Browse City of St. Augustine civic records
Every published record for City of St. Augustine, newest first. Filter by board, year, or industry to jump straight to the records you want, and page through to reach the full archive.
1,111 records
b. To facilitate the development of vacant land and the reimagination and repurposing of underutilized
A proposal is under review to help develop vacant land and repurpose underutilized properties in a specific area. The goal is to create a high-quality, multi-modal, mixed-use environment. This initiative is currently planned and under review by the Corridor Review Committee. The project is expected to involve site clearing and grading, followed by underground utility work and road construction. Vertical construction for mixed-use buildings would then begin, encompassing framing, mechanical, and finish trades. Final landscaping and site improvements would complete the project. Local contractors, trades, suppliers, and service providers should consider engaging early to understand the project's scope and potential needs before formal plans and bids are established.
- Board:
- Corridor Review Committee
- Date:
- 2026-05-07
- Type:
- Agenda_item
b. Vertical Hardie square channel siding
Corridor Review Committee listed this item on its agenda for 2026-05-07 in City of St. Augustine. The posted record gives the item title and nothing else, so there is no site, no size and no applicant on file for it yet. Local businesses that want to follow it can open the official agenda link above and watch for the fuller write-up the body posts as the meeting gets closer.
- Board:
- Corridor Review Committee
- Date:
- 2026-05-07
- Type:
- Agenda_item
c. A granted modification and any conditions attached to it shall be entered on the face of or attached to the
Corridor Review Committee listed this item on its agenda for 2026-05-07 in City of St. Augustine. The posted record gives the item title and nothing else, so there is no site, no size and no applicant on file for it yet. Local businesses that want to follow it can open the official agenda link above and watch for the fuller write-up the body posts as the meeting gets closer.
- Board:
- Corridor Review Committee
- Date:
- 2026-05-07
- Type:
- Agenda_item
c. Add new window to west elevation with “Catio” wrap-around to the window on the north elevation
Corridor Review Committee listed this item on its agenda for 2026-05-07 in City of St. Augustine. The posted record gives the item title and nothing else, so there is no site, no size and no applicant on file for it yet. Local businesses that want to follow it can open the official agenda link above and watch for the fuller write-up the body posts as the meeting gets closer.
- Board:
- Corridor Review Committee
- Date:
- 2026-05-07
- Type:
- Agenda_item
c. East elevation door overhang
Corridor Review Committee listed this item on its agenda for 2026-05-07 in City of St. Augustine. The posted record gives the item title and nothing else, so there is no site, no size and no applicant on file for it yet. Local businesses that want to follow it can open the official agenda link above and watch for the fuller write-up the body posts as the meeting gets closer.
- Board:
- Corridor Review Committee
- Date:
- 2026-05-07
- Type:
- Agenda_item
c. Encroachments into the public right-of-way.
Corridor Review Committee listed this item on its agenda for 2026-05-07 in City of St. Augustine. The posted record gives the item title and nothing else, so there is no site, no size and no applicant on file for it yet. Local businesses that want to follow it can open the official agenda link above and watch for the fuller write-up the body posts as the meeting gets closer.
- Board:
- Corridor Review Committee
- Date:
- 2026-05-07
- Type:
- Agenda_item
c. Gently sloped roof with parapet and exaggerated fascia to match existing building
Corridor Review Committee listed this item on its agenda for 2026-05-07 in City of St. Augustine. The posted record gives the item title and nothing else, so there is no site, no size and no applicant on file for it yet. Local businesses that want to follow it can open the official agenda link above and watch for the fuller write-up the body posts as the meeting gets closer.
- Board:
- Corridor Review Committee
- Date:
- 2026-05-07
- Type:
- Agenda_item
c. In the case of flat roofs, roof materials shall be light-colored or a planted surface (green roof).
Corridor Review Committee listed this item on its agenda for 2026-05-07 in City of St. Augustine. The posted record gives the item title and nothing else, so there is no site, no size and no applicant on file for it yet. Local businesses that want to follow it can open the official agenda link above and watch for the fuller write-up the body posts as the meeting gets closer.
- Board:
- Corridor Review Committee
- Date:
- 2026-05-07
- Type:
- Agenda_item
c. Modifications to the non-dimensional requirements contained in this document.
Corridor Review Committee listed this item on its agenda for 2026-05-07 in City of St. Augustine. The posted record gives the item title and nothing else, so there is no site, no size and no applicant on file for it yet. Local businesses that want to follow it can open the official agenda link above and watch for the fuller write-up the body posts as the meeting gets closer.
- Board:
- Corridor Review Committee
- Date:
- 2026-05-07
- Type:
- Agenda_item
c. Primary features such as window shapes and sizes, opening patterns and entry doors, roof shapes and material
This item concerns proposed changes to design guidelines for buildings in St. Augustine. The changes focus on how primary features like windows, doors, roofs, siding, and porches can be repaired or altered. The key is that the overall character of these elements must be kept the same, though height increases are allowed. This item is currently under review by the Corridor Review Committee. If approved, the work could involve repairs and alterations to existing building features. This might include work on window and door installations, roofing, siding, and porch construction. Local contractors, trades, suppliers, and service providers are encouraged to monitor this review. Engaging early could provide an advantage as specific project details and permit requirements are developed.
