Aviation and Seaport Committee: July 2026
Miami-Dade County
PASSENGER BOARDING BRIDGES (MOD)
Miami-Dade County Board of County Commissioners (BCC) is considering extending Prequalification Pool No. RTQ-01841 for Passenger Boarding Bridges. The extension requests an additional five years and $147,080,000 in expenditure authority, bringing the total modified cumulative pool amount to $297,464,300. This pool supports the Miami-Dade Aviation Department (MDAD) and PortMiami for the purchase and installation of new passenger boarding bridges, refurbishment of existing ones, and procurement of parts and supplies. MDAD requires $137,080,000 for 40 new bridges, refurbishment of 50 existing bridges, and parts. PortMiami requires $10,000,000 for new bridges for the North Bulkhead project and modifications/repairs. The pool was established on November 2, 2021, and currently has eight prequalified vendors, including four local vendors, two of which are certified Small Business Enterprises (SBE). The extension aims to streamline procurement processes and reduce administrative burdens. The item is scheduled for an Agenda Date of 9/1/2026.
- Board:
- Aviation and Seaport Committee
- Date:
- 2026-07-13
- Type:
- Resolution
- Decision:
- Pending BCC Assignment
- Applicant:
- Miami-Dade Aviation Department and PortMiami
PASSENGER BOARDING BRIDGES (MOD)
Miami-Dade County Board of County Commissioners is considering a resolution to extend Prequalification Pool No. RTQ-01841 for Passenger Boarding Bridges. The extension requests an additional five years and $147,080,000 in expenditure authority, bringing the total modified cumulative pool amount to $297,464,300. This pool supports the Miami-Dade Aviation Department (MDAD) and PortMiami for the purchase and installation of new passenger boarding bridges, refurbishment of existing ones, and procurement of parts and supplies. MDAD requires $137,080,000 for 40 new bridges, 50 refurbishments, and maintenance parts. PortMiami requires $10,000,000 for new bridges for the North Bulkhead project and modifications/repairs. The pool was established on November 2, 2021, and currently has eight prequalified vendors, including four local vendors, two of which are certified Small Business Enterprises (SBE). The extension aims to streamline procurement, reduce administrative work, and ensure continued operational efficiency. The Aviation and Seaport Committee forwarded the item to the Board with a favorable recommendation.
- Board:
- Aviation and Seaport Committee
- Date:
- 2026-07-13
- Type:
- Resolution
- Decision:
- Pending BCC Assignment (Forwarded to BCC with a favorable recommendation by Aviation and Seaport Committee)
- Applicant:
- Miami-Dade Aviation Department and PortMiami
PASSENGER BOARDING BRIDGES (MOD)
Resolution authorizing additional time of five years and expenditure authority in the amount of $147,080,000.00 for a total modified cumulative pool amount of $297,464,300.00 for Prequalification Pool No. RTQ-01841, Passenger Boarding Bridges, for the Miami-Dade Aviation Department and PortMiami. The pool term expires on December 31, 2026, and has a current cumulative allocation of $150,384,300. If approved, the pool will have a modified cumulative allocation of $297,464,300 and will expire on December 31, 2031. The item was forwarded to the BCC with a favorable recommendation by the Aviation and Seaport Committee on 7/13/2026. Agenda date is 9/1/2026. The resolution provides that any contract award under the pool exceeding $5,000,000.00, or $1,500,000.00 for Miami-Dade Aviation Department, is ratified by the Board. MDAD is requesting $137,080,000 to fund the furnishing and installation of forty (40) new passenger boarding bridges, the refurbishment of fifty (50) existing ones, and the procurement of essential parts and materials. PortMiami is requesting $10,000,000 to support operational needs, including the purchase of new passenger boarding bridges for the North Bulkhead project, as well as modifications and repairs to existing bridges. The pool includes three groups: Group 1 - Purchase and installation of new passenger boarding bridges; Group 2 - Refurbishment of existing boarding bridges; and Group 3 - Purchase of parts and supplies for passenger boarding bridges. Currently, there are eight prequalified vendors, including four local vendors, of which two are certified SBE firms. The pool was established by the Board on November 2, 2021, through Resolution No. 1028-21, for a five-year term.
- Board:
- Aviation and Seaport Committee
- Date:
- 2026-07-13
- Type:
- Resolution
- Decision:
- Forwarded to BCC with a favorable recommendation
PASSENGER BOARDING BRIDGES (MOD)
Resolution authorizing additional time of five years and expenditure authority in the amount of $147,080,000.00 for a total modified cumulative pool amount of $297,464,300.00 for Prequalification Pool No. RTQ-01841, Passenger Boarding Bridges, for the Miami-Dade Aviation Department and PortMiami. The pool term expires on December 31, 2026, and has a current cumulative allocation of $150,384,300. If approved, the pool will have a modified cumulative allocation of $297,464,300 and will expire on December 31, 2031. The pool includes three groups: Group 1 - Purchase and installation of new passenger boarding bridges; Group 2 - Refurbishment of existing boarding bridges; and Group 3 - Purchase of parts and supplies for passenger boarding bridges. MDAD is requesting $137,080,000 to fund the furnishing and installation of forty (40) new passenger boarding bridges, the refurbishment of fifty (50) existing ones, and the procurement of essential parts and materials. PortMiami is requesting $10,000,000 to support operational needs, including the purchase of new passenger boarding bridges for the North Bulkhead project, as well as modifications and repairs to existing bridges. The item was forwarded to the BCC with a favorable recommendation by the Aviation and Seaport Committee on 7/13/2026. Agenda date is 9/1/2026. The document does not state a final decision by the Board. The document does not state any public comment or stakeholder sentiment.
- Board:
- Aviation and Seaport Committee
- Date:
- 2026-07-13
- Type:
- Resolution
- Decision:
- Forwarded to BCC with a favorable recommendation by the Aviation and Seaport Committee on 7/13/2026; final Board decision not stated
PASSENGER BOARDING BRIDGES (MOD)
Miami-Dade County Board of County Commissioners is considering a resolution to extend Prequalification Pool No. RTQ-01841 for Passenger Boarding Bridges. The extension seeks an additional five years and $147,080,000 in expenditure authority, bringing the total modified cumulative pool amount to $297,464,300. This pool supports the Miami-Dade Aviation Department (MDAD) and PortMiami for the purchase and installation of new passenger boarding bridges, refurbishment of existing ones, and procurement of parts and supplies. MDAD requires $137,080,000 for 40 new bridges, refurbishment of 50 existing bridges, and parts. PortMiami requires $10,000,000 for new bridges for the North Bulkhead project and modifications/repairs. The pool was established on November 2, 2021, and currently has eight prequalified vendors, including four local vendors, two of which are certified SBE firms. The extension aims to streamline procurement processes and reduce administrative work for vendors. Any contract award exceeding $5,000,000, or $1,500,000 for MDAD, requires Board ratification.
