Corridor Review Committee
City of St. Augustine
Latest meetings
CRCagenda100126
The Corridor Review Committee agenda for October 1, 2026 lists four continued items for design approval of new buildings and site features related to a larger redevelopment plan, all on King Street. No decision is stated for any item; they are listed as continued items from the previous meeting. No public comment sentiment is stated in the document.
- Board:
- Corridor Review Committee
- Date:
- 2026-10-01
- Type:
- Agenda
- Decision:
- not stated; items are continued from previous meeting
- Address:
- 130 King Street; 132 King Street; 134 King Street; 136 King Street
- Applicant:
- Marquis Latimer + Halback, Inc. for all items; Owners: Donna R. & Scott G. Wendler for 130, 132, 136 King Street; Wendler Properties III, LLC for 134 King Street
Corridor Review Committee
The Corridor Review Committee of the City of St. Augustine met on October 1, 2026, to review agenda items, including continued items from a previous meeting and other business. The main items were four applications (HP2026-0055 through HP2026-0058) submitted by Marquis Latimer + Halback, Inc. These applications are under review and could involve design or planning work for projects in the corridor. Local contractors, trades, and suppliers may find opportunities related to these applications once they are approved. The next regular meeting is scheduled for November 5, 2026, pending new or continued applications.
- Board:
- Corridor Review Committee
- Date:
- 2026-10-01
- Type:
- Meeting
4. Modification and approval of Agenda
Corridor Review Committee listed this item on its agenda for 2026-08-06 in City of St. Augustine. The posted record gives the item title and nothing else, so there is no site, no size and no applicant on file for it yet. Local businesses that want to follow it can open the official agenda link above and watch for the fuller write-up the body posts as the meeting gets closer.
- Board:
- Corridor Review Committee
- Date:
- 2026-08-06
- Type:
- Agenda_item
5. New Business (All items in this section are related and part of a larger project)
Corridor Review Committee listed this item on its agenda for 2026-08-06 in City of St. Augustine. The posted record gives the item title and nothing else, so there is no site, no size and no applicant on file for it yet. Local businesses that want to follow it can open the official agenda link above and watch for the fuller write-up the body posts as the meeting gets closer.
- Board:
- Corridor Review Committee
- Date:
- 2026-08-06
- Type:
- Agenda_item
CRCagenda080626
[130 King Street; case HP2026-0055] Design approval for new building and site features at 130 King Street, part of a larger redevelopment plan. Applicant Marquis Latimer + Halback, Inc. for owners Donna R. & Scott G. Wendler. Case number HP2026-0055. [132 King Street; case HP2026-0056] Design approval for new building and site features at 132 King Street, part of a larger redevelopment plan. Applicant Marquis Latimer + Halback, Inc. for owners Donna R. & Scott G. Wendler. Case number HP2026-0056. [134 King Street; case HP2026-0057] Design approval for new building and site features at 134 King Street, part of a larger redevelopment plan. Applicant Marquis Latimer + Halback, Inc. for owner Wendler Properties III, LLC. Case number HP2026-0057. [136 King Street; case HP2026-0058] Design approval for new building and site features at 136 King Street, part of a larger redevelopment plan. Applicant Marquis Latimer + Halback, Inc. for owners Donna R. & Scott G. Wendler. Case number HP2026-0058. [King Street Rights-of-Way; case HP2026-0054] Review of proposed designs for King Street improvements. Applicant Marquis Latimer + Halback for owner City of St. Augustine. Case number HP2026-0054.
- Board:
- Corridor Review Committee
- Date:
- 2026-08-06
- Type:
- Agenda
- Address:
- 130 King Street
- Applicant:
- Marquis Latimer + Halback, Inc.
CRCagendaFINAL080626
The document is an amended agenda for the Corridor Review Committee meeting on Thursday, August 6, 2026, at 2:00 PM in the Alcazar Room. It lists multiple related projects under New Business, all involving design approval for new buildings and site features as part of a larger redevelopment plan on King Street, plus a City project for King Street improvements. No decision is stated; the agenda only lists items for review. Public comment is limited to general comments for items not on the agenda; no specific stakeholder sentiment is recorded.
