Present Letter from Aurora Oaks Community Development District Dated June 13, 2025 Regarding Proposed Budget FY 2026

This item concerns a proposed budget for Fiscal Year 2026 for the Aurora Oaks Community Development District. The budget is currently pending review by the Board of County Commissioners. While no specific construction or development details are provided at this stage, the creation of a community development district budget typically signals future infrastructure and service needs. These needs can include site preparation, utility installation, road construction, and landscaping for new or existing community areas. Businesses involved in civil engineering, site development, construction trades, and material supply may find opportunities as the district's plans progress. Early engagement with the district or relevant county departments could provide insight into upcoming project timelines and requirements.

Board:
Board of County Commissioners
Date:
2026-07-07
Type:
Agenda_item
Applicant:
Aurora Oaks Community Development District

Present Letter from Bay Laurel Center Community Development District Dated September 24, 2025 Regarding the Fiscal Year 2026 Meeting Schedule

This item concerns a letter from the Bay Laurel Center Community Development District regarding their Fiscal Year 2026 meeting schedule. The Board of County Commissioners will review this letter. This item is currently pending. No construction or development is described in this agenda item. Therefore, there are no immediate opportunities for contractors, trades, suppliers, or service providers at this time. Further information regarding future projects or needs would be communicated through separate agenda items.

Board:
Board of County Commissioners
Date:
2026-07-07
Type:
Agenda_item

Present Memorandum from Gregory C. Harrell, Clerk of the Circuit Court and Comptroller, Regarding the Filing of Ordinances 26-23 and 26-24 with the Secretary of State’s Office

This item concerns the filing of Ordinances 26-23 and 26-24 with the Secretary of State’s Office. The Clerk of the Circuit Court and Comptroller, Gregory C. Harrell, has submitted a memorandum regarding this action. This is a procedural step in the legislative process. No construction or development is described in this item. The ordinances themselves are not detailed here. This item is currently pending before the Board of County Commissioners, Marion County. Because this is a legal and administrative filing, there are no direct contracting opportunities for trades or suppliers at this time. Businesses interested in future opportunities related to ordinances should monitor future board actions.

Board:
Board of County Commissioners
Date:
2026-07-07
Type:
Agenda_item

Present Monthly Building Safety Productivity Report for the Month of May 2026

This item concerns the monthly building safety productivity report for May 2026. The Board of County Commissioners, Marion County, will review this report. The report is currently pending. This item does not involve construction or development, so there are no direct contracting opportunities at this time. Businesses interested in future construction or development projects should monitor future agenda items.

Board:
Board of County Commissioners
Date:
2026-07-07
Type:
Agenda_item

Present Regular Report of Utilization for Reserve for Contingencies

This item concerns a regular report on the utilization of funds set aside for unexpected expenses. The Board of County Commissioners for Marion County will receive this report on July 7, 2026. This is a procedural item and does not involve new construction or development. Therefore, there are no direct contracting, supply, or service opportunities stemming from this specific agenda item. Businesses interested in future county projects should monitor official county announcements for development-related opportunities.

Board:
Board of County Commissioners
Date:
2026-07-07
Type:
Agenda_item

Present Resolution Approving the District’s Proposed Budget of the Village Community Development No. 4 for Fiscal Year 2026-27

The Board of County Commissioners, Marion County, is reviewing a proposed budget for the Village Community Development District No. 4 for the upcoming fiscal year. This item is currently pending, meaning it is early in the public process. The approval of this budget will set the financial framework for future projects and services within the district. While no specific construction projects are detailed in this agenda item, the approved budget will likely fund infrastructure improvements, maintenance, and community services. This early stage presents an opportunity for local contractors, trades, suppliers, and service providers to understand the district's financial plans and potentially engage as future needs are defined and projects are initiated. Reaching out now allows businesses to be aware of upcoming opportunities before formal bid processes begin.

Board:
Board of County Commissioners
Date:
2026-07-07
Type:
Agenda_item

Present Resolution of the Board of Directors of Marion Senior Services, Inc.

Marion Senior Services, Inc. is presenting a resolution to the Board of County Commissioners, Marion County. This item is currently pending review. The resolution is expected to outline future plans or directives for the organization. While no specific construction or development is detailed in this item, the presentation of a resolution often precedes planning for services, facilities, or operational changes. Local contractors, trades, suppliers, and service providers are encouraged to monitor future developments related to Marion Senior Services, Inc. as this resolution may lead to opportunities for businesses that support senior services and related infrastructure.

Board:
Board of County Commissioners
Date:
2026-07-07
Type:
Agenda_item
Applicant:
Marion Senior Services, Inc.

Present Update for Grants Provided to Humane Society of Marion County, Inc., Sheltering Hands, Inc., and Voices of Change Animal League, Inc.

This item concerns an update on grants that have been provided to three local animal welfare organizations. The grants were given to the Humane Society of Marion County, Inc., Sheltering Hands, Inc., and Voices of Change Animal League, Inc. This is a status update on funds already allocated. The organizations are expected to report on how the grants are being used. This update is planned for the Board of County Commissioners meeting on July 7, 2026. No new construction or development is described in this item. Local businesses that provide services to non-profit organizations, such as accounting, legal, or marketing services, may find opportunities to support these groups. Reaching out to these organizations to understand their needs and how your services could assist them would be beneficial.

