Skip to main content

Be First, Build Lasting Relationships

Board of County Commissioners: June 2026

Miami-Dade County

RELATING TO THE INFILL HOUSING INITIATIVE PROGRAM

Miami-Dade County Board of County Commissioners amended Ordinance No. 01-47, relating to the Infill Housing Initiative Program. The amendment, codified in Section 17-124 of the Miami-Dade County Code, limits the number of extensions and the total time that may be granted to developers for property development under the program. Specifically, no more than two one-year extensions will be granted per property, with a possibility of one additional extension in extraordinary circumstances upon a two-thirds vote. The amendment aims to promote accountability, ensure program efficiency, and expedite affordable housing production. The ordinance was adopted on first reading on 4/21/2026, deferred on 6/2/2026, and amended on 6/16/2026. A final version is noted as being in Legislative File No. 261111.

Board:
Board of County Commissioners
Date:
2026-06-16
Type:
Ordinance
Decision:
Amended

RELATING TO THE INFILL HOUSING INITIATIVE PROGRAM

Miami-Dade County Board of County Commissioners amended Ordinance No. 01-47, relating to the Infill Housing Initiative Program. The amendment, identified as Legislative Item File Number 260671, limits the number of extensions and the total time that may be granted to developers for property development under the program. Specifically, no more than two one-year extensions will be granted, with a possibility of one additional extension under extraordinary circumstances upon a two-thirds vote. The ordinance was amended on June 16, 2026, after being deferred on June 2, 2026, and adopted on first reading on April 21, 2026. Public comment was not recorded during the committee hearing, but Commissioner Bastien expressed support for the program and noted an amendment to protect developers, while Commissioner Bermudez emphasized the need for consequences for non-developing entities. The deferral was requested by Commissioner Hardemon due to the absence of key commissioners.

Board:
Board of County Commissioners
Date:
2026-06-16
Type:
Ordinance
Decision:
Amended

RELATING TO THE INFILL HOUSING INITIATIVE PROGRAM

Miami-Dade County Board of County Commissioners amended Ordinance No. 01-47, which established the Infill Housing Initiative Program. The amendment, File Number 260671, limits the number of extensions and the total time that may be granted to developers for property development under the program. Specifically, no more than two one-year extensions will be granted per property, with a possibility of one additional extension under extraordinary circumstances (declared emergencies, natural disasters) upon a two-thirds vote. The amendment aims to increase accountability, program efficiency, and expedite the delivery of affordable housing. The ordinance was adopted on first reading on 4/21/2026, deferred on 6/2/2026, and amended on 6/16/2026. A final version is noted in File No. 261111.

Board:
Board of County Commissioners
Date:
2026-06-16
Type:
Ordinance
Decision:
Amended

RELATING TO THE INFILL HOUSING INITIATIVE PROGRAM

Miami-Dade County Board of County Commissioners amended Ordinance No. 01-47, relating to the Infill Housing Initiative Program. The amendment, codified in Section 17-124 of the Code of Miami-Dade County, Florida, limits the number of extensions and the total time developers can receive for completing projects under the program. Specifically, no more than two one-year extensions will be granted per property, with a possibility for one additional extension under extraordinary circumstances (declared emergencies, natural disasters, or other significant delays beyond developer control) requiring a two-thirds board vote and detailed justification. The amendment aims to increase accountability, program efficiency, and expedite the delivery of affordable housing. The ordinance was introduced on April 14, 2026, adopted on first reading on April 21, 2026, deferred on June 2, 2026, and amended on June 16, 2026. A final version is noted under Legislative File No. 261111.

Board:
Board of County Commissioners
Date:
2026-06-16
Type:
Ordinance
Decision:
Amended

RELATING TO THE INFILL HOUSING INITIATIVE PROGRAM

This ordinance amends Section 17-124 of the Miami-Dade County Code to limit extensions granted to developers under the Infill Housing Initiative Program. The program aims to increase affordable housing, redevelop urban neighborhoods, and generate ad valorem taxes. The amendment restricts developers to a maximum of two one-year extensions for property development, with a possibility for one additional extension in extraordinary circumstances (declared emergencies, natural disasters) upon a two-thirds vote. The goal is to promote accountability, program efficiency, and expedite affordable housing production. The ordinance was amended by the Board of County Commissioners on June 16, 2026, after being deferred on June 2, 2026, and forwarded with a favorable recommendation from the Intergovernmental and Economic Impact Committee on May 13, 2026. Public comment was not recorded during the committee hearing.

Board:
Board of County Commissioners
Date:
2026-06-16
Type:
Ordinance
Decision:
Amended

RELATING TO THE INFILL HOUSING INITIATIVE PROGRAM

This legislative matter concerns an ordinance amending Section 17-124 of the Miami-Dade County Code, relating to the Infill Housing Initiative Program. The amendment aims to limit the number of extensions and the total time that may be granted to developers for property development under the program. Specifically, it limits extensions to a maximum of two, each for no more than one year, with a possibility of one additional extension under extraordinary circumstances (declared emergencies, natural disasters) upon a two-thirds vote. The ordinance was amended on June 16, 2026, after being deferred on June 2, 2026, and adopted on first reading on April 21, 2026. The Intergovernmental and Economic Impact Committee forwarded it with a favorable recommendation on May 13, 2026. The purpose of the Infill Housing Program is to increase affordable housing, redevelop urban neighborhoods, and generate ad valorem taxes. The amendment seeks to promote accountability, ensure program efficiency, and expedite affordable housing production by limiting extensions that delay delivery of much-needed units and can lead to underutilization of public land.

Board:
Board of County Commissioners
Date:
2026-06-16
Type:
Ordinance
Decision:
Amended

RELATING TO THE INFILL HOUSING INITIATIVE PROGRAM

Miami-Dade County Ordinance File Number 260671 amends Section 17-124 of the Code of Miami-Dade County, Florida, relating to the Infill Housing Initiative Program. The ordinance limits the number of extensions and the total time that may be granted to developers for property development under the program. Specifically, no more than two one-year extensions will be granted per property, with a possibility of one additional extension in extraordinary circumstances upon a two-thirds vote. This aims to promote accountability, program efficiency, and expedite affordable housing production. The ordinance was amended by the Board of County Commissioners on June 16, 2026, after being deferred on June 2, 2026, and adopted on first reading on April 21, 2026. The final amended version is detailed in Legislative File No. 261111.

