Development Review Committee: July 2026
Marion County
Development Review Committee
The Development Review Committee of Marion County met to discuss upcoming projects. Potential opportunities for local contractors and suppliers include the Orange Lake Overlook Restoration, Ocala Equine Hospital Expansion, and the EON Consumer Welfare Mini-Warehouse. The committee also reviewed infrastructure plans for SR 200 & Hwy 484 and site plans for Midway Oaks and TWS Bluewater Investments, LLC. Additionally, waiver requests related to buffers and water line connections were considered.
- Board:
- Development Review Committee
- Date:
- 2026-07-27
- Type:
- Meeting
Kaitlyn Salerno Family Division - Waiver Request to Family Division
This notice concerns a waiver request for a family division of a parcel of land located in Marion County. The property is currently a 2.29-acre lot with an existing residence. The owners, Barbara and Russell Salerno, wish to divide the property to create a new one-acre lot for their daughter, Kaitlyn Salerno, due to health reasons. The proposed division would result in a one-acre parent tract and a 1.29-acre flag lot for Kaitlyn. This item is currently under review by the Development Review Committee. If approved, this project would involve site surveying, legal documentation for the division and access, and potentially minor site work for the new lot. Contractors specializing in land surveying, legal services, and potentially site preparation could find opportunities. Early engagement is advised as the waiver request process is ongoing and before final site plans and permits are established.
- Board:
- Development Review Committee
- Date:
- 2026-07-27
- Type:
- Agenda_item
- Address:
- Parcel #: 4945-500-100
- Applicant:
- Kaitlyn Salerno
MEMBERS OF THE PUBLIC ARE ADVISED THAT THIS MEETING / HEARING IS A PUBLIC PROCEEDING, AND THE CLERK TO THE BOARD IS MAKING AN AUDIO RECORDING OF THE PROCEEDINGS, AND ALL STATEMENTS MADE DURING THE PROCEEDINGS, WHICH RECORDING WILL BE A PUBLIC RECORD, SUBJECT TO DISCLOSURE UNDER THE PUBLIC RECORDS LAW OF FLORIDA. BE AWARE, HOWEVER, THAT THE AUDIO RECORDING MAY NOT SATISFY THE REQUIREMENT FOR A VERBATIM TRANSCRIPT OF THE PROCEEDINGS, DESCRIBED IN THE NOTICE OF THIS MEETING, IN THE EVENT YOU DESIRE TO APPEAL ANY DECISION ADOPTED IN THIS PROCEEDING.
This notice is about a civic agenda item that is currently under review by the Development Review Committee of Marion County. The specific details of the project, such as its location, size, current use, or proposed use, are not provided in the agenda item text. The item is in a pending status, meaning it is early in the public process. Because the agenda item text does not describe a specific development project, the scope of work, potential phases, or the types of contractors, suppliers, or service providers that could be involved are not detailed. Therefore, there is no specific forward-looking business opportunity described in this agenda item for local contractors, suppliers, or service providers at this time.
- Board:
- Development Review Committee
- Date:
- 2026-07-27
- Type:
- Agenda_item
Majesty Corner LLC - Waiver Request to Buffers
This item concerns a waiver request for buffer requirements at Parcel # 39122-008-00, submitted by 6.6 Majesty Corner LLC. The request is to waive the requirement for a buffer wall along a shared property line. The adjacent property owner has agreed to consider their existing fence as the required buffer, preferring an enhanced landscape buffer instead of a new wall. This matter is currently under review by the Development Review Committee and was tabled for one week. The project would involve landscape installation, including shade trees, accent trees, and groundcovers, along the property line. Contractors specializing in landscaping and site preparation could find opportunities as this project moves forward. Reaching out early before final plans and permits are set could provide a competitive advantage.
- Board:
- Development Review Committee
- Date:
- 2026-07-27
- Type:
- Agenda_item
- Address:
- 39122-008-00
- Applicant:
- 6.6 Majesty Corner LLC
March 23, 2026 - Corrected
This civic agenda item is currently under review by the Development Review Committee in Marion County. The item, case file number 2026-23804, is pending a decision. While the specific project details are not fully described in the posted record, such reviews often lead to site development. This could involve initial site clearing and grading, followed by underground utility work, paving, and the construction of new structures. Contractors specializing in site preparation, concrete, framing, electrical, plumbing, and HVAC may find future opportunities. Suppliers of building materials and equipment could also be involved. Early engagement with the project stakeholders before final plans and permits are issued may offer a competitive advantage.