- Board:
- Aviation and Seaport Committee
- Date:
- 2026-07-13
- Type:
- Resolution
- Decision:
- Before the Board
- Applicant:
- Miami-Dade Aviation Department and PortMiami
PASSENGER BOARDING BRIDGES (MOD)
Resolution R-754-26, File Number 261140, adopted by the Miami-Dade Board of County Commissioners on 9/1/2026, authorizes a five-year extension and $147,080,000 in additional expenditure authority for Prequalification Pool No. RTQ-01841, Passenger Boarding Bridges, for the Miami-Dade Aviation Department (MDAD) and PortMiami. The total modified cumulative pool amount becomes $297,464,300, with the pool expiring on December 31, 2031. The pool covers purchase and installation of new passenger boarding bridges, refurbishment of existing ones, and purchase of parts and supplies. MDAD requests $137,080,000 for 40 new bridges, refurbishment of 50 existing ones, and parts; PortMiami requests $10,000,000 for the North Bulkhead project and modifications/repairs. Any contract award exceeding $5,000,000, or $1,500,000 for MDAD, requires Board ratification. The pool was established on November 2, 2021, via Resolution No. 1028-21. The item was forwarded to the BCC with a favorable recommendation by the Aviation and Seaport Committee on 7/13/2026. Eight prequalified vendors are listed, including four local vendors, two of which are certified Small Business Enterprises (SBEs). No public comment or stakeholder sentiment is stated in the document.
- Board:
- Aviation and Seaport Committee
- Date:
- 2026-07-13
- Type:
- Resolution
- Decision:
- Adopted
- Applicant:
- Miami-Dade Aviation Department and PortMiami
PORT OF MIAMI CRANE MANAGEMENT, INC.
Miami-Dade County Board of County Commissioners is considering Resolution File Number 261160, which seeks to waive competitive bidding for Amendment No. 3 to the 2012 Container Handling Crane Maintenance Management Agreement with Port of Miami Crane Management, Inc. (PMCM). This amendment would provide five additional one-year renewals for crane maintenance management services. The estimated annual cost is $25,287,000.00, totaling $126,435,000.00 if all renewal options are exercised. PMCM is a nonprofit corporation created and funded by the County, uniquely qualified to provide these services, with approximately 45% of its budget allocated to ILA labor. The Aviation and Seaport Committee forwarded the item to the Board with a favorable recommendation. The Board is expected to vote on this matter on September 1, 2026.
- Board:
- Aviation and Seaport Committee
- Date:
- 2026-07-13
- Type:
- Resolution
- Decision:
- Pending BCC Assignment (Resolution before the Board)
- Address:
- PortMiami
- Applicant:
- Port of Miami Crane Management, Inc. (PMCM)
PORT OF MIAMI CRANE MANAGEMENT, INC.
The document is a legislative item for a resolution adopted by the Miami-Dade County Commission on 7/21/2026, waiving competitive bidding and approving Amendment No. 3 to the 2012 Container Handling Crane Maintenance Management Agreement between Miami-Dade County and Port of Miami Crane Management, Inc. (PMCM). The amendment provides five additional one-year renewals at an estimated annual cost of $25,287,000.00, and $126,435,000.00 if all renewal options are exercised. The scope is countywide as PortMiami is a regional asset. The resolution was forwarded to the Board of County Commissioners with a favorable recommendation from the Aviation and Seaport Committee on 7/13/2026 and 7/20/2026. No public comment or stakeholder sentiment is stated in the document.
- Board:
- Aviation and Seaport Committee
- Date:
- 2026-07-13
- Type:
- Resolution
- Decision:
- Adopted
- Applicant:
- Port of Miami Crane Management, Inc. (PMCM)
PORT OF MIAMI CRANE MANAGEMENT, INC.
The document is a legislative item for a resolution adopted by the Miami-Dade County Board of County Commissioners on July 21, 2026, waiving competitive bidding and approving Amendment No. 3 to the 2012 Container Handling Crane Maintenance Management Agreement between Miami-Dade County and Port of Miami Crane Management, Inc. (PMCM). The amendment provides the County with five additional one-year renewals at an estimated annual cost of $25,287,000.00, and $126,435,000.00 if all renewal options are exercised. The resolution authorizes the County Mayor or designee to execute the amendment and exercise termination, renewal, and other County rights. The document does not state a specific project site, address, parcel, or size. It describes an administrative contract amendment for crane maintenance management services at PortMiami, located within District 5, with countywide impact. The staff recommendation is to approve the resolution. The document does not state any public comment or stakeholder sentiment.
- Board:
- Aviation and Seaport Committee
- Date:
- 2026-07-13
- Type:
- Resolution
- Decision:
- Adopted
- Applicant:
- Port of Miami Crane Management, Inc. (PMCM), a Florida not for profit corporation
PORT OF MIAMI CRANE MANAGEMENT, INC.
Miami-Dade County Board of County Commissioners adopted Resolution R-631-26 (File Number 261160) on July 21, 2026, waiving competitive bidding and approving Amendment No. 3 to the 2012 Container Handling Crane Maintenance Management Agreement with Port of Miami Crane Management, Inc. (PMCM), a Florida not-for-profit corporation. The amendment provides five additional one-year renewals at an estimated annual cost of $25,287,000.00, and $126,435,000.00 if all renewal options are exercised. The County Mayor or designee is authorized to execute the amendment and exercise termination, renewal, and other County rights. The agreement covers maintenance management of container handling cranes, cargo handling equipment, rubber-tired gantry cranes (RTGs), and passenger boarding bridges at PortMiami. The item was forwarded to the BCC with a favorable recommendation by the Aviation and Seaport Committee on July 13, 2026, and adopted on July 21, 2026. No public comment or stakeholder sentiment is stated in the document.
- Board:
- Aviation and Seaport Committee
- Date:
- 2026-07-13
- Type:
- Resolution
- Decision:
- Adopted
- Applicant:
- Port of Miami Crane Management, Inc. (PMCM)
PORT OF MIAMI CRANE MANAGEMENT, INC.
The document is a legislative item for a resolution adopted by the Miami-Dade County Commission on 7/21/2026, waiving competitive bidding and authorizing Amendment No. 3 to the 2012 Container Handling Crane Maintenance Management Agreement between Miami-Dade County and Port of Miami Crane Management, Inc. (PMCM). The amendment provides five additional one-year renewals at an estimated annual cost of $25,287,000.00, and $126,435,000.00 if all renewal options are exercised. The project location is PortMiami, within District 5. The applicant is Port of Miami Crane Management, Inc. The case file number is 261160, with reference R-631-26. The decision was Adopted. The document does not state a specific street address, parcel/folio, acreage, or number of units/lots. The zoning/use change is not stated; the action is a contract amendment for crane maintenance management services. Public comment sentiment is not stated in the document.
- Board:
- Aviation and Seaport Committee
- Date:
- 2026-07-13
- Type:
- Resolution
- Decision:
- Adopted
- Applicant:
- Port of Miami Crane Management, Inc. (PMCM)
PORT OF MIAMI CRANE MANAGEMENT, INC.
The document is a legislative item for a resolution waiving competitive bidding and approving Amendment No. 3 to the 2012 Container Handling Crane Maintenance Management Agreement between Miami-Dade County and Port of Miami Crane Management, Inc. (PMCM). The amendment provides the County with five additional one-year renewals at an estimated annual cost of $25,287,000.00, and $126,435,000.00 if all renewal options are exercised. The resolution was adopted on 7/21/2026. No specific street address, parcel, or project size is stated. The work involves maintenance management of container handling cranes and cargo handling equipment at PortMiami, including rubber-tired gantry cranes (RTGs) and Passenger Boarding Bridges (PBBs). The applicant is Port of Miami Crane Management, Inc. The case/file number is 261160, with reference R-631-26. The decision was Adopted. Key dates include introduction on 6/24/2026, committee favorable recommendation on 7/13/2026, and final action on 7/21/2026. The business opportunity is for contractors/trades to potentially provide services or materials to PMCM, which operates at cost with no mark-up, but the document does not specify a procurement process or project scope beyond the maintenance agreement. No public comment or stakeholder sentiment is stated in the document.
