Skip to main content

Be First, Build Lasting Relationships

Browse Collier County civic records

Every published record for Collier County, newest first. Filter by board, year, or industry to jump straight to the records you want, and page through to reach the full archive.

2,479 records

14. If prehistoric or historic artifacts, such as pottery or ceramics, projectile points, stone tools, dugout

This notice is about a permit condition for a project in Collier County. If any prehistoric or historic artifacts, such as pottery, stone tools, or old building materials, are found during work, all digging must stop immediately. The project owner must contact the Florida Department of State, Division of Historical Resources, and the local permitting agency. Work cannot restart until the Division of Historical Resources gives permission. If unmarked human remains are found, all work must stop, and authorities must be notified. This condition is part of Permit No: 11-113559-P. This item is currently under review as a permit condition. The scope of work involves site preparation, underground utility work, and construction, with potential for discovery during any subsurface disturbance. Contractors, suppliers, and service providers interested in future work related to this project are encouraged to reach out early. Understanding these permit conditions now can help businesses prepare for potential involvement before final plans and bids are set.

Board:
Hearing Examiner Meeting
Date:
2026-04-23
Type:
Agenda_item

15. Any delineation of the extent of a wetland or other surface water submitted as part of the permit

Hearing Examiner Meeting listed this item on its agenda for 2026-04-23 in Collier County. The posted record gives the item title and nothing else, so there is no site, no size and no applicant on file for it yet. Local businesses that want to follow it can open the official agenda link above and watch for the fuller write-up the body posts as the meeting gets closer.

Board:
Hearing Examiner Meeting
Date:
2026-04-23
Type:
Agenda_item

16. The permittee shall provide routine maintenance of all components of the stormwater management

This item concerns the routine maintenance of a stormwater management system. The permittee is required to remove trapped sediments and debris from all system components. Removed materials must be disposed of properly in a landfill or other uplands, following state regulations. This maintenance is planned and under review as part of ongoing permit conditions. The work will involve site clearing and grading for access, debris removal, and potentially hauling and disposal services. Local contractors, suppliers, and service providers in site prep, grading, waste management, and hauling could find opportunities. Reaching out early before specific maintenance schedules and disposal plans are finalized may offer a competitive advantage.

Board:
Hearing Examiner Meeting
Date:
2026-04-23
Type:
Agenda_item

17. This permit is issued based on the applicant's submitted information that reasonably demonstrates that

Hearing Examiner Meeting listed this item on its agenda for 2026-04-23 in Collier County. The posted record gives the item title and nothing else, so there is no site, no size and no applicant on file for it yet. Local businesses that want to follow it can open the official agenda link above and watch for the fuller write-up the body posts as the meeting gets closer.

Board:
Hearing Examiner Meeting
Date:
2026-04-23
Type:
Agenda_item

18. A Recorded Notice of Environmental Resource Permit may be recorded in the county public records in

A recorded notice of an Environmental Resource Permit is planned for recording in county public records. This notice, related to Permit No: 11-113559-P, is a procedural step and not an encumbrance on the property. The permit itself is subject to special conditions outlined in Florida Administrative Code 62-330.350. This item is currently under review. The recording of this notice will not directly initiate construction work but signifies a step towards potential future development. Contractors, suppliers, and service providers interested in future projects in this area should monitor public records and county planning documents for development opportunities that may arise following the finalization of environmental permits. Early engagement with project stakeholders and understanding the permitting process can provide a competitive advantage as projects move from review to planning and construction phases.

Board:
Hearing Examiner Meeting
Date:
2026-04-23
Type:
Agenda_item

2) Abate all violations by: Obtalning all required

This item concerns a Code Enforcement Board case, Case No. CESD20240008491, involving violations that need to be abated. The process requires obtaining all necessary building permits or demolition permits. This matter is currently under review by the Code Enforcement Board, following a hearing on January 22, 2025, and the issuance of findings of fact, conclusions of law, and an order. The work involved will likely include obtaining permits, potentially demolition, and subsequent construction or repair to bring the property into compliance. Contractors, suppliers, and service providers interested in this type of work should monitor this case as it progresses through the enforcement process. Early engagement could provide an advantage before specific bid processes or permit applications are finalized.