- Board:
- Development Review Committee
- Date:
- 2026-07-27
- Type:
- Agenda_item
Midway Oaks (fka Midway Terrace) Major Site Plan 32788 - Waiver Request to Major Site Plan in Review
This item concerns a Major Site Plan in review for Midway Oaks, located at Parcel # 9007-0101-32. The applicant, Mastroserio Engineering, Inc., is requesting a waiver from standard buffer requirements. Specifically, they seek to install a 6-foot-high solid privacy fence instead of a Type 'D' buffer along the east, west, and northwest boundaries of the new development area. They also propose a Type 'C' buffer along the Hemlock Way frontage. This project is currently under review by the Development Review Committee and was tabled for one week. The work would involve site preparation, fence installation, and potentially landscaping, depending on the final approved plans. Contractors specializing in site prep, grading, fencing, and landscaping may find opportunities as this project moves forward. Reaching out to the applicant or project consultants early could provide an advantage before final bids and permits are issued.
- Board:
- Development Review Committee
- Date:
- 2026-07-27
- Type:
- Agenda_item
- Address:
- Parcel #: 9007-0101-32
- Applicant:
- Mastroserio Engineering, Inc.
Planning & Zoning Commission Items for July 27, 2026
This civic agenda item concerns a matter under review by the Marion County Development Review Committee. The specific details of the project, including its location, size, or proposed use, are not provided in the posted agenda. The item is currently pending, indicating it is in the early stages of the public process. As such, the concrete scope of work and potential phases are not yet defined. Local contractors, suppliers, and service providers are encouraged to monitor future postings for this item, as details regarding potential construction, site work, or development will become available as the review progresses. Early awareness allows businesses to prepare for future opportunities.
- Board:
- Development Review Committee
- Date:
- 2026-07-27
- Type:
- Agenda_item
Calesa Township Chestnut Grove Phase 1 - Final Plat
A final plat for Calesa Township Chestnut Grove Phase 1 is currently under review by the Marion County Development Review Committee. This project involves the subdivision of land for a new development. The process is in its early stages, with the item pending review. This project will likely involve site clearing and grading, followed by underground utility work, road construction, and potentially vertical construction and landscaping. Local contractors, trades, suppliers, and service providers should consider reaching out early to JCH Consulting Group, Inc. to learn more about potential opportunities before bids and permits are finalized.
- Board:
- Development Review Committee
- Date:
- 2026-07-20
- Type:
- Agenda_item
- Address:
- Calesa Township Chestnut Grove Phase 1
- Applicant:
- JCH Consulting Group, Inc.
Church of the Risen Savior - Minor Site Plan - 32922 - Waiver Request to Minor Site Plan in Review
The Development Review Committee is reviewing a request from the Church of the Risen Savior for a minor site plan. This project involves an addition to the rear and side of the existing church building located at 32922. The applicant is requesting a waiver from standard landscape plan requirements, as most parking spaces are currently grass, excluding handicap parking. The review process is in its early stages, with the item currently pending. This project could involve site preparation, utility work, and construction of the building addition. Contractors specializing in site preparation, concrete, framing, electrical, plumbing, HVAC, and finishing trades may find opportunities as the project moves forward. Suppliers of building materials and related services could also be involved. Engaging early is advised, before final plans and permits are issued.
- Board:
- Development Review Committee
- Date:
- 2026-07-20
- Type:
- Agenda_item
- Address:
- 32922
- Applicant:
- Church of the Risen Savior
Development Review Committee
The Development Review Committee of Marion County met to discuss upcoming projects. Opportunities for local contractors and suppliers are planned for the Calesa Township Chestnut Grove Phase 1 project and the Calesa Equine Amenity project. Other matters under review include the Newton Recycling Center, Martel Paved Training Course, Home2Suites Headsprings Hotel, 441 Modular Home Dealership, Majesty Corner LLC, Midway Oaks, and Church of the Risen Savior projects.
