Indian River County MPO Technical Advisory Committee (TAC) Meeting: May 2026
Indian River County
5. Scenario modeling for major new developments, proposed land use changes,
Indian River County MPO Technical Advisory Committee (TAC) Meeting listed this item on its agenda for 2026-05-29. The posted record gives the item title and nothing else, so there is no site, no size and no applicant on file for it yet. Local businesses that want to follow it can open the official agenda link above and watch for the fuller write-up the body posts as the meeting gets closer.
- Board:
- Indian River County MPO Technical Advisory Committee (TAC) Meeting
- Date:
- 2026-05-29
- Type:
- Agenda_item
5. Summary Sheet on Roadway Improvement Projects – No Action Required
Indian River County MPO Technical Advisory Committee (TAC) Meeting listed this item on its agenda for 2026-05-29. The posted record gives the item title and nothing else, so there is no site, no size and no applicant on file for it yet. Local businesses that want to follow it can open the official agenda link above and watch for the fuller write-up the body posts as the meeting gets closer.
- Board:
- Indian River County MPO Technical Advisory Committee (TAC) Meeting
- Date:
- 2026-05-29
- Type:
- Agenda_item
6. Crash Data System Development and Analysis
Indian River County MPO Technical Advisory Committee (TAC) Meeting listed this item on its agenda for 2026-05-29. The posted record gives the item title and nothing else, so there is no site, no size and no applicant on file for it yet. Local businesses that want to follow it can open the official agenda link above and watch for the fuller write-up the body posts as the meeting gets closer.
- Board:
- Indian River County MPO Technical Advisory Committee (TAC) Meeting
- Date:
- 2026-05-29
- Type:
- Agenda_item
6. Cumulative 2 -year and 4 -year reduction of on -road mobile source
The Indian River County MPO is planning to support state targets for improving transportation system reliability. This involves programming projects within the FY 2027-FY 2031 Transportation Improvement Program (TIP) that will enhance travel time reliability on Interstate and non-Interstate National Highway System (NHS) roads. Specific investments will include improvements to the Strategic Intermodal System (SIS), congestion relief projects, and bicycle and pedestrian infrastructure. The MPO has committed to supporting FDOT's statewide performance targets, which are currently under review and will guide future project selections. This planning phase presents an early opportunity for contractors, suppliers, and service providers to engage with the MPO and understand upcoming project needs. Early outreach can help businesses align their services with the MPO's long-term goals for infrastructure improvement and system performance.
- Board:
- Indian River County MPO Technical Advisory Committee (TAC) Meeting
- Date:
- 2026-05-29
- Type:
- Agenda_item
- Applicant:
- Indian River MPO
6. MPO Public Involvement effort evaluation
Indian River County MPO Technical Advisory Committee (TAC) Meeting listed this item on its agenda for 2026-05-29. The posted record gives the item title and nothing else, so there is no site, no size and no applicant on file for it yet. Local businesses that want to follow it can open the official agenda link above and watch for the fuller write-up the body posts as the meeting gets closer.
- Board:
- Indian River County MPO Technical Advisory Committee (TAC) Meeting
- Date:
- 2026-05-29
- Type:
- Agenda_item
6. Origin-Destination mapping
Indian River County MPO Technical Advisory Committee (TAC) Meeting listed this item on its agenda for 2026-05-29. The posted record gives the item title and nothing else, so there is no site, no size and no applicant on file for it yet. Local businesses that want to follow it can open the official agenda link above and watch for the fuller write-up the body posts as the meeting gets closer.
- Board:
- Indian River County MPO Technical Advisory Committee (TAC) Meeting
- Date:
- 2026-05-29
- Type:
- Agenda_item
6. Planning for consistency with MAP-21/FAST Act provisions including
Indian River County MPO Technical Advisory Committee (TAC) Meeting listed this item on its agenda for 2026-05-29. The posted record gives the item title and nothing else, so there is no site, no size and no applicant on file for it yet. Local businesses that want to follow it can open the official agenda link above and watch for the fuller write-up the body posts as the meeting gets closer.
- Board:
- Indian River County MPO Technical Advisory Committee (TAC) Meeting
- Date:
- 2026-05-29
- Type:
- Agenda_item
6. Presentation on Transportation Technology and Data – No Action Required
Indian River County MPO Technical Advisory Committee (TAC) Meeting listed this item on its agenda for 2026-05-29. The posted record gives the item title and nothing else, so there is no site, no size and no applicant on file for it yet. Local businesses that want to follow it can open the official agenda link above and watch for the fuller write-up the body posts as the meeting gets closer.
- Board:
- Indian River County MPO Technical Advisory Committee (TAC) Meeting
- Date:
- 2026-05-29
- Type:
- Agenda_item
6. Small-area and sub-area model development and calibration
Indian River County MPO Technical Advisory Committee (TAC) Meeting listed this item on its agenda for 2026-05-29. The posted record gives the item title and nothing else, so there is no site, no size and no applicant on file for it yet. Local businesses that want to follow it can open the official agenda link above and watch for the fuller write-up the body posts as the meeting gets closer.
- Board:
- Indian River County MPO Technical Advisory Committee (TAC) Meeting
- Date:
- 2026-05-29
- Type:
- Agenda_item
6. Status Report of MPO Advisory Committees
Indian River County MPO Technical Advisory Committee (TAC) Meeting listed this item on its agenda for 2026-05-29. The posted record gives the item title and nothing else, so there is no site, no size and no applicant on file for it yet. Local businesses that want to follow it can open the official agenda link above and watch for the fuller write-up the body posts as the meeting gets closer.
- Board:
- Indian River County MPO Technical Advisory Committee (TAC) Meeting
- Date:
- 2026-05-29
- Type:
- Agenda_item
7. Access Management Classification and Re-classification Study development
The Indian River County MPO Technical Advisory Committee (TAC) is reviewing the development of an Access Management Classification and Re-classification Study. This study will examine how access is managed along roadways within Indian River County. The project is currently in the planning and review phase. This early stage means there is an opportunity for local contractors, trades, suppliers, and service providers to engage. The study will likely involve data collection, analysis, and the development of new access management standards. Potential work could include traffic engineering, planning services, and the supply of related materials or software. Engaging now, before detailed plans and specifications are finalized, allows businesses to understand the project's direction and potentially influence future bid opportunities.
- Board:
- Indian River County MPO Technical Advisory Committee (TAC) Meeting
- Date:
- 2026-05-29
- Type:
- Agenda_item
- Address:
- Indian River County
7. Air-quality modeling and analysis
Indian River County MPO Technical Advisory Committee (TAC) Meeting listed this item on its agenda for 2026-05-29. The posted record gives the item title and nothing else, so there is no site, no size and no applicant on file for it yet. Local businesses that want to follow it can open the official agenda link above and watch for the fuller write-up the body posts as the meeting gets closer.