- Board:
- Corridor Review Committee
- Date:
- 2026-05-07
- Type:
- Agenda_item
c. The proposed modification will not have a material negative impact on adjacent uses, or the applicant proposes to
This item concerns a proposed modification to a project in St. Johns. The applicant states the modification will not negatively impact nearby properties, or they plan to lessen any negative effects. The proposal is currently under review by the Corridor Review Committee. This review stage suggests that planning and design work may be ongoing. Businesses involved in site preparation, grading, utility work, construction trades, and final landscaping could find opportunities as the project moves forward. Engaging with the applicant or project team early, before final plans and permits are set, may provide an advantage for local contractors, suppliers, and service providers.
- Board:
- Corridor Review Committee
- Date:
- 2026-05-07
- Type:
- Agenda_item
c. To provide standards and criteria by which proposed development in the area will be reviewed.
The Corridor Review Committee (CRC) is reviewing proposed standards and criteria for future development along King Street. This review includes potential modifications to design standards based on unique project characteristics. The CRC will evaluate any requests for modifications independently. This process is currently under review, indicating an early stage for potential projects. The work that could be set in motion includes site planning, design, and the eventual construction of new developments. Phases may involve initial site preparation, followed by building construction and finishing trades. Local contractors, suppliers, and service providers are encouraged to engage early. Understanding the review process now offers an advantage before specific site plans, bids, and permits are finalized.
- Board:
- Corridor Review Committee
- Date:
- 2026-05-07
- Type:
- Agenda_item
- Address:
- 230 W. King Street
d. A proposed change to an approved modification shall be added to the approved modification and considered in the
Corridor Review Committee listed this item on its agenda for 2026-05-07 in City of St. Augustine. The posted record gives the item title and nothing else, so there is no site, no size and no applicant on file for it yet. Local businesses that want to follow it can open the official agenda link above and watch for the fuller write-up the body posts as the meeting gets closer.
- Board:
- Corridor Review Committee
- Date:
- 2026-05-07
- Type:
- Agenda_item
d. A reduction of a setback to less than 5 feet adjacent to a single family residential district.
Corridor Review Committee listed this item on its agenda for 2026-05-07 in City of St. Augustine. The posted record gives the item title and nothing else, so there is no site, no size and no applicant on file for it yet. Local businesses that want to follow it can open the official agenda link above and watch for the fuller write-up the body posts as the meeting gets closer.
- Board:
- Corridor Review Committee
- Date:
- 2026-05-07
- Type:
- Agenda_item
d. Additions shall be designed so that there is the least possible loss or obstruction of character-defining features.
The City of St. Augustine's Corridor Review Committee is reviewing a design proposal for additions at 230 W. King Street. The proposal focuses on ensuring new additions do not detract from the existing building's character-defining features, maintaining its prominence in the streetscape. Specific guidelines address allowable exterior finishes, permitting natural siding like cedar and cypress but restricting exposed pre-engineered metal and plastic panels unless a modification is approved. The review is currently planned, indicating an early stage in the public process. This project could involve site preparation, demolition of non-character-defining elements, new construction, and exterior finishing work. Contractors specializing in historic building renovations, exterior finishes, and general construction may find opportunities. Engaging early allows businesses to understand the project's specific material and design requirements before formal bidding.
- Board:
- Corridor Review Committee
- Date:
- 2026-05-07
- Type:
- Agenda_item
- Address:
- 230 W. King Street
d. Compliance with the requirement is technically infeasible based on site conditions.
Corridor Review Committee listed this item on its agenda for 2026-05-07 in City of St. Augustine. The posted record gives the item title and nothing else, so there is no site, no size and no applicant on file for it yet. Local businesses that want to follow it can open the official agenda link above and watch for the fuller write-up the body posts as the meeting gets closer.
- Board:
- Corridor Review Committee
- Date:
- 2026-05-07
- Type:
- Agenda_item
d. Mansard roofs shall be prohibited.
Corridor Review Committee listed this item on its agenda for 2026-05-07 in City of St. Augustine. The posted record gives the item title and nothing else, so there is no site, no size and no applicant on file for it yet. Local businesses that want to follow it can open the official agenda link above and watch for the fuller write-up the body posts as the meeting gets closer.
- Board:
- Corridor Review Committee
- Date:
- 2026-05-07
- Type:
- Agenda_item
d. Metal access stairs at rear
Corridor Review Committee listed this item on its agenda for 2026-05-07 in City of St. Augustine. The posted record gives the item title and nothing else, so there is no site, no size and no applicant on file for it yet. Local businesses that want to follow it can open the official agenda link above and watch for the fuller write-up the body posts as the meeting gets closer.
- Board:
- Corridor Review Committee
- Date:
- 2026-05-07
- Type:
- Agenda_item
d. Painted brick finish
Corridor Review Committee listed this item on its agenda for 2026-05-07 in City of St. Augustine. The posted record gives the item title and nothing else, so there is no site, no size and no applicant on file for it yet. Local businesses that want to follow it can open the official agenda link above and watch for the fuller write-up the body posts as the meeting gets closer.
- Board:
- Corridor Review Committee
- Date:
- 2026-05-07
- Type:
- Agenda_item
e. Kawneer storefront system windows on front elevation (see glazing calculations attached)
Corridor Review Committee listed this item on its agenda for 2026-05-07 in City of St. Augustine. The posted record gives the item title and nothing else, so there is no site, no size and no applicant on file for it yet. Local businesses that want to follow it can open the official agenda link above and watch for the fuller write-up the body posts as the meeting gets closer.
- Board:
- Corridor Review Committee
- Date:
- 2026-05-07
- Type:
- Agenda_item
See the actual businesses behind these numbers
Get the real filings, with addresses and officers, backed by a 14-day money-back guarantee.
Create your account