Board:
Board of County Commissioners
Date:
2026-06-16
Type:
Ordinance
Decision:
Amended

RELATING TO THE INFILL HOUSING INITIATIVE PROGRAM

This legislative matter concerns amendments to the Miami-Dade County Infill Housing Initiative Program, specifically Section 17-124 of the Code of Miami-Dade County, Florida. The ordinance aims to limit the number of extensions and the total time developers can be granted for completing projects under the program. The proposed changes restrict extensions to a maximum of two, each for no more than one year, with a possibility for one additional extension under extraordinary circumstances requiring a two-thirds board vote. The ordinance was amended and deferred for further consideration. Public comment during the deferral process included support for the program's goal of increasing affordable housing, with an amendment proposed to protect developers from delays caused by factors beyond their control, including administrative delays and lawsuits. A commissioner suggested deferral to ensure representation from affected districts.

Board:
Board of County Commissioners
Date:
2026-06-16
Type:
Ordinance
Decision:
Amended, Deferred

RELATING TO THE INFILL HOUSING INITIATIVE PROGRAM

This ordinance amends Section 17-124 of the Miami-Dade County Code to limit extensions granted to developers under the Infill Housing Initiative Program. Developers will be limited to a maximum of two one-year extensions for any individual property. An additional extension may be granted upon a two-thirds vote of the Board for extraordinary circumstances. The ordinance aims to promote accountability, program efficiency, and expedite affordable housing production. The Board of County Commissioners amended the ordinance on June 16, 2026, after deferring it on June 2, 2026, to allow for further discussion and amendments. The ordinance was adopted on first reading on April 21, 2026, and forwarded with a favorable recommendation by the Intergovernmental and Economic Impact Committee on May 13, 2026.

Board:
Board of County Commissioners
Date:
2026-06-16
Type:
Ordinance
Decision:
Amended

RELATING TO THE INFILL HOUSING INITIATIVE PROGRAM

Miami-Dade County Board of County Commissioners amended Ordinance No. 01-47, relating to the Infill Housing Initiative Program. The amendment, File Number 260671, limits the number of extensions and the total time that may be granted to developers for property development under the program. Specifically, no more than two one-year extensions will be granted, with a possibility of one additional extension for extraordinary circumstances upon a two-thirds vote. The ordinance was amended on June 16, 2026, after being deferred on June 2, 2026, and adopted on first reading on April 21, 2026. Commissioner Bastien supported the ordinance, noting an amendment to protect developers working on affordable housing. Commissioner Hardemon requested the deferral due to the absence of key commissioners. Commissioner Bermudez emphasized the need for consequences for non-developing entities.

Board:
Board of County Commissioners
Date:
2026-06-16
Type:
Ordinance
Decision:
Amended

RELATING TO THE INFILL HOUSING INITIATIVE PROGRAM

Miami-Dade County Board of County Commissioners amended Ordinance No. 01-47, relating to the Infill Housing Initiative Program. The amendment, identified as Legislative Item File Number 260671, limits the number of extensions and the total time that may be granted to developers for property development under the program. Specifically, no more than two one-year extensions are allowed, with a possibility for one additional extension in extraordinary circumstances upon a two-thirds vote. This change aims to increase accountability, program efficiency, and expedite the delivery of affordable housing. The ordinance was amended on June 16, 2026, after being deferred on June 2, 2026, and adopted on first reading on April 21, 2026. The final version is noted as being in Legislative File No. 261111.

Board:
Board of County Commissioners
Date:
2026-06-16
Type:
Ordinance
Decision:
Amended

RELATING TO THE INFILL HOUSING INITIATIVE PROGRAM

Ordinance amending Section 17-124 of the Code of Miami-Dade County to limit the number of extensions and time granted to developers under the Infill Housing Initiative Program. No specific project site, address, parcel, acreage, or applicant is stated. The ordinance limits extensions to no more than two, each for no more than one year, with a possible additional extension by two-thirds Board vote for extraordinary circumstances. The Board of County Commissioners amended the item on 6/16/2026, with the final version in Legislative File No. 261111. It was deferred on 6/2/2026, forwarded with favorable recommendation on 5/13/2026, and adopted on first reading on 4/21/2026. Public comment: Commissioner Bastien supported the ordinance and proffered an amendment to avoid adverse effects on developers; Commissioner Hardemon suggested deferral because affected commissioners were absent; Commissioner Bermudez stated there needed to be consequences for developers who obtained infill properties but did not develop them. No public testimony was given at the 5/13/2026 hearing.

Board:
Board of County Commissioners
Date:
2026-06-16
Type:
Ordinance
Decision:
Amended

RELATING TO THE INFILL HOUSING INITIATIVE PROGRAM

Miami-Dade County Board of County Commissioners amended Ordinance No. 01-47, relating to the Infill Housing Initiative Program. The amendment, identified as Legislative Item File Number 260671, limits the number of extensions and the total time that may be granted to developers for property development under the program. Specifically, no more than two one-year extensions are allowed, with a possibility for one additional extension in extraordinary circumstances upon a two-thirds vote. The amendment aims to promote accountability, ensure program efficiency, and expedite affordable housing production. The ordinance was adopted on first reading on 4/21/2026, deferred on 6/2/2026, and amended on 6/16/2026. A final version is noted under Legislative File No. 261111.

Board:
Board of County Commissioners
Date:
2026-06-16
Type:
Ordinance
Decision:
Amended

RELATING TO THE INFILL HOUSING INITIATIVE PROGRAM

Miami-Dade County Board of County Commissioners amended Ordinance No. 01-47, relating to the Infill Housing Initiative Program. The amendment, codified in Section 17-124 of the Miami-Dade County Code, limits the number of extensions and the total time that may be granted to developers for property development under the program. Specifically, no more than two one-year extensions will be granted per property. An additional one-year extension may be granted in cases of declared emergencies, natural disasters, or other extraordinary circumstances, requiring a two-thirds vote. The amendment aims to promote accountability, ensure program efficiency, and expedite affordable housing production. The ordinance was adopted on first reading on 4/21/2026, deferred on 6/2/2026, and amended on 6/16/2026. A final version is noted as being in Legislative File No. 261111. Public comment was not recorded during the Intergovernmental and Economic Impact Committee hearing.