- Board:
- Corridor Review Committee
- Date:
- 2026-08-06
- Type:
- Agenda
- Decision:
- not stated; agenda only, no decision recorded
- Address:
- 130 King Street; 132 King Street; 134 King Street; 136 King Street; King Street Rights-of-Way
- Applicant:
- Marquis Latimer + Halback, Inc. (for HP2026-0055, HP2026-0056, HP2026-0057, HP2026-0058); Marquis Latimer + Halback (for HP2026-0054)
CRCagendaPACKET080626
[130, 132, 134, & 136 King Street, St. Augustine, Florida; case HP2026-0055, HP2026-0056, HP2026-0057, HP2026-0058 (also HP2026-0054 for King Street Rights-of-Way)] The Corridor Review Committee agenda for August 6, 2026, lists four related design approval applications (HP2026-0055 through HP2026-0058) for properties at 130, 132, 134, and 136 King Street, St. Augustine, Florida, owned by Donna R. & Scott G. Wendler and Wendler Properties III, LLC, with Marquis Latimer + Halback, Inc. as applicant. The project involves rehabilitation and adaptive reuse of existing structures, two new structures, and site changes across 8 parcels between King and Oviedo Streets. The staff recommendation is to CONTINUE the proposed design to allow the applicant time to respond to comments, finalize a development agreement, and provide additional details. The agenda also includes a city project (HP2026-0054) for King Street Rights-of-Way improvements. The document does not state a decision (approved/denied/deferred) for the August 6, 2026 meeting, only the staff recommendation. Public comment sentiment is not stated in the document. [King Street Rights-of-Way, Saint Augustine, 32084; case HP2026-0054] Design Review application HP2026-0054 for King Street Right of Way (ROW) Improvements and Cathedral Place Right of Way (ROW) Improvements in St. Augustine, Florida. The project includes repaving King Street with a central brick lane for turning at intersections from Charlotte Street westward to Malaga Street; reducing Cathedral Place from two driving lanes with street parking on both sides to a single lane with expanded sidewalks and parking only on the north side along the Plaza to St. George Street; installing brick paved crosswalks, monument columns (8' H), and unified streetscape elements; constructing a new wall (4'-4" H x 2'-9" wide) along the Alcazar Hotel site with Lightner Museum and City Hall names; restoring and reinstalling the Pell horse trough; and landscaping between sidewalks and road with specified trees and groundcover. The applicant is Jeremy Marquis of Marquis, and the property owner is the City of Saint Augustine. The meeting date is August 6, 2026. The document does not state a decision. Staff does not make recommendations regarding City projects; the Corridor Review Committee (CRC) should make a determination based on evidence provided. The document includes sample motions for approval, continuation, or denial. Public comment or stakeholder sentiment is not stated in the document. The document includes a note that the King Street Design Standards for Entry Corridors (DSEC) do not address the public right of way, and the CRC should consider what is overall consistent with the intent of the Design Standards. The document also includes an email from Charles Tingley, Research Historian at the St. Augustine Historical Society Research Library, providing historical context on street light fixtures, stating that the current preferred design is 'cobbled together from available parts' and 'there is absolutely nothing Colonial about them.'
- Board:
- Corridor Review Committee
- Date:
- 2026-08-06
- Type:
- Agenda_packet
- Decision:
- Staff recommendation is to CONTINUE the proposed design. No final decision is stated in the document.
- Address:
- 130, 132, 134, & 136 King Street, St. Augustine, Florida
- Applicant:
- Marquis Latimer + Halback, Inc. (Applicant); Owners: Donna R. & Scott G. Wendler (130, 132, 136 King Street) and Wendler Properties III, LLC (134 King Street)
a) HP2026-0054 Marquis Latimer + Halback - Applicant
The City of St. Augustine is reviewing proposed designs for improvements along King Street. This project is currently under review by the Corridor Review Committee. The scope of work is expected to involve site clearing and grading, followed by underground utility work and paving. Mechanical and finish trades may also be involved, along with final landscaping. Local contractors, trades, suppliers, and service providers are encouraged to reach out early to learn more about this planned project. Engaging before site plans, bids, and permits are finalized offers an advantage in securing potential work.
- Board:
- Corridor Review Committee
- Date:
- 2026-08-06
- Type:
- Agenda_item
- Address:
- King Street Rights-of-Way
- Applicant:
- Marquis Latimer + Halback
a) HP2026-0055 Marquis Latimer + Halback, Inc. - Applicant
A new building and site features are being proposed for 130 King Street in St. Augustine. The applicant, Marquis Latimer + Halback, Inc., is seeking design approval for these additions as part of a larger redevelopment plan. This item is currently under review by the Corridor Review Committee. The project is expected to involve site preparation, construction of new structures, and associated landscaping. Contractors, suppliers, and service providers in areas such as site clearing, grading, concrete work, building construction, electrical, plumbing, HVAC, and landscaping may find opportunities. Engaging early, before final plans and permits are set, could provide a competitive advantage for securing work on this project.
