Skip to main content

Be First, Build Lasting Relationships

Browse Columbia County civic records

Every published record for Columbia County, newest first. Filter by board, year, or industry to jump straight to the records you want, and page through to reach the full archive.

1,985 records

p. 68

Columbia County is reviewing a proposal for underground fiber optic cable construction. This project involves directional boring to install 235 feet of fiber cable and 2-inch innerduct at a minimum depth of 36 inches. The work is planned to run parallel to the road within the right of way. This item is currently under review by the Board of County Commissioners. The project scope includes site preparation for boring, installation of underground conduit, and pulling the fiber optic cable. Future phases may involve connecting the cable and activating the service. Local contractors, suppliers, and service providers in site preparation, underground utilities, and fiber optic installation can find opportunities. Early engagement is advised as plans and permits are still being finalized.

Board:
Board of County Commissioners
Date:
2026-07-16
Type:
Agenda_item
Address:
Columbia County
Applicant:
Comcast

p. 69

Columbia County is reviewing a proposal to install new underground fiber optic cable and associated conduit. The project involves directional boring to place approximately 375 feet of fiber cable and two 2-inch HDPE innerducts. This work will be done parallel to the road right-of-way at a minimum depth of 36 inches, with a reamer size of 4 inches. The project is currently under review by the Board of County Commissioners. If approved, the work would involve site preparation, directional boring, conduit installation, and fiber optic cable pulling and activation. This early stage presents an opportunity for contractors specializing in underground utility construction, directional boring, and fiber optic installation to engage with the county. Reaching out now, before final plans and permits are issued, allows businesses to understand the project scope and prepare for potential bidding.

Board:
Board of County Commissioners
Date:
2026-07-16
Type:
Agenda_item
Address:
Columbia County
Applicant:
Comcast

p. 7

This public notice is for a permit cancellation request for permit number 000055794. The request was made by PWD Orlando LLC, with James Rowland listed as the permit holder/authorizer. The reason for cancellation is that the work was cancelled. The request is currently under review by the Columbia County Building Department. This item does not describe a project that would set in motion construction work. Therefore, there is no direct work opportunity for contractors, trades, suppliers, or service providers at this time. Local businesses should monitor future public notices for new development projects.

Board:
Board of County Commissioners
Date:
2026-07-16
Type:
Agenda_item
Address:
135 NE Hernando Ave, Suite B-21, Lake City, FL 32055

p. 7

The Columbia County Emergency Management office is seeking approval for the 2026-27 EMPA Grant Agreement, totaling $105,806. This grant, which was previously discussed and approved by the grant committee, provides state funding for the annual emergency management budget. The grant period begins July 1, 2026, and concludes June 30, 2027. Additional federal EMPG funds will also be received, with that agreement starting October 1, 2026. The Board of County Commissioners will review and approve the agreement. This process involves administrative steps for signing the grant documents. Local contractors, suppliers, and service providers are encouraged to engage with the Emergency Management office early, as grant funding often supports various operational needs and potential future projects.

Board:
Board of County Commissioners
Date:
2026-07-16
Type:
Agenda_item
Address:
P.O. Box 1787, Lake City, FL 32056-1787
Applicant:
Columbia County Emergency Management

p. 70

Columbia County is reviewing a proposal for underground telecommunication facilities. The project involves installing various sizes of innerduct, including 1-inch, 2-inch, and 1-inch sizes, with a minimum depth of 36 inches for directional bores. This project is currently under review by the Board of County Commissioners. The work will likely involve site preparation, directional boring, and the installation of underground conduits. Contractors specializing in underground utility work, directional drilling, and telecommunications infrastructure may find opportunities. Early engagement is advised as the project progresses through the review process.

Board:
Board of County Commissioners
Date:
2026-07-16
Type:
Agenda_item
Address:
Sheet 35 of 50

p. 71

Columbia County is reviewing a proposal for the installation of approximately 215 feet of fiber optic cable and two 2-inch innerducts. This project involves directional boring under existing infrastructure, with a minimum depth of 36 inches. The proposed work is planned to run parallel to a road within the right-of-way. This item is currently under review by the Board of County Commissioners. The project scope includes site preparation for boring, the directional bore itself, and the installation of the fiber optic cable and innerducts. Future phases may involve connecting the new cable to existing networks. Local contractors, suppliers, and service providers in site preparation, directional boring, underground utility installation, and fiber optic cable supply could find opportunities. Early engagement is advised as plans and permits are still being finalized.