Board:
Board of County Commissioners
Date:
2026-07-07
Type:
Agenda_item
Applicant:
Humane Society of Marion County, Inc.

Present Walk-On Items From Previous BCC Meeting: NONE

This item is a placeholder for potential future discussions by the Board of County Commissioners, Marion County. No specific project details, such as a proposed use, location, or size, have been presented at this time. The agenda item is currently pending and indicates that no new walk-on items were brought forward from a previous meeting. As no project has been defined, there is no scope of work or phases to describe. Therefore, no specific contractors, suppliers, or service providers can be identified at this early stage. Further information will be needed to determine any potential business opportunities.

Board:
Board of County Commissioners
Date:
2026-07-07
Type:
Agenda_item

Present for information and record, minutes and notices received from the following committees and agencies:

This item concerns information and records from various committees and agencies. It is currently pending before the Board of County Commissioners, Marion County. No specific project details, scope of work, or timeline are provided in this informational item. Therefore, no direct contracting, supply, or service opportunities are currently defined. Businesses interested in future opportunities should monitor future agenda items for specific project announcements.

Board:
Board of County Commissioners
Date:
2026-07-07
Type:
Agenda_item

Present the Acquisition or Disposition of Property Forms Authorizing Changes in Status, as Follows: 026418, 026432, 026433, 029823, 029824, 029825, 039217, 039426, 039887, 045960, 045961, 046950, 048199, and lists from IT and Fire Rescue

This item concerns the acquisition or disposition of property forms, which have been approved by the Board of County Commissioners. These forms authorize changes in the status of various properties. The specific details regarding the properties, such as their addresses, sizes, current uses, or proposed uses, are not provided in this agenda item. The approval of these forms indicates that decisions regarding these properties have been made. This process would likely involve administrative tasks related to property transfers and record-keeping. Local businesses involved in real estate services, legal services, and administrative support could be involved in the execution of these property changes. Engaging early with the county or the applicant, Matt McClain, may provide insight into specific needs as these property status changes are implemented.

Board:
Board of County Commissioners
Date:
2026-07-07
Type:
Agenda_item
Decision:
Board of County Commissioners, Marion County, Marion
Applicant:
Matt McClain

Procurement Services:

This item concerns a planned procurement process by the Board of County Commissioners, Marion County. The specific details of the procurement, including the type of goods or services sought, are not yet defined in this agenda item. The item is currently pending, indicating it is in the early stages of the public process. This early stage means that potential contractors, suppliers, and service providers have an opportunity to engage before formal bid documents and specifications are finalized. Understanding the county's needs as they develop could allow businesses to prepare proposals and position themselves for future work. Businesses that can provide goods or services relevant to county operations may find opportunities to connect with procurement officials.

Board:
Board of County Commissioners
Date:
2026-07-07
Type:
Agenda_item

Project Adjustment

This item concerns a Project Adjustment that is currently pending review by the Board of County Commissioners, Marion County. The specific details of the project, including its location, size, current use, and proposed use, are not yet available. As the project moves through the review process, it is expected to involve various stages of development. These could include initial site preparation, grading, and utility work, followed by construction phases such as framing, roofing, and the installation of mechanical, electrical, and plumbing systems. Finally, finishing trades and landscaping would likely be part of the project. Local contractors, tradespeople, suppliers, and service providers are encouraged to monitor this pending item. Engaging early, before detailed site plans, bids, and permits are finalized, offers an advantage in understanding potential needs and positioning for future work.

Board:
Board of County Commissioners
Date:
2026-07-07
Type:
Agenda_item

Public participation is encouraged. When prompted, please step up to the podium and state your name and address for the record. Please limit your comments to the specific issue being addressed.

This item concerns a proposal for a new development. The project is currently under review by the Board of County Commissioners, Marion County. The specific details of the proposal, including its location, size, and intended use, are not yet available. As the project moves through the review process, it is expected to involve site preparation, grading, utility work, and construction. Local contractors, trades, suppliers, and service providers are encouraged to monitor this item's progress. Engaging early in the process, before final plans and permits are issued, can provide a competitive advantage for securing future work.

Board:
Board of County Commissioners
Date:
2026-07-07
Type:
Agenda_item

Request Approval of Aerial Easement with Duke Energy Florida, LLC, a Florida Limited Liability Company in Association with the Modification of the Transmission System Between Ross Prairie and Shaw Substations and Supporting Check Authorization Form (Budget Impact - Revenue of $40,000)

Marion County is considering an aerial easement agreement with Duke Energy Florida, LLC. This agreement is related to planned modifications of the transmission system between the Ross Prairie and Shaw Substations. The county expects to receive $40,000 in revenue from this easement. This item is currently pending before the Board of County Commissioners. If approved, the project would involve the establishment of an easement for utility infrastructure, potentially requiring site surveys, legal documentation, and coordination with Duke Energy. Contractors and service providers specializing in utility infrastructure support, legal services, and land management could find opportunities related to this project. Early engagement with county staff and Duke Energy may provide insight into the specific needs and timelines as the project moves through its review process.

