Skip to main content

Be First, Build Lasting Relationships

Browse Lee County civic records

Every published record for Lee County, newest first. Filter by board, year, or industry to jump straight to the records you want, and page through to reach the full archive.

1,404 records

30. Approve a Purchase of Sewage By-Pass Pumps

Lee County is planning to purchase four sewage by-pass pumps from Thompson Pump for $199,994.00. This purchase is part of the FY26 Utilities Capital Improvement Program and was approved by the Board of County Commissioners. The pumps are needed to ensure sewage flow continues during maintenance, system failures, power outages, or emergencies. This project is currently in the planning and procurement phase, with Thompson Pump identified as the lowest bidder. The work will involve the installation and integration of these specialized pumps into the existing sewage system, which may include site preparation and utility connections. Local contractors, suppliers, and service providers in the utilities and construction sectors can explore opportunities by engaging with Lee County early in the process, before final bids and permits are issued, to understand the project's specific needs and potential involvement.

Board:
Lee Board of County Commissioners
Date:
2026-05-05
Type:
Agenda_item
Decision:
Lee Board of County Commissioners

30. Award Annual Contract for Hendry County Cover Soil

The Lee Board of County Commissioners is planning to award an annual contract for cover soil services. This contract is for Universal Trax of South Florida, LLC to provide cover soil, transportation, and delivery for the Lee/Hendry County Regional Solid Waste Disposal Facility. The facility needs this service due to increased waste tonnages over the past five years, which has increased the demand for soil to cover the waste as required by the landfill operations permit. This contract will allow the department to supplement existing on-site soil sources as needed to support ongoing operations and maintain regulatory compliance. The initial term of the contract is for three years with options to renew. This is an opportunity for contractors and suppliers involved in soil sourcing, transportation, and delivery. Reaching out early could provide an advantage as this contract is planned for award.

Board:
Lee Board of County Commissioners
Date:
2026-05-05
Type:
Agenda_item
Address:
Lee/Hendry County Regional Solid Waste Disposal Facility

30. Award Annual Contract for Hendry County Cover Soil

The Lee Board of County Commissioners is planning to award an annual contract for cover soil services to Universal Trax of South Florida, LLC. This contract is for the Lee/Hendry County Regional Solid Waste Disposal Facility. The services include providing cover soil, transportation, and delivery. The estimated annual spending is up to $612,950, with a maximum contract value of $3,060,000 over an initial three-year term, plus potential renewals. This contract is currently under review and is planned for award. The work will involve the ongoing supply and delivery of cover soil, which is a critical need due to increased waste tonnages and reduced on-site soil availability for landfill operations and closures. This opportunity could benefit contractors specializing in material supply, transportation, and heavy equipment operation. Early engagement with the county or the selected contractor may provide insight into specific needs and timelines before the contract is finalized.

Board:
Lee Board of County Commissioners
Date:
2026-05-05
Type:
Agenda_item
Address:
Lee/Hendry County Regional Solid Waste Disposal Facility

31. Approve Sole Source Purchase for In-Situ Water Level and Water Quality Instruments

This item concerns the approval of a sole source purchase for water level and water quality instruments. The Lee Board of County Commissioners is considering a sole source agreement with In-Situ, Inc. This agreement would cover equipment, parts, service, and repair for the county's water and wastewater treatment facilities. In-Situ is identified as the only authorized Florida distributor for specific submersible data logging instruments used to measure water levels and store data in production wells and water monitoring stations. The total expenditures for the previous twelve months were $109,225.69. This sole source method is intended to maintain continuity with existing county products and services, leveraging prior investments to avoid service disruptions. The item has been approved by the Board. This approval allows for ongoing needs related to the maintenance and servicing of water monitoring equipment. Businesses that supply or service similar instruments, or provide related maintenance, may find opportunities to engage with the county as this sole source agreement progresses.

Board:
Lee Board of County Commissioners
Date:
2026-05-05
Type:
Agenda_item
Applicant:
In-Situ, Inc.

31. Approve Supplemental Task Authorization for CEI for Burnt Store Rd Safety

The Lee Board of County Commissioners is considering a Supplemental Task Authorization (STA) for construction engineering and inspection (CEI) services related to the Burnt Store Road Safety Improvement Project. This item is currently under review and is planned to begin in June. The CEI services will involve consulting for contract administration, site inspection, construction observation, material testing, and post-construction tasks. This project represents an early-stage opportunity for local contractors, suppliers, and service providers. Engaging now, before final bids and permits are set, could provide a competitive advantage for businesses specializing in civil engineering, site preparation, construction inspection, and material testing.

