board Meeting
- Date:
- 2026-06-09
- Type:
- Agenda_item
- Address:
- 671 Centros St, Pensacola, FL 32502
- Applicant:
- MacBeth Residence
f: 850-470-6397
A residential project is planned for 671 Centros Street in Pensacola, Florida. This project involves the construction of the "MacBeth Residence." The plans include details for windows and doors, suggesting a focus on residential building. The project is currently under review by the Planning Board Meeting, City of Pensacola, Escambia. This early stage means that site clearing, grading, underground utility work, foundation, framing, roofing, and interior and exterior finishing trades will be needed. Local contractors, suppliers, and service providers are encouraged to engage with the project early. Understanding the project details before final plans, bids, and permits are issued can provide a competitive advantage for securing work.
- Board:
- Planning Board Meeting
- Date:
- 2026-06-09
- Type:
- Agenda_item
- Address:
- 671 Centros St, Pensacola, FL 32502
f: 850-470-6397
A new residence is planned for 671 Centros Street in Pensacola. The project involves the construction of a home, including a front entry, back patio, and carport. This project is currently under review by the Aragon Architectural Review Board. The work will likely involve site preparation, foundation, framing, roofing, and the installation of windows, doors, plumbing, electrical, and HVAC systems. Finishing trades for interior and exterior surfaces, along with landscaping and fencing, will also be required. Local contractors, trades, suppliers, and service providers are encouraged to engage early in the process, before final plans and permits are issued, to explore potential opportunities.
- Board:
- Planning Board Meeting
- Date:
- 2026-06-09
- Type:
- Agenda_item
- Address:
- 671 Centros St, Pensacola, FL 32502
i. Any of the following species having a minimum trunk diameter of eight inches
Planning Board Meeting listed this item on its agenda for 2026-06-09 in City of Pensacola. The posted record gives the item title and nothing else, so there is no site, no size and no applicant on file for it yet. Local businesses that want to follow it can open the official agenda link above and watch for the fuller write-up the body posts as the meeting gets closer.
- Board:
- Planning Board Meeting
- Date:
- 2026-06-09
- Type:
- Agenda_item
i. Driveways shall be allowed at locations indicated in the Aragon Design Code.
This item concerns proposed changes to driveway material regulations within the Aragon Design Code. The proposed rules would allow driveways at specific locations and specify acceptable materials from the street edge to the building setback. These materials include brick, concrete pavers, colored or stamped concrete, or poured concrete. The use of coloring agents for asphalt or concrete driveways would also be permitted. This agenda item is currently under review by the Planning Board. If approved, the project would involve work related to site preparation and the installation of approved driveway materials. Contractors specializing in concrete, paving, masonry, and landscaping services may find opportunities as this project moves forward. Early engagement could be beneficial before final plans and permits are established.
- Board:
- Planning Board Meeting
- Date:
- 2026-06-09
- Type:
- Agenda_item
i. Exterior lighting. Exterior lighting in the district will be post-mounted street
This notice concerns proposed exterior lighting standards for a district in Pensacola, Florida, as reviewed by the Planning Board. The standards detail requirements for post-mounted street lights and building-mounted lights, including ornamental designs, fixture types, and height limits for post-mounted lights. Specific lamp types are allowed, while others are prohibited. This item is currently under review. The project would involve the installation of new exterior lighting systems, potentially including site clearing and grading for pole placement, underground utility work for electrical connections, and the installation of various lighting fixtures. Contractors specializing in electrical work, lighting system installation, and potentially landscaping services could find opportunities. Engaging early allows businesses to understand the specific design and material requirements before bids and permits are finalized.
- Board:
- Planning Board Meeting
- Date:
- 2026-06-09
- Type:
- Agenda_item
i. General consideration. The board shall consider plans for buildings based on
The City of Pensacola Planning Board will consider plans for new buildings. This review will focus on the exterior design, materials, colors, and site layout. The board will look at features like walls, walkways, paved areas, plantings, accessory buildings, signs, and how the building fits into its surroundings. This is a general consideration of building plans based on existing regulations. The item is currently under review by the Planning Board. This process could lead to site clearing, grading, utility work, paving, building construction, and landscaping. Local contractors, suppliers, and service providers are encouraged to engage early to understand potential project needs before bids and permits are finalized.