Board:
Code Enforcement Board Meeting
Date:
2026-04-23
Type:
Agenda_item
Applicant:
Code Enforcement Board

2) Code Enforcement Board review thal may result in fines up to $1000 per day per violation, as long as

This notice is about a code enforcement case concerning an unpermitted shipping container at 1485 Rock Rd, Naples, FL 34120. The property owner is Juan Felipe Arcila. The case is currently under review by the Code Enforcement Board, with a hearing scheduled for April 23, 2026. This situation may lead to fines and require compliance with various local, state, and federal regulations. These could include obtaining permits for land alteration, site development, or demolition, along with paying impact fees. Businesses involved in site clearing, grading, permitting, and construction services may find opportunities as the property owner addresses these code violations. Early engagement could be beneficial before final plans and permits are established.

Board:
Code Enforcement Board Meeting
Date:
2026-04-23
Type:
Agenda_item
Address:
2800 North Horseshoe Dr, Naples, FL 34104
Applicant:
Juan Felipe Arcila

2) Code Enforcement Board review that may resuit in fines up to $1000 per day per violation, as long as

This item concerns a potential code violation identified by Collier County Code Enforcement. The violation may lead to daily fines and prosecution costs if not resolved. It is currently under review by the Code Enforcement Board. Addressing this violation could require compliance and approvals from various departments, potentially involving permits such as right-of-way, building, demolition, Site Development Plan, or variances. This process may also necessitate the payment of impact fees and other outstanding fees. Contractors, suppliers, and service providers in site preparation, grading, demolition, and general construction may find opportunities as the property owner seeks to rectify the violation. Early engagement before final plans and permits are issued could be advantageous.

Board:
Code Enforcement Board Meeting
Date:
2026-04-23
Type:
Agenda_item
Address:
2800 North Horseshoe Dr, Naples, FL34104

2) Code Enforcement Board review that may result in fines up to $1000 per day per violation, as long as

This item concerns a code enforcement review for Case Number CESD20230005361. The review may lead to daily fines and prosecution costs if violations are not corrected. The process may require compliance and approval from various departments, potentially involving permits for right-of-way, building, demolition, and site development plans. It may also require variances and payment of impact or other fees. This review is currently under review by the Code Enforcement Board. The work could involve site clearing, grading, utility work, paving, structure demolition or repair, and landscaping, depending on the nature of the violation. Contractors, suppliers, and service providers should reach out to Code Enforcement early to understand the specific requirements and potential opportunities as the case progresses through the review process.

Board:
Code Enforcement Board Meeting
Date:
2026-04-23
Type:
Agenda_item
Address:
2800 North Horseshoe Dr, Naples, FL 34104

2) Code Enforcement Board review that may result in fines up to $1000 per day per violation, as long as

A property owner in Naples is under review for alleged violations of Collier County Land Development Code related to unpermitted improvements. The property, located at 120 12th St NE, Naples, FL 34120, has a permitted storage building that reportedly received improvements including framing, drywall, electrical, plumbing, and mini-split AC units without the necessary county permits or inspections. This case is currently before the Code Enforcement Board, with potential daily fines and costs of prosecution. The violation may require compliance and approval from various departments, potentially involving right-of-way permits, building permits, demolition, site development plans, variances, and impact fees. Contractors specializing in framing, drywall, electrical, plumbing, and HVAC systems, as well as suppliers of building materials, could find opportunities if the property owner seeks to rectify these issues by obtaining proper permits and completing the work to code. Engaging early could provide an advantage before formal plans and bids are finalized.

Board:
Code Enforcement Board Meeting
Date:
2026-04-23
Type:
Agenda_item
Address:
2800 North Horseshoe Dr, Naples, FL 34104
Applicant:
Eliani Isidron Canizarez

2) Code Enforcement Board review that may result in fines up to $1000 per day per violation, as long as

A property at 4267 4th Ave SE in Naples is under review by the Collier County Code Enforcement Board. The property owners, Alejandro Ceron Finley and Christina Marie Finley, have been notified of violations related to unpermitted work. Specifically, a second driveway was added to the property without a required Collier County Right-of-Way Permit, and an unpermitted shaded structure was built in the rear. The property is currently zoned E. The review process is in its early stages, with a hearing scheduled for April 23, 2026. Corrective actions include ceasing all work in the right-of-way, obtaining applicable permits, or removing offending materials. Additionally, the property owner must obtain all required Collier County Building Permits or Demolition permits and request inspections for completion or occupancy for the structure or alteration. This situation could lead to future work involving site clearing, grading, utility work, paving, framing, mechanical and finish trades, and final landscaping, depending on the outcome of the review and the owner's decision to permit or remove the structures. Contractors, suppliers, and service providers interested in potential future work should monitor this case and consider reaching out to the property owners or relevant county departments to understand potential needs as the process unfolds.