Board:
Lee Board of County Commissioners
Date:
2026-05-05
Type:
Agenda_item
Decision:
Lee Board of County Commissioners
Address:
Burnt Store Rd

31. Approve Supplemental Task Authorization for CEI for Burnt Store Rd Safety

The Lee Board of County Commissioners is considering approving a Supplemental Task Authorization (STA) for AIM Engineering & Surveying, Inc. This authorization is for construction engineering and inspection (CEI) services related to the Burnt Store Road Safety Improvement Project. The project is planned to begin in June, with funding already available in the current budget. CEI services will involve consulting for contract administration, site inspection, construction observation, material testing, and post-construction tasks. This project is currently under review and represents an early opportunity for local contractors and suppliers. The work will likely involve site preparation, utility coordination, road improvements, and final inspections, offering potential business for general contractors, site prep and grading services, concrete and paving companies, and material suppliers. Engaging early before final bids and permits are issued could provide a competitive advantage.

Board:
Lee Board of County Commissioners
Date:
2026-05-05
Type:
Agenda_item
Decision:
Lee Board of County Commissioners
Address:
Burnt Store Road

32. Approve Contract Change Order for CEI Services of Lee & Joan Intersection

The Lee Board of County Commissioners is considering a contract change order for construction engineering and inspection services related to the Lee Blvd and Joan Ave North Intersection Improvement project. This item is currently under review. The project involves engineering and inspection work for intersection improvements. This could lead to future needs for site clearing, grading, utility work, paving, and final landscaping as the project progresses. Local contractors, trades, suppliers, and service providers are encouraged to monitor this item as it moves through the review process. Early engagement before final bids and permits are issued could provide a competitive advantage for potential work.

Board:
Lee Board of County Commissioners
Date:
2026-05-05
Type:
Agenda_item
Decision:
Lee Board of County Commissioners
Address:
Lee Blvd and Joan Ave North

32. Approve Contract Change Order for CEI Services of Lee & Joan Intersection

This item concerns a contract change order for construction engineering and inspection services related to the Lee Boulevard and Joan Avenue North Intersection Improvement project. The Lee Board of County Commissioners is considering approving an additional $20,218 for Hardesty & Hanover, LLC, bringing the total contract to $362,799.93. This project is currently under review for approval. The work involves construction engineering and inspection for intersection improvements. This early stage presents an opportunity for contractors, suppliers, and service providers to engage with the project stakeholders. Early involvement can provide insight into future needs and potential subcontracting opportunities as the project progresses through its phases.

Board:
Lee Board of County Commissioners
Date:
2026-05-05
Type:
Agenda_item
Decision:
Lee Board of County Commissioners
Address:
Lee Blvd and Joan Ave North

32. Award Contract for Installation of 12-Inch Water Valve

The Lee Board of County Commissioners has approved a project to replace a broken 12-inch water main valve. This valve is located south of Tide March Drive on Winkler Road. The approved contract amount is $148,883.00, awarded to Boyd Irrigation Inc. as the lowest bidder. This project is part of the FY26 Utilities Major Maintenance budget. The work will involve replacing the existing valve to allow for proper shutdown and isolation of the water line during maintenance or emergencies. This project is now approved and funded, moving into the implementation phase. Contractors specializing in utility work, specifically water main installation and valve replacement, are encouraged to connect with the county for potential involvement as the project moves forward. Early engagement before final scheduling and procurement details are set can provide a competitive advantage.

Board:
Lee Board of County Commissioners
Date:
2026-05-05
Type:
Agenda_item
Decision:
Lee Board of County Commissioners
Address:
south of Tide March Drive on Winkler Road

33. Approve County Project Authorization for Pine Island Resurfacing

Lee County is planning to resurface local roads in the Alden Pines area of Pine Island, west of Stringfellow Road. The project includes milling, leveling, and resurfacing on Tamarac Drive, Grande Pine Road, Clubhouse Drive, Raintree Drive, Sandarac Drive, and Bokeelia Road, covering a total of 4.5 lane miles. This project is currently under review for approval. The work will involve site preparation, paving, and potentially utility adjustments. Local contractors, trades, suppliers, and service providers are encouraged to reach out early to learn more about this upcoming road improvement project, as opportunities for bidding and work may arise before final plans and permits are settled.