- Board:
- Corridor Review Committee
- Date:
- 2026-08-06
- Type:
- Agenda_item
- Address:
- 130 King Street
- Applicant:
- Marquis Latimer + Halback, Inc.
b) HP2026-0056 Marquis Latimer + Halback, Inc. - Applicant
The City of St. Augustine's Corridor Review Committee is reviewing a proposal for a new building and site features at 132 King Street. This project is part of a larger redevelopment plan. The item is currently under review, indicating an early stage in the public process. The work would likely involve site clearing and grading, followed by underground utility and stormwater management systems. Subsequent phases could include paving, vertical construction for the building, and interior finish trades. Finally, landscaping and site finishing would occur. Contractors, suppliers, and service providers in site preparation, general construction, and specialty trades should consider reaching out now to learn more about this project before detailed site plans, bids, and permits are finalized, as this offers an advantage in securing future work.
- Board:
- Corridor Review Committee
- Date:
- 2026-08-06
- Type:
- Agenda_item
- Address:
- 132 King Street
- Applicant:
- Marquis Latimer + Halback, Inc.
c) HP2026-0057 Marquis Latimer + Halback, Inc. - Applicant
A new building and site features are proposed for 134 King Street as part of a larger redevelopment plan. The applicant is Marquis Latimer + Halback, Inc., and the owner is Wendler Properties III, LLC. This project is currently under review by the City of St. Augustine's Corridor Review Committee. The scope of work would likely involve site preparation, construction of new structures, and associated landscaping. Early engagement with the project team could provide local contractors, suppliers, and service providers with an advantage as plans and bid opportunities develop.
- Board:
- Corridor Review Committee
- Date:
- 2026-08-06
- Type:
- Agenda_item
- Address:
- 134 King Street
- Applicant:
- Marquis Latimer + Halback, Inc.
d) HP2026-0058 Marquis Latimer + Halback, Inc. - Applicant
A redevelopment plan is being considered for 136 King Street. The applicant, Marquis Latimer + Halback, Inc., is seeking design approval for new building and site features. This project is currently under review by the Corridor Review Committee. The work could involve site preparation, construction of new structures, and associated landscaping. Local contractors, trades, suppliers, and service providers are encouraged to engage early to understand the project's scope and potential needs before final plans and permits are established. This early engagement can provide a competitive advantage.
- Board:
- Corridor Review Committee
- Date:
- 2026-08-06
- Type:
- Agenda_item
- Address:
- 136 King Street
- Applicant:
- Marquis Latimer + Halback, Inc.
1. Aluminum Storefront windows on front facade – see attached Kawneer brochure
Corridor Review Committee listed this item on its agenda for 2026-05-07 in City of St. Augustine. The posted record gives the item title and nothing else, so there is no site, no size and no applicant on file for it yet. Local businesses that want to follow it can open the official agenda link above and watch for the fuller write-up the body posts as the meeting gets closer.
- Board:
- Corridor Review Committee
- Date:
- 2026-05-07
- Type:
- Agenda_item
1. Location Map (GIS)
Corridor Review Committee listed this item on its agenda for 2026-05-07 in City of St. Augustine. The posted record gives the item title and nothing else, so there is no site, no size and no applicant on file for it yet. Local businesses that want to follow it can open the official agenda link above and watch for the fuller write-up the body posts as the meeting gets closer.
- Board:
- Corridor Review Committee
- Date:
- 2026-05-07
- Type:
- Agenda_item
1. Mechanical equipment shall not be permitted within any required building setback unless the utility company
Corridor Review Committee listed this item on its agenda for 2026-05-07 in City of St. Augustine. The posted record gives the item title and nothing else, so there is no site, no size and no applicant on file for it yet. Local businesses that want to follow it can open the official agenda link above and watch for the fuller write-up the body posts as the meeting gets closer.
- Board:
- Corridor Review Committee
- Date:
- 2026-05-07
- Type:
- Agenda_item
See the actual businesses behind these numbers
Get the real filings, with addresses and officers, backed by a 14-day money-back guarantee.
Create your account