Board:
Board of County Commissioners
Date:
2026-06-16
Type:
Ordinance
Decision:
Amended

RELATING TO THE INFILL HOUSING INITIATIVE PROGRAM

Miami-Dade County Board of County Commissioners amended Ordinance No. 260671 on June 16, 2026, relating to the Infill Housing Initiative Program. The amendment, which modifies Section 17-124 of the Code of Miami-Dade County, Florida, limits the number of extensions and the total time that may be granted to developers for property development under the program. Specifically, no more than two one-year extensions will be granted per property, with a possibility of one additional extension in extraordinary circumstances (declared emergencies, natural disasters) upon a two-thirds vote. The amendment aims to promote accountability, ensure program efficiency, and expedite the delivery of affordable housing. The Intergovernmental and Economic Impact Committee forwarded the ordinance with a favorable recommendation on May 13, 2026, after a public hearing where no one appeared to speak. The ordinance was adopted on first reading on April 21, 2026. A final version is noted in Legislative File No. 261111.

Board:
Board of County Commissioners
Date:
2026-06-16
Type:
Ordinance
Decision:
Amended

RELATING TO THE INFILL HOUSING INITIATIVE PROGRAM

The document is a legislative matter for an ordinance amending Section 17-124 of the Code of Miami-Dade County, Florida, relating to the Infill Housing Initiative Program. The ordinance limits the number of extensions and time that may be granted to developers under the program. The Board of County Commissioners amended the ordinance on 6/16/2026, and the final amended version is in Legislative File No. 261111. The ordinance was deferred on 6/2/2026, forwarded with a favorable recommendation on 5/13/2026, and adopted on first reading on 4/21/2026. No specific project site, address, parcel, acreage, or applicant is stated in the document.

Board:
Board of County Commissioners
Date:
2026-06-16
Type:
Ordinance
Decision:
Amended

RELATING TO THE INFILL HOUSING INITIATIVE PROGRAM

Miami-Dade County Board of County Commissioners amended Ordinance No. 01-47, relating to the Infill Housing Initiative Program. The amendment, File Number 260671, limits the number of extensions and the total time that may be granted to developers for property development under the program. Specifically, no more than two one-year extensions will be granted, with a possibility for one additional extension under extraordinary circumstances upon a two-thirds vote. The ordinance aims to increase accountability and expedite affordable housing production. The item was deferred on June 2, 2026, to allow affected commissioners to participate in the discussion and was later amended and forwarded with a favorable recommendation on May 13, 2026, after a public hearing where no one appeared to speak. It was adopted on first reading on April 21, 2026.

Board:
Board of County Commissioners
Date:
2026-06-16
Type:
Ordinance
Decision:
Amended

RELATING TO THE INFILL HOUSING INITIATIVE PROGRAM

Miami-Dade County Board of County Commissioners amended Ordinance No. 01-47, specifically Section 17-124 of the Code of Miami-Dade County, Florida, relating to the Infill Housing Initiative Program. The amendment limits the number of extensions and the total time that may be granted to developers for property development under the program. Previously, extensions could be granted by the Board. The amendment restricts extensions to a maximum of two, each for no more than one year, with potential for one additional extension in extraordinary circumstances upon a two-thirds vote. The decision to grant extensions will consider developer progress, reasons for delay, compliance, and impact on affordable housing delivery. The ordinance was amended on June 16, 2026, after being deferred on June 2, 2026, and forwarded with a favorable recommendation from the Intergovernmental and Economic Impact Committee on May 13, 2026. It was adopted on first reading on April 21, 2026. The public hearing before the Intergovernmental and Economic Impact Committee on May 13, 2026, had no public speakers.

Board:
Board of County Commissioners
Date:
2026-06-16
Type:
Ordinance
Decision:
Amended

RELATING TO THE INFILL HOUSING INITIATIVE PROGRAM

This is a legislative item amending Section 17-124 of the Code of Miami-Dade County, Florida, to limit the number of extensions and time that may be granted to developers under the Miami-Dade County Infill Housing Initiative Program. The ordinance limits extensions to no more than two, each for no more than one year, with a possible additional extension by a two-thirds vote of the Board for extraordinary circumstances. The item was introduced on 4/14/2026, adopted on first reading on 4/21/2026, forwarded with a favorable recommendation on 5/13/2026, deferred on 6/2/2026, and amended on 6/16/2026. The final amended version is Legislative File No. 261111. No specific project site, address, parcel, acreage, or applicant is stated. Public comment: Commissioner Bastien expressed support and proffered an amendment to avoid adversely affecting developers; Commissioner Hardemon suggested deferral because affected commissioners were absent; Commissioner Bermudez stated there needed to be consequences for developers who obtained infill properties but did not develop them.

Board:
Board of County Commissioners
Date:
2026-06-16
Type:
Ordinance
Decision:
Amended on 6/16/2026; final version as adopted is Legislative File No. 261111

RELATING TO THE INFILL HOUSING INITIATIVE PROGRAM

This is a legislative matter amending the Miami-Dade County Infill Housing Initiative Program, specifically Section 17-124 of the Code of Miami-Dade County, to limit the number of extensions and time that may be granted to developers. The ordinance limits extensions to no more than two, each for no more than one year, with a possible additional extension by a two-thirds vote of the Board for extraordinary circumstances. The ordinance was introduced on 4/14/2026, adopted on first reading on 4/21/2026, forwarded with a favorable recommendation on 5/13/2026, deferred on 6/2/2026, and amended on 6/16/2026. The final amended version is Legislative File No. 261111. No specific project site, address, parcel, acreage, or applicant is stated. Public comment included Commissioner Bastien expressing support and proffering an amendment to avoid adverse effects on developers, Commissioner Hardemon suggesting deferral due to absent affected commissioners, and Commissioner Bermudez stating there needed to be consequences for developers who obtain infill properties but do not develop them.