- Board:
- Indian River County MPO Technical Advisory Committee (TAC) Meeting
- Date:
- 2026-05-29
- Type:
- Agenda_item
7. Land Use and Transportation coordination studies, including vacant land,
The Indian River County MPO Technical Advisory Committee (TAC) is reviewing land use and transportation coordination studies. These studies will look at vacant land, population, and development projections, as well as production and attraction balance. This item is currently under review. The work will involve data collection, analysis, and planning to inform future development decisions. This early stage presents an opportunity for local contractors, trades, suppliers, and service providers to engage. Understanding the scope of these studies now allows businesses to position themselves for potential future work related to transportation and land use projects that may arise from these planning efforts. Reaching out to the MPO or relevant planning departments could provide insights into upcoming needs.
- Board:
- Indian River County MPO Technical Advisory Committee (TAC) Meeting
- Date:
- 2026-05-29
- Type:
- Agenda_item
7. Status Report of MPO Advisory Committees – No Action Required
Indian River County MPO Technical Advisory Committee (TAC) Meeting listed this item on its agenda for 2026-05-29. The posted record gives the item title and nothing else, so there is no site, no size and no applicant on file for it yet. Local businesses that want to follow it can open the official agenda link above and watch for the fuller write-up the body posts as the meeting gets closer.
- Board:
- Indian River County MPO Technical Advisory Committee (TAC) Meeting
- Date:
- 2026-05-29
- Type:
- Agenda_item
7. Transportation Disadvantaged Analysis
Indian River County MPO Technical Advisory Committee (TAC) Meeting listed this item on its agenda for 2026-05-29. The posted record gives the item title and nothing else, so there is no site, no size and no applicant on file for it yet. Local businesses that want to follow it can open the official agenda link above and watch for the fuller write-up the body posts as the meeting gets closer.
- Board:
- Indian River County MPO Technical Advisory Committee (TAC) Meeting
- Date:
- 2026-05-29
- Type:
- Agenda_item
7. Visualization and Graphics, including Computer Simulation development
Indian River County MPO Technical Advisory Committee (TAC) Meeting listed this item on its agenda for 2026-05-29. The posted record gives the item title and nothing else, so there is no site, no size and no applicant on file for it yet. Local businesses that want to follow it can open the official agenda link above and watch for the fuller write-up the body posts as the meeting gets closer.
- Board:
- Indian River County MPO Technical Advisory Committee (TAC) Meeting
- Date:
- 2026-05-29
- Type:
- Agenda_item
8. Design, Permitting, and Environmental Studies
This item concerns design, permitting, and environmental studies for a project in Indian River County. The Indian River County MPO Technical Advisory Committee (TAC) is reviewing this agenda item. The project's specific details, including its location, size, and proposed use, are not yet defined in this agenda item. The current stage is under review, indicating early planning phases. This project will likely involve initial site assessments, environmental impact studies, and the development of design and permitting documents. These early stages typically require services from engineering, environmental consulting, and legal professionals. Local contractors, suppliers, and service providers are encouraged to engage early in the process to understand potential future needs as plans develop.
- Board:
- Indian River County MPO Technical Advisory Committee (TAC) Meeting
- Date:
- 2026-05-29
- Type:
- Agenda_item
- Address:
- Indian River County
8. Other Business
Indian River County MPO Technical Advisory Committee (TAC) Meeting listed this item on its agenda for 2026-05-29. The posted record gives the item title and nothing else, so there is no site, no size and no applicant on file for it yet. Local businesses that want to follow it can open the official agenda link above and watch for the fuller write-up the body posts as the meeting gets closer.
- Board:
- Indian River County MPO Technical Advisory Committee (TAC) Meeting
- Date:
- 2026-05-29
- Type:
- Agenda_item
8. Other activities contained in the MPO Public Participation Plan
Indian River County MPO Technical Advisory Committee (TAC) Meeting listed this item on its agenda for 2026-05-29. The posted record gives the item title and nothing else, so there is no site, no size and no applicant on file for it yet. Local businesses that want to follow it can open the official agenda link above and watch for the fuller write-up the body posts as the meeting gets closer.
- Board:
- Indian River County MPO Technical Advisory Committee (TAC) Meeting
- Date:
- 2026-05-29
- Type:
- Agenda_item
8. Public Transportation Agency Safety Plans
Indian River County MPO Technical Advisory Committee (TAC) Meeting listed this item on its agenda for 2026-05-29. The posted record gives the item title and nothing else, so there is no site, no size and no applicant on file for it yet. Local businesses that want to follow it can open the official agenda link above and watch for the fuller write-up the body posts as the meeting gets closer.
- Board:
- Indian River County MPO Technical Advisory Committee (TAC) Meeting
- Date:
- 2026-05-29
- Type:
- Agenda_item
8. Regional Long Range Planning studies
Indian River County MPO Technical Advisory Committee (TAC) Meeting listed this item on its agenda for 2026-05-29. The posted record gives the item title and nothing else, so there is no site, no size and no applicant on file for it yet. Local businesses that want to follow it can open the official agenda link above and watch for the fuller write-up the body posts as the meeting gets closer.
- Board:
- Indian River County MPO Technical Advisory Committee (TAC) Meeting
- Date:
- 2026-05-29
- Type:
- Agenda_item
9. Safety and Security studies
The Indian River County MPO Technical Advisory Committee (TAC) is reviewing a proposal related to safety and security studies. This item is currently under review by the committee. The scope of work would involve studies and analysis related to safety and security. This early stage in the review process presents an opportunity for local contractors, trades, suppliers, and service providers to engage. Reaching out now, before specific plans or bids are finalized, allows businesses to understand the project's direction and potentially influence future needs.
- Board:
- Indian River County MPO Technical Advisory Committee (TAC) Meeting
- Date:
- 2026-05-29
- Type:
- Agenda_item
A. Roadway Capacity Projects
Indian River County MPO Technical Advisory Committee (TAC) Meeting listed this item on its agenda for 2026-05-29. The posted record gives the item title and nothing else, so there is no site, no size and no applicant on file for it yet. Local businesses that want to follow it can open the official agenda link above and watch for the fuller write-up the body posts as the meeting gets closer.
- Board:
- Indian River County MPO Technical Advisory Committee (TAC) Meeting
- Date:
- 2026-05-29
- Type:
- Agenda_item
A. Roadway Capacity Projects ...................................................................................................... A-1
Indian River County MPO Technical Advisory Committee (TAC) Meeting listed this item on its agenda for 2026-05-29. The posted record gives the item title and nothing else, so there is no site, no size and no applicant on file for it yet. Local businesses that want to follow it can open the official agenda link above and watch for the fuller write-up the body posts as the meeting gets closer.