Board:
Code Enforcement Board Meeting
Date:
2026-04-23
Type:
Agenda_item
Address:
2800 North Horseshoe Dr, Naples, FL34104
Applicant:
ALEJANDRO CERON FINLEY

2) Code Enforcement Board review that may result in fines up to $1000 per day per violation, as long as

A property owner, BAYSHORE SUITES LLC, is currently under review by the Collier County Code Enforcement Board for operating multiple businesses without required Collier County approvals and business tax receipts at 3200 Bayshore Dr, Naples, FL 34112. This matter is scheduled for a public hearing on April 23, 2026, where potential daily fines up to $1000 per violation may be imposed if the violation remains uncorrected. The violation requires obtaining and displaying necessary Collier County approvals and local business tax receipts by December 2, 2026. This situation may lead to requirements for additional compliance and approvals from various departments, potentially including building permits, site development plans, and impact fee payments, depending on the nature of the businesses involved. Local contractors, suppliers, and service providers are encouraged to monitor this case as corrective actions could involve obtaining permits and undertaking work related to business operations and property compliance. Early engagement with the property owner or relevant county departments could provide insight into potential future needs for construction, trade, or supply services.

Board:
Code Enforcement Board Meeting
Date:
2026-04-23
Type:
Agenda_item
Address:
2800 North Horseshoe Dr, Naples, FL 34104
Applicant:
BAYSHORE SUITES LLC

2) Code Enforcement Board review that may result in fines up to $1000 per day per violation, as long as

This notice concerns a code enforcement matter for a property located at 4215 4th Ave SE in Naples, Florida. The property owners, Frank Vicente Garcia Loret De Mola and Lizyan Hernandez Hernandez, are cited for installing wood fencing without a permit and for installing chain link fencing without a required Collier County building permit. This situation is currently under review by the Code Enforcement Board, with a hearing scheduled for April 23, 2026. The review process could result in daily fines if violations are not corrected. Potential work related to this case could involve obtaining necessary permits for fencing, site development plans, and potentially demolition or construction if structures are non-compliant. Contractors specializing in fencing, site preparation, and general construction may find opportunities if permits are secured and work is authorized. Engaging early with the property owners or the county could provide insight into the specific requirements and potential timelines for any necessary corrective actions.

Board:
Code Enforcement Board Meeting
Date:
2026-04-23
Type:
Agenda_item
Address:
2800 North Horseshoe Dr, Naples, FL 34104
Applicant:
Frank Vicente Garcia Loret De Mola

2) Code Enforcement Board review that may result in fines up to $1000 per day per violation, as long as

A property owner at 881 20th St SE, Naples, FL 34117 is under review by the Collier County Code Enforcement Board for multiple unpermitted structures. These include a shipping container, a shed with an awning, an above-ground swimming pool, and an aluminum roof awning. The property is currently zoned for estates. This case is currently under review by the Code Enforcement Board, which could result in daily fines if violations are not corrected. Corrective actions may require obtaining building permits, demolition permits, site development plan approvals, and certificates of occupancy, as well as paying impact fees and other required fees. This situation could lead to work involving site clearing, demolition, grading, utility work, construction of new structures or removal of existing ones, and final landscaping. Local contractors, trades, suppliers, and service providers are encouraged to reach out early to understand the potential scope of work and requirements before final plans and permits are issued.

Board:
Code Enforcement Board Meeting
Date:
2026-04-23
Type:
Agenda_item
Address:
2800 North Horseshoe Dr, Naples, FL 34104
Applicant:
Juan Carlos Gonzalez Zaldivar

2) Code Enforcement Board review that may result in fines up to ${000 per day per violation, as long as

This item concerns a code enforcement case for work performed in the right-of-way without required Collier County permits or approvals at 6404 College Park Circle in Naples. The owner, COLLEGE PARK HOLDINGS LTD, has been notified of the violation and is subject to potential daily fines and prosecution costs if the violation is not corrected. The violation involves work in the public right-of-way, which requires a permit from the Collier County Transportation Operations Department. This situation is currently under review by the Code Enforcement Board, with a hearing scheduled for April 23, 2026. Corrective actions include ceasing all work in the right-of-way and obtaining the necessary permits. This process may involve site development plan approvals, land alteration permits, and potentially building permits if further construction is planned. Contractors and suppliers involved in site work, grading, utility installation, or any form of land alteration could be impacted. Early engagement with the property owner and relevant county departments is advisable before final plans and permits are settled.