Board:
Board of County Commissioners
Date:
2026-06-16
Type:
Ordinance
Decision:
Amended

RELATING TO THE INFILL HOUSING INITIATIVE PROGRAM

This is a legislative matter amending the Miami-Dade County Infill Housing Initiative Program, specifically Section 17-124 of the Code of Miami-Dade County, Florida. The ordinance limits the number of extensions and time that may be granted to developers under the program. The Board of County Commissioners amended the ordinance on 6/16/2026, and the final amended version is Legislative File No. 261111. The ordinance was adopted on first reading on 4/21/2026, forwarded with a favorable recommendation following a public hearing on 5/13/2026, and deferred on 6/2/2026. The amendment clarifies that delays caused beyond the developer's control include administrative delays caused by the county or other governmental entities and lawsuits, excluding lawsuits brought by or against the county. It also allows the Board by a two-thirds vote to grant one additional extension where the developer demonstrates the home is substantially completed. No specific project site, address, parcel, acreage, or dollar amount is stated. The document is a policy change, not a specific development project.

Board:
Board of County Commissioners
Date:
2026-06-16
Type:
Ordinance
Decision:
Amended

RELATING TO THE INFILL HOUSING INITIATIVE PROGRAM

This legislative matter concerns amendments to the Miami-Dade County Infill Housing Initiative Program, specifically Section 17-124 of the Code of Miami-Dade County, Florida. The ordinance aims to limit the number of extensions and the total time developers can be granted for completing projects under the program. The proposed changes restrict extensions to a maximum of two, each for no more than one year, with a possibility for one additional extension under extraordinary circumstances requiring a two-thirds board vote. The ordinance was amended and deferred by the Board of County Commissioners on June 2, 2026, to allow for further discussion and participation from affected commissioners. It was adopted on first reading on April 21, 2026, and forwarded with a favorable recommendation by the Intergovernmental and Economic Impact Committee on May 13, 2026. The final amended version is noted in Legislative File No. 261111.

Board:
Board of County Commissioners
Date:
2026-06-16
Type:
Ordinance
Decision:
Amended (on 6/16/2026), Deferred (on 6/2/2026), Adopted on first reading (on 4/21/2026)

RELATING TO THE INFILL HOUSING INITIATIVE PROGRAM

Ordinance amending Section 17-124 of the Code of Miami-Dade County to limit the number of extensions and time granted to developers under the Miami-Dade County Infill Housing Initiative Program. No more than two extensions, each for no more than one year, may be granted by the Board to any developer for any individual property. The Board may grant one additional extension upon a two-thirds vote in cases involving declared emergencies, natural disasters, or other extraordinary circumstances, with detailed written justification. The ordinance was adopted on first reading on 4/21/2026, forwarded with favorable recommendation on 5/13/2026, deferred on 6/2/2026, and amended on 6/16/2026. The final amended version is Legislative File No. 261111. Public comment: Commissioner Bastien expressed support and proffered an amendment to ensure proposed changes would not adversely affect developers; Commissioner Hardemon suggested deferral because affected commissioners were not present; Commissioner Bermudez stated there needed to be consequences for developers who obtained infill properties but did not develop them. No public hearing speakers appeared at the 5/13/2026 hearing.

Board:
Board of County Commissioners
Date:
2026-06-16
Type:
Ordinance
Decision:
Amended

RELATING TO THE INFILL HOUSING INITIATIVE PROGRAM

This legislative matter concerns an amendment to the Miami-Dade County Infill Housing Initiative Program, specifically Section 17-124 of the Code of Miami-Dade County, Florida. The amendment aims to limit the number of extensions and the total time that can be granted to developers for completing projects under the program. The ordinance was introduced on April 14, 2026, and amended on June 16, 2026. A key change is that no more than two one-year extensions will be granted per property, with a possibility for one additional extension under extraordinary circumstances and a two-thirds vote. The purpose of the Infill Housing Program is to increase affordable housing, redevelop urban neighborhoods, and eliminate blight. The ordinance was adopted on first reading on April 21, 2026, deferred on June 2, 2026, and amended on June 16, 2026. The final version is detailed in Legislative File No. 261111. Public comment was minimal during committee review, with no one appearing to speak at the Intergovernmental and Economic Impact Committee hearing. Commissioner Bastien expressed support and proposed an amendment to protect developers facing delays beyond their control. Commissioner Hardemon requested deferral due to the absence of key commissioners. Commissioner Bermudez emphasized the need for consequences for non-developing entities.

Board:
Board of County Commissioners
Date:
2026-06-16
Type:
Ordinance
Decision:
Amended

RELATING TO THE INFILL HOUSING INITIATIVE PROGRAM

This is a legislative matter amending Section 17-124 of the Code of Miami-Dade County, Florida, to limit the number of extensions and time that may be granted to developers under the Miami-Dade County Infill Housing Initiative Program. The ordinance limits extensions to no more than two, each for no more than one year, with a possible additional extension by a two-thirds vote of the Board for extraordinary circumstances. The ordinance was introduced on 4/14/2026, adopted on first reading on 4/21/2026, forwarded with a favorable recommendation on 5/13/2026, deferred on 6/2/2026, and amended on 6/16/2026. The final amended version is Legislative File No. 261111. No specific project site, address, parcel, acreage, or applicant is stated. Public comment: Commissioner Bastien expressed support and proffered an amendment to avoid adversely affecting developers; Commissioner Hardemon suggested deferral because affected commissioners were absent; Commissioner Bermudez stated there needed to be consequences for developers who obtained infill properties but did not develop them.

Board:
Board of County Commissioners
Date:
2026-06-16
Type:
Ordinance
Decision:
Amended

RELATING TO THE INFILL HOUSING INITIATIVE PROGRAM

Miami-Dade County Board of County Commissioners amended Ordinance No. 01-47, relating to the Infill Housing Initiative Program. The amendment, File Number 260671, limits the number of extensions and the total time that may be granted to developers for property development under the program. Specifically, no more than two one-year extensions will be granted, with a possibility of one additional extension for extraordinary circumstances upon a two-thirds vote. The ordinance aims to increase accountability and expedite affordable housing production. The matter was deferred on June 2, 2026, to allow for the presence of affected commissioners and was subsequently amended and forwarded with a favorable recommendation on May 13, 2026, after a public hearing where no one appeared to speak. It was adopted on first reading on April 21, 2026.