- Board:
- Aviation and Seaport Committee
- Date:
- 2026-07-13
- Type:
- Resolution
- Decision:
- Adopted
- Applicant:
- Port of Miami Crane Management, Inc.
PORT OF MIAMI CRANE MANAGEMENT, INC.
Miami-Dade County is seeking to approve and execute Amendment No. 3 to the 2012 Container Handling Crane Maintenance Management Agreement with Port of Miami Crane Management, Inc. (PMCM). This amendment will add five additional one-year renewals to the existing agreement. Competitive bidding procedures are being waived for this amendment. PMCM is a Florida not-for-profit corporation created and funded by the County, responsible for managing the maintenance of the County's seaport gantry cranes and other cargo handling equipment. The estimated annual cost for the renewals is $25,287,000.00, totaling $126,435,000.00 if all renewal options are exercised. The agreement also covers maintenance for Rubber-Tired Gantry Cranes (RTGs) and Passenger Boarding Bridges (PBBs). The item is currently 'In Committee' with an Agenda Date of 9/1/2026.
- Board:
- Aviation and Seaport Committee
- Date:
- 2026-07-13
- Type:
- Resolution
- Decision:
- In Committee
- Address:
- PortMiami
- Applicant:
- Port of Miami Crane Management, Inc. (PMCM)
PORT OF MIAMI CRANE MANAGEMENT, INC.
The document is a legislative item for a resolution adopted by the Miami-Dade Board of County Commissioners on 7/21/2026, waiving competitive bidding and approving Amendment No. 3 to the 2012 Container Handling Crane Maintenance Management Agreement between Miami-Dade County and Port of Miami Crane Management, Inc. (PMCM). The amendment provides the County with five additional one-year renewals at an estimated annual cost of $25,287,000.00, and $126,435,000.00 if all renewal options are exercised. The project location is PortMiami, located within District 5. The applicant is Port of Miami. The case/file number is 261160, with reference R-631-26. The decision was adopted. The document does not state a specific street address, parcel/folio, acreage, or number of units/lots. Public comment sentiment is not stated.
- Board:
- Aviation and Seaport Committee
- Date:
- 2026-07-13
- Type:
- Resolution
- Decision:
- Adopted
- Applicant:
- Port of Miami
PORT OF MIAMI CRANE MANAGEMENT, INC.
The document is a legislative item for a resolution adopted by the Miami-Dade County Commission on 7/21/2026, waiving competitive bidding and approving Amendment No. 3 to the 2012 Container Handling Crane Maintenance Management Agreement between Miami-Dade County and Port of Miami Crane Management, Inc. (PMCM). The amendment provides the County with five additional one-year renewals at an estimated annual cost of $25,287,000.00, and $126,435,000.00 if all renewal options are exercised. The project location is PortMiami, within District 5, represented by Commissioner Vicki L. Lopez. The document does not state a specific street address, parcel/folio, acreage, or zoning/use change. The applicant/developer/owner is Port of Miami Crane Management, Inc. (PMCM), a Florida not for profit corporation. The case/file number is 261160, with reference R-631-26. The decision was Adopted on 7/21/2026. Key dates include introduction on 6/24/2026, Aviation and Seaport Committee favorable recommendation on 7/13/2026, and final action on 7/21/2026. The business opportunity is the maintenance management of container handling cranes and cargo handling equipment at PortMiami, including rubber-tired gantry cranes (RTGs) and Passenger Boarding Bridges (PBBs), with a five-year renewal option. The document does not state any public comment or stakeholder sentiment.
- Board:
- Aviation and Seaport Committee
- Date:
- 2026-07-13
- Type:
- Resolution
- Decision:
- Adopted
- Applicant:
- Port of Miami Crane Management, Inc. (PMCM)
PORT OF MIAMI CRANE MANAGEMENT, INC.
Miami-Dade County Board of County Commissioners (BCC) is considering Resolution File Number 261160, which proposes waiving competitive bidding to approve and execute Amendment No. 3 to the 2012 Container Handling Crane Maintenance Management Agreement with Port of Miami Crane Management, Inc. (PMCM). This amendment would provide five additional one-year renewals for crane maintenance management services. The estimated annual cost is $25,287,000.00, with a potential total of $126,435,000.00 if all renewal options are exercised. PMCM is a Florida not-for-profit corporation created and funded by the County, uniquely qualified to provide these services, with approximately 45% of its budget allocated to International Longshoremen's Association (ILA) labor. The Aviation and Seaport Committee forwarded the resolution to the BCC with a favorable recommendation on 7/13/2026. The BCC agenda date is 9/1/2026.
- Board:
- Aviation and Seaport Committee
- Date:
- 2026-07-13
- Type:
- Resolution
- Decision:
- Forwarded to BCC with a favorable recommendation by Aviation and Seaport Committee; Pending BCC Assignment
- Address:
- PortMiami
- Applicant:
- Port of Miami Crane Management, Inc. (PMCM)
PORT OF MIAMI CRANE MANAGEMENT, INC.
Miami-Dade County Board of County Commissioners approved Amendment No. 3 to the 2012 Container Handling Crane Maintenance Management Agreement between the County and Port of Miami Crane Management, Inc. (PMCM). This amendment waives competitive bidding and adds five additional one-year renewals to the agreement. The estimated annual cost is $25,287,000.00, totaling $126,435,000.00 if all renewal options are exercised. PMCM is a Florida not-for-profit corporation created and funded by the County to manage maintenance of seaport gantry cranes and other cargo handling equipment. The Aviation and Seaport Committee forwarded the item with a favorable recommendation. No public comment was stated in the document.
- Board:
- Aviation and Seaport Committee
- Date:
- 2026-07-13
- Type:
- Resolution
- Decision:
- Approved
- Address:
- PortMiami
- Applicant:
- Port of Miami Crane Management, Inc. (PMCM)
PORT OF MIAMI CRANE MANAGEMENT, INC.
Miami-Dade County is seeking to approve and execute Amendment No. 3 to the 2012 Container Handling Crane Maintenance Management Agreement with Port of Miami Crane Management, Inc. (PMCM). This amendment will add five additional one-year renewals to the existing agreement. Competitive bidding will be waived. The estimated annual cost for these renewals is $25,287,000.00, totaling $126,435,000.00 if all renewal options are exercised. PMCM is a Florida not-for-profit corporation created and funded by the County, responsible for the maintenance of the Port's gantry cranes and other cargo handling equipment. The agreement also covers Passenger Boarding Bridges. The item is currently 'In Committee' and has an Agenda Date of 9/1/2026.
- Board:
- Aviation and Seaport Committee
- Date:
- 2026-07-13
- Type:
- Resolution
- Decision:
- In Committee
- Address:
- PortMiami
- Applicant:
- Port of Miami Crane Management, Inc. (PMCM)
PORT OF MIAMI CRANE MANAGEMENT, INC.