- Board:
- Indian River County MPO Technical Advisory Committee (TAC) Meeting
- Date:
- 2026-05-29
- Type:
- Agenda_item
A. Short & Long Range Transportation Planning/Corridor Analyses and Sub-area
The Indian River County MPO Technical Advisory Committee (TAC) is considering transportation planning and corridor analyses. This involves potential work to develop long and short-range transportation plans, analyses, and studies. These studies could include various subtasks to support the planning efforts. The item is currently under review by the TAC. This project could lead to future infrastructure needs and planning documents. Local contractors, trades, suppliers, and service providers are encouraged to engage early to understand the scope and potential phases of work as planning progresses. Early involvement can provide an advantage before specific project details, bids, and permits are finalized.
- Board:
- Indian River County MPO Technical Advisory Committee (TAC) Meeting
- Date:
- 2026-05-29
- Type:
- Agenda_item
B. Non-Motorized Transportation Planning– The consultant(s) may be required to
Indian River County MPO Technical Advisory Committee (TAC) Meeting listed this item on its agenda for 2026-05-29. The posted record gives the item title and nothing else, so there is no site, no size and no applicant on file for it yet. Local businesses that want to follow it can open the official agenda link above and watch for the fuller write-up the body posts as the meeting gets closer.
- Board:
- Indian River County MPO Technical Advisory Committee (TAC) Meeting
- Date:
- 2026-05-29
- Type:
- Agenda_item
B. TRAFFIC OPERATIONS, MAINTENANCE, AND SAFETY PROJECTS
The Indian River County MPO Technical Advisory Committee (TAC) is reviewing a Transportation Improvement Program (TIP) for Fiscal Years 2027 through 2031. This program includes various traffic operations, maintenance, and safety projects funded by federal dollars. The total estimated federal funding across these five years is over $28.5 million. Specific projects and their funding allocations are detailed across the fiscal years, with significant amounts planned for FY2027/28 and FY2028/29. This review stage means that planning and design work for these projects is likely underway or will begin soon. The scope of work could involve site preparation, utility adjustments, road improvements, and safety upgrades. Local contractors, suppliers, and service providers should monitor the progress of these projects as detailed plans and bid opportunities will emerge. Engaging early with the MPO or relevant agencies could provide insight into upcoming needs for construction, materials, and specialized services.
- Board:
- Indian River County MPO Technical Advisory Committee (TAC) Meeting
- Date:
- 2026-05-29
- Type:
- Agenda_item
B. Traffic Operations, Maintenance, and Safety Projects
The Indian River County MPO Technical Advisory Committee (TAC) is reviewing traffic operations, maintenance, and safety projects. This review is an early stage in the public process. The projects will likely involve planning and design work for various traffic improvements. These could include road upgrades, intersection modifications, and safety enhancements. Work may involve site assessments, traffic studies, and preliminary engineering. Later phases could include construction, such as paving, signal installation, and signage. Local contractors, trades, suppliers, and service providers should consider engaging with the MPO early. Understanding the scope and timeline now can provide an advantage before formal bidding and permitting processes begin.
- Board:
- Indian River County MPO Technical Advisory Committee (TAC) Meeting
- Date:
- 2026-05-29
- Type:
- Agenda_item
B. Traffic Operations, Maintenance, and Safety Projects ............................................................ B-1
Indian River County MPO Technical Advisory Committee (TAC) Meeting listed this item on its agenda for 2026-05-29. The posted record gives the item title and nothing else, so there is no site, no size and no applicant on file for it yet. Local businesses that want to follow it can open the official agenda link above and watch for the fuller write-up the body posts as the meeting gets closer.
- Board:
- Indian River County MPO Technical Advisory Committee (TAC) Meeting
- Date:
- 2026-05-29
- Type:
- Agenda_item
C. TRANSIT AND TRANSPORTATION DISADVANTAGED PROJECTS
The Indian River County MPO Technical Advisory Committee (TAC) is reviewing transit and transportation disadvantaged projects. This review includes planned federal funding allocations over five years, from 2026/27 through 2030/31. The total federal funding proposed for these projects is $39,000,000, with an overall total funding of $48,394,009. This review stage means that specific project details, scopes of work, and timelines are still being determined. Businesses involved in transit operations, transportation services, and related support industries may find future opportunities as these projects move forward. Early engagement with the MPO could provide insights as plans develop.
- Board:
- Indian River County MPO Technical Advisory Committee (TAC) Meeting
- Date:
- 2026-05-29
- Type:
- Agenda_item
C. Transit Planning - The consultant(s) may be required to perform the following transit
Indian River County MPO Technical Advisory Committee (TAC) Meeting listed this item on its agenda for 2026-05-29. The posted record gives the item title and nothing else, so there is no site, no size and no applicant on file for it yet. Local businesses that want to follow it can open the official agenda link above and watch for the fuller write-up the body posts as the meeting gets closer.
- Board:
- Indian River County MPO Technical Advisory Committee (TAC) Meeting
- Date:
- 2026-05-29
- Type:
- Agenda_item
C. Transit and Transportation Disadvantaged Projects
The Indian River County MPO Technical Advisory Committee (TAC) is reviewing transit and transportation disadvantaged projects. This review is in the early planning stages. The scope of work will likely involve planning, design, and construction phases for various transit improvements. These projects could include new transit stops, accessible pathways, and updated transportation services for disadvantaged individuals. Local contractors, suppliers, and service providers are encouraged to engage early in this process. Understanding the project details before final plans, bids, and permits are set can provide a competitive advantage for future work.
- Board:
- Indian River County MPO Technical Advisory Committee (TAC) Meeting
- Date:
- 2026-05-29
- Type:
- Agenda_item
- Address:
- Indian River County
C. Transit and Transportation Disadvantaged Projects ............................................................... C-1
Indian River County MPO Technical Advisory Committee (TAC) Meeting listed this item on its agenda for 2026-05-29. The posted record gives the item title and nothing else, so there is no site, no size and no applicant on file for it yet. Local businesses that want to follow it can open the official agenda link above and watch for the fuller write-up the body posts as the meeting gets closer.
- Board:
- Indian River County MPO Technical Advisory Committee (TAC) Meeting
- Date:
- 2026-05-29
- Type:
- Agenda_item
D. BICYCLE, PEDESTRIAN, TRAILS, AND ENHANCEMENT PROJECTS
The Indian River County MPO Technical Advisory Committee (TAC) is reviewing bicycle, pedestrian, and trails projects for potential funding. These projects are planned for the fiscal years 2027 through 2031, with a total estimated federal funding of $2,454,141. The proposed work includes various enhancement projects, with specific funding allocated for "DIOH," "LF," "TALL," and "TALT." This review stage means that detailed site plans, bids, and permits are not yet finalized, offering an early opportunity for businesses. The scope of work is expected to involve site preparation, grading, potential utility work, paving for trails and pedestrian paths, and final landscaping. Contractors, suppliers, and service providers in site prep, grading, paving, concrete, electrical, and landscaping could find opportunities. Reaching out now allows businesses to engage before the project details are fully settled, potentially securing a competitive advantage.