Board:
Board of County Commissioners
Date:
2026-06-16
Type:
Ordinance
Decision:
Amended

RELATING TO THE INFILL HOUSING INITIATIVE PROGRAM

Miami-Dade County Board of County Commissioners amended Ordinance No. 01-47, relating to the Infill Housing Initiative Program. The amendment, identified as Legislative Item File Number 260671, limits the number of extensions and the total time that may be granted to developers for completing affordable housing projects on county-owned properties. Specifically, no more than two one-year extensions will be granted, with a possibility for one additional extension under extraordinary circumstances (declared emergencies, natural disasters, or other significant delays) upon a two-thirds vote. The ordinance aims to increase accountability, program efficiency, and expedite the delivery of affordable housing. The amendment was adopted on first reading on 4/21/2026, deferred on 6/2/2026 for further discussion and commissioner input, and then amended and forwarded to the Board of County Commissioners on 6/16/2026. A related final version is noted under File Number 261111.

Board:
Board of County Commissioners
Date:
2026-06-16
Type:
Ordinance
Decision:
Amended

RELATING TO THE INFILL HOUSING INITIATIVE PROGRAM

Miami-Dade County Board of County Commissioners amended Ordinance No. 01-47, relating to the Infill Housing Initiative Program. The amendment, File Number 260671, limits the number of extensions and the total time that may be granted to developers for property development under the program. Specifically, no more than two one-year extensions are allowed, with a possibility for one additional extension in extraordinary circumstances upon a two-thirds vote. This aims to increase accountability, program efficiency, and expedite affordable housing production. The ordinance was adopted on first reading on 4/21/2026, deferred on 6/2/2026, and amended on 6/16/2026. A final version is noted as being in File Number 261111.

Board:
Board of County Commissioners
Date:
2026-06-16
Type:
Ordinance
Decision:
Amended

RELATING TO THE INFILL HOUSING INITIATIVE PROGRAM

Miami-Dade County Board of County Commissioners amended Ordinance No. 01-47, specifically Section 17-124 of the Code of Miami-Dade County, Florida, relating to the Infill Housing Initiative Program. The amendment limits the number of extensions and the total time that may be granted to developers for property development under the program. Previously, developers had two years for development, extendable by the Board. The amendment restricts extensions to a maximum of two, each for no more than one year, with a possibility of one additional extension in extraordinary circumstances upon a two-thirds vote. The amendment aims to promote accountability, ensure program efficiency, and expedite affordable housing production. The ordinance was amended on June 16, 2026, after being deferred on June 2, 2026, and adopted on first reading on April 21, 2026. The final version is noted as being in Legislative File No. 261111.

Board:
Board of County Commissioners
Date:
2026-06-16
Type:
Ordinance
Decision:
Amended
Applicant:
Developers participating in the Miami-Dade County Infill Housing Initiative Program

RELATING TO THE INFILL HOUSING INITIATIVE PROGRAM

This legislative matter concerns an amendment to the Miami-Dade County Infill Housing Initiative Program, specifically Section 17-124 of the Code of Miami-Dade County, Florida. The amendment aims to limit the number of extensions and the total time that can be granted to developers for completing projects under the program. The proposed changes include a maximum of two one-year extensions, with a possibility for one additional extension under extraordinary circumstances requiring a two-thirds board vote. The purpose of the Infill Housing Program is to increase affordable housing, redevelop urban neighborhoods, and generate ad valorem taxes. The amendment was introduced on 4/14/2026, adopted on first reading on 4/21/2026, deferred by the Board of County Commissioners on 6/2/2026, and amended on 6/16/2026. A final version is noted in Legislative File No. 261111. Public comment was not recorded during the Intergovernmental and Economic Impact Committee hearing.

Board:
Board of County Commissioners
Date:
2026-06-16
Type:
Ordinance
Decision:
Amended

RELATING TO THE INFILL HOUSING INITIATIVE PROGRAM

This legislative matter concerns an amendment to the Miami-Dade County Infill Housing Initiative Program. The ordinance, File Number 260671, amends Section 17-124 of the Code of Miami-Dade County, Florida, to limit the number of extensions and the total time that may be granted to developers for property development under the program. Specifically, no more than two one-year extensions will be granted per property, with a possibility of one additional extension in extraordinary circumstances (declared emergencies, natural disasters) upon a two-thirds vote. The amendment aims to promote accountability, ensure program efficiency, and expedite affordable housing production. The ordinance was amended on June 16, 2026, after being deferred on June 2, 2026, and adopted on first reading on April 21, 2026. The Intergovernmental and Economic Impact Committee forwarded it with a favorable recommendation on May 13, 2026.

Board:
Board of County Commissioners
Date:
2026-06-16
Type:
Ordinance
Decision:
Amended

RELATING TO THE INFILL HOUSING INITIATIVE PROGRAM

Ordinance amending Section 17-124 of the Code of Miami-Dade County to limit the number of extensions and time granted to developers under the Miami-Dade County Infill Housing Initiative Program. The ordinance limits extensions to no more than two per property, each for no more than one year, with a possible additional extension by a two-thirds vote for extraordinary circumstances. It was introduced 4/14/2026, adopted on first reading 4/21/2026, forwarded with favorable recommendation 5/13/2026, deferred 6/2/2026, and amended 6/16/2026. Final adopted version is Legislative File No. 261111. No specific project site, address, parcel, acreage, or applicant is stated.

Board:
Board of County Commissioners
Date:
2026-06-16
Type:
Ordinance
Decision:
Amended

RELATING TO THE INFILL HOUSING INITIATIVE PROGRAM

This is a legislative item amending Section 17-124 of the Code of Miami-Dade County, Florida, to limit the number of extensions and time that may be granted to developers under the Miami-Dade County Infill Housing Initiative Program. The ordinance was introduced on 4/14/2026, adopted on first reading on 4/21/2026, forwarded with a favorable recommendation following a public hearing on 5/13/2026, deferred on 6/2/2026, and amended on 6/16/2026. The final amended version is Legislative File No. 261111. The amendment limits extensions to no more than two, each for no more than one year, with a possible additional extension by a two-thirds vote of the Board for extraordinary circumstances. No specific project, site, or address is stated.