Miami-Dade County Board of County Commissioners is considering Amendment No. 3 to the 2012 Container Handling Crane Maintenance Management Agreement with Port of Miami Crane Management, Inc. (PMCM). This amendment seeks to add five additional one-year renewals to the existing agreement. Competitive bidding is being waived. PMCM is a Florida not-for-profit corporation created and funded by the County to manage the maintenance of the Port's gantry cranes and cargo handling equipment. The estimated annual cost for these renewals is $25,287,000.00, totaling $126,435,000.00 if all renewal options are exercised. The agreement also covers maintenance for Rubber-Tired Gantry Cranes (RTGs) and Passenger Boarding Bridges (PBBs). The matter is currently 'In Committee' with an Agenda Date of 9/1/2026.
- Board:
- Aviation and Seaport Committee
- Date:
- 2026-07-13
- Type:
- Resolution
- Decision:
- In Committee
- Address:
- PortMiami
- Applicant:
- Port of Miami Crane Management, Inc. (PMCM)
PORT OF MIAMI CRANE MANAGEMENT, INC.
Resolution waiving competitive bidding and approving Amendment No. 3 to the 2012 Container Handling Crane Maintenance Management Agreement between Miami-Dade County and Port of Miami Crane Management, Inc. (PMCM), a Florida not for profit corporation. The amendment provides the County with five additional one-year renewals at an estimated annual cost of $25,287,000.00, and $126,435,000.00 if all renewal options are exercised. The resolution was adopted by the Board of County Commissioners on 7/21/2026. The scope is countywide as PortMiami is a regional asset. The proposed annual operating expense budget for FY 2026/2027 for PMCM is approximately $25,287,000. Approximately 45% of the budget is utilized for International Longshoremen's Association (ILA) labor. PMCM is a nonprofit created by the County on June 6, 1999 through resolution No. R-671-99. The Agreement was previously approved by Resolution No. R-638-12, extended by Resolution R-761-17, and modified by Resolution No. R-485-19. Amendment No. 2 was authorized on July 8, 2021. The Seaport Department staff members responsible for monitoring the Agreement are Frederick P. Wong, Jr. Interim Port Director, and Dalgis Betancourt, Assistant Director - Operations. No public comment or stakeholder sentiment is stated in the document.
- Board:
- Aviation and Seaport Committee
- Date:
- 2026-07-13
- Type:
- Resolution
- Decision:
- Adopted
- Applicant:
- Port of Miami Crane Management, Inc. (PMCM)
PORT OF MIAMI CRANE MANAGEMENT, INC.
The document is a legislative item for Miami-Dade County, file number 261160, a resolution adopted on 7/21/2026, waiving competitive bidding and approving Amendment No. 3 to the 2012 Container Handling Crane Maintenance Management Agreement between Miami-Dade County and Port of Miami Crane Management, Inc. (PMCM). The amendment provides five additional one-year renewals at an estimated annual cost of $25,287,000.00, and $126,435,000.00 if all renewal options are exercised. The scope is countywide as PortMiami is a regional asset. The applicant is Port of Miami Crane Management, Inc., a Florida not for profit corporation. The decision was adopted. No public comment or stakeholder sentiment is stated in the document.
- Board:
- Aviation and Seaport Committee
- Date:
- 2026-07-13
- Type:
- Resolution
- Decision:
- Adopted
- Applicant:
- Port of Miami Crane Management, Inc.
PORT OF MIAMI CRANE MANAGEMENT, INC.
Miami-Dade County Board of County Commissioners is considering Amendment No. 3 to the 2012 Container Handling Crane Maintenance Management Agreement with Port of Miami Crane Management, Inc. (PMCM). This amendment waives competitive bidding and adds five additional one-year renewals to the agreement. PMCM, a county-created nonprofit, manages maintenance for the Port's gantry cranes and cargo handling equipment. The estimated annual cost for renewals is $25,287,000, totaling $126,435,000 if all renewal options are exercised. The Aviation and Seaport Committee forwarded the item to the Board with a favorable recommendation. The agreement covers maintenance for container handling cranes, cargo handling equipment, Rubber-Tired Gantry Cranes (RTGs), and Passenger Boarding Bridges (PBBs). Approximately 45% of PMCM's budget is for International Longshoremen's Association (ILA) labor.
- Board:
- Aviation and Seaport Committee
- Date:
- 2026-07-13
- Type:
- Resolution
- Decision:
- Pending BCC Assignment (Forwarded to BCC with a favorable recommendation by Aviation and Seaport Committee)
- Address:
- PortMiami
- Applicant:
- Port of Miami Crane Management, Inc. (PMCM)
PORT OF MIAMI CRANE MANAGEMENT, INC.
Miami-Dade County Board of County Commissioners approved Amendment No. 3 to the 2012 Container Handling Crane Maintenance Management Agreement between the County and Port of Miami Crane Management, Inc. (PMCM). This amendment waives competitive bidding and adds five additional one-year renewals to the agreement. The estimated annual cost is $25,287,000.00, totaling $126,435,000.00 if all renewal options are exercised. PMCM is a Florida not-for-profit corporation created and funded by the County to manage maintenance of seaport gantry cranes and cargo handling equipment. The Aviation and Seaport Committee forwarded the item with a favorable recommendation to the Board of County Commissioners. No public comment is stated in the document.
- Board:
- Aviation and Seaport Committee
- Date:
- 2026-07-13
- Type:
- Resolution
- Decision:
- Approved
- Address:
- PortMiami
- Applicant:
- Port of Miami Crane Management, Inc. (PMCM)
PORT OF MIAMI CRANE MANAGEMENT, INC.
The document is a legislative item for a resolution adopted by the Miami-Dade County Commission on July 21, 2026, waiving competitive bidding and approving Amendment No. 3 to the 2012 Container Handling Crane Maintenance Management Agreement between Miami-Dade County and Port of Miami Crane Management, Inc. (PMCM). The amendment provides five additional one-year renewals at an estimated annual cost of $25,287,000.00, and $126,435,000.00 if all renewal options are exercised. The project location is PortMiami, within District 5, represented by Commissioner Vicki L. Lopez. The applicant is Port of Miami Crane Management, Inc., a Florida not for profit corporation. The case file number is 261160, reference R-631-26. The decision was adopted. Key dates include introduction on 6/24/2026, final action on 7/21/2026, and committee favorable recommendation on 7/13/2026. No public comment or stakeholder sentiment is stated in the document.
- Board:
- Aviation and Seaport Committee
- Date:
- 2026-07-13
- Type:
- Resolution
- Decision:
- Adopted
- Address:
- PortMiami (Seaport Department or Port), located within District 5, represented by Commissioner Vicki L. Lopez.
- Applicant:
- Port of Miami Crane Management, Inc. (PMCM), a Florida not for profit corporation
PORT OF MIAMI CRANE MANAGEMENT, INC.
Miami-Dade County is seeking to approve and execute Amendment No. 3 to the 2012 Container Handling Crane Maintenance Management Agreement with Port of Miami Crane Management, Inc. (PMCM). This amendment will add five additional one-year renewals to the existing agreement. Competitive bidding procedures will be waived. The estimated annual cost for these renewals is $25,287,000.00, totaling $126,435,000.00 if all renewal options are exercised. PMCM is a Florida not-for-profit corporation created and funded by the County, uniquely qualified to manage the maintenance of the Port's gantry cranes and cargo handling equipment, including Rubber-Tired Gantry Cranes and Passenger Boarding Bridges. Approximately 45% of PMCM's budget is allocated to International Longshoremen's Association (ILA) labor.