Board:
Lee Board of County Commissioners
Date:
2026-05-05
Type:
Agenda_item
Address:
Pine Island

33. Approve County Project Authorization for Pine Island Resurfacing

The Lee Board of County Commissioners is planning to authorize a county project for road resurfacing in the Alden Pines area of Pine Island, west of Stringfellow Road. This project involves milling, leveling, and resurfacing approximately 4.5 lane miles of local roads, including Tamarac Drive, Grande Pine Road, Clubhouse Drive, Raintree Drive, Sandarac Drive, and Bokeelia Road. The project is currently under review and has been authorized with a contract awarded to OHLA USA, Inc. The work will likely involve site preparation, milling, paving, and potentially utility adjustments. Local contractors, trades, suppliers, and service providers should consider reaching out to OHLA USA, Inc. or relevant county departments to learn more about potential subcontracting or supply opportunities as the project moves forward, as early engagement can be advantageous before final bid packages and permits are settled.

Board:
Lee Board of County Commissioners
Date:
2026-05-05
Type:
Agenda_item
Decision:
Lee Board of County Commissioners
Address:
Pine Island

33. Execute Community Development Block Grant-Disaster Recovery (CDBG-DR) Loan Documents for

The Lee Board of County Commissioners has approved the execution of loan documents for Renaissance Preserve Senior and Family Apartments. This project will provide up to $8,447,718 in Community Development Block Grant-Disaster Recovery funding. The funds are designated for the rehabilitation of 272 affordable rental housing units located at 4224 Renaissance Preserve Way in Fort Myers. The project is planned to maintain affordability for twenty years. This approval means work is moving forward, likely involving site preparation, utility upgrades, rehabilitation of existing structures, and final landscaping. Contractors, suppliers, and service providers in construction, real estate, and related fields should consider reaching out to understand the project's needs as plans develop.

Board:
Lee Board of County Commissioners
Date:
2026-05-05
Type:
Agenda_item
Address:
4224 Renaissance Preserve Way, Fort Myers, Florida 33916

34. Accept Florida Department of Environmental Protection Grant Funding

The Lee Board of County Commissioners is planning to accept a $1,250,000 grant from the Florida Department of Environmental Protection. This funding is for the Fort Myers Beach Water Reclamation Facility (FMB WRF) Restoration & Capacity Enhancement Project. The grant will help pay for part of the construction and completion of two new anaerobic basins for the facility's Biological Nutrient Removal system. This grant covers a portion of the total project construction. The project is currently planned and has been approved as part of the FY26 Utilities Capital Improvement Program. Work funded by this grant will likely involve site preparation, underground utility work, and the construction of new basins, followed by mechanical and finish trades for the water reclamation facility. Contractors, suppliers, and service providers in site prep, grading, concrete, plumbing, HVAC, electrical, and general construction could find opportunities by reaching out early before final plans and bids are set.

Board:
Lee Board of County Commissioners
Date:
2026-05-05
Type:
Agenda_item
Decision:
Lee Board of County Commissioners
Address:
Fort Myers Beach Water Reclamation Facility

34. Accept Florida Department of Environmental Protection Grant Funding

The Lee Board of County Commissioners is planning to accept a $1,250,000 grant from the Florida Department of Environmental Protection. This funding is for the Fort Myers Beach Water Reclamation Facility (FMB WRF) Restoration & Capacity Enhancement Project. The grant will help pay for part of the construction and completion of two new anaerobic basins for the facility's Biological Nutrient Removal system. This project is part of the FY26 Utilities Capital Improvement Program and has been approved by the Board. The work funded by this grant will involve construction activities related to the new basins. Contractors, suppliers, and service providers in areas such as site preparation, concrete, plumbing, HVAC, and electrical work could find opportunities. Reaching out to the county early, before detailed plans and bids are finalized, may offer an advantage.

Board:
Lee Board of County Commissioners
Date:
2026-05-05
Type:
Agenda_item
Decision:
Lee Board of County Commissioners
Address:
Fort Myers Beach Water Reclamation Facility

34. Execute Community Development Block Grant-Disaster Recovery (CDBG-DR) Loan Documents for

Lee County is planning for the rehabilitation of 86 affordable rental housing units at East Pointe Place, located at 3501-3515 Dale Street in Fort Myers. This project, East Pointe Place Phase 1, is set to receive up to $7,123,238 in Community Development Block Grant-Disaster Recovery (CDBG-DR) funding. The development will maintain its affordability for at least twenty years. The project has been approved by the Lee Board of County Commissioners. This approval will set in motion site work, including potential clearing and grading, followed by utility and infrastructure upgrades. The rehabilitation will then involve structural repairs, mechanical systems, interior finishes, and exterior improvements. Contractors, suppliers, and service providers in construction, trades, and material supply can find opportunities by engaging early before final plans and bids are established.

