CC-pkt-2026-08-12
City Commission · 2026-08-12 · agenda_packet
[401 S. Park Avenue (City Hall Commission Chambers); 1560 North Orange Avenue (conditional use approval); West Welbourne Avenue (road improvements project); Holt Ave (partial vacation); West Fairbanks (CRAIII incentives); case CU #26-04 (conditional use); Ordinance 3369-26 (partial vacation of Holt Ave); IFB14-24 (Yang, Inc.); IFB22-22 (LaFleur Nurseries); IFB14-25 (Allcrete, Inc.); RFQ20-24 (Vision Urban LLC); City of Clermont #2023-071 (Danus Utilities); City of Clermont #2023-072 (RCM Utilities)] The document is a City Commission meeting agenda for August 12, 2026, containing multiple distinct items. It includes a request to approve a 12-month contract extension with Orlando Utilities Commission (OUC) for power supply, with no additional solar resources. The current OUC contract expires December 31, 2026. The recommendation is to extend the contract to December 31, 2027. The document also includes a request to approve a Public Private Partnership for Parking Garage Development, but no specific details are provided. The agenda includes consent agenda items for various contracts, including piggyback contracts for sanitary sewer rehabilitation (Danus Utilities, Inc. and RCM Utilities, Inc.), electrician services (Yang, Inc.), landscape and tree installation (LaFleur Nurseries & Garden Center, LLC), concrete repair services (Allcrete, Inc.), urban design advisor services (Vision Urban LLC), and a waiver of procurement process for the West Welbourne Avenue Road Improvements Project (Southern Development & Construction, Inc.). The agenda also includes a public hearing for Ordinance 3369-26, a partial vacation of Holt Ave for the FBC South Project (2nd reading). The document includes a red light camera survey report. The document also includes minutes from previous meetings, which detail a conditional use approval for a restaurant and cafe at 1560 North Orange Avenue, and a discussion on incentives for West Fairbanks (CRAIII). [401 South Park Avenue, Winter Park, FL 32789; case RFQ26-20] This document is a response to City of Winter Park RFQ No. RFQ26-20 for a Public-Private Partnership for Parking Garage Development. The proposed project is a three-story precast parking garage with approximately 263 spaces plus approximately 75 surface spaces (approximately 338 total spaces) on the City Hall surface lots at 401 South Park Avenue. The project also includes a separate two-story office or mixed-use component as a second phase. The applicant is G3 Development, LLC. The response was submitted on July 15, 2026. The document does not state a decision (approved/denied/deferred/recommended). It also includes a portfolio of past projects by team members, including the US Department of Veterans Affairs Birmingham, AL (65,000 square foot VA medical clinic and eight-story parking garage with 2,400 spaces on an approximately four-acre site), Savannah River International Trade Park Wentworth, GA (Parcels 3 and 4, three buildings), Georgia International Trade Center GA (approximately 1,150 acres), Lake Mary Technology Center Lake Mary, FL (approximately 239,881 square feet across four buildings on 17.6 acres), The Southerly at the Shipyards St Augustine, FL (498,094 square foot apartment community with 270 units on a 3.6-acre site), and Stadium House Gainesville, FL (476,282 square foot student housing complex with 181 units and 623 beds). [case RFQ26-20] This document is a response to City of Winter Park RFQ26-20 for a Public Private Partnership - Parking Garage Development. It contains two separate proposals. The first is from G3 Development, LLC, proposing a parking garage with 338 total spaces (169 net new), including 145 spaces for City Hall, and approximately 18,250 square feet of commercial space. The second is from Lamm & Company Partners and GLN Development Services, proposing a parking garage with liner buildings. The document does not state a decision, as it is a response to a request for qualifications. The location is the City Hall site in Winter Park, Florida, but no specific street address is stated. The document does not state a parcel or folio number. The size for the G3 proposal is 338 parking spaces and approximately 18,250 square feet of commercial space. The size for the Lamm proposal is not stated. The zoning or use change is not explicitly stated, but the G3 proposal describes a parking garage with commercial space. The applicant for the first proposal is G3 Development, LLC. The applicant for the second proposal is Lamm & Company Partners and GLN Development Services. The case number is RFQ26-20. The response deadline was July 15, 2026 at 2:00 pm. The report was generated on August 5, 2026. The business opportunity is a public-private partnership to develop a parking garage at the City Hall site in Winter Park, Florida. The document does not state any public comment or stakeholder sentiment.