- Board:
- Aviation and Seaport Committee
- Date:
- 2026-07-13
- Type:
- Resolution
- Decision:
- In Committee
- Address:
- PortMiami
- Applicant:
- Port of Miami Crane Management, Inc. (PMCM)
PORT OF MIAMI CRANE MANAGEMENT, INC.
Miami-Dade County Board of County Commissioners adopted Resolution R-631-26 (File Number 261160) on July 21, 2026, waiving competitive bidding and approving Amendment No. 3 to the 2012 Container Handling Crane Maintenance Management Agreement between Miami-Dade County and Port of Miami Crane Management, Inc. (PMCM), a Florida not-for-profit corporation. Amendment No. 3 provides the County with five additional one-year renewals at an estimated annual cost of $25,287,000.00, and $126,435,000.00 if all renewal options are exercised. The resolution authorizes the County Mayor or designee to execute Amendment No. 3 and exercise all termination, renewal, and other County rights. The item was forwarded to the Board with a favorable recommendation by the Aviation and Seaport Committee on July 13, 2026, and was adopted on July 21, 2026. The document does not state a specific street address, parcel or folio, acreage, or number of units or lots. The scope is stated as countywide, with PortMiami located within District 5. The document states there is no new fiscal impact as PMCM is a nonprofit corporation operated and funded by the County. The document does not state any public comment or stakeholder sentiment.
- Board:
- Aviation and Seaport Committee
- Date:
- 2026-07-13
- Type:
- Resolution
- Decision:
- Adopted
- Applicant:
- Port of Miami Crane Management, Inc. (PMCM)
PORT OF MIAMI CRANE MANAGEMENT, INC.
Miami-Dade County is seeking to approve and execute Amendment No. 3 to the 2012 Container Handling Crane Maintenance Management Agreement with Port of Miami Crane Management, Inc. (PMCM). This amendment will add five additional one-year renewals to the existing agreement. Competitive bidding will be waived. PMCM is a Florida not-for-profit corporation created and funded by the County, uniquely qualified to provide maintenance for the Port's container handling cranes and other cargo equipment. The estimated annual cost for the renewals is $25,287,000.00, totaling $126,435,000.00 if all renewal options are exercised. The agreement covers maintenance of container handling cranes, rubber-tired gantry cranes (RTGs), and passenger boarding bridges (PBBs). Approximately 45% of PMCM's budget is for International Longshoremen's Association (ILA) labor.
- Board:
- Aviation and Seaport Committee
- Date:
- 2026-07-13
- Type:
- Resolution
- Decision:
- In Committee
- Address:
- PortMiami
- Applicant:
- Port of Miami Crane Management, Inc. (PMCM)
PORT OF MIAMI CRANE MANAGEMENT, INC.
Miami-Dade Board of County Commissioners is considering Resolution File Number 261160, which proposes waiving competitive bidding to approve and execute Amendment No. 3 to the 2012 Container Handling Crane Maintenance Management Agreement with Port of Miami Crane Management, Inc. This amendment would provide five additional one-year renewals, with an estimated annual cost of $25,287,000.00, totaling $126,435,000.00 if all renewals are exercised. Port of Miami Crane Management, Inc. is a Florida not-for-profit corporation created and funded by the County to manage the maintenance of seaport gantry cranes and other cargo handling equipment. The Aviation and Seaport Committee forwarded this item to the Board with a favorable recommendation. The item is scheduled for an Agenda Date of 7/21/2026.
- Board:
- Aviation and Seaport Committee
- Date:
- 2026-07-13
- Type:
- Resolution
- Decision:
- Pending BCC Assignment
- Address:
- PortMiami
- Applicant:
- Port of Miami Crane Management, Inc.
PORT OF MIAMI CRANE MANAGEMENT, INC.
Miami-Dade County is seeking to approve and execute Amendment No. 3 to the 2012 Container Handling Crane Maintenance Management Agreement with Port of Miami Crane Management, Inc. (PMCM). This amendment will add five additional one-year renewals to the existing agreement. Competitive bidding procedures are being waived for this approval. PMCM is a Florida not-for-profit corporation created and funded by the County, uniquely qualified to manage the maintenance of the Port's container handling cranes and other cargo equipment. The estimated annual cost for the renewals is $25,287,000.00, totaling $126,435,000.00 if all renewal options are exercised. The agreement also covers maintenance for Rubber-Tired Gantry Cranes and Passenger Boarding Bridges. The item is currently 'In Committee' with an Agenda Date of 9/1/2026.
- Board:
- Aviation and Seaport Committee
- Date:
- 2026-07-13
- Type:
- Resolution
- Decision:
- In Committee
- Address:
- PortMiami
- Applicant:
- Port of Miami Crane Management, Inc. (PMCM)
PORT OF MIAMI CRANE MANAGEMENT, INC.
The document is a legislative item for a resolution adopted by the Miami-Dade County Commission on July 21, 2026, waiving competitive bidding and approving Amendment No. 3 to the 2012 Container Handling Crane Maintenance Management Agreement between Miami-Dade County and Port of Miami Crane Management, Inc. (PMCM). The amendment provides five additional one-year renewals at an estimated annual cost of $25,287,000.00, and $126,435,000.00 if all renewal options are exercised. The agreement covers maintenance of container handling cranes and cargo handling equipment at PortMiami, including rubber-tired gantry cranes (RTGs) and Passenger Boarding Bridges (PBBs). The resolution was forwarded to the Board of County Commissioners with a favorable recommendation from the Aviation and Seaport Committee on July 13, 2026, and adopted on July 21, 2026. No specific street address, parcel, or acreage is stated. No public comment or stakeholder sentiment is stated.
- Board:
- Aviation and Seaport Committee
- Date:
- 2026-07-13
- Type:
- Resolution
- Decision:
- Adopted
- Applicant:
- Port of Miami Crane Management, Inc. (PMCM)
PORT OF MIAMI CRANE MANAGEMENT, INC.
Miami-Dade County Commission is considering Resolution File Number 261160, which proposes waiving competitive bidding to approve and execute Amendment No. 3 to the 2012 Container Handling Crane Maintenance Management Agreement between Miami-Dade County and Port of Miami Crane Management, Inc. (PMCM). This amendment would provide five additional one-year renewals to the agreement. The estimated annual cost is $25,287,000.00, totaling $126,435,000.00 if all renewal options are exercised. PMCM is a Florida not-for-profit corporation created and funded by the County, uniquely qualified to manage the maintenance of the Port's gantry cranes and cargo handling equipment, including Rubber-Tired Gantry Cranes and Passenger Boarding Bridges. Approximately 45% of PMCM's budget is for International Longshoremen's Association (ILA) labor. The Aviation and Seaport Committee forwarded this item to the Board of County Commissioners with a favorable recommendation.
- Board:
- Aviation and Seaport Committee
- Date:
- 2026-07-13
- Type:
- Resolution
- Decision:
- Recommended for approval by Aviation and Seaport Committee; pending Board of County Commissioners decision.
- Address:
- PortMiami
- Applicant:
- Port of Miami Crane Management, Inc. (PMCM)
PORT OF MIAMI CRANE MANAGEMENT, INC.
