Browse Columbia County civic records
Every published record for Columbia County, newest first. Filter by board, year, or industry to jump straight to the records you want, and page through to reach the full archive.
1,985 records
p. 32
Columbia County is reviewing plans for a proposed utility infrastructure project. The project involves the installation of new underground and aerial utilities, including telecommunications, electrical, gas, water, and sewer lines. This work will require site preparation, trenching, and potentially directional boring to install conduits and pipes. Following underground work, there will be a need for electrical and low-voltage system installations, along with connections to existing and new infrastructure. The project is currently under review by the Board of County Commissioners, indicating an early stage in the planning process. This presents an opportunity for contractors specializing in site clearing, grading, underground utilities, electrical work, plumbing, and concrete services. Suppliers of construction materials and equipment, as well as engineering and surveying firms, may also find opportunities. Engaging early, before final plans and permits are issued, can provide a competitive advantage.
- Board:
- Board of County Commissioners
- Date:
- 2026-07-02
- Type:
- Agenda_item
- Address:
- 126 COUNTY RD 18, HIGH SPRINGS, FL 32643
p. 33
Board of County Commissioners listed this item on its agenda for 2026-07-02 in Columbia County. The posted record gives the item title and nothing else, so there is no site, no size and no applicant on file for it yet. Local businesses that want to follow it can open the official agenda link above and watch for the fuller write-up the body posts as the meeting gets closer.
- Board:
- Board of County Commissioners
- Date:
- 2026-07-02
- Type:
- Agenda_item
p. 33
Board of County Commissioners listed this item on its agenda for 2026-07-02 in Columbia County. The posted record gives the item title and nothing else, so there is no site, no size and no applicant on file for it yet. Local businesses that want to follow it can open the official agenda link above and watch for the fuller write-up the body posts as the meeting gets closer.
- Board:
- Board of County Commissioners
- Date:
- 2026-07-02
- Type:
- Agenda_item
p. 34
This item concerns a planned construction project. The project involves all construction means, methods, techniques, sequences, and procedures, as well as the coordination of all portions of the Work under the Contract Documents. The project is currently under review by the Board of County Commissioners, Columbia County. This early stage means that site plans, bids, and permits have not yet been finalized. The scope of work will likely include site preparation, utility installation, building construction, and finishing trades. Local contractors, trades, suppliers, and service providers are encouraged to reach out now to learn more about potential opportunities as the project progresses through the planning phases. Engaging early can provide a competitive advantage before formal bid processes begin.
- Board:
- Board of County Commissioners
- Date:
- 2026-07-02
- Type:
- Agenda_item
p. 34
This agenda item concerns proposed utility infrastructure standards for Columbia County. The standards focus on minimum clearance heights over roadways and driveways, as well as separation requirements for power and communication lines. These are technical specifications that will guide future utility installations and upgrades within the county. The item is currently under review by the Board of County Commissioners. This review process will likely lead to the adoption of new regulations that will impact how utility work is performed. Contractors and suppliers involved in utility construction, electrical work, and telecommunications will need to adhere to these new standards. Early awareness of these planned specifications allows businesses to prepare for upcoming projects and ensure compliance.
- Board:
- Board of County Commissioners
- Date:
- 2026-07-02
- Type:
- Agenda_item
- Address:
- SW COUNTY RD 18
p. 35
A proposal is currently under review by the Board of County Commissioners for Columbia County. The specific details of this proposal, including its location, size, and intended use, are not provided in the posted record. As the proposal moves through the public process, it may involve site preparation, utility work, and construction. Local contractors, trades, suppliers, and service providers are encouraged to monitor the progress of this item. Early awareness can provide an advantage as project plans and bid opportunities develop.
- Board:
- Board of County Commissioners
- Date:
- 2026-07-02
- Type:
- Agenda_item
p. 35
This item concerns proposed utility infrastructure improvements in Columbia County. The project involves installing new power and communication lines. Specific requirements include an 18-foot minimum clearance height over all roadways and driveways, a 40-foot minimum separation between power and communication lines, and 12 inches minimum separation for communication lines at attachment points, with 6 inches at mid-span. This project is currently under review by the Board of County Commissioners. The work will likely involve site preparation, trenching, conduit installation, utility pole setting, and overhead line stringing. Contractors specializing in utility construction, electrical work, low-voltage systems, and site preparation could find opportunities. Engaging early is advisable as plans and permits are still being developed.
- Board:
- Board of County Commissioners
- Date:
- 2026-07-02
- Type:
- Agenda_item
- Address:
- SW COUNTY RD 18
p. 36
Board of County Commissioners listed this item on its agenda for 2026-07-02 in Columbia County. The posted record gives the item title and nothing else, so there is no site, no size and no applicant on file for it yet. Local businesses that want to follow it can open the official agenda link above and watch for the fuller write-up the body posts as the meeting gets closer.
