Skip to main content

Be First, Build Lasting Relationships

Browse Collier County civic records

Every published record for Collier County, newest first. Filter by board, year, or industry to jump straight to the records you want, and page through to reach the full archive.

2,479 records

e. Design. Towers, excluding alternative tower structures, shall maintain a galvanized gray

This item concerns a proposed design standard for towers, specifically requiring a galvanized gray finish or other approved color, unless federal rules dictate otherwise. The proposal is currently under review by the Board of County Commissioners. If approved, this standard would influence the appearance of future tower construction. The scope of work would involve the application of specified finishes during the construction phase of new towers. This early stage in the review process presents an opportunity for contractors specializing in metal finishing, painting, and related construction trades to engage with the project stakeholders. Early involvement can provide valuable insight into upcoming requirements and potential project needs.

Board:
Board of County Commissioners Meeting
Date:
2026-06-09
Type:
Agenda_item

e. Emergency backup generators. An emergency backup generator is required to be operated

This item concerns a new requirement for emergency backup generators at wireless communication facility sites. The Site Development Plan must show the location and connection for these generators. Vertex has acknowledged this requirement. This is currently under review by the Board of County Commissioners. The project will involve site planning to identify generator locations and connections. This early stage presents an opportunity for contractors specializing in electrical work, site preparation, and potentially concrete services for generator pads. Suppliers of backup generators and related electrical components may also find opportunities. Reaching out now, before final site plans and permits are issued, allows businesses to understand the scope and prepare for potential work.

Board:
Board of County Commissioners Meeting
Date:
2026-06-09
Type:
Agenda_item
Applicant:
Vertex

f. Lighting.

Board of County Commissioners Meeting listed this item on its agenda for 2026-06-09 in Collier County. The posted record gives the item title and nothing else, so there is no site, no size and no applicant on file for it yet. Local businesses that want to follow it can open the official agenda link above and watch for the fuller write-up the body posts as the meeting gets closer.

Board:
Board of County Commissioners Meeting
Date:
2026-06-09
Type:
Agenda_item

f. Prohibition. No equipment or materials shall be stored or parked on the site of a wireless

Board of County Commissioners Meeting listed this item on its agenda for 2026-06-09 in Collier County. The posted record gives the item title and nothing else, so there is no site, no size and no applicant on file for it yet. Local businesses that want to follow it can open the official agenda link above and watch for the fuller write-up the body posts as the meeting gets closer.

Board:
Board of County Commissioners Meeting
Date:
2026-06-09
Type:
Agenda_item

g. Screening.

Board of County Commissioners Meeting listed this item on its agenda for 2026-06-09 in Collier County. The posted record gives the item title and nothing else, so there is no site, no size and no applicant on file for it yet. Local businesses that want to follow it can open the official agenda link above and watch for the fuller write-up the body posts as the meeting gets closer.

Board:
Board of County Commissioners Meeting
Date:
2026-06-09
Type:
Agenda_item

h. Landscaping. A minimum 10-foot wide Type A buffer that includes a 3-foot high, continuous

A landscaping requirement is under review for a project located in Collier County. The proposal mandates a minimum 10-foot wide buffer along the perimeter, featuring a 3-foot high hedge planted closely together. Trees within this buffer must be 12 feet tall when planted. Site plans show this buffer area. This item is currently under review by the Board of County Commissioners. The project will involve site preparation for buffer zones, including clearing and grading, followed by the installation of specified hedging and tree plantings. This early stage presents an opportunity for landscaping contractors, nursery suppliers, and site preparation services to engage with the project team before final plans and permits are issued. Early involvement can provide a competitive advantage.

Board:
Board of County Commissioners Meeting
Date:
2026-06-09
Type:
Agenda_item
Address:
Sheet C-3
Applicant:
Vertex

i. A tower owner shall permit other wireless communication service providers to co

Vertex is proposing to design a new wireless communication tower for T-Mobile, with space for three additional providers to co-locate their facilities. This project is currently under review by the Board of County Commissioners. If approved, the project would involve the construction of the tower and its compound. This could create opportunities for contractors involved in site preparation, concrete work, electrical installation, and general construction. Suppliers of building materials and wireless communication equipment may also find opportunities. Early engagement with Vertex before final site plans, bids, and permits are settled could provide a competitive advantage.