Board:
Board of County Commissioners
Date:
2026-06-16
Type:
Ordinance
Decision:
Amended

RELATING TO THE INFILL HOUSING INITIATIVE PROGRAM

Miami-Dade County Board of County Commissioners amended Ordinance No. 01-47, specifically Section 17-124 of the Code of Miami-Dade County, Florida, relating to the Infill Housing Initiative Program. The amendment limits the number of extensions and the total time that may be granted to developers for property development under the program. Previously, development was required within two years of conveyance, with extensions possible at the Board's discretion. The amendment now restricts extensions to a maximum of two, each no more than one year, for a total of three years (original two plus two one-year extensions). An additional one-year extension may be granted in cases of declared emergencies, natural disasters, or other extraordinary circumstances, requiring a two-thirds vote. The amendment aims to promote accountability, ensure program efficiency, and expedite affordable housing production. The ordinance was adopted on first reading on 4/21/2026, deferred on 6/2/2026, and amended on 6/16/2026. A final version is noted as being in File No. 261111.

Board:
Board of County Commissioners
Date:
2026-06-16
Type:
Ordinance
Decision:
Amended

RELATING TO THE INFILL HOUSING INITIATIVE PROGRAM

This ordinance amends Section 17-124 of the Miami-Dade County Code to limit extensions granted to developers under the Infill Housing Initiative Program. The program aims to increase affordable housing, redevelop urban neighborhoods, and generate ad valorem taxes. The amendment restricts developers to a maximum of two one-year extensions for property development, with a possibility for one additional extension in extraordinary circumstances (declared emergencies, natural disasters) upon a two-thirds vote. This change is intended to promote accountability, program efficiency, and expedite affordable housing production. The ordinance was amended by the Board of County Commissioners on June 16, 2026, after being deferred on June 2, 2026, and forwarded with a favorable recommendation by the Intergovernmental and Economic Impact Committee on May 13, 2026. Public comment was not stated as being provided during the committee hearing.

Board:
Board of County Commissioners
Date:
2026-06-16
Type:
Ordinance
Decision:
Amended

RELATING TO THE INFILL HOUSING INITIATIVE PROGRAM

Miami-Dade County Board of County Commissioners amended Ordinance No. 01-47, relating to the Infill Housing Initiative Program. The amendment, identified as Legislative Item File Number 260671, limits the number of extensions and the total time that may be granted to developers for property development under the program. Specifically, no more than two one-year extensions will be granted, with a possibility of one additional extension under extraordinary circumstances and a two-thirds vote. The ordinance was amended on June 16, 2026, after being deferred on June 2, 2026, to allow for discussion by absent commissioners. Public comment was not recorded during the committee hearing on May 13, 2026. The purpose of the Infill Housing Program is to increase affordable housing, redevelop urban neighborhoods, and generate ad valorem taxes.

Board:
Board of County Commissioners
Date:
2026-06-16
Type:
Ordinance
Decision:
Amended

RELATING TO THE INFILL HOUSING INITIATIVE PROGRAM

This ordinance amends Section 17-124 of the Miami-Dade County Code to limit extensions granted to developers under the Infill Housing Initiative Program. The program aims to increase affordable housing, redevelop urban neighborhoods, and generate ad valorem taxes. The amendment restricts developers to a maximum of two one-year extensions for property development, with a possibility of one additional extension in extraordinary circumstances (declared emergencies, natural disasters) upon a two-thirds vote. The goal is to promote accountability, program efficiency, and expedite affordable housing production. The ordinance was amended by the Board of County Commissioners on June 16, 2026, after being deferred on June 2, 2026, and forwarded with a favorable recommendation from the Intergovernmental and Economic Impact Committee on May 13, 2026. It was adopted on first reading on April 21, 2026.

Board:
Board of County Commissioners
Date:
2026-06-16
Type:
Ordinance
Decision:
Amended

RELATING TO THE INFILL HOUSING INITIATIVE PROGRAM

Miami-Dade County Board of County Commissioners amended Ordinance No. 260671 on June 16, 2026, relating to the Infill Housing Initiative Program. The amendment, which will be included in the Miami-Dade County Code, limits the number of extensions and the total time that may be granted to developers for property development under the program. Specifically, no more than two one-year extensions will be granted per property, with a possibility of one additional extension in extraordinary circumstances (declared emergencies, natural disasters) upon a two-thirds vote. The amendment aims to increase accountability, ensure program efficiency, and expedite the delivery of affordable housing. The Intergovernmental and Economic Impact Committee forwarded the ordinance with a favorable recommendation on May 13, 2026, after a public hearing where no one appeared to speak. The ordinance was adopted on first reading by the Board of County Commissioners on April 21, 2026.

Board:
Board of County Commissioners
Date:
2026-06-16
Type:
Ordinance
Decision:
Amended

RELATING TO THE INFILL HOUSING INITIATIVE PROGRAM

This ordinance amends Section 17-124 of the Miami-Dade County Code to limit extensions granted to developers under the Infill Housing Initiative Program. The program aims to increase affordable housing, redevelop urban neighborhoods, and generate ad valorem taxes. The amendment restricts developers to a maximum of two one-year extensions for property development, with a possibility of one additional extension in extraordinary circumstances (declared emergencies, natural disasters) upon a two-thirds vote. The goal is to promote accountability, program efficiency, and expedite affordable housing production. The ordinance was amended by the Board of County Commissioners on June 16, 2026, after being deferred on June 2, 2026, and forwarded with a favorable recommendation by the Intergovernmental and Economic Impact Committee on May 13, 2026. Public comment was not recorded during the committee hearing.

Board:
Board of County Commissioners
Date:
2026-06-16
Type:
Ordinance
Decision:
Amended

RELATING TO THE INFILL HOUSING INITIATIVE PROGRAM

This ordinance amends Section 17-124 of the Miami-Dade County Code to limit extensions granted to developers under the Infill Housing Initiative Program. The program aims to increase affordable housing, redevelop urban neighborhoods, and generate ad valorem taxes. The amendment restricts developers to a maximum of two one-year extensions for property development, with a possibility for one additional extension in extraordinary circumstances (declared emergencies, natural disasters) upon a two-thirds vote. The goal is to promote accountability, program efficiency, and expedite affordable housing production. The ordinance was amended by the Board of County Commissioners on June 16, 2026, after being deferred on June 2, 2026, and forwarded with a favorable recommendation from the Intergovernmental and Economic Impact Committee on May 13, 2026. Public comment during the committee hearing was not stated.