Miami-Dade County Board of County Commissioners is considering Amendment No. 3 to the 2012 Container Handling Crane Maintenance Management Agreement with Port of Miami Crane Management, Inc. (PMCM). This amendment waives competitive bidding and adds five additional one-year renewals to the agreement. PMCM is a nonprofit created and funded by the County to manage maintenance of seaport gantry cranes and cargo handling equipment. The estimated annual cost for renewals is $25,287,000, totaling $126,435,000 if all renewal options are exercised. The Aviation and Seaport Committee forwarded the item to the Board with a favorable recommendation. The agreement covers maintenance of container handling cranes, cargo handling equipment, Rubber-Tired Gantry Cranes (RTGs), and Passenger Boarding Bridges (PBBs). Approximately 45% of PMCM's budget is for International Longshoremen's Association (ILA) labor.
- Board:
- Aviation and Seaport Committee
- Date:
- 2026-07-13
- Type:
- Resolution
- Decision:
- Pending BCC Assignment (Forwarded to BCC with a favorable recommendation by Aviation and Seaport Committee)
- Address:
- PortMiami
- Applicant:
- Port of Miami Crane Management, Inc. (PMCM)
PORT OF MIAMI CRANE MANAGEMENT, INC.
Miami-Dade County Board of County Commissioners is considering Resolution File Number 261160, which proposes waiving competitive bidding to approve and execute Amendment No. 3 to the 2012 Container Handling Crane Maintenance Management Agreement with Port of Miami Crane Management, Inc. (PMCM). This amendment would provide five additional one-year renewals, with an estimated annual cost of $25,287,000.00, totaling $126,435,000.00 if all renewals are exercised. PMCM is a Florida not-for-profit corporation created and funded by the County to manage maintenance of the Port's gantry cranes and other cargo handling equipment. The Aviation and Seaport Committee forwarded this item to the Board with a favorable recommendation on 7/13/2026. The Board is scheduled to consider this item on 9/1/2026.
- Board:
- Aviation and Seaport Committee
- Date:
- 2026-07-13
- Type:
- Resolution
- Decision:
- Pending BCC Assignment (Forwarded to BCC with a favorable recommendation by Aviation and Seaport Committee)
- Address:
- PortMiami
- Applicant:
- Port of Miami Crane Management, Inc. (PMCM)
PORT OF MIAMI CRANE MANAGEMENT, INC.
The Board of County Commissioners adopted Resolution R-631-26 (File Number 261160) on July 21, 2026, approving Amendment No. 3 to the 2012 Container Handling Crane Maintenance Management Agreement between Miami-Dade County and Port of Miami Crane Management, Inc. (PMCM). The amendment provides the County with five additional one-year renewals at an estimated annual cost of $25,287,000.00, and $126,435,000.00 if all renewal options are exercised. The resolution waives competitive bidding pursuant to Section 2-8.1 of the Code of Miami-Dade County and Section 5.03(D) of the Home Rule Charter. The item was forwarded to the Board with a favorable recommendation from the Aviation and Seaport Committee on July 13, 2026. The document does not state a specific street address, parcel, acreage, or zoning change. The scope is stated as PortMiami, located within District 5, with countywide impact. The applicant is Port of Miami Crane Management, Inc., a Florida not for profit corporation. The document does not state any public comment or stakeholder sentiment.
- Board:
- Aviation and Seaport Committee
- Date:
- 2026-07-13
- Type:
- Resolution
- Decision:
- Adopted
- Applicant:
- Port of Miami Crane Management, Inc.
PORT OF MIAMI CRANE MANAGEMENT, INC.
The document is a legislative item for a resolution adopted by the Miami-Dade County Commission on July 21, 2026, waiving competitive bidding and approving Amendment No. 3 to the 2012 Container Handling Crane Maintenance Management Agreement between Miami-Dade County and Port of Miami Crane Management, Inc. (PMCM). The amendment provides five additional one-year renewals at an estimated annual cost of $25,287,000.00, and $126,435,000.00 if all renewal options are exercised. The project location is PortMiami, located within District 5, represented by Commissioner Vicki L. Lopez. No specific street address, parcel, or acreage is stated. The applicant is Port of Miami Crane Management, Inc., a Florida not for profit corporation. The case/file number is 261160, with reference R-631-26. The decision was adopted. Key dates include introduction on 6/24/2026, committee favorable recommendation on 7/13/2026, forwarded to BCC on 7/20/2026, and final action on 7/21/2026. The business opportunity is for contractors and trades to provide maintenance management services for container handling cranes, cargo handling equipment, rubber-tired gantry cranes (RTGs), and passenger boarding bridges (PBBs) at PortMiami, with a budget of approximately $25,287,000 annually for FY 2026/2027, and $126,435,000 over five years if all renewals are exercised. No public comment or stakeholder sentiment is stated in the document.
- Board:
- Aviation and Seaport Committee
- Date:
- 2026-07-13
- Type:
- Resolution
- Decision:
- Adopted
- Applicant:
- Port of Miami Crane Management, Inc.
PORT OF MIAMI CRANE MANAGEMENT, INC.
Miami-Dade County Board of County Commissioners is considering Resolution File Number 261160, which proposes waiving competitive bidding for Amendment No. 3 to the 2012 Container Handling Crane Maintenance Management Agreement with Port of Miami Crane Management, Inc. (PMCM). This amendment would provide five additional one-year renewals for the agreement. The estimated annual cost is $25,287,000.00, totaling $126,435,000.00 if all renewal options are exercised. PMCM is a Florida not-for-profit corporation created and funded by the County to manage the maintenance of the Port's gantry cranes and cargo handling equipment. The Aviation and Seaport Committee forwarded this item to the Board with a favorable recommendation. The item is scheduled for the Board of County Commissioners agenda on September 1, 2026.
- Board:
- Aviation and Seaport Committee
- Date:
- 2026-07-13
- Type:
- Resolution
- Decision:
- Pending BCC Assignment (scheduled for 9/1/2026 agenda)
- Address:
- PortMiami
- Applicant:
- Port of Miami Crane Management, Inc.
PORT OF MIAMI CRANE MANAGEMENT, INC.
The document is a legislative item for Miami-Dade County, File Number 261160, a Resolution (R-631-26) adopted on 7/21/2026. It waives competitive bidding and approves Amendment No. 3 to the 2012 Container Handling Crane Maintenance Management Agreement between Miami-Dade County and Port of Miami Crane Management, Inc. (PMCM). The amendment provides five additional one-year renewals at an estimated annual cost of $25,287,000.00, and $126,435,000.00 if all renewal options are exercised. The project is located at PortMiami, within District 5, represented by Commissioner Vicki L. Lopez. The applicant is Port of Miami. The decision was adopted on 7/21/2026. The document does not state a specific street address, parcel/folio, acreage, or number of units/lots. The zoning/use change is not stated; the action is a contract amendment for crane maintenance management services. Public comment sentiment is not stated.
- Board:
- Aviation and Seaport Committee
- Date:
- 2026-07-13
- Type:
- Resolution
- Decision:
- Adopted
- Applicant:
- Port of Miami
PORT OF MIAMI CRANE MANAGEMENT, INC.
Miami-Dade Board of County Commissioners is considering Resolution File Number 261160, which seeks to waive competitive bidding for Amendment No. 3 to the 2012 Container Handling Crane Maintenance Management Agreement with Port of Miami Crane Management, Inc. (PMCM). This amendment would provide five additional one-year renewals for crane maintenance services. The estimated annual cost is $25,287,000.00, totaling $126,435,000.00 if all renewals are exercised. PMCM is a nonprofit created and funded by the County to manage seaport gantry cranes and cargo handling equipment. The Aviation and Seaport Committee forwarded the resolution to the Board with a favorable recommendation. No public comment is stated in the document.