- Board:
- Board of County Commissioners
- Date:
- 2026-07-02
- Type:
- Agenda_item
p. 36
This agenda item concerns proposed utility infrastructure improvements in the vicinity of SW County Road 18. The project involves the installation of new power and communication lines, requiring specific clearances and separations between different types of lines. Aerial notes detail minimum clearance heights over roadways and driveways, as well as minimum separations for power and communication lines at attachment points and mid-span. This project is currently under review by the Board of County Commissioners, Columbia County. The work would likely involve site preparation, trenching, conduit installation, utility pole setting, cable pulling, and connection services. Contractors specializing in utility construction, electrical work, low-voltage systems, and site preparation could find opportunities. Engaging early, before final plans and permits are issued, allows businesses to understand the project scope and prepare for potential bidding.
- Board:
- Board of County Commissioners
- Date:
- 2026-07-02
- Type:
- Agenda_item
- Address:
- SW County RD 18
p. 37
This item concerns proposed new aerial utility infrastructure requirements for Columbia County. The Board of County Commissioners is reviewing standards for minimum clearance heights over roadways and driveways, as well as minimum separation distances between power and communication lines. These proposed standards are currently under review. The project would involve the installation or modification of utility poles, lines, and related hardware to meet these new clearance and separation requirements. This could include site preparation, pole setting, wire stringing, and connection work. Local contractors, suppliers, and service providers in the utility and construction sectors should monitor this review process. Early engagement could provide an advantage as specific project plans and permit applications are developed.
- Board:
- Board of County Commissioners
- Date:
- 2026-07-02
- Type:
- Agenda_item
p. 38
This item concerns aerial notes and National Electrical Safety Code (NESC) requirements for utility line clearances and separations. It specifies minimum clearance heights over roadways and driveways, as well as minimum separations between power and communication lines, and between communication lines themselves. The item is currently under review by the Board of County Commissioners. This review will likely lead to requirements for utility work, including potential site clearing and grading for new utility installations or upgrades, underground utility work for power and communication lines, and possibly road and driveway modifications to meet clearance standards. Contractors specializing in utility construction, electrical work, low-voltage systems, and site preparation could find opportunities. Engaging early in the review process may provide an advantage before specific plans and permits are finalized.
- Board:
- Board of County Commissioners
- Date:
- 2026-07-02
- Type:
- Agenda_item
p. 4
This item concerns a legal matter related to Nabors Giblin & Nickerson P.A. and David Kraus of Columbia County. The specific project details, such as location, size, current use, or proposed use, are not provided in this agenda item. The item is currently under review by the Board of County Commissioners, Columbia County. As this is a legal and administrative item, it does not directly outline construction or development work. Therefore, there are no immediate construction-related scopes of work or phases to describe. Local contractors, trades, suppliers, and service providers should note that this item does not present a direct project opportunity at this time.
- Board:
- Board of County Commissioners
- Date:
- 2026-07-02
- Type:
- Agenda_item
- Address:
- 1500 Mahan Drive Suite 200 Tallahassee, Florida 32308
- Applicant:
- Nabors Giblin & Nickerson P.A.
p. 4
Columbia County is reviewing a project that involves the purchase of materials and services. This item is currently under review by the Board of County Commissioners. The project will likely involve site preparation, utility work, and the installation of various materials. Local contractors, suppliers, and service providers are encouraged to engage early to understand the project's scope and potential needs. This early engagement can provide an advantage before formal bidding and permitting processes begin.
- Board:
- Board of County Commissioners
- Date:
- 2026-07-02
- Type:
- Agenda_item
p. 40
This item concerns proposed utility infrastructure improvements near SW Old Lake City Terrace and County Road 18 in Columbia County. The project involves the installation of new power and communication lines, requiring specific clearances and separations between different types of cables. Aerial notes indicate a minimum 18-foot clearance height over roadways and driveways. National Electrical Safety Code (NESC) requirements are detailed for power to communication (40-inch minimum separation) and communication to communication lines (12-inch minimum at attachment points, 6-inch minimum at mid-span). This project is currently under review. The work would involve site preparation for utility pole placement, trenching or aerial installation of conduits and cables, and connection of new lines. This early stage presents an opportunity for contractors specializing in utility construction, electrical work, low-voltage systems, and site preparation. Suppliers of utility poles, cables, and related hardware could also find opportunities by engaging now, before final plans and bids are established.