Board:
Board of County Commissioners
Date:
2026-06-16
Type:
Ordinance
Decision:
Amended

RESOLUTION APPROVING THE FIRST AMENDMENT TO JOINT DEVELOPMEN

Miami-Dade County Board of County Commissioners approved the first amendment to a joint development agreement for the Palmetto Station Transit-Oriented Development Project. This amendment restructures the project to allow developers to enter directly into ground leases with the County, improving financeability. The project will include a minimum of 929 workforce and community housing units, with an optional future phase for an additional 212 units. It will also feature commercial space, transit-supportive infrastructure, and structured parking facilities, preserving at least 550 transit-user parking spaces. The County will receive lease revenues without responsibility for construction or operational costs. The Board also approved the Phase I Ground Lease Agreement and authorized the County Mayor to execute agreements and take necessary actions to implement the project.

Board:
Board of County Commissioners
Date:
2026-06-16
Type:
Resolution
Decision:
Approved (Amended)
Address:
Surrounding and adjacent to the Palmetto Metrorail Station
Applicant:
Out of Foster Foundation, Inc. and RES-DES Palmetto, LLC (developers); Palmetto Crossings, LLC (Phase I Ground Lease)

RESOLUTION APPROVING THE FIRST AMENDMENT TO JOINT DEVELOPMEN

The Board of County Commissioners approved, as amended, a resolution approving the First Amendment to the Joint Development Agreement with Out of Foster Foundation, Inc. and RES-DES Palmetto, LLC for the Palmetto Station Transit-Oriented Development Project. The amendment restructures the project to allow the developer and affiliated entities to enter directly into ground leases with the County for each phase, while preserving the Foundation's role in youth housing operations and community programming. The project will include a minimum of 929 workforce and community housing units, with an optional future phase containing a minimum of 212 additional community housing units. The development will preserve a minimum of 550 dedicated transit-user parking spaces for DTPW and patrons. The parking facilities will be constructed, owned, operated, and maintained by the Developer at no cost to the County. The County will receive lease revenues and other economic consideration while incurring no responsibility for vertical construction costs, parking facility construction costs, financing obligations, or operational expenses. The resolution also approves the Phase I Ground Lease Agreement between Miami-Dade County and Palmetto Crossings, LLC, and authorizes the County Mayor to execute the agreements and take all necessary actions. The motion passed 12-0, with Senator Garcia absent. The amended resolution was assigned Resolution No. R-557-26.

Board:
Board of County Commissioners
Date:
2026-06-16
Type:
Resolution
Decision:
Approved as amended
Address:
Palmetto Metrorail Station, Miami-Dade County, Florida
Applicant:
Out of Foster Foundation, Inc. (formerly MagicWaste Youth Foundation, Inc.) and RES-DES Palmetto, LLC; Phase I Ground Lease with Palmetto Crossings, LLC

RESOLUTION APPROVING THE FIRST AMENDMENT TO JOINT DEVELOPMEN

Miami-Dade County Board of County Commissioners approved the first amendment to a Joint Development Agreement for the Palmetto Station Transit-Oriented Development Project. This amendment restructures the project to allow developers to enter into ground leases directly with the County, facilitating financing while preserving the Foundation's role in youth housing and community programming. The project will include a minimum of 929 workforce and community housing units, with an optional future phase for an additional 212 units. It will also feature commercial space, station improvements, structured parking for transit users (minimum 550 spaces), and transit-supportive infrastructure. The parking facilities will be constructed and maintained by the developer at no cost to the County. The Board also approved the Phase I Ground Lease Agreement and authorized the County Mayor or designee to execute agreements and take necessary actions to implement the project.

Board:
Board of County Commissioners
Date:
2026-06-16
Type:
Resolution
Decision:
Approved (Amended)
Address:
Surrounding and adjacent to the Palmetto Metrorail Station
Applicant:
Out of Foster Foundation, Inc. and RES-DES Palmetto, LLC (developers); Palmetto Crossings, LLC (Phase I Ground Lease)

RESOLUTION APPROVING THE FIRST AMENDMENT TO JOINT DEVELOPMEN

Miami-Dade County Board of County Commissioners approved the first amendment to a Joint Development Agreement for the Palmetto Station Transit-Oriented Development Project. This amendment restructures the project to allow direct ground leases with the County for each phase, preserving the Foundation's role in youth housing and community programming. The project will include a minimum of 929 workforce and community housing units, with an optional future phase for an additional 212 units. It will also feature workforce housing, military housing, transit operator housing, youth housing, commercial space, office space, station improvements, structured parking facilities (preserving 550 transit-user spaces), and transit-supportive infrastructure. The parking facilities will be constructed, owned, and operated by the Developer at no cost to the County. The Board approved the revised Master Plan, Project Schedule, and the Phase I Ground Lease Agreement with Palmetto Crossings, LLC. The resolution was amended and passed by a 12-0 vote.

Board:
Board of County Commissioners
Date:
2026-06-16
Type:
Resolution
Decision:
Approved (Amended)
Address:
Surrounding and adjacent to the Palmetto Metrorail Station
Applicant:
Out of Foster Foundation, Inc. and RES-DES Palmetto, LLC (for the project); Palmetto Crossings, LLC (for Phase I Ground Lease)

RESOLUTION APPROVING THE FIRST AMENDMENT TO JOINT DEVELOPMEN

Miami-Dade County Board of County Commissioners approved the first amendment to a Joint Development Agreement for the Palmetto Station Transit-Oriented Development Project. This amendment restructures the project to allow direct ground leases with the County for each phase, while preserving the Foundation's role in youth housing and community programming. The project will include a minimum of 929 workforce and community housing units, with an optional future phase for an additional 212 units. It will also feature workforce housing, military housing, transit operator housing, youth housing, commercial space, office space, station improvements, structured parking facilities (preserving 550 transit-user spaces), and transit-supportive infrastructure. The parking facilities will be constructed, owned, and operated by the Developer at no cost to the County. The Board approved the revised Master Plan, Project Schedule, and the Phase I Ground Lease Agreement with Palmetto Crossings, LLC. The decision was passed by a 12-0 vote.