- Board:
- Indian River County MPO Technical Advisory Committee (TAC) Meeting
- Date:
- 2026-05-29
- Type:
- Agenda_item
D. Bicycle, Pedestrian, Trail, and Enhancement Projects
This item concerns the Indian River County Metropolitan Planning Organization (MPO) Transportation Improvement Program (TIP) for Fiscal Years 2027 through 2031. The MPO is planning for bicycle, pedestrian, trail, and enhancement projects within Indian River County. This program is currently under review as part of the TIP development process. The scope of work will likely involve planning, design, and construction phases for various infrastructure improvements. These could include new or improved sidewalks, bike lanes, multi-use trails, and related aesthetic enhancements. Local contractors, suppliers, and service providers in areas such as site preparation, grading, paving, electrical, plumbing, HVAC, and landscaping could find opportunities. Engaging early in the planning stages, before final site plans, bids, and permits are established, offers the best chance to compete for future work.
- Board:
- Indian River County MPO Technical Advisory Committee (TAC) Meeting
- Date:
- 2026-05-29
- Type:
- Agenda_item
- Address:
- Indian River County
D. Bicycle, Pedestrian, and Transportation Alternatives Projects ............................................... D-1
Indian River County MPO Technical Advisory Committee (TAC) Meeting listed this item on its agenda for 2026-05-29. The posted record gives the item title and nothing else, so there is no site, no size and no applicant on file for it yet. Local businesses that want to follow it can open the official agenda link above and watch for the fuller write-up the body posts as the meeting gets closer.
- Board:
- Indian River County MPO Technical Advisory Committee (TAC) Meeting
- Date:
- 2026-05-29
- Type:
- Agenda_item
D. Transportation Planning Model Calibration and Sub-Area Modeling The
The Indian River County MPO Technical Advisory Committee (TAC) is reviewing a transportation planning model calibration and sub-area modeling project. This project involves using the FDOT-adopted Travel Demand Forecasting Model standard platform. The scope of work may include various tasks to support the MPO's travel demand forecast modeling efforts. This is an early stage of review, indicating potential opportunities for related services. Businesses involved in data analysis, specialized software, and transportation consulting could find opportunities. Engaging early before detailed plans are finalized may offer a competitive advantage.
- Board:
- Indian River County MPO Technical Advisory Committee (TAC) Meeting
- Date:
- 2026-05-29
- Type:
- Agenda_item
E. Aviation Projects
Indian River County MPO Technical Advisory Committee (TAC) Meeting listed this item on its agenda for 2026-05-29. The posted record gives the item title and nothing else, so there is no site, no size and no applicant on file for it yet. Local businesses that want to follow it can open the official agenda link above and watch for the fuller write-up the body posts as the meeting gets closer.
- Board:
- Indian River County MPO Technical Advisory Committee (TAC) Meeting
- Date:
- 2026-05-29
- Type:
- Agenda_item
E. Aviation Projects ...................................................................................................................... E-1
Indian River County MPO Technical Advisory Committee (TAC) Meeting listed this item on its agenda for 2026-05-29. The posted record gives the item title and nothing else, so there is no site, no size and no applicant on file for it yet. Local businesses that want to follow it can open the official agenda link above and watch for the fuller write-up the body posts as the meeting gets closer.
- Board:
- Indian River County MPO Technical Advisory Committee (TAC) Meeting
- Date:
- 2026-05-29
- Type:
- Agenda_item
E. Traffic Engineering and Operational Studies – Appropriate activities to be performed
Indian River County MPO Technical Advisory Committee (TAC) Meeting listed this item on its agenda for 2026-05-29. The posted record gives the item title and nothing else, so there is no site, no size and no applicant on file for it yet. Local businesses that want to follow it can open the official agenda link above and watch for the fuller write-up the body posts as the meeting gets closer.
- Board:
- Indian River County MPO Technical Advisory Committee (TAC) Meeting
- Date:
- 2026-05-29
- Type:
- Agenda_item
F. TRANSPORTATION PLANNING/STUDIES
The Indian River County MPO is reviewing its Transportation Improvement Program (TIP) for Fiscal Years 2027 through 2031. This program includes planned projects focused on safety, infrastructure condition, and system performance. Specific projects mentioned include widening CR 510, widening CR-512, intersection improvements at US 1 and Aviation Blvd., widening Aviation Blvd., multi-modal safety improvements on 45th St., and safety improvements at the I-95 interchange at CR-512. The TIP also includes numerous resurfacing projects on 43rd Avenue, SR 60, SR A1A, and US 1, as well as new road construction on 82nd Avenue and a new I-95 interchange at Oslo Rd. The program is currently under review as part of the MPO's planning process. This review will set the stage for future construction, including site preparation, grading, utility work, paving, structural work, and finishing trades. Local contractors, suppliers, and service providers are encouraged to engage early to understand the scope and timing of these planned infrastructure improvements.
- Board:
- Indian River County MPO Technical Advisory Committee (TAC) Meeting
- Date:
- 2026-05-29
- Type:
- Agenda_item
- Address:
- CR 510
F. Transportation Planning/Studies
The Indian River County MPO is reviewing its Transportation Improvement Program (TIP) for Fiscal Years 2027 through 2031. This program outlines planned transportation projects, including highway improvements, transit, bicycle, and pedestrian projects. Specific projects include multimodal safety improvements on 45th Street, widening of CR 510 and Aviation Boulevard, paving of 82nd Avenue, intersection improvements at US 1 and Aviation Blvd, widening of US 1, widening of CR-512, resurfacing of I-95 and Sebastian Boulevard, guardrail installation on the north county line, intersection improvements at SR-5/US-1, resurfacing on SR-60, bridge repair at Barber Bridge, bridge replacement at Sebastian Bridge, and resurfacing on Jasmine Lane and Sebastian Bridge. The TIP is currently under review and includes projects in various stages, from planning and design to right-of-way acquisition and construction, with construction phases scheduled from FY 2027 through FY 2031. This process will involve site clearing, grading, utility work, paving, and potentially structural work for bridges. Local contractors, trades, suppliers, and service providers are encouraged to engage early to understand the scope and timing of these projects, as opportunities for bidding and sub-contracting will arise as the TIP progresses through its planning and funding stages.