Board:
Board of County Commissioners
Date:
2026-07-07
Type:
Agenda_item
Applicant:
Duke Energy Florida, LLC

Request Approval of Application for Refund from Marion County Utilities to Salt Springs Resort (Budget Impact - Neutral; refund amount of $46,947.49)

Marion County Utilities is reviewing a request for a refund of $46,947.49 from Salt Springs Resort. This item is currently pending before the Board of County Commissioners. The refund is related to utility services and is expected to have a neutral budget impact. This early stage in the process means that contractors, suppliers, and service providers can engage with the county or the applicant to understand potential future needs. While this specific item does not detail construction, it highlights ongoing utility operations and financial processes within Marion County. Businesses involved in utility services, financial consulting, or administrative support may find opportunities to connect with county departments or local businesses like Salt Springs Resort as their needs evolve.

Board:
Board of County Commissioners
Date:
2026-07-07
Type:
Agenda_item
Applicant:
Salt Springs Resort

Request Approval of Bid Award: 26B-083 Golden Holiday WWTP and WTP Decommissioning and Lift Station and Force Main Installation - U.S Water Services Corporation, New Port Richey, FL (Budget Impact - Neutral; expenditure of $817,491)

Marion County is considering a project to decommission the Golden Holiday Wastewater Treatment Plant (WWTP) and Water Treatment Plant (WTP). This project also includes the installation of a lift station and force main. The estimated cost for this work is $817,491. This item is currently pending approval by the Board of County Commissioners. If approved, the project would involve site preparation, demolition of existing treatment facilities, and the construction of new underground utilities including a lift station and force main. Work could include site clearing, excavation, concrete work, pipe installation, and potentially electrical and mechanical systems for the lift station. Local contractors, suppliers, and service providers should monitor this pending item. Early engagement before final bid awards and permit approvals could offer an advantage for securing work related to this infrastructure project.

Board:
Board of County Commissioners
Date:
2026-07-07
Type:
Agenda_item
Decision:
Board of County Commissioners, Marion County, Marion

Request Approval of Bid Award: 26B-092 Fire Sprinkler Systems and Fire Pumps Inspections and Testing Services - Johnson Controls Fire Protection LP, Milwaukee, WI (Budget Impact - Neutral; expenditure of $76,654)

Marion County is planning to award a bid for fire sprinkler systems and fire pumps inspections and testing services. This service contract is currently under review by the Board of County Commissioners. The estimated expenditure for this service is $76,654. This project will involve regular inspections and testing of fire safety equipment. Services will likely include scheduled site visits for testing, maintenance, and reporting. Businesses specializing in fire protection systems, inspection services, and related maintenance could find opportunities. Early engagement before the final bid award may provide an advantage.

Board:
Board of County Commissioners
Date:
2026-07-07
Type:
Agenda_item
Decision:
Board of County Commissioners, Marion County, Marion

Request Approval of Change Order to Purchase Order 2601179 - Removal and Remounting of Modules - ETR, LLC, Sanford, FL (Budget Impact - Neutral; expenditure of $44,500)

This item concerns a request for approval of a change order to an existing purchase order for the removal and remounting of modules. The work is proposed by ETR, LLC, located in Sanford, Florida. The budget impact is neutral, with an expenditure of $44,500. This item is currently pending before the Board of County Commissioners, Marion County. If approved, this project would involve specialized labor for the removal and reinstallation of modules. This could include tasks related to structural support, electrical connections, and potentially site access for equipment. Contractors specializing in module installation, electrical work, and general construction services could find opportunities. Early engagement before final approvals may provide an advantage in understanding the project's specific needs and timelines.

Board:
Board of County Commissioners
Date:
2026-07-07
Type:
Agenda_item
Decision:
Board of County Commissioners, Marion County, Marion
Applicant:
ETR, LLC

Request Approval of Multiple Change Orders for Water Main Expansion Project Funded by the American Rescue Plan Act - Kimley-Horn & Associates, Inc. and Quality Enterprises USA, Inc. (Budget Impact - Neutral)

Marion County is considering changes to the Water Main Expansion Project. This project is funded by the American Rescue Plan Act. The project is currently pending before the Board of County Commissioners. The work would involve expanding water mains, which could include underground utility work, excavation, and pipe installation. Contractors and suppliers involved in water infrastructure projects may find opportunities. Reaching out to the county or the listed firms early could provide insight into the project's needs before bids are finalized.

Board:
Board of County Commissioners
Date:
2026-07-07
Type:
Agenda_item
Applicant:
Kimley-Horn & Associates, Inc.

Request Approval of Resolution Establishing Voluntary Water Connection Program in Marion Oaks Units 1 and 9 (Budget Impact - None)

Marion County is considering a new Voluntary Water Connection Program for residents in Marion Oaks Units 1 and 9. This program, proposed by the Board of County Commissioners, aims to provide a way for property owners to connect to the public water system. The program is currently under review, with a decision expected on July 7, 2026. If approved, the program would involve planning and coordination for water line extensions and service connections. This could create opportunities for contractors and suppliers involved in utility work, plumbing, and potentially site preparation for new connections. Early engagement with county staff and understanding the program's details before final approvals could provide an advantage for businesses interested in future work.