Board:
Board of County Commissioners
Date:
2026-07-16
Type:
Agenda_item
Address:
Columbia County
Applicant:
COMCAST

p. 72

Columbia County is reviewing a proposal to install new underground fiber optic cable and innerduct. The project involves directional boring to place the conduit, with a minimum depth of 36 inches and a reamer size of 4 inches. This work will be done parallel to the road right of way. The project is currently under review by the Board of County Commissioners. This project will require site preparation, including clearing and grading, followed by underground utility work for conduit installation. The scope of work will also involve backfilling and potential surface restoration. Local contractors, suppliers, and service providers in site preparation, underground utilities, and related trades could find opportunities. Early engagement before final plans and permits are issued may offer a competitive advantage.

Board:
Board of County Commissioners
Date:
2026-07-16
Type:
Agenda_item
Address:
Columbia County
Applicant:
Comcast

p. 74

This project proposes the installation of underground fiber optic cable. The work involves directional boring to install conduit for the cable. Specific details about the project's location, size, or current use are not provided in the available information. The project is currently under review by the Board of County Commissioners. This project would involve site preparation, directional boring for conduit installation, and the pulling of fiber optic cable. Contractors specializing in underground utility work, directional boring, and fiber optic installation may find opportunities. Early engagement is advised as plans and permits are still being processed.

Board:
Board of County Commissioners
Date:
2026-07-16
Type:
Agenda_item
Address:
SW Montana St

p. 75

Columbia County is reviewing a proposal for underground fiber cable installation. The project involves a directional bore to install a 250-foot fiber cable and two 2-inch HDPE innerducts. This work is planned to occur parallel to the road at a minimum depth of 36 inches. The proposal is currently under review by the Board of County Commissioners. This project would involve site preparation for boring, the directional boring operation itself, and potentially backfilling and restoration. Contractors specializing in underground utility work, directional boring, and fiber optic cable installation may find opportunities. Engaging early in the review process allows businesses to understand the project scope before final plans and permits are issued.

Board:
Board of County Commissioners
Date:
2026-07-16
Type:
Agenda_item
Address:
SW Santa Fe Dr
Applicant:
MasTec

p. 78

Columbia County is reviewing a proposal for underground fiber optic cable installation. The project involves a directional bore crossing under Road NW to install two 2-inch HDPE innerducts, which will carry fiber optic cable. The proposed depth for the bore is a minimum of 36 feet, with a reamer size of 4 inches. This project is currently under review by the Board of County Commissioners. If approved, the work would likely involve site preparation for the bore pits, the directional drilling itself, and the installation of the conduit and fiber optic cable. Following this, there would be restoration of the affected areas. Local contractors, suppliers, and service providers in site preparation, directional drilling, utility installation, and restoration services may find opportunities as this project moves through the review process. Early engagement could provide an advantage before final plans and permits are issued.

Board:
Board of County Commissioners
Date:
2026-07-16
Type:
Agenda_item
Address:
Road NW

p. 79

Columbia County is reviewing a proposal to install approximately 465 feet of fiber cable and two 2-inch innerducts. This project involves directional boring to place the conduit parallel to the road right-of-way at a minimum depth of 36 inches. The work will include site preparation for boring, the boring process itself, and potentially backfilling and restoration. This is an early stage in the public process, with the item currently under review by the Board of County Commissioners. Contractors specializing in underground utility installation, directional boring, and site restoration could find opportunities. Reaching out to the county or applicant early in the review process may provide an advantage before final plans and permits are issued.

Board:
Board of County Commissioners
Date:
2026-07-16
Type:
Agenda_item
Address:
Columbia County
Applicant:
Comcast

p. 8

A residential remodel project is planned for a house located at 4306 Shader Rd, Suite 100, in Columbia County. The project involves replacing three non-impact doors of the same size. This project is currently under review, as indicated by the permit issuance date. The scope of work is limited to the replacement of doors, which will involve carpentry and potentially painting or finishing trades. Local contractors, suppliers, and service providers are encouraged to reach out early to learn more about this project. Understanding the project details before final bids and permits are settled can provide a competitive advantage.

Board:
Board of County Commissioners
Date:
2026-07-16
Type:
Agenda_item
Address:
1295 SW RIDGE ST LAKE CITY, FL 32024
Applicant:
MOFFITT JAMES D

p. 8

Board of County Commissioners listed this item on its agenda for 2026-07-16 in Columbia County. The posted record gives the item title and nothing else, so there is no site, no size and no applicant on file for it yet. Local businesses that want to follow it can open the official agenda link above and watch for the fuller write-up the body posts as the meeting gets closer.