- Board:
- Indian River County MPO Technical Advisory Committee (TAC) Meeting
- Date:
- 2026-05-29
- Type:
- Agenda_item
F. Transportation Planning/Studies ............................................................................................. F-1
The Indian River County Metropolitan Planning Organization (MPO) is seeking to approve its Transportation Improvement Program (TIP) for Fiscal Years 2027 through 2031. This program outlines federally and state-funded transportation projects planned for the county over the next five years. The TIP includes capital and non-capital surface transportation projects, such as bicycle facilities, sidewalks, and transportation alternatives, as well as regionally significant projects. The MPO Technical Advisory Committee and Citizens Advisory Committee have reviewed the draft TIP and recommended its approval. This item is currently under review for approval. The TIP identifies projects that will require site preparation, grading, utility work, paving, and potentially construction of new facilities or upgrades. Contractors, suppliers, and service providers in areas like heavy construction, civil engineering, electrical, plumbing, and landscaping may find opportunities as these projects move forward. Engaging early before final bids and permits are issued could provide a competitive advantage.
- Board:
- Indian River County MPO Technical Advisory Committee (TAC) Meeting
- Date:
- 2026-05-29
- Type:
- Agenda_item
- Decision:
- Indian River County Metropolitan Planning Organization
- Address:
- Indian River County
G. Comprehensive Plan and Analysis Reviews - Consultant(s) services are appropriate to
The Indian River County MPO Technical Advisory Committee (TAC) is considering consultant services for a comprehensive plan review and analysis. This project involves examining proposed amendments and conducting analysis for future updates to the county's comprehensive plan. The scope of work is planned and currently under review. This early stage means there is an opportunity for businesses to engage before specific plans and contracts are finalized. Services could include data collection, policy analysis, and report writing. Local contractors, consultants, and service providers in areas like planning, engineering, and data analysis may find opportunities. Reaching out now allows businesses to understand the project's direction and potentially offer their expertise as the review process moves forward.
- Board:
- Indian River County MPO Technical Advisory Committee (TAC) Meeting
- Date:
- 2026-05-29
- Type:
- Agenda_item
I. PURPOSE:
The Indian River County MPO is seeking consultants to provide general transportation planning services. This work will involve assisting MPO staff in creating studies, policy documents, and plans. The selected consultant(s) will offer technical support, review other studies, and manage public involvement activities. Services will be assigned through approved Work Orders, with the MPO deciding which consultant performs specific tasks. The MPO plans to contract with General Planning Consultant(s) for an initial three-year period, with options to extend for two more years. This early stage offers an opportunity for professional services firms, including engineering, architecture, and business consulting, to engage with the MPO before specific scopes of work and contracts are finalized. Reaching out now allows businesses to understand the MPO's needs and potentially shape future service agreements.
- Board:
- Indian River County MPO Technical Advisory Committee (TAC) Meeting
- Date:
- 2026-05-29
- Type:
- Agenda_item
- Applicant:
- Indian River County MPO
II. SCOPE OF SERVICES
Indian River County MPO Technical Advisory Committee (TAC) Meeting listed this item on its agenda for 2026-05-29. The posted record gives the item title and nothing else, so there is no site, no size and no applicant on file for it yet. Local businesses that want to follow it can open the official agenda link above and watch for the fuller write-up the body posts as the meeting gets closer.
- Board:
- Indian River County MPO Technical Advisory Committee (TAC) Meeting
- Date:
- 2026-05-29
- Type:
- Agenda_item
MPO Technical Advisory Committee Agenda
[1800 27th Street, Vero Beach, FL] The Indian River County Metropolitan Planning Organization (MPO) Technical Advisory Committee (TAC) met on May 29, 2026, to consider the FY 2027 – FY 2031 Transportation Improvement Program (TIP). The TIP outlines state and federally funded transportation projects for Indian River County over a five-year period. It includes projects for roads, bikepaths/sidewalks, public transportation, bridges, and airports. The total funding for these improvements over the five years is $254 million, with $121 million in federal funds. The TAC reviewed the TIP and recommended its approval by the MPO. The MPO Board subsequently approved the TIP on June 10, 2026. Several specific roadway improvement projects are prioritized, including widening CR 512 to four lanes from Willow Street to I-95, multimodal safety improvements on 45th Street, widening CR 510, paving 82nd Avenue, intersection improvements at US 1 at Aviation Boulevard, and widening Aviation Boulevard. Sidewalk projects are also included on 43rd Avenue and 41st Street. The TIP also details funding for transit and transportation disadvantaged programs, aviation projects, and transportation planning/studies. Public involvement in the TIP development process included public meetings and review of agendas and staff reports. [From 26th Street to 69th Street; case 2308793] Project involves new road construction for a 5-mile segment of 82nd Avenue, from 26th Street to 69th Street. Right-of-way acquisition is scheduled from FY 2026 to FY 2029, with construction planned for future years. The total project cost is estimated at $13,199,790. [From 43rd Avenue to SR 5/US 1; case 4513681] Project to widen Aviation Boulevard from 2 lanes to 4 lanes over a 2.1-mile corridor, from 43rd Avenue to SR 5/US 1. Includes buffered bike lanes, sidewalks, a shared-use path, median, and drainage improvements. Project Development and Environmental (PD&E) study is funded in FY 2028-2029, and project design is funded in FY 2031. Total project cost is $4,364,628. [From W of 82nd Ave to 58th Ave; case 4056063] Project to widen CR 510 (85th Street) from 2 lanes to 4 lanes for 3.26 miles, between 82nd Avenue and 58th Avenue. Preliminary engineering is underway. Right-of-way acquisition is programmed for FY 2025 through FY 2028. Total project cost is $22,812,798. [From CR-512 to W of 82nd Ave; case 4056064] Project to widen CR 510 (85th Street) from 2 lanes to 4 lanes for 2.2 miles, between CR-512 and 87th Street. Right-of-way funds are programmed for FY 2028. Construction funds are in respective project segments. Total project cost is $13,963,733. [From 87th St to West of 82nd Ave; case 4056068] Project to widen CR 510 (85th Street) from 2 lanes to 4 lanes for 0.871 miles, between 87th Street and 82nd Avenue. Railroad and Utility funds are programmed for FY 2029. Construction funds are programmed for FY 2030 and FY 2031. Total project