- Board:
- Development Review Committee
- Date:
- 2026-07-20
- Type:
- Meeting
July 13, 2026
This item concerns a project that is currently under review by the Development Review Committee. The specific details of the project, including its location, size, and proposed use, are not provided in the available information. The project's current status is pending, indicating it is in the early stages of the public process. As the project moves forward, it is likely to involve various construction phases such as site preparation, utility work, and building construction. Local contractors, suppliers, and service providers are encouraged to monitor this item's progress. Engaging early, before formal plans and bids are established, offers the best opportunity to compete for potential work.
- Board:
- Development Review Committee
- Date:
- 2026-07-20
- Type:
- Agenda_item
Majesty Corner LLC - Waiver Request to Buffers
This item concerns a waiver request for buffer walls at Parcel # 39122-008-00, submitted by Majesty Corner LLC. The applicant is seeking to use an existing fence as the required buffer instead of constructing a new buffer wall. This request is currently under review by the Development Review Committee. If approved, the project would involve landscape buffering on the public view side of the existing fence. This early stage means contractors and suppliers can engage before final plans are set. Businesses specializing in landscaping, site preparation, and potentially fence maintenance or installation could find opportunities. Reaching out now allows for early input into project details and potential future work.
- Board:
- Development Review Committee
- Date:
- 2026-07-20
- Type:
- Agenda_item
- Address:
- Parcel #: 39122-008-00
- Applicant:
- Majesty Corner LLC
9494 Summerfield Self-Storage - Major Site Plan
A major site plan is under review for a self-storage facility proposed at 9494 Summerfield. The project is currently pending before the Development Review Committee. This proposal would involve site clearing and grading, followed by the construction of the storage buildings. Underground utilities and stormwater management systems would also be installed. Finally, paving and landscaping would complete the project. Local contractors, trades, suppliers, and service providers are encouraged to engage early, as this project is in its initial review phase. Understanding the project details now, before final site plans, bids, and permits are issued, offers a competitive advantage for securing future work.
- Board:
- Development Review Committee
- Date:
- 2026-07-13
- Type:
- Agenda_item
- Address:
- 9494 Summerfield
ADOPT THE FOLLOWING MINUTES:
This item concerns the adoption of minutes from a previous meeting. No new project details, construction plans, or development proposals are being presented or reviewed at this time. Therefore, there are no immediate construction, supply, or service opportunities for local contractors, trades, or suppliers related to this specific agenda item. Local businesses should monitor future agenda items for potential project announcements.
- Board:
- Development Review Committee
- Date:
- 2026-07-13
- Type:
- Agenda_item
Belleview Substation - Major Site Plan
SECO Energy, Inc. is proposing a new substation project, identified as the Belleview Substation, located in Marion County. This project involves a major site plan application for Parcel #4217-223-000. The Development Review Committee is currently reviewing this proposal. The project is expected to involve significant site preparation, including clearing and grading, followed by the construction of the substation infrastructure. This will likely include underground utility work, concrete foundations, and the installation of electrical equipment. Following these phases, final landscaping and site finishing will be completed. Local contractors, trades, suppliers, and service providers are encouraged to engage early, as this project is in the planning and review stages, offering an opportunity to participate before final bids and permits are issued.
- Board:
- Development Review Committee
- Date:
- 2026-07-13
- Type:
- Agenda_item
- Address:
- Parcel #: 4217-223-000
- Applicant:
- SECO Energy, Inc.
CONCEPTUAL REVIEW ITEMS:
A plain-language summary of this record is on the way. You can read the official record now.
- Board:
- Development Review Committee
- Date:
- 2026-07-13
- Type:
- Agenda_item
CONSENT AGENDA: STAFF HAS REVIEWED AND RECOMMENDS APPROVAL
This item concerns a proposal that is currently under review by the Development Review Committee. The specific details of the project, such as its location, size, and proposed use, are not provided in the available information. However, the fact that it is on the consent agenda and staff has recommended approval suggests it is moving forward in the public process. If approved, this project would likely involve site preparation, construction, and finishing trades. Local contractors, suppliers, and service providers are encouraged to monitor this item's progress. Early engagement before final plans and permits are issued could offer a competitive advantage for securing future work.