Board:
Board of County Commissioners Meeting
Date:
2026-06-09
Type:
Agenda_item
Decision:
Board of County Commissioners, Collier County
Applicant:
Vertex

i. Access and parking. Each wireless communication facility site shall have access from a

Board of County Commissioners Meeting listed this item on its agenda for 2026-06-09 in Collier County. The posted record gives the item title and nothing else, so there is no site, no size and no applicant on file for it yet. Local businesses that want to follow it can open the official agenda link above and watch for the fuller write-up the body posts as the meeting gets closer.

Board:
Board of County Commissioners Meeting
Date:
2026-06-09
Type:
Agenda_item

i. All wireless communication facilities and support facilities shall be secured to prevent

Board of County Commissioners Meeting listed this item on its agenda for 2026-06-09 in Collier County. The posted record gives the item title and nothing else, so there is no site, no size and no applicant on file for it yet. Local businesses that want to follow it can open the official agenda link above and watch for the fuller write-up the body posts as the meeting gets closer.

Board:
Board of County Commissioners Meeting
Date:
2026-06-09
Type:
Agenda_item

i. Insufficient height to allow the WCF to function reasonably in parity with similar

Board of County Commissioners Meeting listed this item on its agenda for 2026-06-09 in Collier County. The posted record gives the item title and nothing else, so there is no site, no size and no applicant on file for it yet. Local businesses that want to follow it can open the official agenda link above and watch for the fuller write-up the body posts as the meeting gets closer.

Board:
Board of County Commissioners Meeting
Date:
2026-06-09
Type:
Agenda_item

i. No signals, lights, or illumination on towers shall be permitted unless required by the

This item concerns a proposed tower that will not require lighting. Vertex has applied to the FAA for a Determination of No Hazard to Air Navigation and to not require lighting for the tower. The FAA has issued a Determination of No Hazard to Air Navigation, meaning marking and lighting are not necessary for aviation safety. Therefore, Vertex will not be installing any lighting on the proposed tower. This project is currently under review. The scope of work involves the construction of a tower, with the potential for site preparation and foundation work. As lighting is not required, this simplifies the construction process. Local contractors, suppliers, and service providers are encouraged to monitor this project's progress as plans develop.

Board:
Board of County Commissioners Meeting
Date:
2026-06-09
Type:
Agenda_item
Applicant:
Vertex

i. Signage must be provided that includes contact information for the WCF. Such signage

This agenda item concerns proposed signage requirements for a Waste and Recycling Facility (WCF). The signage must display contact information for the WCF and be visible from the outside. Site Plans Sheet C-4 shows the proposed signage. This item is currently under review by the Board of County Commissioners. If approved, the project would involve the installation of new signage, likely including site preparation for placement, fabrication, and installation of the signs. Contractors specializing in signage, site preparation, and potentially general contracting could be involved. Reaching out to the relevant parties early, before final plans and permits are set, may offer an advantage for local businesses.

Board:
Board of County Commissioners Meeting
Date:
2026-06-09
Type:
Agenda_item
Address:
Site Plans Sheet C-4

i. Wireless communication facilities shall be screened with a wall or fence. The wall or

This notice is about a proposed change to wireless communication facility regulations in Collier County. The Board of County Commissioners is reviewing a plan that would require these facilities to be screened by a wall or fence. This fence must be 100 percent opaque, between 8 and 10 feet tall, and designed to prevent unauthorized access. Barbed wire will not be allowed. Vertex is proposing an eight-foot chain link fence with slats and a locked gate as an example. This item is currently under review by the county. If approved, this could lead to work involving site preparation, fence installation, and potentially security system upgrades for future wireless communication facilities. Contractors specializing in fencing, site preparation, and security systems may find opportunities. Early engagement with the county and the applicant could provide insight into specific project requirements as plans develop.