Board:
Board of County Commissioners
Date:
2026-07-07
Type:
Agenda_item
Address:
Marion Oaks Units 1 and 9

Request Approval of Resolution Extending the Service Agreement Date of Resolution No. 23-R-11 for Silver Springs Shores Septic to Sewer Unit 16 (Budget Impact - None)

Marion County is considering a resolution to extend the service agreement date for the Silver Springs Shores Septic to Sewer Unit 16 project. This item is currently pending before the Board of County Commissioners. The project involves extending an existing service agreement, which means no new budget impact is anticipated at this time. While this item does not involve new construction, it relates to ongoing utility services. Businesses involved in utility maintenance, administration, or related services may find opportunities as agreements are managed and potentially renewed. Early engagement with county staff or relevant departments could provide insight into future needs or administrative requirements.

Board:
Board of County Commissioners
Date:
2026-07-07
Type:
Agenda_item

Request Approval of Selection Committee Recommendation: 25Q-160 Lowell Water Distribution System Design - Kimley-Horn and Associates, Inc., Ocala, FL (Budget Impact - Neutral; expenditure of $1,246,765)

Marion County is reviewing a proposal for the 25Q-160 Lowell Water Distribution System Design. This project involves the design phase for improvements to the water distribution system in the Lowell area. The Board of County Commissioners is considering a recommendation from a selection committee. This item is currently pending review, indicating an early stage in the public process. The project will likely involve detailed engineering and design work, potentially leading to future construction phases for system upgrades. Contractors specializing in civil engineering, utility work, and potentially site preparation could find opportunities as this project moves forward. Engaging early allows businesses to understand the project scope before formal bidding and permitting processes begin.

Board:
Board of County Commissioners
Date:
2026-07-07
Type:
Agenda_item
Address:
Lowell
Applicant:
Kimley-Horn and Associates, Inc.

Request Approval of Task Order: 25Q-090-TO-04 Solid Waste Engineering Services - Baseline Landfill Expansion Design - Integrity Environmental Solutions, LLC, Monroe, NC (Budget Impact - Neutral; expenditure of $262,236)

Marion County is considering a Task Order for Solid Waste Engineering Services related to a Baseline Landfill Expansion Design. This item is currently pending before the Board of County Commissioners. The proposed work involves engineering services for the expansion of a landfill. This project would likely involve site assessment, design, and planning phases. Local contractors, suppliers, and service providers in fields such as engineering, environmental consulting, and potentially heavy construction equipment rental could find opportunities. Reaching out to the county or the identified firm early could provide insight into the project's timeline and specific needs before formal bidding processes begin.

Board:
Board of County Commissioners
Date:
2026-07-07
Type:
Agenda_item
Applicant:
Integrity Environmental Solutions, LLC

Request Approval of a Purchase Agreement Associated with the SW 80th Avenue Segment 1B Improvement Project for a Portion of Parcel 21361-000-00 (Budget Impact- Neutral; Expenditure of $20,000)

Marion County is planning the SW 80th Avenue Segment 1B Improvement Project. This project involves the purchase of a portion of Parcel 21361-000-00. The project is currently pending approval by the Board of County Commissioners. The work will likely include land acquisition, followed by site preparation, utility work, and paving for the road segment. This early stage presents an opportunity for local contractors, trades, suppliers, and service providers to engage with the county before final plans and bids are set. Reaching out now could provide an advantage in securing future work related to this infrastructure improvement.

Board:
Board of County Commissioners
Date:
2026-07-07
Type:
Agenda_item
Decision:
Board of County Commissioners, Marion County, Marion
Address:
SW 80th Avenue Segment 1B

Request Approval of a Purchase Agreement Associated with the SW 80th Avenue Segment 1B Improvement Project for a Portion of Parcel 21361-000-03 (Budget Impact- Neutral; expenditure of $20,000)

Marion County is considering a purchase agreement for the SW 80th Avenue Segment 1B Improvement Project. This project involves a portion of Parcel 21361-000-03. The Board of County Commissioners is reviewing this item, and it is currently pending. The project is expected to involve the acquisition of land for public improvements. This could lead to future work such as site clearing, grading, utility installation, and paving along SW 80th Avenue. Contractors, suppliers, and service providers interested in potential future work related to infrastructure improvements should monitor this project's progress. Reaching out early could provide an advantage before formal bidding processes begin.

Board:
Board of County Commissioners
Date:
2026-07-07
Type:
Agenda_item
Address:
SW 80th Avenue Segment 1B

Request Approval of a Purchase Agreement Associated with the SW 80th Avenue Segment 1B Improvement Project for a Portion of Parcel 35467-000-00 (Budget Impact- Neutral; expenditure of $1,700)

Marion County is considering the SW 80th Avenue Segment 1B Improvement Project. This project involves the purchase of a portion of Parcel 35467-000-00. The county is currently seeking approval for a purchase agreement related to this segment of the improvement project. This item is pending before the Board of County Commissioners. The work will likely involve land acquisition, followed by potential site clearing, grading, and utility work as the improvement project progresses. Contractors specializing in site preparation, grading, and underground utilities could find opportunities. Suppliers of construction materials and related services may also be involved. Engaging early, before final plans and permits are set, offers a chance to understand the project's scope and potential needs.