cost is $28,646,932. [From 58th Avenue to East of US 1; case 4416921] Project to widen CR 510 (85th Street) from 2 lanes to 4 lanes for 0.6 miles, between 58th Avenue and US 1. Preliminary engineering is underway. Right-of-way acquisition is programmed for FY 2031. Construction is programmed for future years. Total project cost is $9,201,119. [From Willow Street to SR-9/I-95; case 4573171] Project to widen CR 512 from 2 lanes to 4 lanes for 2.572 miles, between Willow Street and I-95. Construction is funded in FY 2031. Total project cost is $22,957,081. [From I-95 to Oslo Road; case 4130485] Landscaping project in conjunction with FM# 4130482 for the I-95/Oslo Road Interchange. Landscaping is funded in FY 2028 and FY 2030. Project length is 1.01 miles. Total project cost is $1,734,178. [From I-95 to Oslo Road; case 4130482] New interchange construction at I-95/Oslo Road (9th Street SW). Construction is currently underway. Additional Right-of-Way funds are programmed in FY 2028. Project length is 7.379 miles. Total project cost is $108,215,367. [US 1 (SR 5) and Aviation Blvd; case 4416931] Intersection improvements at US 1 (SR 5) and Aviation Blvd. PD&E study completed in 2024. Preliminary engineering programmed for FY 2025-2026. Right-of-way acquisition programmed for FY 2027, FY 2028, FY 2030, and FY 2031. Total project cost is $24,945,608. [From 5th Street SW to 1st Street SW; case 4497001] Resurfacing of 43rd Avenue from 5th Street SW to 1st Street SW, including bike and pedestrian improvements. Construction is programmed for FY 2030. Project length is 0.491 miles. Total project cost is $3,167,000. [From 1st Street SW to 6th Street; case 4442703] Resurfacing of 43rd Avenue from 1st Street SW to 6th Street, including bike and pedestrian improvements. Construction is programmed for FY 2028 and FY 2029. Project length is 0.756 miles. Total project cost is $4,373,593. [From 58th Avenue to 43rd Avenue; case 4533271] Multi-modal safety improvements on 45th Street (N Gifford Road) from 58th Avenue to 43rd Avenue, including bike lanes and sidewalks on both sides. Project design is programmed for 2027. Project length is 0.924 miles. Total project cost is $752,150. [From Indian River County to Partially in St Lucie County; case 4571781] Guardrail installation along 18.902 miles of I-95, extending partially into St. Lucie County. Preliminary engineering is programmed for FY 2027. Construction is programmed for FY 2028. Total project cost is $11,933,675. [case 4512932] Routine mowing on state and interstate highway systems in Indian River County. Funding for FY 2027-2028 totals $688,090. [case 4512933] Routine mowing on state and interstate highway systems in Indian River County. Funding for FY 2029-2031 totals $1,270,320. [case 2336662] Routine maintenance of state highway bridges in Indian River County. Funding for FY 2027-2028 totals $89,904. [case 4278044] Maintenance operations on state highways in Indian River County, including traffic signals. Funding for FY 2027 totals $495,152. [case 2336661] Routine maintenance operations on state highways in Indian River County. Funding for FY 2027-2029 totals $741,708. [case 2342422] Routine maintenance of interstate highway bridges in Indian River County, including in-house bridge inspections. Funding for FY 2027-2028 totals $56,190. [case 2342421] Maintenance operations on interstate highways in Indian River County. Funding for FY 2027-2029 totals $50,571. [From FEC RR to US 1; case 4544441] Traffic control devices/system project on SR 510 (85th Street/Wabasso Road) from FEC RR to US 1. Railroad & Utility work is programmed for FY 2027. Total project cost is $956,032. [From East of I-95 to West of 106th Avenue; case 4493321] Interchange modification at I-95/CR 512 (Fellsmere Road) from I-95 to west of 106th Avenue by extending the eastbound ramp terminal lane to eliminate the drop lane. Construction is programmed for FY 2027. Project length is 0.381 miles. Total project cost is $4,635,725. [From SR-60 to US-1 to Indian River Blvd and 11 Ave; case 4484431] Resurfacing of State Road 60 from 21st Avenue to Indian River Boulevard, and 11th Avenue from 20th Street to 21st Street. Railroad & Utility work is funded in FY 2028. Construction is programmed for FY 2029. Project length is 3.11 miles. Total project cost is $8,676,684. [From East of Fort Drum Wildlife entrance to CR-512; case 4484441] Resurfacing of State Road 60 from East of Fort Drum Wildlife entrance to CR-512. This project is on the SIS network. Construction is programmed for FY 2030 and FY 2031. Project length is 7.14 miles. [SR A1A over the Sebastian Inlet; case 4456181] Project involves the replacement of Bridge #880005 on SR A1A over the Sebastian Inlet. Construction of the new bridge is scheduled to begin in FY 2026, with contract incentives programmed for 2030 and additional Right of Way funds in FY 2031. This project is in conjunction with FM# 4456182. [SR A1A between the Sebastian Inlet Bridge to Sand Dollar Lane; case 4456182] Resurfacing of SR A1A from the Sebastian Inlet Bridge to Sand Dollar Lane. Construction is programmed for FY 2029, following the completion of the new Sebastian Inlet bridge. Design and construction are in conjunction with FM# 4456181. [SR A1A between the Indian River/St. Lucie County line to Jasmine Lane; case 4498181] Resurfacing of SR A1A between the Indian River/St. Lucie County line and Jasmine Lane. Construction is programmed for FY 2027. [SR-60/Beachland Blvd over ICWW; case 4566461] Repair and rehabilitation of the SR-60/Beachland Blvd Bridge over the Intracoastal Waterway (ICWW). Preliminary engineering is funded in FY 2028 and FY 2029, with construction funded from FY 2031. [State highway system roadways in Indian River County; case 4515841] Maintenance and operation of traffic signals on state highway system roadways within Indian River County. [US 1 (SR 5) between N of 87 St and S of Sebastian Blvd (CR 512); case 4498121] Resurfacing of US 1 (SR 5) between north of 87th Street and south of Sebastian Boulevard (CR 512). Construction is programmed for FY 2027. [case 4071906] Indian River County receives Florida Department of Transportation (FDOT) Block Grant and Federal Transit Administration (FTA) Section 5307 funds for operating assistance. Actual FTA funding levels are subject to change annually. [Fellsmere (GoLine route #10); case 4071824] Section 5311 formula funds for rural area transit operations, supporting the continued operation of GoLine route #10 in Fellsmere. [case 4071902] Indian River County receives Federal Transit Administration (FTA) Section 5307 funds for transit capital assistance. Actual FTA funding levels are subject to change annually. [case 4457281] Indian River County receives Federal Transit Administration (FTA) Section 5339 funds for transit capital assistance. [32nd Avenue to US 1; case 4570951] Construction of a sidewalk from 32nd Avenue to US 1. This project is part of the 2025 Transportation Alternative Cycle and is an MPO Priority #2 LAP with Indian River County. [45th Street to 49th Street; case 4529951] Sidewalk construction from 45th Street to 49th Street. Construction is