Board:
Code Enforcement Board Meeting
Date:
2026-04-23
Type:
Agenda_item
Address:
2800 North Horseshoe Dr, Naples, FL34104
Applicant:
COLLEGE PARK HOLDINGS LTD

2) Code Enforcement Board review that may result in flnes up to $1000 per day per violation, as long as

A property owner at 4267 4th Ave SE, Naples, FL 34117 is under review for a violation of the Florida Building Code. The violation involves the installation of wood fencing without a required permit. This case is currently before the Code Enforcement Board, indicating an early stage in the process. Corrective actions may include applying for and obtaining necessary building permits, inspections, and certificates of completion or occupancy for the fence, or alternatively, removing the structure and restoring the property. This situation could lead to work involving site preparation, fence construction, and potentially related permitting and inspection services. Contractors, suppliers, and service providers interested in this type of work are encouraged to reach out early to understand the specific requirements and potential needs before final decisions are made.

Board:
Code Enforcement Board Meeting
Date:
2026-04-23
Type:
Agenda_item
Address:
2800 North Horseshoe Dr, Naples, FL 34104
Applicant:
Alejandro Ceron Finley

2) Code Enforcement Board review that may result in flnes up to $1000 per day per violation, as long as

This notice concerns a code enforcement matter for BTLP LLC at 481 2nd St NE in Naples, Florida. The property owner is facing violations related to expired pool permits and potentially other required permits for land alteration or construction. The case is currently under review by the Collier County Code Enforcement Board. This situation may require the owner to obtain various permits, including a right-of-way permit, building permit, demolition permit, Site Development Plan, or variances, along with paying impact fees and other required fees. Businesses that provide services related to permitting, site development, construction, and property compliance could find opportunities by engaging early. Understanding the specific requirements and potential scope of work, such as site clearing, grading, utility work, or construction, before final plans and permits are settled, offers a strategic advantage.

Board:
Code Enforcement Board Meeting
Date:
2026-04-23
Type:
Agenda_item
Address:
2800 North Horseshoe Dr, Naples, FL 34104
Applicant:
BTLP LLC

2. A complete copy of this permit shall be kept at the work site of the permitted activity during the

Hearing Examiner Meeting listed this item on its agenda for 2026-04-23 in Collier County. The posted record gives the item title and nothing else, so there is no site, no size and no applicant on file for it yet. Local businesses that want to follow it can open the official agenda link above and watch for the fuller write-up the body posts as the meeting gets closer.

Board:
Hearing Examiner Meeting
Date:
2026-04-23
Type:
Agenda_item

2. Allowing the proposed setback changes is critical for the project's operational efficiency, traffic

A request is under review for changes to setback requirements for a property located in Collier County. The applicant seeks to adjust the northern setback to be 50% of the building height, with a minimum of 15 feet. This change is expected to influence the alignment of a new building and the design of its parking lot. The original landscape setback/buffer for the existing building, constructed in 1989/1991, was 5 feet. This item is currently under review by the Hearing Examiner. If approved, the project would involve site clearing, grading, and construction of a new building and parking facilities. Contractors specializing in site preparation, concrete, building construction, electrical, plumbing, HVAC, and landscaping could find opportunities. Early engagement with the applicant may provide insight into project needs before formal bidding processes begin.

Board:
Hearing Examiner Meeting
Date:
2026-04-23
Type:
Agenda_item

2. Att A - Site Plan with Deviations - Exhibit C

This item concerns a proposed site plan with deviations for a property located in Collier County. The specific details regarding the applicant, the exact address or parcel identifier, the size of the property in acres or square footage, its current use or zoning, and the proposed use or zoning are not provided in this agenda item. The item is currently under review by the Hearing Examiner. This review process would typically involve site preparation, grading, utility work, and construction if the plan is approved. Local contractors, suppliers, and service providers are encouraged to monitor this review process. Early engagement before final site plans, bids, and permits are established could offer a competitive advantage for potential work related to this project.

Board:
Hearing Examiner Meeting
Date:
2026-04-23
Type:
Agenda_item

See the actual businesses behind these numbers

Get the real filings, with addresses and officers, backed by a 14-day money-back guarantee.

Create your account