- Board:
- Aviation and Seaport Committee
- Date:
- 2026-07-13
- Type:
- Resolution
- Decision:
- Pending BCC Assignment (as of document date)
- Address:
- PortMiami
- Applicant:
- Port of Miami Crane Management, Inc. (PMCM)
PORT OF MIAMI CRANE MANAGEMENT, INC.
Miami-Dade County Board of County Commissioners is considering Amendment No. 3 to the 2012 Container Handling Crane Maintenance Management Agreement with Port of Miami Crane Management, Inc. (PMCM). This amendment seeks to waive competitive bidding requirements and add five additional one-year renewals to the existing agreement. PMCM, a Florida not-for-profit corporation created and funded by the County, manages the maintenance of the Port's gantry cranes and other cargo handling equipment. The estimated annual cost for these services is $25,287,000, with a total potential cost of $126,435,000 if all renewal options are exercised. The Aviation and Seaport Committee has forwarded this item to the Board of County Commissioners with a favorable recommendation. The agreement involves International Longshoremen's Association (ILA) labor, which constitutes approximately 45% of PMCM's budget.
- Board:
- Aviation and Seaport Committee
- Date:
- 2026-07-13
- Type:
- Resolution
- Decision:
- Pending BCC Assignment (Forwarded to BCC with a favorable recommendation by Aviation and Seaport Committee)
- Address:
- PortMiami
- Applicant:
- Port of Miami Crane Management, Inc. (PMCM)
PORT OF MIAMI CRANE MANAGEMENT, INC.
Miami-Dade County Commissioners are considering approving Amendment No. 3 to the 2012 Container Handling Crane Maintenance Management Agreement with Port of Miami Crane Management, Inc. (PMCM). This amendment would waive competitive bidding and add five additional one-year renewals to the existing agreement. The estimated annual cost for these renewals is $25,287,000.00, totaling $126,435,000.00 if all renewal options are exercised. PMCM is a Florida not-for-profit corporation created and funded by the County to manage the maintenance of seaport gantry cranes and other cargo handling equipment. The Aviation and Seaport Committee forwarded this item to the Board of County Commissioners with a favorable recommendation. No public comment is stated in the document.
- Board:
- Aviation and Seaport Committee
- Date:
- 2026-07-13
- Type:
- Resolution
- Decision:
- Recommended for approval by Aviation and Seaport Committee; pending Board of County Commissioners approval
- Address:
- PortMiami
- Applicant:
- Port of Miami Crane Management, Inc. (PMCM)
PORT OF MIAMI CRANE MANAGEMENT, INC.
Resolution waiving competitive bidding to approve Amendment No. 3 to the 2012 Container Handling Crane Maintenance Management Agreement between Miami-Dade County and Port of Miami Crane Management, Inc. (PMCM), a Florida not for profit corporation. Amendment No. 3 provides the County with five additional one-year renewals at an estimated annual cost of $25,287,000.00, and $126,435,000.00 if all renewal options are exercised. The resolution authorizes the County Mayor or designee to execute Amendment No. 3 and exercise termination, renewal, and other County rights. The item was forwarded to the Board of County Commissioners with a favorable recommendation by the Aviation and Seaport Committee on 7/13/2026 and placed on the July 21, 2026 Board agenda. No final action is stated. No public comment or stakeholder sentiment is stated.
- Board:
- Aviation and Seaport Committee
- Date:
- 2026-07-13
- Type:
- Resolution
- Decision:
- Forwarded to BCC with a favorable recommendation by the Aviation and Seaport Committee on 7/13/2026; placed on the July 21, 2026 Board agenda; final action not stated
- Applicant:
- Port of Miami Crane Management, Inc. (PMCM)
PORT OF MIAMI CRANE MANAGEMENT, INC.
Miami-Dade County Board of County Commissioners (BCC) is considering Resolution File Number 261160, which proposes waiving competitive bidding to approve and execute Amendment No. 3 to the 2012 Container Handling Crane Maintenance Management Agreement with Port of Miami Crane Management, Inc. (PMCM). This amendment would provide five additional one-year renewals for the agreement. The estimated annual cost is $25,287,000.00, totaling $126,435,000.00 if all renewal options are exercised. PMCM is a Florida not-for-profit corporation created and funded by the County to manage maintenance of the Port's gantry cranes and other cargo handling equipment, including Rubber-Tired Gantry Cranes (RTGs) and Passenger Boarding Bridges. The Aviation and Seaport Committee forwarded this item to the BCC with a favorable recommendation on 7/13/2026. The BCC Agenda Date is 9/1/2026.
- Board:
- Aviation and Seaport Committee
- Date:
- 2026-07-13
- Type:
- Resolution
- Decision:
- Forwarded to BCC with a favorable recommendation by Aviation and Seaport Committee; Pending BCC Assignment
- Address:
- PortMiami
- Applicant:
- Port of Miami Crane Management, Inc. (PMCM)
PORT OF MIAMI CRANE MANAGEMENT, INC.
The document is a legislative item for Miami-Dade County, file number 261160, a resolution that was adopted on 7/21/2026. It approves Amendment No. 3 to the 2012 Container Handling Crane Maintenance Management Agreement between Miami-Dade County and Port of Miami Crane Management, Inc. (PMCM), a Florida not for profit corporation. The amendment provides the County with five additional one-year renewals at an estimated annual cost of $25,287,000.00, and $126,435,000.00 if all renewal options are exercised. The resolution waives competitive bidding requirements. The project location is PortMiami, within District 5. The applicant is Port of Miami. The decision was adopted. The document does not state a specific street address, parcel/folio, acreage, or a zoning/use change.
- Board:
- Aviation and Seaport Committee
- Date:
- 2026-07-13
- Type:
- Resolution
- Decision:
- Adopted
- Applicant:
- Port of Miami
PORT OF MIAMI CRANE MANAGEMENT, INC.
Miami-Dade County Board of County Commissioners (BCC) is considering Resolution File Number 261160, which proposes waiving competitive bidding to approve and execute Amendment No. 3 to the 2012 Container Handling Crane Maintenance Management Agreement with Port of Miami Crane Management, Inc. (PMCM). This amendment would provide five additional one-year renewals for crane maintenance management services. The estimated annual cost is $25,287,000.00, totaling $126,435,000.00 if all renewal options are exercised. PMCM is a Florida not-for-profit corporation created and funded by the County, uniquely qualified to provide these services, with approximately 45% of its budget allocated to International Longshoremen's Association (ILA) labor. The Aviation and Seaport Committee forwarded the resolution to the BCC with a favorable recommendation on 7/13/2026. The BCC agenda date is 9/1/2026.
- Board:
- Aviation and Seaport Committee
- Date:
- 2026-07-13
- Type:
- Resolution
- Decision:
- Forwarded to BCC with a favorable recommendation by Aviation and Seaport Committee; Pending BCC Assignment
- Address:
- PortMiami
- Applicant:
- Port of Miami Crane Management, Inc. (PMCM)
PORT OF MIAMI CRANE MANAGEMENT, INC.