Agenda items
- 1. A formal solicitation was issued to award this contract. This is the second of four
- 1. CC-min-2026-07-22 DRAFT
- 1. CC-min-2026-07-23 ws
- 1. CDW Government, LLC - Sourcewell #121923-CDW - Technology Products and
- 1. Chesterfield
- 1. Commercial Transportation Impact Fees Fund
- Utilities (Sub)
- 1. Commission OUC Contract Extension 08122026
- Utilities (Sub)
- 1. Danus Utilities, Inc. - Amendment 1 - City of Clermont #2023-071
- Utilities (Sub)
- Concrete & Masonry
- General Contractor
- Site Prep, Grading & Hardscape
- Restoration & Waterproofing
- Building & Industrial Supply
- Engineering & Architecture
- Waste Management
- 1. Danus Utilities, Inc. - Amendment 1 - City of Clermont #2023-071
- Utilities (Sub)
- Concrete & Masonry
- Site Prep, Grading & Hardscape
- General Contractor
- Engineering & Architecture
- 1. General Fund
- 1. IFB14-24 - Amendment 2 - Yang, Inc. - Electrician Services; For
- Electrical
- Building & Industrial Supply
- Engineering & Architecture
- Office & Business Support Services
- 1. IFB14-24 - Amendment 2 - Yang, Inc. - Electrician Services; For
- Electrical
- Utilities (Sub)
- Government Authority
- 1. IFB14-24 - Amendment 2 - Yang, Inc. - Electrician Services; For services on an as
- Electrical
- Utilities (Sub)
- Cleaning & Janitorial
- 1. Jason F. McHugh — City Manager, City of Wildwood
- 1. Maintain full retail credit for solar customers.
- 1. Meeting Called to Order
- 1. Meeting Called to Order
- 1. Meeting Called to Order
- 1. Meeting Called to Order
- 1. Pricing for this project was solicited from three (3) other contractors awarded under the
- General Contractor
- Site Prep, Grading & Hardscape
- Concrete & Masonry
- Electrical
- HVAC & Climate Control
- Painting & Flooring
- Plumbing
- Roofing
- Building & Industrial Supply
- Real Estate Development
- Engineering & Architecture
- Legal Services
- Landscaping & Lawn Service
- 1. Proposal Response
- General Contractor
- Concrete & Masonry
- Electrical
- HVAC & Climate Control
- Plumbing
- Site Prep, Grading & Hardscape
- Building & Industrial Supply
- Engineering & Architecture
- Real Estate Development
- Commercial Brokerage
- Landscaping & Lawn Service
- 1. Proposal Response
- General Contractor
- Concrete & Masonry
- Electrical
- HVAC & Climate Control
- Painting & Flooring
- Site Prep, Grading & Hardscape
- Engineering & Architecture
- Real Estate Development
- Building & Industrial Supply
- 1. Proposal Response
- General Contractor
- Concrete & Masonry
- Electrical
- HVAC & Climate Control
- Plumbing
- Site Prep, Grading & Hardscape
- Building & Industrial Supply
- Engineering & Architecture
- Real Estate Development
- Title & Settlement Services
- 1. Southern Development & Construction, Inc. - West Welbourne
- Site Prep, Grading & Hardscape
- Concrete & Masonry
- Construction (Other)
- General Contractor
- Painting & Flooring
- Building & Industrial Supply
- Engineering & Architecture
- Landscaping & Lawn Service
- 1. Southern Development & Construction, Inc. - West Welbourne
- General Contractor
- Site Prep, Grading & Hardscape
- Concrete & Masonry
- Painting & Flooring
- Utilities (Sub)
- Building & Industrial Supply
- 1. Southern Development & Construction, Inc. - West Welbourne Avenue Road
- General Contractor
- Site Prep, Grading & Hardscape
- Building & Industrial Supply
- Engineering & Architecture
- 1. Winter Park RLC Survey Responses 08-04-26
- Engineering & Architecture
- Business Consulting
- Accounting & Tax
- Government Authority
- 12. Action Items Requiring Discussion
- 13. Action Items Requiring Discussion
- 13. Action Items Requiring Discussion
- 13. Public Hearings: Quasi-Judicial Matters
- Legal Services
- Engineering & Architecture
- Landscaping & Lawn Service
- 14. Public Hearings: Quasi-Judicial Matters
- 14. Public Hearings: Quasi-Judicial Matters
- 15. City Commission Reports
- Site Prep, Grading & Hardscape
- Construction (Other)