Board:
Board of County Commissioners
Date:
2026-07-07
Type:
Agenda_item
Address:
SW 80th Avenue Segment 1B

Request Approval of a Purchase Agreement Associated with the SW 80th Avenue Segment 1B Improvement Project for a Portion of Parcel 35467-000-01 (Budget Impact- Neutral; expenditure of $1,800)

Marion County is considering a purchase agreement for a portion of Parcel 35467-000-01 related to the SW 80th Avenue Segment 1B Improvement Project. This project is currently under review by the Board of County Commissioners. The proposed work involves acquiring land for the SW 80th Avenue Segment 1B Improvement Project. This early stage means that site plans, bids, and permits are not yet finalized. Contractors, suppliers, and service providers in site preparation, grading, utility work, paving, and material supply could find opportunities as the project moves forward. Engaging now allows businesses to understand the project's scope and prepare for future bidding processes.

Board:
Board of County Commissioners
Date:
2026-07-07
Type:
Agenda_item
Address:
SW 80th Avenue Segment 1B

Request Approval of a Purchase Agreement Associated with the SW 80th Avenue Segment 1B Improvement Project for a Portion of Parcel 35467-000-02 (Budget Impact- Neutral; expenditure of $500)

Marion County Board of County Commissioners is considering a purchase agreement for the SW 80th Avenue Segment 1B Improvement Project. This project involves a portion of Parcel 35467-000-02. The item is currently pending review by the Board. The project will likely involve land acquisition and related administrative tasks. This early stage presents an opportunity for local contractors, suppliers, and service providers to engage with the county before final plans and bids are established. Reaching out now could provide an advantage in securing future work related to this infrastructure improvement.

Board:
Board of County Commissioners
Date:
2026-07-07
Type:
Agenda_item
Address:
SW 80th Avenue Segment 1B

Request Approval of a Purchase Agreement and Addendum for Parcel 8004-0543-04 Associated with the Marion Oaks Manor Extension Road Improvement Project (Budget Impact - Neutral; expenditure of $402,211.25)

Marion County is planning road improvements for the Marion Oaks Manor Extension. This project involves the purchase of Parcel 8004-0543-04, with a budgeted expenditure of $402,211.25. The item is currently pending approval by the Board of County Commissioners. The work will likely include land acquisition, site preparation, utility relocation or installation, and paving. Contractors specializing in road construction, site clearing, grading, concrete, paving, and utility work may find opportunities. Suppliers of construction materials and equipment could also be involved. Early engagement before final bids and permits are issued could provide a competitive advantage.

Board:
Board of County Commissioners
Date:
2026-07-07
Type:
Agenda_item
Decision:
Board of County Commissioners, Marion County, Marion
Address:
Parcel 8004-0543-04

Request Approval of a Resolution of the Board of County Commissioners of Marion County Approving Plan of Financing Involving the Issuance by the Housing Finance Authority of Marion County of Its Multifamily Mortgage Revenue Bonds - Project Name Forest Springs Apartments (Budget Impact - None)

The Board of County Commissioners of Marion County is considering a plan for financing the Forest Springs Apartments project. This project involves the Housing Finance Authority of Marion County issuing multifamily mortgage revenue bonds. The item is currently pending review by the Board. If approved, this plan would set in motion activities related to the development of the Forest Springs Apartments. This could include site preparation, construction of apartment buildings, and related infrastructure. Local contractors, trades, suppliers, and service providers are encouraged to monitor this item's progress. Engaging early, before final financing and construction plans are set, offers an advantage in understanding potential opportunities.

Board:
Board of County Commissioners
Date:
2026-07-07
Type:
Agenda_item
Decision:
Board of County Commissioners, Marion County

Request Approval of the First Amendment of the Marion County Standard Professional Services Agreement Community Development Block Grant Program (CDBG-PS) with Marion County Sexual Assault Center, Inc. (Budget Impact - Neutral; not to exceed $75,950)

Marion County is considering an amendment to a professional services agreement for the Community Development Block Grant Program (CDBG-PS). This item is currently pending before the Board of County Commissioners. The proposed amendment involves a budget impact that is neutral and will not exceed $75,950. This agreement is with the Marion County Sexual Assault Center, Inc. The work under this agreement is ongoing and involves services related to the CDBG-PS program. Local contractors, suppliers, and service providers should monitor this item as it progresses through the review process. Early engagement could provide an advantage as the details of the services and any potential sub-contracting opportunities are clarified.

Board:
Board of County Commissioners
Date:
2026-07-07
Type:
Agenda_item
Applicant:
Marion County Sexual Assault Center, Inc.

Request Approval to Consider the Donation of Cages from Marion County Animal Services to Sheltering Hands

Marion County Animal Services is considering a donation of cages to Sheltering Hands. This item is currently pending before the Board of County Commissioners. If approved, this could involve the transfer of used equipment. Businesses that provide animal care supplies or services may find opportunities related to this transfer.