- Board:
- Planning Board Meeting
- Date:
- 2026-06-09
- Type:
- Agenda_item
i. Informational signs. All informational signs, even if erected on private property,
Planning Board Meeting listed this item on its agenda for 2026-06-09 in City of Pensacola. The posted record gives the item title and nothing else, so there is no site, no size and no applicant on file for it yet. Local businesses that want to follow it can open the official agenda link above and watch for the fuller write-up the body posts as the meeting gets closer.
- Board:
- Planning Board Meeting
- Date:
- 2026-06-09
- Type:
- Agenda_item
i. Landscaping requirements in the GRD-1 district shall be based on Aragon
Planning Board Meeting listed this item on its agenda for 2026-06-09 in City of Pensacola. The posted record gives the item title and nothing else, so there is no site, no size and no applicant on file for it yet. Local businesses that want to follow it can open the official agenda link above and watch for the fuller write-up the body posts as the meeting gets closer.
- Board:
- Planning Board Meeting
- Date:
- 2026-06-09
- Type:
- Agenda_item
i. Meeting hall, U.S. Post Office pavilion, buildings used for community purposes,
The City of Pensacola Planning Board is reviewing a proposal for a new community building. This building would be located at the U.S. Post Office pavilion and is planned to be no larger than 5,000 square feet. The proposed use is for community purposes. This item is currently under review by the Planning Board. If approved, the project would involve site preparation, construction of the building structure, and potentially interior and exterior finishing work. Local contractors, trades, suppliers, and service providers are encouraged to monitor this project's progress. Early engagement could provide an advantage as plans develop and before bids are solicited.
- Board:
- Planning Board Meeting
- Date:
- 2026-06-09
- Type:
- Agenda_item
- Address:
- U.S. Post Office pavilion
i. Original fences in the older sections of the city were constructed of wood with
This item concerns the Aragon Design Code, which guides fence construction in older sections of Pensacola. The code specifies that original fences were often made of wood with paint, or of brick or wrought iron. The style and materials used for fences typically matched the main building on the property. This item is currently under review by the Planning Board. The review will likely involve discussions and potential updates to the design code related to fence materials and styles. This could lead to future opportunities for contractors specializing in fencing, masonry, and painting, as well as suppliers of wood, brick, and wrought iron. Early engagement with city planning staff and the board could provide insight into upcoming needs and requirements.
- Board:
- Planning Board Meeting
- Date:
- 2026-06-09
- Type:
- Agenda_item
i. Outbuildings and uses can include:
Planning Board Meeting listed this item on its agenda for 2026-06-09 in City of Pensacola. The posted record gives the item title and nothing else, so there is no site, no size and no applicant on file for it yet. Local businesses that want to follow it can open the official agenda link above and watch for the fuller write-up the body posts as the meeting gets closer.
- Board:
- Planning Board Meeting
- Date:
- 2026-06-09
- Type:
- Agenda_item
i. Provide photographs of the site for the proposed new construction in sufficient
This item concerns a proposed new construction project in Pensacola. The applicant is required to submit photographs of the site, showing existing features like trees, fences, sidewalks, driveways, and the land's shape. They must also provide pictures of the surrounding street and nearby buildings to show how the new construction fits in. This project is currently under review by the Planning Board. The work will likely involve site preparation, including clearing and grading, followed by the construction of the new building. This early stage in the review process presents an opportunity for local contractors, trades, suppliers, and service providers. Reaching out now, before detailed site plans, bids, and permits are finalized, allows businesses to understand the project's scope and potentially secure future work.
- Board:
- Planning Board Meeting
- Date:
- 2026-06-09
- Type:
- Agenda_item
See the actual businesses behind these numbers
Get the real filings, with addresses and officers, backed by a 14-day money-back guarantee.
Create your account