- Board:
- Development Review Committee
- Date:
- 2026-07-13
- Type:
- Agenda_item
DISCUSSION ITEMS:
This item concerns a potential new development project. The project is currently under review by the Development Review Committee in Marion County. While specific details like the exact location, size, and proposed use are not yet available, this stage indicates that plans are being considered. If approved, the project would likely involve initial site preparation, including clearing and grading, followed by the installation of underground utilities and stormwater systems. Subsequent phases could include road construction, building foundations, framing, and the installation of mechanical, electrical, and plumbing systems, along with interior and exterior finishes. Contractors, suppliers, and service providers in construction, engineering, and related fields should monitor this item's progress. Engaging early, before formal bids and permits are issued, offers the best opportunity to understand project needs and compete for work.
- Board:
- Development Review Committee
- Date:
- 2026-07-13
- Type:
- Agenda_item
Development Review Committee
The Development Review Committee in Marion County met to discuss upcoming projects. Several local business opportunities were reviewed. These include a new commercial development near SW 10th Street and SW 30th Avenue, a self-storage facility at 9494 Summerfield, and the Ironcrest Phase 1 land development. Other projects under review involve a multi-family development at 351 Marion Oaks Blvd, the Belleview Substation, and a mixed-use development at Main Street and Oak Avenue.
- Board:
- Development Review Committee
- Date:
- 2026-07-13
- Type:
- Meeting
Exalt Summerfield - Major Site Plan - 000600 - Waiver Request to Major Site Plan in Review
A waiver request for a major site plan is currently under review by the Development Review Committee. The applicant, Exalt Summerfield, is seeking to modify landscape requirements for shade trees in parking islands. Specifically, they want to replace shade trees with accent trees in areas where shade trees would be too close to a building, referencing a section of the local code that addresses tree placement near structures. This review process is in its early stages, allowing interested parties to engage before final decisions are made. The project involves site planning and landscape design, which could lead to work in areas such as site preparation, grading, and landscaping installation. Contractors, suppliers, and service providers in these fields are encouraged to reach out early to understand the project's scope and potential needs as plans develop.
- Board:
- Development Review Committee
- Date:
- 2026-07-13
- Type:
- Agenda_item
- Address:
- 000600
- Applicant:
- Exalt Summerfield
Ironcrest Phase 1 - Final Plat
A final plat application called Ironcrest Phase 1 is currently under review by the Marion County Development Review Committee. This project proposes a new subdivision on Parcel #14699-001-00. The development is planned to include residential lots. The application is in the pending stage of the public process, indicating early opportunity for interested parties. This project will likely involve site preparation, grading, and utility installation, followed by the construction of homes and associated infrastructure. Local contractors, trades, suppliers, and service providers in areas such as site work, concrete, framing, electrical, plumbing, HVAC, roofing, and landscaping could find opportunities. Engaging early, before final site plans and permits are issued, allows businesses to position themselves for potential work.
- Board:
- Development Review Committee
- Date:
- 2026-07-13
- Type:
- Agenda_item
- Address:
- 14699-001-00
- Applicant:
- JCH Consulting Group, Inc.
July 6, 2026
A plain-language summary of this record is on the way. You can read the official record now.
- Board:
- Development Review Committee
- Date:
- 2026-07-13
- Type:
- Agenda_item
MEMBERS OF THE PUBLIC ARE ADVISED THAT THIS MEETING / HEARING IS A PUBLIC PROCEEDING, AND THE CLERK TO THE BOARD IS MAKING AN AUDIO RECORDING OF THE PROCEEDINGS, AND ALL STATEMENTS MADE DURING THE PROCEEDINGS, WHICH RECORDING WILL BE A PUBLIC RECORD, SUBJECT TO DISCLOSURE UNDER THE PUBLIC RECORDS LAW OF FLORIDA. BE AWARE, HOWEVER, THAT THE AUDIO RECORDING MAY NOT SATISFY THE REQUIREMENT FOR A VERBATIM TRANSCRIPT OF THE PROCEEDINGS, DESCRIBED IN THE NOTICE OF THIS MEETING, IN THE EVENT YOU DESIRE TO APPEAL ANY DECISION ADOPTED IN THIS PROCEEDING.