Board:
Board of County Commissioners
Date:
2026-07-07
Type:
Agenda_item
Decision:
Board of County Commissioners, Marion County, Marion
Applicant:
Sheltering Hands

Request Approval to Schedule and Advertise a Public Hearing to Adopt Annual Rate Resolutions and Certify Non-Ad Valorem Assessment Rolls for Fire Rescue, Solid Waste and Stormwater Services on Tuesday, September 15, 2026, at 10:00 a.m. in the McPherson Governmental Campus Auditorium

Marion County is planning to hold a public hearing on Tuesday, September 15, 2026, to consider adopting annual rate resolutions and certifying non-ad valorem assessment rolls for Fire Rescue, Solid Waste, and Stormwater services. This item is currently pending review by the Board of County Commissioners. The process will involve establishing rates and assessments for these essential services. This early stage means that contractors, suppliers, and service providers can engage with county staff to understand future needs. Reaching out now, before final decisions are made, offers an advantage in positioning for potential work related to these services.

Board:
Board of County Commissioners
Date:
2026-07-07
Type:
Agenda_item
Address:
McPherson Governmental Campus Auditorium

Request Approval to Schedule and Advertise a Public Hearing to Consider an Ordinance Amending the Marion County Code, Chapter 17, Special Assessments, Article VI, the Marion County Local Provider Participation Fund Non-Ad Valorem Special Assessment on Tuesday, July 21, 2026, at 10:00 a.m., or as Soon Thereafter in the McPherson Governmental Campus Auditorium

This item concerns a proposed amendment to Marion County Code, Chapter 17, Article VI, which deals with the Marion County Local Provider Participation Fund Non-Ad Valorem Special Assessment. The Board of County Commissioners is considering this ordinance amendment. The item is currently pending, with a public hearing scheduled for July 21, 2026. This process involves legal and administrative steps to potentially change how special assessments are handled. The work generated by this item is primarily administrative and legal in nature, focusing on code review and public notification. Local contractors, suppliers, and service providers should monitor this process as it moves forward, as early awareness of potential changes in assessment procedures could be beneficial.

Board:
Board of County Commissioners
Date:
2026-07-07
Type:
Agenda_item
Address:
McPherson Governmental Campus Auditorium

Request Approval to Schedule and Advertise a Public Hearing to Consider an Ordinance Amending the Marion County Code, Chapter 2, Administration, Article IV, Board and Commissions, Division 3, Housing Finance Authority, Section 2-98, Membership on Tuesday, July 21, 2026, at 10:00 a.m., or as Soon Thereafter in the McPherson Governmental Campus Auditorium

The Board of County Commissioners for Marion County is planning to consider an ordinance that would amend Chapter 2 of the Marion County Code. This proposed change relates to Article IV, Division 3, specifically Section 2-98, which covers membership on the Housing Finance Authority. The item is currently pending, meaning it is in the early stages of the public review process. This ordinance amendment does not involve physical construction or site work at this time. The primary focus is on administrative code changes. Local businesses, particularly those in legal services and government relations, may find opportunities to engage with the county as this ordinance is reviewed and potentially adopted. Early engagement is advised as the process moves forward.

Board:
Board of County Commissioners
Date:
2026-07-07
Type:
Agenda_item
Address:
McPherson Governmental Campus Auditorium

Request Authorization to Proceed with Foreclosure Action for Code Enforcement Liens recorded against the Estate of Bonnie L. Fleig

This item concerns a request to begin foreclosure action for code enforcement liens against the Estate of Bonnie L. Fleig. The Board of County Commissioners, Marion County, has approved this request. This action is early in the process, as it authorizes the initial step of foreclosure. The work that will follow involves legal processes to resolve the liens, which could eventually lead to the property being sold or transferred. This early stage presents an opportunity for legal service providers specializing in foreclosure and real estate law to engage with the county or the estate's representatives. Reaching out now, before specific legal strategies or property disposition plans are finalized, allows for potential involvement in the resolution process.

Board:
Board of County Commissioners
Date:
2026-07-07
Type:
Agenda_item
Decision:
Board of County Commissioners, Marion County
Applicant:
Matt McClain

Request Authorization to Proceed with the Filing of Legal Action for an Abatement of a Nuisance (Remove Unsafe Building/Structure) on Property Owned by James Travis and Peggy Travis (Parcel No. 5020-002-009)

Marion County is moving forward with legal action to address a nuisance property. The Board of County Commissioners has approved a request to file legal action for an abatement of a nuisance, specifically to remove an unsafe building or structure. This action concerns property located at Parcel No. 5020-002-009, owned by James Travis and Peggy Travis. The process involves legal proceedings to authorize the removal of the unsafe structure. This early stage means that the county is initiating the legal process to gain authorization for the demolition and removal of the building. Businesses involved in demolition, site clearing, and waste removal could be positioned to provide services once legal authorization is granted and the abatement process begins. Early engagement with county officials or the property owners, once legally permitted, may provide insight into the project timeline and specific requirements.

