Development Review Committee
City of Coral Gables
Latest meetings
DERC-26-08-0081 - DRC Level 2. New construction of a 4-story, 4-unit townhouse development with approximately 25,702 sq. ft. area referred as “Edgewater Townhouse”, located at 61 Edgewater Dr.
A new townhouse development is planned for 61 Edgewater Drive. The project, referred to as “Edgewater Townhouse,” proposes the new construction of a 4-story building with 4 units. The total area for this development is approximately 25,702 square feet. This item is currently pending review by the Development Review Committee. The project is expected to involve site preparation, foundation work, framing, and the installation of all necessary utilities and finishes. Local contractors, trades, suppliers, and service providers are encouraged to engage early to understand the project scope as plans develop. This early engagement can provide an advantage before site plans, bids, and permits are finalized.
- Board:
- Development Review Committee
- Date:
- 2026-09-25
- Type:
- Agenda_item
- Address:
- 61 Edgewater Dr
DERC-26-09-0083 - DRC Level 2. New construction of a 3-story, 4-unit townhouse development with approximately 9,132 sq. ft. total floor area, located at 1414 Galiano Street.
A developer is proposing new construction of a 3-story, 4-unit townhouse development at 1414 Galiano Street. The project would have approximately 9,132 square feet of total floor area. This item is currently under review by the Development Review Committee of the City of Coral Gables. The project is in the early planning stage, before site plans and permits are finalized. The scope of work would include site clearing and grading, foundation and concrete work, vertical framing, and exterior finishes. It would also involve mechanical, electrical, and plumbing systems, as well as final landscaping. Local contractors, suppliers, and service providers in these fields could compete for work, and reaching out early is the advantage.
- Board:
- Development Review Committee
- Date:
- 2026-09-25
- Type:
- Agenda_item
- Address:
- 1414 Galiano Street
Development Review Committee
The City of Coral Gables Development Review Committee met on September 25, 2026, to review two pending applications for new townhouse construction. One project at 1414 Galiano Street is a 3-story, 4-unit townhouse building with about 9,132 square feet. The other project at 61 Edgewater Drive, called Edgewater Townhouse, is a 4-story, 4-unit building with about 25,702 square feet. These projects could involve work for site preparation crews, foundation and framing contractors, utility installers, electricians, plumbers, and building material suppliers. The committee has not approved these plans yet, so contractors should watch for future updates.
- Board:
- Development Review Committee
- Date:
- 2026-09-25
- Type:
- Meeting
DERC-26-08-0082 Level 1. Subdivision review for a Tentative Plat entitled “Sunlit Gardens” located at 10005 and 10015 Snapper Creek Road.
A tentative plat review is planned for a subdivision called "Sunlit Gardens." This project is located at 10005 and 10015 Snapper Creek Road. The review is currently pending before the Development Review Committee. This early stage means that site plans and permits are still being developed. The project would likely involve site clearing and grading, followed by underground utility work and road construction. Subsequent phases would include building construction, finishing trades, and final landscaping. Contractors, suppliers, and service providers who engage early may have an advantage in securing work as the project moves through its planning stages.
- Board:
- Development Review Committee
- Date:
- 2026-08-28
- Type:
- Agenda_item
- Address:
- 10005 and 10015 Snapper Creek Road
The Development Review Committee will be held on Friday, August 28, 2026, commencing at 9:30 a.m.
This notice is about a Development Review Committee meeting scheduled for August 28, 2026, in Coral Gables. The committee provides input on technical issues for development projects to ensure they align with city policies. This is an early stage in the public process, as the committee's comments are not final approvals and further detailed plans may be required later. The meeting will cover technical aspects of development proposals, which could eventually lead to site clearing, grading, utility work, paving, building construction, and landscaping. Local contractors, trades, suppliers, and service providers are encouraged to monitor this process. Engaging early, before formal plans and bids are set, offers the best opportunity to understand potential future work and compete for contracts.
- Board:
- Development Review Committee
- Date:
- 2026-08-28
- Type:
- Agenda_item
- Address:
- drc@coralgables.com
DERC-26-01-0069 Level 1. Amendments to the University of Miami Development Agreement and proposed Comprehensive Plan Text and Map amendments, Zoning Code Text and Map amendments, and Amendments to the University of Miami Campus Master Plan for the University of Miami.
The University of Miami is proposing amendments to its Development Agreement and Campus Master Plan. This includes changes to the city's Comprehensive Plan and Zoning Code. The Development Review Committee is currently reviewing these proposals. This review process is early, with the item pending before the committee. The proposed changes could lead to future site development and construction work. This may involve site preparation, grading, utility work, building construction, and landscaping. Local contractors, trades, suppliers, and service providers are encouraged to monitor this item. Engaging early, before final plans and permits are issued, can provide a competitive advantage.
- Board:
- Development Review Committee
- Date:
- 2026-06-26
- Type:
- Agenda_item
- Applicant:
- University of Miami
DERC-26-06-0077 Level 2. Change of Use for the existing five-story building to a mixed-use development with residential and commercial uses, located at 3195 Ponce de Leon Boulevard.
A change of use is under review for the existing five-story building at 3195 Ponce de Leon Boulevard. The proposal is to convert the building into a mixed-use development, including both residential and commercial spaces. This item is currently pending review by the Development Review Committee. If approved, the project would involve interior renovations and potential exterior modifications to accommodate the new uses. Work could include updates to building systems, interior framing, finishes, and potentially site improvements. Local contractors, suppliers, and service providers are encouraged to monitor this project's progress as it moves through the review process. Early engagement could provide an advantage as plans develop.