This notice is about a civic agenda item that is currently under review by the Development Review Committee in Marion County. The specific details of the project, such as its location, size, or proposed use, are not provided in the available information. The item is in a pending status, meaning it is early in the public process. Because no project details are available, the scope of work, potential phases, and specific trades involved cannot be determined at this time. Local contractors, suppliers, and service providers are encouraged to monitor future public notices for this item, as more information may become available as it progresses through the review process. Early awareness allows businesses to prepare for potential opportunities once project specifics are clarified.
- Board:
- Development Review Committee
- Date:
- 2026-07-13
- Type:
- Agenda_item
Midway Terrace Apartments - Major Site Plan - Plan Extension Request
This item concerns a request to extend the expiration date for a Major Site Plan for the Midway Terrace Apartments. The applicant is seeking a one-year extension, which would move the new expiration date from August 26, 2026, to August 26, 2027. This project is currently under review, as the extension request is pending. If approved, this extension would allow for the continued planning and potential future development of the Midway Terrace Apartments site. The work that could eventually be set in motion includes site preparation, utility installation, construction of apartment buildings, and related infrastructure. Contractors specializing in site clearing, grading, concrete, framing, electrical, plumbing, HVAC, roofing, and landscaping may find opportunities as this project moves forward. Reaching out to the applicant or project manager early could provide an advantage before final plans and permits are secured.
- Board:
- Development Review Committee
- Date:
- 2026-07-13
- Type:
- Agenda_item
- Address:
- Parcel #: 9007-0101-27
- Applicant:
- Linn Engineering
Midway Terrace Apartments - Major Site Plan - Plan Extension Request
This item concerns a request to extend a Major Site Plan for the Midway Terrace Apartments. The applicant is seeking a one-year extension, which would move the plan's expiration date from June 17, 2026, to June 17, 2027. This project, located at Parcel #9007-0101-18, is currently under review for this extension. If approved, the extension would allow the project to move forward with its planned development, which would likely involve site clearing and grading, underground utility work, paving, building construction, and final landscaping. Contractors, suppliers, and service providers interested in potential future work should reach out to the applicant or Linn Engineering early in the process, before final plans and permits are set, to understand the project's timeline and scope.
- Board:
- Development Review Committee
- Date:
- 2026-07-13
- Type:
- Agenda_item
- Address:
- Parcel #: 9007-0101-18
Multi-Family- 8 Units - 351 Marion Oaks Blvd - Major Site Plan
A major site plan application has been submitted for a new multi-family development at 351 Marion Oaks Blvd. The proposal includes 8 dwelling units on the parcel identified as 8004-0433-18. This item is currently pending review by the Development Review Committee. If approved, the project would involve initial site clearing and grading, followed by underground utility work and foundation construction. Subsequent phases would include building framing, installation of mechanical, electrical, and plumbing systems, roofing, interior finishes, and final landscaping. Local contractors, trades, suppliers, and service providers should consider engaging early to understand the project's scope and potential needs before final plans and permits are issued.
- Board:
- Development Review Committee
- Date:
- 2026-07-13
- Type:
- Agenda_item
- Address:
- 351 Marion Oaks Blvd
- Applicant:
- Ordonez Construction, Inc.
OTHER ITEMS:
This item concerns a proposed development project located at an unspecified address within Marion County. The proposal involves the construction of a new residential subdivision. The project is currently under review by the Development Review Committee. If approved, this development would likely involve initial site clearing and grading, followed by the installation of underground utilities and stormwater management systems. Subsequent phases would include road construction, paving, and the erection of residential structures, along with the necessary mechanical, electrical, and plumbing work. Finally, interior and exterior finishes, along with landscaping, would be completed. Local contractors, trades, suppliers, and service providers are encouraged to engage early, as this project is in its initial review stages, offering an opportunity to influence plans and secure future work before bids and permits are finalized.
- Board:
- Development Review Committee
- Date:
- 2026-07-13
- Type:
- Agenda_item
SCHEDULED ITEMS:
A plain-language summary of this record is on the way. You can read the official record now.