- Admin Services (Other)
- Signage & Printing
- Engineering & Architecture
- 15. Public Hearings: Non Quasi-Judicial Matters
- 15. Public Hearings: Non Quasi-Judicial Matters
- 16. Summary of Meeting Actions
- General Contractor
- Site Prep, Grading & Hardscape
- Concrete & Masonry
- Utilities (Sub)
- Building & Industrial Supply
- 17. Summary of Meeting Actions
- 17. Summary of Meeting Actions
- 2. A formal solicitation was issued to award this contract. This is the fourth and final
- 2. Authorized Signatory
- General Contractor
- Concrete & Masonry
- Electrical
- HVAC & Climate Control
- Plumbing
- Site Prep, Grading & Hardscape
- Building & Industrial Supply
- Real Estate Development
- Engineering & Architecture
- 2. Authorized Signatory
- General Contractor
- Concrete & Masonry
- Electrical
- Plumbing
- HVAC & Climate Control
- Roofing
- Site Prep, Grading & Hardscape
- Building & Industrial Supply
- Engineering & Architecture
- Real Estate Development
- Commercial & Business Insurance
- 2. Authorized Signatory
- General Contractor
- Concrete & Masonry
- Site Prep, Grading & Hardscape
- Electrical
- Plumbing
- HVAC & Climate Control
- Carpentry & Cabinetry
- Building & Industrial Supply
- Real Estate Development
- Engineering & Architecture
- 2. Craig Shadrix — City Manager, City of Ocoee
- General Contractor
- Concrete & Masonry
- Electrical
- HVAC & Climate Control
- Painting & Flooring
- Plumbing
- Site Prep, Grading & Hardscape
- Building & Industrial Supply
- Real Estate Development
- Engineering & Architecture
- Waste Management
- 2. Credit at wholesale avoided cost.
- 2. Discussion Item (s)
- 2. G3 Development
- 2. General Fund, Designations Trust Funds
- 2. IFB22-22 - Amendment 4 - LaFleur Nurseries & Garden Center, LLC
- Site Prep, Grading & Hardscape
- Landscaping & Lawn Service
- Building & Industrial Supply
- 2. IFB22-22 - Amendment 4 - LaFleur Nurseries & Garden Center, LLC
- Nursery & Horticulture
- Site Prep, Grading & Hardscape
- Landscaping & Lawn Service
- 2. IFB22-22 - Amendment 4 - LaFleur Nurseries & Garden Center, LLC - Landscape and
- Site Prep, Grading & Hardscape
- Nursery & Horticulture
- Landscaping & Lawn Service
- 2. RCM Utilities, Inc. - Amendment 1 - City of Clermont #2023-072
- Utilities (Sub)
- Concrete & Masonry
- Restoration & Waterproofing
- Construction (Other)
- General Contractor
- Engineering & Architecture
- 2. RCM Utilities, Inc. - Amendment 1 - City of Clermont #2023-072
- Utilities (Sub)
- Concrete & Masonry
- Restoration & Waterproofing
- General Contractor
- Engineering & Architecture
- 2. RCM Utilities, Inc. - Amendment 1 - City of Clermont #2023-072 - Sanitary Sewer
- Utilities (Sub)
- Concrete & Masonry
- General Contractor
- Site Prep, Grading & Hardscape
- Restoration & Waterproofing
- 2. RFQ6-23 - Geosyntec Consultants, Inc. - Professional Stormwater Management
- Engineering & Architecture
- Site Prep, Grading & Hardscape
- Utilities (Sub)
- 3. Craig Radzak — Assistant City Manager, City of Sanford
- General Contractor
- Concrete & Masonry
- Electrical
- HVAC & Climate Control
- Plumbing
- Roofing
- Site Prep, Grading & Hardscape
- Building & Industrial Supply
- Real Estate Development
- Engineering & Architecture
- Accounting & Tax
- Lending & Credit
- Commercial & Business Insurance
- 3. General Fund, Community Redevelopment Fund
- 3. IFB14-25 - Allcrete, Inc. - Concrete Repair Services; Requesting
- Concrete & Masonry
- Site Prep, Grading & Hardscape
- General Contractor
- Building & Industrial Supply
- 3. IFB14-25 - Allcrete, Inc. - Concrete Repair Services; Requesting
- Concrete & Masonry
- General Contractor
- Site Prep, Grading & Hardscape
- Building & Industrial Supply
- 3. IFB14-25 - Allcrete, Inc. - Concrete Repair Services; Requesting additional funds to
- Concrete & Masonry
- Site Prep, Grading & Hardscape
- General Contractor
- Building & Industrial Supply
- 3. Implement a minimum bill of approximately $83 per month.
