CRAAB-pkt-2026-04-23
Community Redevelopment Advisory Board Regular Meeting · 2026-04-23 · agenda_packet
The document is an agenda and minutes for the Community Redevelopment Advisory Board meeting on April 23, 2026. It includes a discussion item on the W. Fairbanks Economic Vitality Overview & Next Steps, which presents draft programs: a Septic to Sewer Conversion Grant Program (up to $20,000 for eligible property owners in the Fairbanks Corridor) and a Catalyst Development Program (CDP) for businesses in the CRA district with a minimum total development cost of $2.5 million and a minimum of 1 acre, with a maximum incentive of $500,000. It also includes a Capital Project Worksheet listing various projects with estimated costs, and staff updates on projects such as Denning/Fairbanks Lake Rose Improvements, MLK Park Community Playground, and CRA MLK Stormwater / W. Fairbanks Stormwater Improvements. The document does not state a decision on any specific project; it is an agenda for discussion. Public comment sentiment is not stated in the document.
Agenda items
- 1) Contact Orange County Housing and Community Development
- 1. Capital Projects Worksheet_CRA Agency_April 2026
- Site Prep, Grading & Hardscape
- Concrete & Masonry
- Electrical
- HVAC & Climate Control
- Painting & Flooring
- Plumbing
- Roofing
- General Contractor
- Building & Industrial Supply
- Engineering & Architecture
- Real Estate Development
- Landscaping & Lawn Service
- Utilities (Sub)
- 1. Connect to the City sewer system when service becomes available
- 1. Connection Cost Assistance
- Utilities (Sub)
- Site Prep, Grading & Hardscape
- General Contractor
- Plumbing
- 1. Confirm Eligibility
- 1. Housing Program Comparison Matrix
- 1. Septic to Sewer Conversion Program- Guidelines_DRAFT
- Utilities (Sub)
- Site Prep, Grading & Hardscape
- Concrete & Masonry
- Construction (Other)
- Building & Industrial Supply
- Engineering & Architecture
- Government Authority
- 2) Visit the Orange County Government website
- 2. Catalyst Development Program (CDP) Guidelines
- 2. Lake Rose Corner - Vision Concept
- 2. Properly abandon existing septic systems in accordance with regulations
- 2. Reduced or Waived Fees
- 2. Submit an application
- 3) Call 311 for information and referrals
- 3. Construction Support
- Utilities (Sub)
- General Contractor
- Site Prep, Grading & Hardscape
- Building & Industrial Supply
- 3. Design & Permitting
- 3. MLK Park Restroom Design_Conceptual Option B
- General Contractor
- Concrete & Masonry
- Electrical
- HVAC & Climate Control
- Painting & Flooring
- Plumbing
- Site Prep, Grading & Hardscape
- Restoration & Waterproofing
- Roofing
- Building & Industrial Supply
- Engineering & Architecture
- Landscaping & Lawn Service
- 3. Obtain all required permits and inspections
- 3. Select Pages from WP Citizen Survey_2026
- Site Prep, Grading & Hardscape
- Plumbing
- General Contractor
- Utilities (Sub)
- Building & Industrial Supply
- 4) Reach out to local non-profit organizations
- Site Prep, Grading & Hardscape
- Concrete & Masonry
- Construction (Other)
- Building & Industrial Supply
- Engineering & Architecture
- 4. Complete connection within the specified timeframe (typically 6–18 months after
- 4. Construction & Connection
- General Contractor
- Site Prep, Grading & Hardscape
- Electrical
- Plumbing
- HVAC & Climate Control
- Concrete & Masonry
- Utilities (Sub)
- Building & Industrial Supply
- Engineering & Architecture
- Real Estate Development
- Legal Services
- Landscaping & Lawn Service
- 4. Expedited Permitting
- 5. Redevelopment Incentives
- Plumbing
- Site Prep, Grading & Hardscape
- Utilities (Sub)
- Building & Industrial Supply
- Engineering & Architecture
- Real Estate Development
- Pest Control
- Construction (Other)
- 7. Board Comments
- Site Prep, Grading & Hardscape
- Utilities (Sub)
- Concrete & Masonry
- Construction (Other)
- A. Establish financing mechanisms for purchase and
- Real Estate Development
- General Contractor
- Building & Industrial Supply
- Engineering & Architecture
- Legal Services
- Lending & Credit
- B. Purchase and rehabilitate homes and residential properties
- General Contractor
- Handyman & Remodeling
- Carpentry & Cabinetry
- Concrete & Masonry
- Drywall & Insulation
- Electrical
- HVAC & Climate Control
- Painting & Flooring
- Plumbing
- Roofing
- Site Prep, Grading & Hardscape
- Restoration & Waterproofing
- Building & Industrial Supply
- Real Estate Development
- Property Management
- C. Establish and operate land banks for homes and residential
- D. Demolish blighted structures.
- E. Redevelop demolished or vacant properties as housing.*
- W. Fairbanks Economic Vitality Overview & Next Steps
- Site Prep, Grading & Hardscape
- Utilities (Sub)
- General Contractor
- Real Estate Development
- Engineering & Architecture
- Building & Industrial Supply
- a. Attainable Housing Discussion
- General Contractor
- Site Prep, Grading & Hardscape
- Concrete & Masonry
- Roofing
- Electrical
- Plumbing
- HVAC & Climate Control
- Painting & Flooring
- Building & Industrial Supply
- Real Estate Development
- Engineering & Architecture
- Legal Services
- a. CRAAB photo - annual report
- a. Project Updates
- Site Prep, Grading & Hardscape
- General Contractor
- Electrical
- Plumbing
- HVAC & Climate Control
- Painting & Flooring
- Lighting & Low-Voltage Systems
- Building & Industrial Supply
- Engineering & Architecture
- Landscaping & Lawn Service
- a. Project Updates 5 minutes
- a. Project Updates 5 minutes
- a. W. Fairbanks Economic Vitality - EDAB discussions overview
- a. W. Fairbanks Economic Vitality Overview & Next Steps 30 minutes
- a. W. Fairbanks Economic Vitality Overview & Next Steps 30 minutes
- b. Capital Project Worksheet 30 minutes
- b. Capital Project Worksheet 30 minutes
- b. City Department Discussion - Public Works
- Site Prep, Grading & Hardscape
- Utilities (Sub)
- Building & Industrial Supply
- c. Capital Project Worksheet Update
Follow this across meetings
See the actual businesses behind these numbers
Get the real filings, with addresses and officers, backed by a 14-day money-back guarantee.
Create your account