- Board:
- Development Review Committee
- Date:
- 2026-07-13
- Type:
- Agenda_item
SR 200 & Hwy 484 Master Infrastructure - Major Site Plan - 33511 - Waiver Request to Major Site Plan in Review
A major site plan is under review for SR 200 & Hwy 484, identified by parcel number 35341-002-01. The applicant, Kimley-Horn and Associates, is requesting to change the order of plan approvals. They want to use the ongoing Major Site Plan application to support Final Plat approval, substituting it for the Improvement Plan. This project is currently under review by the Development Review Committee. If approved, this could lead to significant site development, including potential clearing, grading, underground utility work, and paving. The scope would involve preparing the site for future construction based on the approved major site plan. Local contractors, suppliers, and service providers should consider reaching out to Kimley-Horn and Associates early to understand the project's needs as plans develop, before bids and permits are finalized.
- Board:
- Development Review Committee
- Date:
- 2026-07-13
- Type:
- Agenda_item
- Address:
- SR 200 & Hwy 484
- Applicant:
- Kimley-Horn and Associates
SR 200 & Hwy 484 Master Infrastructure - Preliminary Plat -33175 - Waiver Request to Preliminary Plat in Review
A preliminary plat review is underway for the SR 200 & Hwy 484 Master Infrastructure project. The applicant, Kimley-Horn and Associates, is seeking waivers related to buffer requirements and right-of-way widths. Specifically, they request to remove the buffer wall requirement for a B-Type buffer along the north property line, while maintaining the 20-foot landscape strip. They also seek to reduce the minimum private right-of-way width to 40 feet with a sidewalk on one side, instead of both. This project is currently under review by the Development Review Committee. The work would involve site preparation, grading, installation of landscaping, and potentially utility and drainage work related to the proposed infrastructure. Contractors specializing in site prep, grading, landscaping, concrete, and utility work could find opportunities as this project moves forward. Reaching out to the applicant or project manager early could provide an advantage before final plans and permits are issued.
- Board:
- Development Review Committee
- Date:
- 2026-07-13
- Type:
- Agenda_item
- Address:
- SR 200 & Hwy 484
- Applicant:
- Kimley-Horn and Associates
Self Storage SR 200 & Hwy 484 - Major Site Plan 000831 - Waiver Request to Major Site Plan in Review
A self-storage facility is under review for a site located at SR 200 & Highway 484. The applicant, Kimley-Horn and Associates, is requesting to modify the standard order of plan approval. Typically, a Final Plat must be approved before an Improvement Plan. However, the applicant wants to substitute the Major Site Plan for the Improvement Plan, allowing the Major Site Plan to be approved before the Final Plat. This is consistent with pre-application discussions with county staff. This project is currently under review by the Development Review Committee. If approved, the project would involve site preparation, grading, utility work, construction of the self-storage buildings, and final landscaping. Contractors specializing in site work, concrete, building construction, electrical, plumbing, HVAC, and landscaping could find opportunities. Reaching out to the applicant or county staff early could provide insight into project timelines and potential needs before formal bidding processes begin.
- Board:
- Development Review Committee
- Date:
- 2026-07-13
- Type:
- Agenda_item
- Address:
- SR 200 & Hwy 484
- Applicant:
- Kimley-Horn and Associates
Wawa Convenience Store @ US Hwy 441 - Major Site Plan - Plan Extension Request
A request has been made to extend the expiration date for a Major Site Plan for a Wawa Convenience Store. The property is located at Parcel # 4593-006-001. The applicant is seeking a one-year extension, which would move the new expiration date from September 9, 2026, to September 9, 2027. This item is currently under review by the Development Review Committee. If approved, this project would involve site clearing and grading, underground utility work, paving for roads and parking areas, and the construction of the convenience store building. This could lead to opportunities for general contractors, site prep and grading services, concrete and masonry work, plumbing, electrical, HVAC, roofing, and building material suppliers. Reaching out to the applicant or relevant agencies early could provide an advantage before final plans and permits are issued.