- 3. Lamm & Company Partners
- General Contractor
- Concrete & Masonry
- Electrical
- HVAC & Climate Control
- Building & Industrial Supply
- Engineering & Architecture
- 3. RFQ6-23 - Geosyntec Consultants, Inc. - Professional Stormwater Management
- Engineering & Architecture
- Site Prep, Grading & Hardscape
- Concrete & Masonry
- Utilities (Sub)
- General Contractor
- Building & Industrial Supply
- 3. This request for additional funds will support the continued use of the contract by the
- Concrete & Masonry
- Site Prep, Grading & Hardscape
- Landscaping & Lawn Service
- 4. A formal solicitation was issued to award this contract. This is the second of four
- 4. Community Partner Presentation
- 4. Community Partner Presentation
- 4. Each task order will be brought to City Commission for approval, with the funding
- General Contractor
- Legal Services
- Engineering & Architecture
- Building & Industrial Supply
- Office & Business Support Services
- 4. Establish a voluntary green energy fund to support diverse energy investments.
- Utilities (Sub)
- Solar Installation
- Engineering & Architecture
- Business Consulting
- Building & Industrial Supply
- Office & Business Support Services
- 4. RFQ20-24 - Amendment 2 - Vision Urban LLC - Urban Design
- Engineering & Architecture
- Business Consulting
- Legal Services
- 4. RFQ20-24 - Amendment 2 - Vision Urban LLC - Urban Design
- Business Consulting
- Engineering & Architecture
- 4. RFQ20-24 - Amendment 2 - Vision Urban LLC - Urban Design Advisor; For professional
- Engineering & Architecture
- Business Consulting
- 5. Mayor’s Report
- 6. Citizen Budget Comments
- 6. Mayor’s Report
- 6. Mayor’s Report
- 7. Citizen Budget Comments
- 7. Citizen Budget Comments
- 7. City Manager’s Report
- 8. City Attorney’s Report
- Legal Services
- Engineering & Architecture
- Landscaping & Lawn Service
- Site Prep, Grading & Hardscape
- Transportation (Other)
- Government Authority
- 8. City Manager’s Report
- 8. City Manager’s Report
- 9. City Attorney’s Report
- 9. City Attorney’s Report
- 9. Non-Action ItemsPublic Comments | 5 p.m. or soon thereafter
- A. State of Florida Business License
- A. State of Florida Business License
- A. State of Florida Business License
- A. Successful Respondent shall keep and maintain public records that ordinarily and necessarily would be required by the public agency in order to
- A. Successful Respondent shall keep and maintain public records that ordinarily and necessarily would be required by the public agency in order to
- A. Successful Respondent shall keep and maintain public records that ordinarily and necessarily would be required by the public agency in order to
- A. The individual is the representative of the firm, the Respondent who has submitted the attached response.
- A. The individual is the representative of the firm, the Respondent who has submitted the attached response.