Board:
Board of County Commissioners Meeting
Date:
2026-06-09
Type:
Agenda_item
Address:
Sheet C-4
Applicant:
Vertex

i. Wireless communication facility towers. Each new tower that will exceed a height of 75

This item concerns proposed regulations for wireless communication facility towers. Specifically, new towers over 75 feet but not exceeding 199 feet above natural grade will not be allowed to be guyed. Vertex has stated they are not proposing a guyed tower and will comply with this section. This is currently under review by the Board of County Commissioners. If approved, this regulation could impact future tower construction, potentially requiring specialized engineering and construction methods for non-guyed towers. Contractors involved in tower construction, electrical work for communication equipment, and site preparation could be affected. Early engagement with the permitting and planning departments is advised.

Board:
Board of County Commissioners Meeting
Date:
2026-06-09
Type:
Agenda_item
Applicant:
Vertex

ii. Bird diverter devices. Each guyed tower greater than 75 feet in height above natural

This item concerns a proposed regulation for bird diverter devices on guyed towers taller than 75 feet. The regulation would require these devices to be installed and maintained on each guy wire. The applicant, Vertex, is not proposing to build a guyed tower, install guy wires, or add bird diverter devices. This item is currently under review by the Board of County Commissioners. If approved, the regulation would set standards for future tower construction and maintenance. This could create opportunities for contractors specializing in site preparation, electrical work, and specialized installations related to communication towers and safety equipment. Early engagement with the county and potential developers could provide insight into future compliance needs and related service demands.

Board:
Board of County Commissioners Meeting
Date:
2026-06-09
Type:
Agenda_item
Applicant:
Vertex

ii. Equipment cabinets. The overall height of ground-mounted equipment or equipment

This item concerns proposed regulations for ground-mounted equipment cabinets, limiting their overall height to 12 feet. These rules are intended to apply to future users who may share equipment space. The regulations are currently under review by the Board of County Commissioners. If approved, this could lead to the need for site preparation, installation of specialized cabinets, and potentially electrical and low-voltage system work. Local contractors, suppliers, and service providers are encouraged to monitor this review process. Understanding these requirements early could provide an advantage when future site plans and permits are developed.

Board:
Board of County Commissioners Meeting
Date:
2026-06-09
Type:
Agenda_item
Address:
Sheet GN-1

ii. Insufficient structural strength to support the WCF;

Board of County Commissioners Meeting listed this item on its agenda for 2026-06-09 in Collier County. The posted record gives the item title and nothing else, so there is no site, no size and no applicant on file for it yet. Local businesses that want to follow it can open the official agenda link above and watch for the fuller write-up the body posts as the meeting gets closer.

Board:
Board of County Commissioners Meeting
Date:
2026-06-09
Type:
Agenda_item

ii. No commercial signs or advertising shall be allowed. Vertex is not proposing any

Board of County Commissioners Meeting listed this item on its agenda for 2026-06-09 in Collier County. The posted record gives the item title and nothing else, so there is no site, no size and no applicant on file for it yet. Local businesses that want to follow it can open the official agenda link above and watch for the fuller write-up the body posts as the meeting gets closer.

Board:
Board of County Commissioners Meeting
Date:
2026-06-09
Type:
Agenda_item

ii. Security lighting to protect on-ground facilities/equipment shall be fully shielded and

Board of County Commissioners Meeting listed this item on its agenda for 2026-06-09 in Collier County. The posted record gives the item title and nothing else, so there is no site, no size and no applicant on file for it yet. Local businesses that want to follow it can open the official agenda link above and watch for the fuller write-up the body posts as the meeting gets closer.

Board:
Board of County Commissioners Meeting
Date:
2026-06-09
Type:
Agenda_item

ii. Site lighting (not required by FAA) shall be elevated less than 20 feet above grade, fully

This agenda item concerns proposed site lighting regulations for future development. While the current applicant, Vertex, is not proposing any lighting improvements, their future collocators must follow specific rules. These rules state that any required site lighting must be less than 20 feet high, fully shielded, and directed away from nearby properties. This item is currently under review by the Board of County Commissioners. If approved, this could lead to future needs for electrical contractors specializing in low-voltage lighting systems and site preparation services for installation. Early engagement with the county and potential developers could provide insight into future project scopes.

Board:
Board of County Commissioners Meeting
Date:
2026-06-09
Type:
Agenda_item
Applicant:
Vertex

See the actual businesses behind these numbers

Get the real filings, with addresses and officers, backed by a 14-day money-back guarantee.

Create your account