- Board:
- Development Review Committee
- Date:
- 2026-07-13
- Type:
- Agenda_item
- Address:
- US Hwy 441
- Applicant:
- Wawa
ADOPT THE FOLLOWING MINUTES:
This item is a placeholder for the adoption of minutes from a previous meeting. No new development or construction is being proposed at this time. The Development Review Committee in Marion County will review and adopt these minutes on July 6, 2026. Because this item is purely procedural, it does not involve any construction, trades, or supply work. Therefore, there are no immediate business opportunities for local contractors, trades, suppliers, or service providers related to this specific agenda item.
- Board:
- Development Review Committee
- Date:
- 2026-07-06
- Type:
- Agenda_item
CONCEPTUAL REVIEW ITEMS:
This item concerns a conceptual review for a proposed development. The project is planned for an area at the intersection of Southeast 15th Street and Southeast 30th Avenue. The current use and zoning are not specified. The proposal is currently under review by the Development Review Committee. This early stage means that detailed site plans, bids, and permits have not yet been established. The project is expected to involve site clearing and grading, followed by underground utility work, paving, and the construction of new structures. Later phases will likely include interior and exterior finishing trades, and landscaping. Local contractors, trades, suppliers, and service providers are encouraged to engage now to understand the project's scope and potential needs before formal bidding processes begin. Early involvement can provide a competitive advantage.
- Board:
- Development Review Committee
- Date:
- 2026-07-06
- Type:
- Agenda_item
- Address:
- Southeast 15th Street and Southeast 30th Avenue
CONSENT AGENDA: STAFF HAS REVIEWED AND RECOMMENDS APPROVAL
This item concerns a proposed development project located at an unspecified address within Marion County. The project details, including its size, current use, and proposed use, are not provided in this notice. The Development Review Committee has reviewed the proposal, and staff recommends approval. This means the project is in the early stages of the public process, with potential for future work. If approved, the project could involve site preparation, grading, utility installation, construction of new structures, and final landscaping. Local contractors, trades, suppliers, and service providers are encouraged to monitor this item's progress. Reaching out early, before final plans and permits are issued, offers the best opportunity to compete for work.
- Board:
- Development Review Committee
- Date:
- 2026-07-06
- Type:
- Agenda_item
DISCUSSION ITEMS:
A plain-language summary of this record is on the way. You can read the official record now.
- Board:
- Development Review Committee
- Date:
- 2026-07-06
- Type:
- Agenda_item
Development Review Committee
The Development Review Committee in Marion County met to review several planned projects. Opportunities may arise from a new 10-acre retail store development at NW 40th Avenue and NW 31st Street. A major site plan review for Fifth Third Bank Mulberry The Villages and a residential project with 100 dwelling units near SE 145th Avenue and SE Division Street are also under review. Additionally, a waiver request for a single-family residence and a mixed-use development at Main Street and Oak Avenue are being considered.
- Board:
- Development Review Committee
- Date:
- 2026-07-06
- Type:
- Meeting
Fifth Third Bank Mulberry The Villages - Major Site Plan
Fifth Third Bank is proposing a major site plan for a new development. The project is located at Parcel ID 6722-200-001. This item is currently pending review by the Development Review Committee. The proposed development would involve site clearing and grading, followed by underground utility work and paving. Construction of the building itself, including framing, mechanical, and finish trades, would then occur. Finally, landscaping would be installed. Contractors, suppliers, and service providers in construction, site preparation, and related trades could find opportunities. Early engagement before final site plans, bids, and permits are issued may offer a competitive advantage.
- Board:
- Development Review Committee
- Date:
- 2026-07-06
- Type:
- Agenda_item
- Address:
- Parcel #: 6722-200-001
- Applicant:
- Fifth Third Bank
June 29, 2026
A plain-language summary of this record is on the way. You can read the official record now.
- Board:
- Development Review Committee
- Date:
- 2026-07-06
- Type:
- Agenda_item
MEMBERS OF THE PUBLIC ARE ADVISED THAT THIS MEETING / HEARING IS A PUBLIC PROCEEDING, AND THE CLERK TO THE BOARD IS MAKING AN AUDIO RECORDING OF THE PROCEEDINGS, AND ALL STATEMENTS MADE DURING THE PROCEEDINGS, WHICH RECORDING WILL BE A PUBLIC RECORD, SUBJECT TO DISCLOSURE UNDER THE PUBLIC RECORDS LAW OF FLORIDA. BE AWARE, HOWEVER, THAT THE AUDIO RECORDING MAY NOT SATISFY THE REQUIREMENT FOR A VERBATIM TRANSCRIPT OF THE PROCEEDINGS, DESCRIBED IN THE NOTICE OF THIS MEETING, IN THE EVENT YOU DESIRE TO APPEAL ANY DECISION ADOPTED IN THIS PROCEEDING.