Board:
Board of County Commissioners
Date:
2026-07-16
Type:
Agenda_item

p. 80

Columbia County is reviewing plans for a new underground fiber optic cable installation. This project involves directional boring to install approximately 165 feet of fiber cable and two 2-inch innerducts, followed by another section of approximately 305 feet of fiber cable and two 2-inch innerducts. The work requires directional boring at a minimum depth of 36 inches with a 4-inch reamer size. The project is currently under review by the Board of County Commissioners. This initiative will likely involve site clearing, excavation, directional boring, conduit installation, and fiber optic cable pulling and splicing. Local contractors, suppliers, and service providers in site preparation, underground utilities, and telecommunications installation can find opportunities by engaging early in the process before final plans and permits are issued.

Board:
Board of County Commissioners
Date:
2026-07-16
Type:
Agenda_item
Address:
Santa Fe
Applicant:
Comcast

p. 81

A project is planned to install fiber cable and innerduct using directional boring methods. This work will involve creating bore pits and running the cable and innerduct under roadways and parallel to road right-of-ways. The proposed installation includes a minimum depth of 36 inches for some sections and 48 inches for others, with a 4-inch reamer size. This project is currently under review by the Board of County Commissioners. The scope of work will likely involve site preparation for bore pits, the directional boring process itself, and potentially restoration of disturbed areas. Contractors specializing in underground utility installation, directional boring, and related site work may find opportunities. Early engagement is advised as plans and permits are still being finalized.

Board:
Board of County Commissioners
Date:
2026-07-16
Type:
Agenda_item
Applicant:
Comcast

p. 9

A building permit application has been submitted for a remodel project at 1295 SW Ridge Street in Lake City. The property owner is listed as James D. and Jeri-Sue Moffitt. The applicant and contractor is James Rowland of PWD Orlando LLC. This project is currently under review by the Columbia County Building and Zoning Department. The scope of work would involve interior and exterior modifications to an existing structure. This early stage in the process means contractors, suppliers, and service providers can engage to understand the project details as they develop. Businesses specializing in general contracting, carpentry, electrical, plumbing, HVAC, painting, flooring, and potentially restoration or waterproofing could find opportunities. Reaching out now allows for potential involvement before final plans, bids, and permits are issued.

Board:
Board of County Commissioners
Date:
2026-07-16
Type:
Agenda_item
Address:
4306 SHADER RD STE 100 ORLANDO , FL 32808
Applicant:
JAMES ROWLAND

p. 9

Board of County Commissioners listed this item on its agenda for 2026-07-16 in Columbia County. The posted record gives the item title and nothing else, so there is no site, no size and no applicant on file for it yet. Local businesses that want to follow it can open the official agenda link above and watch for the fuller write-up the body posts as the meeting gets closer.

Board:
Board of County Commissioners
Date:
2026-07-16
Type:
Agenda_item

p. 9

The North Florida Water Utilities Authority is proposing its budget for the fiscal year 2026/2027. This proposal includes operational and maintenance expenses for the Ellisville Sewer and CR-136 Sewer systems. The budget outlines planned spending for salaries, insurance, professional services, contractual services, utilities, repairs, maintenance, and equipment. Specific new expenses are noted for capital equipment, professional services, contractual services for location and mowing/landscaping, and new full-time employees. This budget is currently under review by the Board of County Commissioners. The project will involve site clearing and grading for new equipment, underground utility work for sewer system maintenance, paving for access, and potentially framing, mechanical, and finish trades for new equipment installations. Contractors, suppliers, and service providers in utilities, construction, and landscaping could find opportunities. Engaging early before final bids and permits are set offers a competitive advantage.

Board:
Board of County Commissioners
Date:
2026-07-16
Type:
Agenda_item
Address:
Ellisville Sewer
Applicant:
North Florida Water Utilities Authority

v) A provision specifying that any balance of unobligated funds which has been

Board of County Commissioners listed this item on its agenda for 2026-07-16 in Columbia County. The posted record gives the item title and nothing else, so there is no site, no size and no applicant on file for it yet. Local businesses that want to follow it can open the official agenda link above and watch for the fuller write-up the body posts as the meeting gets closer.

Board:
Board of County Commissioners
Date:
2026-07-16
Type:
Agenda_item

v) Authorize, condone, or ignore organizational conflicts of interest;

Board of County Commissioners listed this item on its agenda for 2026-07-16 in Columbia County. The posted record gives the item title and nothing else, so there is no site, no size and no applicant on file for it yet. Local businesses that want to follow it can open the official agenda link above and watch for the fuller write-up the body posts as the meeting gets closer.

Board:
Board of County Commissioners
Date:
2026-07-16
Type:
Agenda_item

See the actual businesses behind these numbers

Get the real filings, with addresses and officers, free for 7 days. No credit card required.

Start your free trial