programmed for FY 2027 and FY 2028. [Sebastian Municipal Airport; case 4571381] Aviation security project at Sebastian Municipal Airport. [Sebastian Municipal Airport; case 4571461] Aviation preservation project at Sebastian Municipal Airport. [Sebastian Municipal Airport (west side); case 4533791] Construction of an access road and utilities on the west side of Sebastian Municipal Airport. [Sebastian Municipal Airport; case 4550111] Construction of a taxiway at Sebastian Municipal Airport as part of an Aviation Capacity Project. [Sebastian Municipal Airport; case 4549981] Update of the Airport Master Plan for Sebastian Municipal Airport. [Vero Beach Regional Airport; case 4515381] Rehabilitation of the airport drainage system at Vero Beach Regional Airport. [Vero Beach Regional Airport (Taxiway A South of Runway 12R); case 4533831] Rehabilitation of Taxiway A South of Runway 12R at Vero Beach Regional Airport. This is a 2024 MPO Aviation Priority #16 project. [Vero Beach Regional Airport (Taxiway E West of Runway 4); case 4548971] Extension, marking, and lighting of Taxiway E West of Runway 4 at Vero Beach Regional Airport. [Vero Beach Regional Airport (Runway 4/22); case 4549011] Environmental phase for the extension of Runway 4/22 at Vero Beach Regional Airport. [case 4393276] Indian River FY2026/2027-2027/2028 Unified Planning Work Program (UPWP) for transportation planning. [case 4393277] Indian River FY2028/2029-2029/2030 Unified Planning Work Program (UPWP) for transportation planning. [case 4393278] Indian River FY2030/2031-2031/2032 Unified Planning Work Program (UPWP) for transportation planning. [1st Street SW at 27th Avenue] Construction of a left turn lane and traffic signal at the intersection of 1st Street SW and 27th Avenue. [4th Street & 29th Avenue] Replacement of a culvert at 4th Street and 29th Avenue. [8th Street from 66th Avenue to 74th Avenue] Road construction and realignment of 8th Street from 66th Avenue to 74th Avenue. [8th Street from 74th Avenue to 82nd Avenue] Road construction and realignment of 8th Street from 74th Avenue to 82nd Avenue. [13th Street SW at 43rd Avenue] Realignment of 13th Street SW at 43rd Avenue. [20th Avenue] Construction of a pedestrian bridge at 20th Avenue. [20th Avenue (East Side) from 8th Street to 12th Street] Construction of a sidewalk on the east side of 20th Avenue from 8th Street to 12th Street. [25th Street SW from 43rd Avenue to Koblegard Road] Paving of 25th Street SW from 43rd Avenue to Koblegard Road. [26th Street from 43rd Avenue to 58th Avenue] Two-lane realignment and construction with pedestrian features on 26th Street from 43rd Avenue to 58th Avenue (1 mile), including a 4-lane scale and design. [26th Street from 58th Avenue to 66th Avenue] Two-lane realignment and construction with pedestrian features on 26th Street from 58th Avenue to 66th Avenue (1 mile). [26th Street at County Building] Construction of a sidewalk crossing at 26th Street at the County Building. [27th Avenue at Oslo Road] Improvements at the intersection of 27th Avenue and Oslo Road, including a northbound right turn lane and a long left turn lane. [28th Court (East Side) from 47th Street to 49th Street] Construction of a sidewalk on the east side of 28th Court from 47th Street to 49th Street. This project is part of GNP Action 7.4. [32nd Avenue] Road corridor construction on 32nd Avenue. [33rd Street & 62nd Court] Replacement of a culvert at 33rd Street and 62nd Court. [37th Street and Indian River Boulevard] Intersection improvements at 37th Street and Indian River Boulevard. [US Highway 1 to 37th Street and to 41st Street via McCrystal Drive/11th Drive] Aviation extension from US Highway 1 to 37th Street and to 41st Street via McCrystal Drive/11th Drive. [41st Street (North Side) from 32nd Avenue to US Hwy 1] Construction of a sidewalk on the north side of 41st Street from 32nd Avenue to US Hwy 1. This project is part of GNP Action 7.4. [41st Street & US 1 (Old Dixie)] Intersection improvements at 41st Street and US 1, including Old Dixie. [41st Street at 58th Avenue] Construction of a northbound right turn lane at 41st Street and 58th Avenue. [41st Street Canal H] Replacement of the 41st Street Canal H Culvert. [43rd Avenue from 26th Street to 41st Street] Full depth reclamation of 43rd Avenue from 26th Street to 41st Street. [43rd Ave Bridge over South Relief Canal (5th St SW to 1st St SW)] Replacement of the 43rd Ave Bridge over the South Relief Canal, including pedestrian crossing, from 5th Street SW to 1st Street SW. [43rd Avenue from 5th Street SW to 1st Street SW] Pedestrian and bicycle access improvements on 43rd Avenue from 5th Street SW to 1st Street SW (FDOT 75% - County 25%). [43rd Avenue from 1st Street SW to 6th Street] Pedestrian and bicycle access improvements on 43rd Avenue from 1st Street SW to 6th Street (FDOT 75% - County 25%). [43rd Avenue from 6th Street to 12th Street] Pedestrian and bicycle access improvements on 43rd Avenue from 6th Street to 12th Street (FDOT 75% - County 25%). [43rd Avenue from 12th Street to 18th Street] Pedestrian and bicycle access improvements on 43rd Avenue from 12th Street to 18th Street (FDOT 75% - County 25%). [43rd Avenue (Both Sides) from 45th Street to 49th Street] Construction of sidewalks on both sides of 43rd Avenue from 45th Street to 49th Street. [45th Street at US 1] Construction of a left turn lane at the intersection of 45th Street and US 1. [45th Street & 58th Avenue] Signalization replacement at the intersection of 45th Street and 58th Avenue. [49th Street (North Side) from 43rd Avenue to Old Dixie Hwy] Construction of a sidewalk on the north side of 49th Street from 43rd Avenue to Old Dixie Highway. This project is part of GNP Action 7.4. [49th Street & US 1] Intersection improvements at 49th Street and US 1. [53rd Street from 58th Avenue to 66th Avenue] Widening of 53rd Street from 58th Avenue to 66th Avenue (600-foot 4-lane segment). [53rd Street from 58th Avenue to 66th Avenue] Widening of 53rd Street from 58th Avenue to 66th Avenue (800-foot 4-lane segment). [53rd Street west of 58th Avenue to 66th Avenue] Widening of 53rd Street west of 58th Avenue to 66th Avenue (1,000-foot 2-lane segment). [58th Avenue & 33rd Street] Left turn lanes at 58th Avenue and 33rd Street. [58th Avenue & 37th Street] Left turn lanes at 58th Avenue and 37th Street. [58th Ave & 21st SW] Replacement of a culvert at 58th Ave & 21st SW. [66th Avenue SW & 17th Street SW] Replacement of a culvert at 66th Avenue SW & 17th Street SW. [66th Avenue from 69th Street to 85th Street] Four-lane construction of 66th Avenue from 69th Street to 85th Street (2.0 miles), including side streets and side street bridges. [66th Avenue at CR512] Improvements at the intersection of 66th Avenue and CR512. [82nd Ave Bridge] Replacement of the 82nd Ave Bridge. [CR512 from Willow St to I-95] Four-lane widening of CR512 from Willow St to I-95. [CR512] Safety improvements on CR512. [Ercildoune Heights] Drainage improvements in Ercildoune Heights. [Highland Drive] Construction of approximately 4500 linear feet of sidewalk on Highland Drive. [Indian River Blvd from 17th St. Bridge to US Highway 