Board:
Lee Board of County Commissioners
Date:
2026-05-05
Type:
Agenda_item
Address:
3501-3515 Dale Street, Fort Myers, Florida 33916

35. Approve Single Source Purchase of CO2 Systems Equipment, Parts, and Services

The Lee Board of County Commissioners is considering a single-source purchase for CO2 systems equipment, parts, and services. This planned purchase aims to secure TOMCO2 Systems Company as the sole provider for installation, maintenance, and repairs of CO2 refrigeration systems. These systems are crucial for regulating water pH to ensure water quality and meet regulatory standards. The proposed expenditure is $75,000, funded through the Enterprise Fund and included in the current budget. This item is currently under review. The scope of work involves ongoing services such as installation, equipment provision, parts supply, cleaning, repairs, preventative maintenance, and inspections. Businesses that supply specialized equipment, parts, or maintenance services for CO2 refrigeration systems may find opportunities. Engaging early could provide an advantage before final procurement decisions are made.

Board:
Lee Board of County Commissioners
Date:
2026-05-05
Type:
Agenda_item

35. Approve Single Source Purchase of CO2 Systems Equipment, Parts, and Services

Lee County is planning to approve a single-source purchase for CO2 systems equipment, parts, and services. This purchase will secure TOMCO2 Systems Company as the sole provider for installation, equipment, parts, cleaning, repairs, preventative maintenance, and inspections for CO2 refrigeration systems. These systems are used to regulate water pH for quality and compliance. The county is looking to spend up to $75,000 this year, with $41,890.09 spent in the previous year. This item is currently under review by the Lee Board of County Commissioners. The work will involve ongoing maintenance, repair, and supply of specialized equipment for existing water quality systems. This early stage presents an opportunity for specialized contractors and suppliers in HVAC, plumbing, and equipment maintenance to engage with the county regarding their services and product offerings. Early engagement can help businesses align their capabilities with the county's needs before specific contracts are finalized.

Board:
Lee Board of County Commissioners
Date:
2026-05-05
Type:
Agenda_item

35. Execute Community Development Block Grant-Disaster Recovery (CDBG-DR) Loan Documents for

The Lee Board of County Commissioners has approved funding for the Landings at East Point project. This project will provide up to $6,117,180 in Community Development Block Grant-Disaster Recovery (CDBG-DR) funding to rehabilitate 126 affordable rental housing units. The property is located at 3701 Nelson Tills Boulevard in Fort Myers. The rehabilitation work will ensure continued affordability for these units for twenty years. This project will involve site preparation, rehabilitation of existing structures, and potentially new construction elements. Contractors, suppliers, and service providers interested in this work should reach out to understand the project details as plans develop. Early engagement can provide an advantage before bids and permits are finalized.

Board:
Lee Board of County Commissioners
Date:
2026-05-05
Type:
Agenda_item
Address:
3701 Nelson Tills Boulevard, Fort Myers, Florida 33916

36. Approve Annual Piggyback Contract for Technology Products and Services with

The Lee Board of County Commissioners is considering approving an annual contract for technology products and services. This contract would be with DGR Systems, LLC, for the as-needed purchase of network infrastructure equipment. The purchase includes specific items like a FortiGate firewall, FortiSwitch core and rugged switches, SFP transceivers, power supplies, associated licenses, and a three-year FortiCare Premium support plan. This item is currently under review by the Board. If approved, the project would involve the procurement and installation of network equipment. This could include site preparation for new equipment, potential integration with existing systems, and ongoing support services. Local contractors, suppliers, and service providers in technology and related fields may find opportunities. Reaching out to the county early, before final contract details and procurement are settled, could provide an advantage in securing future work related to this technology upgrade.

Board:
Lee Board of County Commissioners
Date:
2026-05-05
Type:
Agenda_item
Decision:
Lee Board of County Commissioners

36. Approve Annual Piggyback Contract for Technology Products and Services with

The Lee Board of County Commissioners is considering approving an annual piggyback contract for technology products and services. This contract would be with DGR Systems, LLC, for the as-needed purchase of network infrastructure equipment. It also includes a one-time purchase of specific Fortinet equipment, such as a firewall and switches, along with licenses and three-year support. This item is currently under review by the Board. If approved, the contract would allow for the purchase of technology hardware and related support services. This could involve site preparation for new equipment, installation, and ongoing maintenance. Local contractors, suppliers, and service providers in the technology sector may find opportunities by engaging early. Understanding the county's needs before final bids and permits are set can provide a competitive advantage.

Board:
Lee Board of County Commissioners
Date:
2026-05-05
Type:
Agenda_item
Decision:
Lee Board of County Commissioners

See the actual businesses behind these numbers

Get the real filings, with addresses and officers, backed by a 14-day money-back guarantee.

Create your account