Board:
Board of County Commissioners
Date:
2026-07-07
Type:
Agenda_item
Decision:
Board of County Commissioners, Marion County, Marion
Address:
Parcel No. 5020-002-009
Applicant:
Kathy Bryant

Request Board Authorization for County Attorney and County Engineer to Proceed with the Acquisition of Certain Property Interests from Forestar (USA) Real Estate Group, Inc., Ocala Preserve Community Development District, and Ocala Preserve Association, Inc., Or Their Successors in Interest, for the NW 49th Street Phase 3 Road Construction Project, Within the Purchase Price and Other Parameters Described Herein

Marion County Commissioners have approved a plan for the NW 49th Street Phase 3 Road Construction Project. This project involves the county attorney and county engineer moving forward with acquiring property interests needed for the road. The acquisition is from Forestar (USA) Real Estate Group, Inc., Ocala Preserve Community Development District, and Ocala Preserve Association, Inc. This project is in the early stages, with authorization for acquisition now approved. The work will likely begin with property acquisition, followed by design and engineering, then site clearing, grading, and utility work. Finally, paving and finishing of the road will occur. Contractors, suppliers, and service providers in site preparation, heavy construction, paving, and related trades can find opportunities by engaging early. Reaching out now, before detailed plans and bids are finalized, offers the best chance to compete for this work.

Board:
Board of County Commissioners
Date:
2026-07-07
Type:
Agenda_item
Decision:
Marion County Commissioners
Applicant:
Michelle Stone

Request Renewal of Federal Forestry Shared Revenue for Special Projects Fiscal Year 2026-27

This item concerns a request for the renewal of Federal Forestry Shared Revenue for special projects. The request is made by Matt McClain and is being reviewed by the Board of County Commissioners, Marion County. This is a renewal of existing funding for special projects related to federal forestry. The item has been approved by the Board of County Commissioners. This approval means that funding is likely to continue for projects that have been ongoing or are planned. The scope of work would involve the continuation or initiation of special projects funded by this revenue. These projects could include activities such as land management, conservation efforts, or other initiatives related to federal forestry resources. Local contractors, trades, suppliers, and service providers should be aware that this renewal could lead to opportunities for work related to these forestry projects. Reaching out to the applicant or relevant county departments early could provide insight into specific project needs and timelines.

Board:
Board of County Commissioners
Date:
2026-07-07
Type:
Agenda_item
Applicant:
Matt McClain

Request for Approval of Workers’ Compensation Settlement in the Workers’ Compensation Case, Deanna Etheredge v. Marion County Parks and Recreation, OJCC Case No. 11-021101WRH (Budget Impact - Neutral; expenditure of $120,000)

This item concerns a request for approval of a workers' compensation settlement for a case involving Marion County Parks and Recreation. The settlement amount is $120,000. This matter is currently pending before the Board of County Commissioners, Marion County. The budget impact is noted as neutral. This item is early in the public process, as it is pending approval. This settlement does not involve construction or physical work on county property. Therefore, there are no direct opportunities for contractors, trades, suppliers, or service providers related to physical development or construction at this time. Businesses that provide legal services or financial services related to settlements may find this item relevant.

Board:
Board of County Commissioners
Date:
2026-07-07
Type:
Agenda_item
Decision:
Board of County Commissioners, Marion County

Request for Release of Lien on Code Enforcement Case Number 854448, Parcel Number 03421-000-00

This item involves a request for the release of a lien related to a code enforcement case. The lien is associated with Parcel Number 03421-000-00. The Board of County Commissioners, Marion County, has approved this request. This means a legal process has concluded regarding a property issue. No new construction or development is indicated by this agenda item. Therefore, there is no direct work for contractors, trades, or suppliers at this time. Businesses involved in legal services or property title services might be relevant to the process that led to this approval.

Board:
Board of County Commissioners
Date:
2026-07-07
Type:
Agenda_item
Decision:
Board of County Commissioners, Marion County, Marion
Address:
Parcel Number 03421-000-00
Applicant:
Kathy Bryant

Request to Cancel the Public Hearing to Consider Planning and Zoning Items on Tuesday, September 1, 2026, at 2:00 p.m. in the McPhearson Governmental Campus Auditorium

This item concerns a request to cancel a public hearing that was scheduled for Tuesday, September 1, 2026, at 2:00 p.m. The hearing was to consider planning and zoning items at the McPhearson Governmental Campus Auditorium. The request is currently pending before the Board of County Commissioners, Marion County. Because this item is a procedural request to cancel a hearing, it does not involve any direct construction, site work, or supply needs at this time. Therefore, there are no immediate contracting or supply opportunities related to this specific agenda item. Local contractors, trades, suppliers, and service providers should monitor future agenda items for potential projects.

Board:
Board of County Commissioners
Date:
2026-07-07
Type:
Agenda_item
Address:
McPhearson Governmental Campus Auditorium

Reserved for comments related to items specifically listed on this agenda. Scheduled requests will be heard first and limited to five (5) minutes. Unscheduled requests will be limited to two (2) minutes. Citizens may contact Marion County Administration by 5:00 p.m. the Friday before the meeting at 352-438-2300 to request to speak or submit the request online at: www.marionfl.org.

This notice is for a civic agenda item that is planned and under review by the Board of County Commissioners, Marion County. The item is scheduled for discussion on July 7, 2026. While the specific details of the project are not yet available, this early stage in the public process means that potential contractors, suppliers, and service providers can engage with the county to understand future needs. As the project progresses, it is likely to involve site preparation, grading, utility work, construction, and landscaping. Businesses specializing in general contracting, site preparation, concrete, electrical, plumbing, HVAC, roofing, painting, flooring, and landscaping may find opportunities. Reaching out to Marion County Administration now, before detailed plans and permits are finalized, offers an advantage in understanding and competing for potential work.