- B. State of Florida Professional License Renewal
- General Contractor
- Concrete & Masonry
- Electrical
- Lighting & Low-Voltage Systems
- Site Prep, Grading & Hardscape
- Building & Industrial Supply
- Real Estate Development
- Engineering & Architecture
- Government Authority
- B. State of Florida Professional License Renewal
- General Contractor
- Concrete & Masonry
- Electrical
- HVAC & Climate Control
- Plumbing
- Site Prep, Grading & Hardscape
- Building & Industrial Supply
- Engineering & Architecture
- Real Estate Development
- B. State of Florida Professional License Renewal
- B. Successful Respondent shall provide the public with access to such public records on the same terms and conditions that the public agency
- General Contractor
- Concrete & Masonry
- Site Prep, Grading & Hardscape
- Electrical
- Plumbing
- HVAC & Climate Control
- Painting & Flooring
- Roofing
- Building & Industrial Supply
- Real Estate Development
- Engineering & Architecture
- Legal Services
- B. Successful Respondent shall provide the public with access to such public records on the same terms and conditions that the public agency
- B. The individual is fully informed respecting the preparation and contents of the attached solicitation and of all pertinent circumstances respecting
- B. The individual is fully informed respecting the preparation and contents of the attached solicitation and of all pertinent circumstances respecting
- General Contractor
- Concrete & Masonry
- Electrical
- HVAC & Climate Control
- Plumbing
- Site Prep, Grading & Hardscape
- Engineering & Architecture
- Building & Industrial Supply
- C. Successful Respondent shall ensure that public records that are exempt or that are confidential and exempt from the public record requirements
- C. Successful Respondent shall ensure that public records that are exempt or that are confidential and exempt from the public record requirements
- C. Such solicitation is genuine and is not a collusive or sham solicitation.
- C. Such solicitation is genuine and is not a collusive or sham solicitation.
- D. Neither the said Respondent nor any of its officers, partners, owners, agent representatives, employees, or parties in interest, including this affiant,
- D. Neither the said Respondent nor any of its officers, partners, owners, agent representatives, employees, or parties in interest, including this affiant,
- D. Successful Respondent shall meet all requirements for retaining public records and transfer to the public agency, at no cost, all public records in
- General Contractor
- Concrete & Masonry
- Electrical
- HVAC & Climate Control
- Lighting & Low-Voltage Systems
- Painting & Flooring
- Plumbing
- Roofing
- Site Prep, Grading & Hardscape
- Building & Industrial Supply
- Real Estate Development
- Engineering & Architecture
- Waste Management
- D. Successful Respondent shall meet all requirements for retaining public records and transfer to the public agency, at no cost, all public records in
- General Contractor
- Concrete & Masonry
- Electrical
- Plumbing
- HVAC & Climate Control
- Site Prep, Grading & Hardscape
- Building & Industrial Supply
- E. The response is fair and proper and is not tainted by any collusion, conspiracy, or unlawful Agreement on the part of the pro poser or any of its
- General Contractor
- Site Prep, Grading & Hardscape
- Concrete & Masonry
- Electrical
- Plumbing
- HVAC & Climate Control
- Painting & Flooring
- Roofing
- Building & Industrial Supply
- Real Estate Development
- Engineering & Architecture
- Accounting & Tax
- Lending & Credit
- Landscaping & Lawn Service
- E. The response is fair and proper and is not tainted by any collusion, conspiracy, or unlawful Agreement on the part of the pro poser or any of its
- General Contractor
- Concrete & Masonry
- Site Prep, Grading & Hardscape
- Electrical
- Plumbing
- HVAC & Climate Control
- Painting & Flooring
- Drywall & Insulation
- Roofing
- Building & Industrial Supply
- Real Estate Development
- Engineering & Architecture
- Landscaping & Lawn Service
- a. Approve the minutes of the regular meeting, July 22, 2026. 1 minute
- a. Approve the minutes of the regular meeting, July 22, 2026. 1 minute
- a. Approve the minutes of the regular meeting, July 8, 2026.