1] Pedestrian, bicycle, and access improvements on Indian River Boulevard from 17th St. Bridge to US Highway 1 (FDOT 75% - County 25%). Miscellaneous Right of Way Acquisition. [64th Avenue to Wabasso Park] Sidewalk extension from 64th Avenue to Wabasso Park. Installation of traffic controllers. Replacement of traffic cameras. [Rain Tree Corners] Replacement of a culvert at Rain Tree Corners. [Roseland Road Bridge] Replacement of the Roseland Road Bridge. Construction of sidewalks and designated bicycle lanes. Replacement of various culverts. [104th Ave (Vero Lake Estates) from 79th to 87th] Petition millings for Vero Lake Estates on 104th Ave from 79th to 87th. This document outlines various transportation projects and funding allocations for Indian River County, Florida, for the fiscal years 2027-2031. It details projects related to airport improvements, road widenings and resurfacing, sidewalk construction, and bridge replacements. Specific projects include CR 510 widening, SR A1A resurfacing and bridge replacement, US 1 resurfacing, and improvements at Sebastian Municipal Airport and Vero Beach Regional Airport. The document also covers funding sources such as the National Freight Program, National Highways Bridges, and various state and federal transportation alternatives programs. Additionally, it addresses the roles and responsibilities of the Florida Department of Transportation (FDOT) and Metropolitan Planning Organizations (MPOs) in transportation performance management, including data collection, target setting, and reporting. The 2026 List of Priority Projects for Indian River County includes several highway, regional highway, congestion management, transit, and bicycle/pedestrian projects. Priority Highway Projects include multimodal safety improvements on 45th Street, widening of CR 510 and CR 512, construction of new roadways on 82nd Avenue, intersection improvements at US 1 and Aviation Boulevard, and widening of Aviation Boulevard and US 1. Priority Regional Highways include widening of CR 512 and 26th Street. Congestion Management Process projects involve updating traffic signal equipment countywide. Transit priorities include a vehicle maintenance building addition, construction of a North County Hub, initiation of Sunday operating hours, and construction of shelters and benches. Bicycle & Pedestrian Projects include filling sidewalk gaps on 43rd Avenue and 41st Street, constructing a shared use path along the Trans-Florida Central Railroad Trail, widening sidewalks on 49th Street and 28th Court, and constructing paths/sidewalks on various other streets. The Indian River County MPO is seeking General Planning Consultants (GPCs) to provide transportation planning services. Services may include short and long-range transportation planning, corridor analyses, non-motorized transportation planning, transit planning, travel demand forecasting model calibration, traffic engineering studies, public participation activities, comprehensive plan reviews, and congestion management process updates. The contracts will be for three years with an option for two additional years. The MPO currently has four GPCs whose contracts expire on December 14, 2026.
- Board:
- Indian River County MPO Technical Advisory Committee (TAC) Meeting
- Date:
- 2026-05-29
- Type:
- Agenda_packet
- Decision:
- Recommended for approval by TAC on May 29, 2026; Approved by MPO Board on June 10, 2026
- Address:
- 1800 27th Street, Vero Beach, FL
- Applicant:
- Indian River County Metropolitan Planning Organization (MPO)
MPO Technical Advisory Committee Meeting Minutes 03-27-2026 - Approved
The Metropolitan Planning Organization Technical Advisory Committee (TAC) met on March 27, 2026. The committee approved the FY 2026/27–FY 2027/28 Unified Planning Work Program (UPWP) and the 2026 Title VI Program Update. An informational item was presented on a Summary Sheet of Roadway Improvement Projects, with public comment suggesting the addition of a legend and update date. A presentation on Transportation Technology and Data was also given, covering Florida Traffic Counts, the Interactive Transportation Improvement Program (TIP), Indian River County Capital Improvement Plan (CIP), Indian River County GIS Map Gallery, and the Florida Local Technical Assistance Program (LTAP) Center. There were no public comments or other business.
- Board:
- Indian River County MPO Technical Advisory Committee (TAC) Meeting
- Date:
- 2026-05-29
- Type:
- Minutes
- Decision:
- Approved (FY 2026/27–FY 2027/28 Unified Planning Work Program and 2026 Title VI Program Update)
- Address:
- 1800 27th Street, Vero Beach, Florida
S. Wimbrow Dr. .50 Sidewalk on one side Sebastian - 17
The Indian River County MPO Technical Advisory Committee (TAC) is reviewing a proposed Scope of Services for General Planning Consultants (GPCs). This scope outlines transportation planning tasks that GPCs may perform, including public involvement, long and short-range transportation planning, transit planning, non-motorized transportation planning, and special project planning. The MPO plans to solicit new GPCs this summer, with contracts expected to last three years, potentially extendable for two more. This process is currently under review, with staff recommending approval of the Scope of Services to begin the selection process. The work will involve various planning activities, and the MPO will issue work orders to selected GPCs. Local businesses in engineering, architecture, and professional consulting services could find opportunities by engaging with the MPO early in this selection process, before specific work orders and procurement details are finalized. This early engagement allows firms to understand the MPO's needs and potentially compete for future planning tasks.
- Board:
- Indian River County MPO Technical Advisory Committee (TAC) Meeting
- Date:
- 2026-05-29
- Type:
- Agenda_item
- Address:
- S. Wimbrow Dr.
a) FDOT will collect and maintain data, perform calculations of performance metrics and
This item concerns the Indian River County MPO Technical Advisory Committee's review of data collection and performance metric calculations for transportation planning. The Florida Department of Transportation (FDOT) will gather and manage data, perform calculations for statewide and MPO-specific performance metrics, and share these results with the MPO. This process will use specific national datasets for travel time calculations on the Interstate System and National Highway System. The item is currently under review by the committee. This review process will involve data analysis and reporting, which may lead to future needs for specialized data management and analysis services. Businesses with expertise in transportation data, performance metrics, and regulatory compliance could find opportunities to support these ongoing planning efforts.
- Board:
- Indian River County MPO Technical Advisory Committee (TAC) Meeting
- Date:
- 2026-05-29
- Type:
- Agenda_item
See the actual businesses behind these numbers
Get the real filings, with addresses and officers, backed by a 14-day money-back guarantee.
Create your account