Board:
Board of County Commissioners
Date:
2026-06-16
Type:
Resolution
Decision:
Approved (Amended)
Address:
Surrounding and adjacent to the Palmetto Metrorail Station
Applicant:
Out of Foster Foundation, Inc. and RES-DES Palmetto, LLC (for the development); Palmetto Crossings, LLC (for Phase I Ground Lease)

RESOLUTION APPROVING THE FIRST AMENDMENT TO JOINT DEVELOPMEN

Miami-Dade County Board of County Commissioners approved the first amendment to a Joint Development Agreement for the Palmetto Station Transit-Oriented Development Project. This amendment restructures the project to allow developers to enter into ground leases directly with the County, improving financeability. The project will include a minimum of 929 workforce and community housing units, with an optional future phase for an additional 212 units. It will also feature commercial space, station improvements, structured parking facilities (preserving 550 transit-user spaces), and transit-supportive infrastructure. The County will receive lease revenues without responsibility for construction or operational costs. The Board also approved the Phase I Ground Lease Agreement and authorized the County Mayor to execute agreements and take necessary actions to implement the project. The resolution was amended and passed by a 12-0 vote.

Board:
Board of County Commissioners
Date:
2026-06-16
Type:
Resolution
Decision:
Approved (Amended)
Address:
Surrounding and adjacent to the Palmetto Metrorail Station
Applicant:
Out of Foster Foundation, Inc. and RES-DES Palmetto, LLC (developers); Palmetto Crossings, LLC (Phase I Ground Lease)

RESOLUTION APPROVING THE FIRST AMENDMENT TO JOINT DEVELOPMEN

Miami-Dade County Commissioners approved the first amendment to a joint development agreement for the Palmetto Station Transit-Oriented Development Project. This amendment restructures the project to allow developers to enter ground leases directly with the County, while preserving the Foundation's role in youth housing and community programming. The project will include a minimum of 929 workforce and community housing units, with an optional future phase for an additional 212 units. It will also feature workforce housing, military housing, transit operator housing, youth housing, commercial space, office space, station improvements, structured parking facilities (preserving 550 transit-user spaces), and transit-supportive infrastructure. The parking facilities will be constructed, owned, and operated by the Developer at no cost to the County. The Board adopted the amended resolution, which will be assigned Resolution No. R-557-26.

Board:
Board of County Commissioners
Date:
2026-06-16
Type:
Resolution
Decision:
Approved (Amended)
Address:
Surrounding and adjacent to the Palmetto Metrorail Station
Applicant:
Out of Foster Foundation, Inc. and RES-DES Palmetto, LLC (as developers); Palmetto Crossings, LLC (as Phase I Ground Lease tenant)

RESOLUTION APPROVING THE FIRST AMENDMENT TO JOINT DEVELOPMEN

The Board of County Commissioners approved, as amended, a resolution approving the First Amendment to the Joint Development Agreement with Out of Foster Foundation, Inc. and RES-DES Palmetto, LLC for the Palmetto Station Transit-Oriented Development Project, approving a Phase I Ground Lease Agreement, approving a revised Master Plan and Project Schedule, and authorizing execution of related documents. The project is a mixed-use transit-oriented development on County-owned property surrounding and adjacent to the Palmetto Metrorail Station, including a minimum of 929 workforce and community housing units, an optional future phase with a minimum of 212 additional community housing units, a minimum of 550 dedicated transit-user parking spaces, structured parking, commercial space, and transit-supportive infrastructure. The First Amendment restructures the project to allow the developer and affiliated entities to enter directly into ground leases with the County for each phase, improving financeability. The motion passed 12-0, with Senator Garcia absent. The amended resolution was assigned Resolution No. R-557-26.

Board:
Board of County Commissioners
Date:
2026-06-16
Type:
Resolution
Decision:
Approved as amended
Applicant:
Out of Foster Foundation, Inc. (formerly MagicWaste Youth Foundation, Inc.) and RES-DES Palmetto, LLC; Phase I Ground Lease with Palmetto Crossings, LLC.

RESOLUTION APPROVING THE FIRST AMENDMENT TO JOINT DEVELOPMEN

Miami-Dade County Board of County Commissioners approved the first amendment to a joint development agreement for the Palmetto Station Transit-Oriented Development Project. This amendment restructures the project to allow developers to enter directly into ground leases with the County, while preserving the Foundation's role in youth housing and community programming. The project will include a minimum of 929 workforce and community housing units, with an optional future phase for an additional 212 units. It will also feature workforce housing, military housing, transit operator housing, youth housing, commercial and office space, station improvements, structured parking facilities (preserving 550 transit-user spaces), and transit-supportive infrastructure. The parking facilities will be constructed, owned, and operated by the Developer at no cost to the County. The Board also approved the Phase I Ground Lease Agreement with Palmetto Crossings, LLC. The resolution was amended and passed by a 12-0 vote.

Board:
Board of County Commissioners
Date:
2026-06-16
Type:
Resolution
Decision:
Approved (Amended)
Address:
Surrounding and adjacent to the Palmetto Metrorail Station
Applicant:
Out of Foster Foundation, Inc. and RES-DES Palmetto, LLC (developers); Palmetto Crossings, LLC (Phase I Ground Lease)

RESOLUTION APPROVING THE FIRST AMENDMENT TO JOINT DEVELOPMEN

Miami-Dade County Board of County Commissioners approved the first amendment to a joint development agreement for the Palmetto Station Transit-Oriented Development Project. This amendment restructures the project to allow developers to enter directly into ground leases with the County for each phase, while preserving the Foundation's role in youth housing and community programming. The project will include a minimum of 929 workforce and community housing units, with an optional future phase for an additional 212 units. It will also feature workforce housing, military housing, transit operator housing, youth housing, commercial space, office space, station improvements, structured parking facilities (preserving 550 transit-user spaces), and transit-supportive infrastructure. The parking facilities will be constructed, owned, operated, and maintained by the Developer at no cost to the County. The Board also approved the Phase I Ground Lease Agreement and authorized the County Mayor or designee to execute agreements and take necessary actions to implement the project.

Board:
Board of County Commissioners
Date:
2026-06-16
Type:
Resolution
Decision:
Approved (Amended)
Address:
Surrounding and adjacent to the Palmetto Metrorail Station
Applicant:
Out of Foster Foundation, Inc. and RES-DES Palmetto, LLC (developers); Palmetto Crossings, LLC (Phase I Ground Lease)

See the actual businesses behind these numbers

Get the real filings, with addresses and officers, backed by a 14-day money-back guarantee.

Create your account