- a. Budget Discussion & Set Tentative Millage Rate
- Legal Services
- Accounting & Tax
- Business Consulting
- Government Authority
- a. CU #26-04. Request of Rebecca Wilson, Lowndes-Law, on behalf of WP Station
- General Contractor
- Carpentry & Cabinetry
- Drywall & Insulation
- Electrical
- HVAC & Climate Control
- Painting & Flooring
- Plumbing
- Site Prep, Grading & Hardscape
- Building & Industrial Supply
- Real Estate Development
- Engineering & Architecture
- Landscaping & Lawn Service
- Full-Service Restaurant
- Quick-Service Restaurant
- Signage & Printing
- a. FY 27 Budget Presentations
- Utilities (Sub)
- General Contractor
- Electrical
- Site Prep, Grading & Hardscape
- Building & Industrial Supply
- a. Michael Poole - TDT Citizen Advisory Task Force Update 10 minutes
- a. Michael Poole - TDT Citizen Advisory Task Force Update 10 minutes
- a. Ordinance 3369-26 - Partial Vacation of Holt Ave- FBC South Project
- Legal Services
- Engineering & Architecture
- Site Prep, Grading & Hardscape
- a. Ordinance 3369-26 - Partial Vacation of Holt Ave- FBC South Project
- Site Prep, Grading & Hardscape
- Utilities (Sub)
- Engineering & Architecture
- a. Orlando Utilities Commission Power Supply Contract Extension 15 minutes
- a. Orlando Utilities Commission Power Supply Contract Extension 15 minutes
- a. Red Light Camera Survey 10 minutes
- a. Red Light Camera Survey 10 minutes
- a. Request for discussion at future meeting of Resolution 2281-24 and
- Site Prep, Grading & Hardscape
- General Contractor
- Building & Industrial Supply
- Engineering & Architecture
- Legal Services
- Government Authority
- a. Request for discussion at future meeting of Resolution 2281-24 and
- Site Prep, Grading & Hardscape
- General Contractor
- Engineering & Architecture
- Building & Industrial Supply
- Landscaping & Lawn Service
- a. Winter Park Crew Proclamation 5 Minutes
- a. Winter Park Crew Proclamation 5 Minutes
- b. Approve the minutes of the work session, July 23, 2026. 1 minute
- b. Approve the minutes of the work session, July 23, 2026. 1 minute
- b. Approve the minutes of the work session, July 9, 2026
- b. Cost of Service Update and Net Energy Metering Public Outreach Discussion
- Utilities (Sub)
- Engineering & Architecture
- Business Consulting
- Building & Industrial Supply
- b. Heather Alexander, Winter Park Playhouse 10 minutes
- b. Heather Alexander, Winter Park Playhouse 10 minutes
- b. Proposed billboard swap deal with Clear Channel
- Site Prep, Grading & Hardscape
- Construction (Other)
- Waste Management
- b. Public Private Partnership for Parking Garage Development 15 minutes
- General Contractor
- Concrete & Masonry
- Electrical
- Plumbing
- HVAC & Climate Control
- Building & Industrial Supply
- Real Estate Development
- Engineering & Architecture
- b. Public Private Partnership for Parking Garage Development 15 minutes
- General Contractor
- Concrete & Masonry
- Electrical
- HVAC & Climate Control
- Painting & Flooring
- Plumbing
- Roofing
- Site Prep, Grading & Hardscape
- Building & Industrial Supply
- Real Estate Development
- Engineering & Architecture
- Waste Management
- b. Update on SR 426 (Aloma Avenue) Project and Schedule
- Site Prep, Grading & Hardscape
- Concrete & Masonry
- Electrical
- HVAC & Climate Control
- Painting & Flooring
- Plumbing
- General Contractor
- Utilities (Sub)
- Building & Industrial Supply
- Trucking & Freight
- Engineering & Architecture
- Landscaping & Lawn Service
- c. Approve the following piggyback contracts:
- c. Approve the following piggyback contracts: 1 minute
- c. Approve the following piggyback contracts: 1 minute
- d. Approve the following contracts:
- d. Approve the following contracts: 1 minute
- d. Approve the following contracts: 1 minute
- e. Approval to waive Procurement Process 1 minute
- e. Approval to waive Procurement Process 1 minute
Follow this across meetings
Board
City CommissionApplicants and firms
- Rebecca Wilson, Lowndes-Law, on behalf of WP Station Tower, LLC (property owner) for the conditional use; Southern Development & Construction, Inc. for the West Welbourne Avenue Road Improvements Project; Danus Utilities, Inc.; RCM Utilities, Inc.; Yang, Inc.; LaFleur Nurseries & Garden Center, LLC; Allcrete, Inc.; Vision Urban LLC
- G3 Development, LLC
- G3 Development, LLC; Lamm & Company Partners and GLN Development Services