Board:
Board of County Commissioners
Date:
2026-07-07
Type:
Agenda_item
Address:
www.marionfl.org

Scheduled requests will be heard first and limited to five (5) minutes. Unscheduled speakers will be limited to two (2) minutes. Citizens may contact Marion County Administration by 5:00 p.m. the Friday before the meeting at 352-438-2300 to request to speak or sign up online at: www.marionfl.org .

This is a public notice regarding a civic agenda item that is planned for review by the Board of County Commissioners, Marion County. The meeting is scheduled for July 7, 2026. While no specific project details like location, size, or proposed use are provided in this notice, the item concerns public input and participation. The process involves citizens contacting Marion County Administration to request speaking time or signing up online. This early stage in the civic process means that any potential future development or project that might arise from discussions at this meeting is still in its conceptual phase. Businesses interested in future opportunities related to county projects should monitor upcoming agendas and engage with county administration to understand potential needs as they develop. Early awareness allows for better preparation and positioning for future work.

Board:
Board of County Commissioners
Date:
2026-07-07
Type:
Agenda_item
Address:
www.marionfl.org

Solid Waste Disposal Fund - Solid Waste Disposal - $150,000

This item concerns the Solid Waste Disposal Fund for Marion County. The Board of County Commissioners is reviewing a proposed allocation of $150,000 for solid waste disposal services. This is an early stage in the public process, as the item is currently pending review. The allocation of these funds would likely involve contracts for waste hauling, landfill services, and potentially recycling or processing operations. These services could be phased in over the fiscal year. Local contractors, suppliers, and service providers in the waste management and logistics sectors may find opportunities. Engaging with the county early, before final budgets and contracts are set, could provide an advantage in securing future work related to these services.

Board:
Board of County Commissioners
Date:
2026-07-07
Type:
Agenda_item

Southwest Florida Water Management District (SWFWMD) - For Minutes and Agendas, Visit the Website at http://www.WaterMatters.org

This item concerns a project planned by the Southwest Florida Water Management District (SWFWMD). While specific details about the project's location, size, or proposed use are not provided in this agenda item, it is currently pending review. The project is expected to involve work related to water management, which could include site preparation, grading, and potentially underground utility or drainage system installation. Further phases might involve construction and landscaping. Local contractors, trades, suppliers, and service providers should monitor the SWFWMD website for future updates. Early engagement with the district as plans develop could offer an advantage in securing future work related to this initiative.

Board:
Board of County Commissioners
Date:
2026-07-07
Type:
Agenda_item
Applicant:
Southwest Florida Water Management District

St. Johns River Water Management District (SJRWMD) - For Minutes and Agendas, Visit the Website at https://www.sjrwmd.com

This item concerns the St. Johns River Water Management District (SJRWMD). The Board of County Commissioners, Marion County, Marion will review this item on July 7, 2026. The specific nature of the project or proposal is not detailed in the provided information. As this item is pending review, it represents an early stage in the public process. Potential work could involve various phases depending on the final project, such as planning, design, permitting, and construction. Local contractors, trades, suppliers, and service providers are encouraged to monitor this item for future developments. Early engagement may offer an advantage as details become available.

Board:
Board of County Commissioners
Date:
2026-07-07
Type:
Agenda_item
Applicant:
St. Johns River Water Management District

The Marion County Board of County Commissioners welcomes you to its regularly scheduled meeting held the first and third Tuesday of each month at 9 a.m. unless otherwise noted. The zoning portion of the meeting is held on the third Tuesday of each month at 2:00 p.m. and the third Wednesday of each month at 1:30 p.m., unless otherwise noted.

This notice is about a regularly scheduled meeting of the Marion County Board of County Commissioners. The meeting will include a zoning portion. The board meets on the first and third Tuesdays of each month. The zoning portion is held on the third Tuesday of each month at 2:00 p.m. and the third Wednesday of each month at 1:30 p.m. This item is currently under review as part of the board's regular meeting schedule. The meeting will involve discussions and decisions on zoning matters. Local contractors, trades, suppliers, and service providers are encouraged to monitor the board's agenda, which is posted online before each meeting. Early awareness of potential projects discussed during zoning portions can provide an advantage in preparing for future work.

Board:
Board of County Commissioners
Date:
2026-07-07
Type:
Agenda_item
Address:
601 SE 25th Ave., Ocala, FL 34471

Transfer Project Funds and Amend the Capital Improvement Program - Marion County Utility Fund - $429,563

Marion County is planning to transfer project funds and amend its Capital Improvement Program for the Marion County Utility Fund. This action involves a financial allocation of $429,563. The item has been approved by the Board of County Commissioners. This approval will likely lead to future work related to utility infrastructure improvements. The scope of work could include planning, design, and construction phases for various utility projects. Contractors, suppliers, and service providers in the utility sector, including those specializing in site preparation, underground utilities, and related construction services, may find opportunities. Engaging early before specific projects are detailed and bid could provide a competitive advantage.

Board:
Board of County Commissioners
Date:
2026-07-07
Type:
Agenda_item
Decision:
Board of County Commissioners, Marion County, Marion
Applicant:
Matt McClain

See the actual businesses behind these numbers

Get the real filings, with addresses and officers, free for 7 days. No credit card required.

Start your free trial