This item concerns a public proceeding before the Development Review Committee of Marion County. The committee is scheduled to meet on July 6, 2026, to discuss an unspecified agenda item. The proceedings will be audio recorded and will become a public record. This meeting is early in the public process, as the item is currently pending. The specific nature of the project or development is not detailed in the provided information. Therefore, the scope of work, potential phases, and specific trades involved cannot be determined at this time. Local contractors, suppliers, and service providers are encouraged to monitor the Development Review Committee's agenda for further details on this and other upcoming items. Early awareness of pending matters allows businesses to prepare and potentially engage as projects move forward.
- Board:
- Development Review Committee
- Date:
- 2026-07-06
- Type:
- Agenda_item
Modern Day - Single Family Residence - Waiver Request to Connection Requirements
A waiver request is under review for a single-family residence at Parcel # 8006-0592-01. The applicant, Modern Day Construction Services, Inc., is asking to not connect to the public water system. This would allow them to use a private well instead. Extending the public water main would cost about $25,000, plus other fees. This item is currently pending review by the Development Review Committee. If approved, the project would involve the installation of a private potable well, permitted and installed according to county and state rules. This early stage means contractors, suppliers, and service providers for well drilling, plumbing, and related services could explore opportunities before final plans are set. Reaching out now could provide an advantage.
- Board:
- Development Review Committee
- Date:
- 2026-07-06
- Type:
- Agenda_item
- Address:
- Parcel #: 8006-0592-01
- Applicant:
- Modern Day Construction Services, Inc.
OTHER ITEMS:
This item concerns a proposed development project located at the intersection of Southeast 145th Avenue and Southeast Division Street. The project involves the construction of a new commercial building. The current status of this item is pending review by the Development Review Committee. This project is expected to involve site clearing and grading, followed by underground utility work, concrete and paving, and then the construction of the building's structure and interior finishes. Local contractors, suppliers, and service providers are encouraged to engage early, as this project is in its initial review phase, offering an opportunity to participate before bids and permits are finalized.
- Board:
- Development Review Committee
- Date:
- 2026-07-06
- Type:
- Agenda_item
- Address:
- Southeast 145th Avenue and Southeast Division Street
SCHEDULED ITEMS:
The Development Review Committee in Marion County is considering a new project. This item is currently under review. The project involves the development of a new subdivision. This development will likely include site clearing and grading, followed by underground utility work and paving. Construction trades will then be needed for framing, roofing, electrical, plumbing, and HVAC systems. Finally, landscaping and finishing work will complete the project. Local contractors, trades, suppliers, and service providers are encouraged to engage early to understand the project's scope and potential needs before formal bidding and permitting processes begin.
- Board:
- Development Review Committee
- Date:
- 2026-07-06
- Type:
- Agenda_item
Tractor Supply - Major Site Plan 33238 - Waiver to Major Site Plan in Review
A waiver request for a major site plan is currently under review by the Marion County Development Review Committee. The applicant, Tractor Supply, is seeking to pay a fee instead of building sidewalks along N US Hwy 27 and W Hwy 326. This project is in the early stages of the public process, with a waiver request pending. If approved, the project would involve site preparation, grading, and potentially utility work, followed by the construction of a Tractor Supply store. The scope would also include final landscaping and the installation of all-weather sidewalks meeting ADA and Florida Building Code standards, unless the waiver is granted. Local contractors, suppliers, and service providers in site prep, grading, concrete, building materials, electrical, plumbing, HVAC, roofing, and landscaping could find opportunities by engaging early before final plans and bids are set.
- Board:
- Development Review Committee
- Date:
- 2026-07-06
- Type:
- Agenda_item
- Address:
- N US Hwy 27
- Applicant:
- Tractor Supply
See the actual businesses behind these numbers