- Board:
- Board of County Commissioners
- Date:
- 2026-07-02
- Type:
- Agenda_item
- Address:
- SW Old Lake City Terrace
p. 41
Board of County Commissioners listed this item on its agenda for 2026-07-02 in Columbia County. The posted record gives the item title and nothing else, so there is no site, no size and no applicant on file for it yet. Local businesses that want to follow it can open the official agenda link above and watch for the fuller write-up the body posts as the meeting gets closer.
- Board:
- Board of County Commissioners
- Date:
- 2026-07-02
- Type:
- Agenda_item
p. 43
A site plan is under review for a project located at 126 County Road 18 in High Springs, Florida. The project involves the development of a site that includes aerial notes regarding minimum clearance heights over roadways and driveways, as well as specific separation requirements for power and communication lines. The current use or zoning is not specified, but the plan details infrastructure and utility placement. This item is currently under review by the Board of County Commissioners, Columbia County. The project would likely involve site clearing and grading, installation of underground utilities, and potentially road and driveway construction. Contractors specializing in site preparation, grading, utility work, and concrete services could find opportunities. Suppliers of construction materials and equipment may also be involved. Reaching out to the project stakeholders early, before final plans and permits are issued, could provide a competitive advantage for securing work.
- Board:
- Board of County Commissioners
- Date:
- 2026-07-02
- Type:
- Agenda_item
- Address:
- 126 County Road 18, High Springs, FL 32643
p. 44
This agenda item concerns proposed utility infrastructure standards for aerial installations. Specifically, it details minimum clearance heights over roadways and driveways, as well as separation requirements between power and communication lines. These standards are currently under review by the Board of County Commissioners, Columbia County. The project would involve the planning and potential installation of new or upgraded utility poles, power lines, and communication cables, adhering to National Electrical Safety Code (NESC) requirements. This work could include site preparation for pole placement, trenching or aerial installation of conduits, and the physical stringing and connection of wires. Contractors specializing in electrical work, low-voltage systems, and general construction could find opportunities as these standards are finalized and projects are initiated. Early engagement is advised before specific bid packages and permits are issued.
- Board:
- Board of County Commissioners
- Date:
- 2026-07-02
- Type:
- Agenda_item
- Address:
- SW OLD LAKE CITY TERRACE
p. 45
This item concerns proposed utility infrastructure improvements near SW Old Lake City Terrace and County Road 18 in Columbia County. The project involves the installation of new power and communication lines, requiring specific separation distances between different types of cables and overhead clearances above roadways and driveways. The proposal is currently under review by the Board of County Commissioners. This project will likely involve site preparation, trenching or pole installation, underground and overhead utility work, and potentially road or driveway modifications. Contractors specializing in utility construction, electrical work, low-voltage systems, and site clearing could find opportunities. Engaging early in the review process allows businesses to understand the project scope before final plans and permits are issued.
- Board:
- Board of County Commissioners
- Date:
- 2026-07-02
- Type:
- Agenda_item
- Address:
- SW Old Lake City Terrace
p. 46
This item concerns aerial utility infrastructure requirements for an unspecified project. It details minimum clearance heights over roadways and driveways, as well as minimum separation distances between power and communication lines, and between communication lines themselves. These standards are part of the National Electrical Safety Code (NESC) requirements. The project is currently under review by the Board of County Commissioners, Columbia County. The scope of work would involve the installation and management of overhead utility lines, including potential pole setting, riser installation, and the careful routing and separation of power and communication cables. This early stage presents an opportunity for contractors specializing in utility construction, electrical work, and low-voltage systems, as well as suppliers of utility poles, cables, and hardware, to engage before detailed site plans and permits are finalized.
- Board:
- Board of County Commissioners
- Date:
- 2026-07-02
- Type:
- Agenda_item
p. 47
The Board of County Commissioners of Columbia County is reviewing proposed standards for minimum clearances and separations of power and telephone facilities carried on the same pole. This review is based on the National Electrical Safety Code (NESC). The proposed standards detail required vertical and horizontal distances for power lines, telephone lines, and related equipment in various locations, including public highways, alleys, private property, and driveways. This item is currently under review by the Board. The work would involve understanding and potentially implementing these new utility line clearance standards, which could affect future construction, maintenance, and upgrades of electrical and telecommunication infrastructure. Contractors, suppliers, and service providers involved in utility work, electrical installation, and telecommunications could benefit from understanding these proposed regulations. Engaging early in this review process allows businesses to prepare for potential changes in project requirements and specifications.
- Board:
- Board of County Commissioners
- Date:
- 2026-07-02
- Type:
- Agenda_item
- Address:
- 126 COUNTY RD 18 HIGH SPRINGS, FL 32643
See the actual businesses behind these numbers
Get the real filings, with addresses and officers, free for 7 days. No credit card required.
Start your free trial