- Board:
- Development Review Committee
- Date:
- 2026-06-26
- Type:
- Agenda_item
- Address:
- 3195 Ponce de Leon Boulevard
DERC-26-06-0078 Level 2. New construction of a two-story office building on the existing parking lot associated with 3195 Ponce de Leon Boulevard, subject to any other required legislative approvals for the site.
The Development Review Committee of the City of Coral Gables is reviewing a proposal for new construction at 3195 Ponce de Leon Boulevard. The project plans to build a two-story office building on the current parking lot. This item is currently pending review, meaning it is in the early stages of the public process. If approved, the project would involve site preparation, foundation work, building construction, and utility connections. This early stage presents an opportunity for local contractors, trades, suppliers, and service providers to engage before final plans and bids are set. Reaching out now could provide an advantage in securing future work related to this development.
- Board:
- Development Review Committee
- Date:
- 2026-06-26
- Type:
- Agenda_item
- Address:
- 3195 Ponce de Leon Boulevard
DERC-26-06-0079 Level 2. Proposed renovation of Fred B. Hartnett Ponce Circle Park, located at 2810 Ponce de Leon Boulevard.
The City of Coral Gables Development Review Committee is reviewing a proposal to renovate Fred B. Hartnett Ponce Circle Park. This project is located at 2810 Ponce de Leon Boulevard. The renovation plans are currently pending review. This project would involve site clearing and grading, followed by potential underground utility work and paving. It would also include vertical construction for any new structures or improvements, mechanical and finish trades for park amenities, and final landscaping. Local contractors, trades, suppliers, and service providers should consider reaching out early to learn more about this planned park renovation. Engaging before final site plans, bids, and permits are established offers the best opportunity to compete for work.
- Board:
- Development Review Committee
- Date:
- 2026-06-26
- Type:
- Agenda_item
- Address:
- 2810 Ponce de Leon Boulevard
NOTE
A plain-language summary of this record is on the way. You can read the official record now.
- Board:
- Development Review Committee
- Date:
- 2026-06-26
- Type:
- Agenda_item
PERSONAL COMMENTS
This item is currently under review by the Development Review Committee for the City of Coral Gables. No specific project details, such as a proposed use, address, or size, have been provided in the agenda item. As this is a preliminary stage, the exact scope of work is not yet defined. Future phases could involve site preparation, construction, and related trades, depending on what is eventually proposed and approved. Local contractors, suppliers, and service providers are encouraged to monitor future agendas for this item to identify potential opportunities as more information becomes available. Early engagement before formal plans and permits are issued can offer a competitive advantage.
- Board:
- Development Review Committee
- Date:
- 2026-06-26
- Type:
- Agenda_item
The Development Review Committee will be held on Friday, June 26, 2026, commencing at 9:30 a.m.
The Development Review Committee (DRC) of the City of Coral Gables will hold a meeting on June 26, 2026, to discuss development projects. The DRC is an administrative and technical committee that offers input on technical issues to ensure projects align with City Commission policies. Comments from the DRC are not final and additional feedback may arise with more detailed plans. This meeting is part of the early review process, meaning projects are still in the planning stages. While the DRC provides input, no decisions are made at these meetings. Local contractors, suppliers, and service providers are encouraged to monitor these early reviews. Understanding the project's direction at this stage can provide an advantage before formal plans, bids, and permits are finalized.
- Board:
- Development Review Committee
- Date:
- 2026-06-26
- Type:
- Agenda_item
- Address:
- drc@coralgables.com
DERC-26-04-0075 | DRC Level 2. Malaga Residences - New construction of a four (4) story building consisting of twenty-five (25) dwelling units with Mediterranean Bonus, located at 300, 310, and 318 Malaga Avenue.
A new four-story residential building with twenty-five dwelling units is planned for Malaga Avenue in Coral Gables. The project, known as Malaga Residences, is currently under review by the Development Review Committee. This project will likely involve site clearing and grading, followed by underground utility work and foundation construction. Subsequent phases will include vertical framing, roofing, and the installation of mechanical, electrical, and plumbing systems. The final stages will focus on interior finishes, exterior cladding, and landscaping. Local contractors, trades, suppliers, and service providers should consider reaching out early to learn more about potential opportunities as this project moves through the review process, before bids and permits are finalized.
- Board:
- Development Review Committee
- Date:
- 2026-05-29
- Type:
- Agenda_item
- Address:
- 300, 310, and 318 Malaga Avenue
- Applicant:
- Malaga Residences
DERC-26-05-0076 | DRC Level 2. PNC Bank - Change of use and interior renovation of an existing one-story restaurant building into a bank branch office with a new walk-up ATM, night depository, parking lot and landscape exterior improvements, located at 4231 South Le Jeune Road.
The Development Review Committee is considering a change of use and interior renovation project at 4231 South Le Jeune Road. The proposal involves transforming an existing one-story restaurant building into a bank branch office. This would include adding a walk-up ATM, a night depository, and making improvements to the parking lot and landscaping. This item is currently pending review by the committee. The project would likely involve site clearing and grading for parking and landscape work, followed by interior renovation, electrical, plumbing, and HVAC work for the bank branch. Final landscaping and paving would complete the project. Local contractors, suppliers, and service providers should consider reaching out early to learn more about this project as plans develop, as this offers an opportunity to engage before bids and permits are finalized.
- Board:
- Development Review Committee
- Date:
- 2026-05-29
- Type:
- Agenda_item
- Address:
- 4231 South Le Jeune Road
- Applicant:
- PNC Bank
NOTE
A plain-language summary of this record is on the way. You can read the official record now.
- Board:
- Development Review Committee
- Date:
- 2026-05-29
- Type:
- Agenda_item
See the actual businesses behind these numbers
Get the real filings, with addresses and officers, backed by a 14-day money-back guarantee.
Create your account