Miami-Dade County Commissioners are considering approving Amendment No. 3 to the 2012 Container Handling Crane Maintenance Management Agreement with Port of Miami Crane Management, Inc. (PMCM). This amendment waives competitive bidding and adds five additional one-year renewals to the existing agreement. The estimated annual cost is $25,287,000, totaling $126,435,000 if all renewals are exercised. PMCM is a nonprofit created and funded by the County to manage maintenance of seaport gantry cranes and cargo handling equipment. The Aviation and Seaport Committee forwarded the resolution with a favorable recommendation to the Board of County Commissioners. No public comment is stated in the document.
- Board:
- Aviation and Seaport Committee
- Date:
- 2026-07-13
- Type:
- Resolution
- Decision:
- Recommended for approval by Aviation and Seaport Committee; pending Board of County Commissioners approval
- Address:
- PortMiami
- Applicant:
- Port of Miami Crane Management, Inc. (PMCM)
PORT OF MIAMI CRANE MANAGEMENT, INC.
The document is a legislative item for a resolution adopted by the Miami-Dade County Board of County Commissioners on 7/21/2026. The resolution waives competitive bidding and approves Amendment No. 3 to the 2012 Container Handling Crane Maintenance Management Agreement between Miami-Dade County and Port of Miami Crane Management, Inc. (PMCM). The amendment provides the County with five additional one-year renewals at an estimated annual cost of $25,287,000.00, and $126,435,000.00 if all renewal options are exercised. The item was forwarded to the Board with a favorable recommendation from the Aviation and Seaport Committee on 7/13/2026 and 7/20/2026. The document does not state a specific street address, parcel, acreage, or zoning change. The scope is stated as countywide, with PortMiami located within District 5. The applicant/developer/owner is Port of Miami Crane Management, Inc. The case/file number is 261160. The decision is Adopted. Key dates include Introduced: 6/24/2026, Final Action: 7/21/2026, Agenda Date: 7/21/2026. The business opportunity is the continuation of a maintenance management agreement for container handling cranes and cargo handling equipment at PortMiami, with potential for work related to crane maintenance and related services. The document does not state any public comment or stakeholder sentiment.
- Board:
- Aviation and Seaport Committee
- Date:
- 2026-07-13
- Type:
- Resolution
- Decision:
- Adopted
- Applicant:
- Port of Miami Crane Management, Inc.
PORT OF MIAMI CRANE MANAGEMENT, INC.
Miami-Dade County Board of County Commissioners is considering Resolution File Number 261160, which seeks to waive competitive bidding for Amendment No. 3 to the 2012 Container Handling Crane Maintenance Management Agreement with Port of Miami Crane Management, Inc. (PMCM). This amendment would provide five additional one-year renewals for maintenance services, with an estimated annual cost of $25,287,000.00, totaling $126,435,000.00 if all renewals are exercised. PMCM is a nonprofit corporation funded by the County and uniquely qualified to perform these services, utilizing International Longshoremen's Association (ILA) labor. The Aviation and Seaport Committee forwarded the resolution with a favorable recommendation. The Board is expected to vote on this item on September 1, 2026.
- Board:
- Aviation and Seaport Committee
- Date:
- 2026-07-13
- Type:
- Resolution
- Decision:
- Pending BCC Assignment (Forwarded to BCC with a favorable recommendation by Aviation and Seaport Committee)
- Address:
- PortMiami
- Applicant:
- Port of Miami Crane Management, Inc. (PMCM)
PORT OF MIAMI CRANE MANAGEMENT, INC.
The document is a legislative item for Miami-Dade County, File Number 261160, a Resolution (R-631-26) that was Adopted on 7/21/2026. It approves Amendment No. 3 to the 2012 Container Handling Crane Maintenance Management Agreement between Miami-Dade County and Port of Miami Crane Management, Inc. (PMCM), a Florida not for profit corporation. The amendment provides the County with five additional one-year renewals at an estimated annual cost of $25,287,000.00, and $126,435,000.00 if all renewal options are exercised. The resolution waives competitive bidding pursuant to Section 2-8.1 of the Code of Miami-Dade County and Section 5.03(D) of the Home Rule Charter. The item was introduced on 6/24/2026, forwarded to the Board of County Commissioners with a favorable recommendation by the Aviation and Seaport Committee on 7/13/2026 and 7/20/2026, and adopted by the Board of County Commissioners on 7/21/2026. The staff recommendation is to approve the resolution. The document does not state a specific street address, parcel, or acreage for the project. The scope is stated as countywide, with PortMiami located within District 5. The applicant is Port of Miami. The document states there is no new fiscal impact as PMCM is a nonprofit corporation, operated and funded by the County. The document does not include any public comment or stakeholder sentiment.
- Board:
- Aviation and Seaport Committee
- Date:
- 2026-07-13
- Type:
- Resolution
- Decision:
- Adopted
- Applicant:
- Port of Miami
PORT OF MIAMI CRANE MANAGEMENT, INC.
Miami-Dade County Commission is considering Resolution File Number 261160, which seeks to waive competitive bidding to approve and execute Amendment No. 3 to the 2012 Container Handling Crane Maintenance Management Agreement with Port of Miami Crane Management, Inc. (PMCM). This amendment would provide five additional one-year renewals to the agreement. The estimated annual cost is $25,287,000.00, totaling $126,435,000.00 if all renewal options are exercised. PMCM is a Florida not-for-profit corporation created and funded by the County, uniquely qualified to manage the maintenance of the Port's gantry cranes and cargo handling equipment, including Rubber-Tired Gantry Cranes and Passenger Boarding Bridges. Approximately 45% of PMCM's budget is allocated to International Longshoremen's Association (ILA) labor. The Aviation and Seaport Committee forwarded this item with a favorable recommendation to the Board of County Commissioners (BCC). The BCC agenda date is July 21, 2026.
- Board:
- Aviation and Seaport Committee
- Date:
- 2026-07-13
- Type:
- Resolution
- Decision:
- Recommended for approval by Aviation and Seaport Committee; pending decision by County Commission on 7/21/2026
- Address:
- PortMiami
- Applicant:
- Port of Miami Crane Management, Inc. (PMCM)
PORT OF MIAMI CRANE MANAGEMENT, INC.
Miami-Dade County Board of County Commissioners is considering Resolution File Number 261160, which seeks to waive competitive bidding for Amendment No. 3 to the 2012 Container Handling Crane Maintenance Management Agreement with Port of Miami Crane Management, Inc. (PMCM). This amendment would provide five additional one-year renewals for crane maintenance management services. The estimated annual cost is $25,287,000, with a total potential cost of $126,435,000 if all renewal options are exercised. PMCM is a nonprofit corporation created and funded by the County, responsible for maintaining the Port's gantry cranes and other cargo handling equipment, including Rubber-Tired Gantry Cranes and Passenger Boarding Bridges. The Aviation and Seaport Committee forwarded this item to the Board with a favorable recommendation. The item is scheduled for the Board of County Commissioners agenda on September 1, 2026.
- Board:
- Aviation and Seaport Committee
- Date:
- 2026-07-13
- Type:
- Resolution
- Decision:
- Pending BCC Assignment (Resolution before the Board)
- Address:
- PortMiami
- Applicant:
- Port of Miami Crane Management, Inc. (PMCM)
See the actual businesses behind these numbers
Get the real filings, with addresses and officers, backed by a 14-day money-back guarantee.
Create your account