Board of County Commissioners: July 2026
Miami-Dade County
CONTRACT AWARD TO HORIZON CONTRACTORS INC.
Miami-Dade County Board of County Commissioners adopted Resolution R-640-26 (File Number 261131) on July 21, 2026, approving a contract award to Horizon Contractors, Inc. for the capital project 'Roadway Improvements to NW 58 Street from NW 97 Avenue to NW 79 Avenue' (Project No. 20250068). The contract value is $17,933,304.63, inclusive of a construction contingency allowance of $1,618,298.15 and other allowances of $132,025.00, for a term of 730 calendar days. The project entails complete reconstruction of the existing roadway to a four-lane roadway with continuous center turning lane, bike lanes, sidewalks, curbs and gutters, storm drainage system, pavement markings and signage, upgraded traffic signalization, and roadway lighting. The project is located primarily within District 12, represented by Commissioner Juan Carlos Bermudez, and is funded by Mobility Impact Fees. The base contract amount is $16,182,981.48. The project was advertised on October 16, 2025, and eight bids were received on November 19, 2025. Horizon Contractors, Inc. submitted the lowest base bid. The contract period is 730 calendar days with substantial completion occurring within 657 days from the Notice to Proceed. The project was initially planned as design-build but was cancelled due to utility conflicts; DTPW assumed the design contract and resolved the conflicts. The project manager is Fernando Mardones, DTPW Engineer III. The contract manager is Tiondra Wright, Chief. The project manager is Rene Idarraga, Chief. The company address for Horizon Contractors, Inc. is 8175 W 32 Ave, Suite #2, Hialeah, Florida 33018. The company principal and qualifier is Jose M. Sanchez. A 1.00% Small Business Development Goods & Services goal has been established. The annual estimated operations and maintenance costs are approximately $33,961.38. The project was forwarded to the BCC with a favorable recommendation by the Transportation Committee on July 14, 2026, and July 20, 2026. The resolution was introduced on June 22, 2026. The final action was on July 21, 2026. The project is associated with Project No. 77230. The funding source is Arterial Roads - Countywide / 2000000538 FY 25 - 26 Adopted Budget and Multi-Year Capital Plan, Volume 2, Page 135 Mobility Impact Fees. The bid bond expires on May 19, 2026, and the bid is valid until November 19, 2026. The review committee meeting date was April 17, 2025. The project is subject to Responsible Wages (Resolution No. R-54-10), Sea Level Rise (Ordinance 14-79), and Sustainable Buildings Ordinance (I.O. No. 8-8). The project has a mandatory clearing house. The project includes an IG fee. The project does not include Art in Public Places. The project does not have PTP, GOB, or ARRA funding. The project does not exceed legal requirements. Standard payment and performance bond is required. The project was bid on a unit price basis. The three lowest responsive and responsible bids were: Horizon Contractors, Inc. at $16,182,981.48 (0.55% below the County's cost estimate), H&R Paving, Inc. at $16,662,061.25 (2.40% above), and General Asphalt Co., Inc. at $18,655,434.96 (14.65% above). Horizon Contractors, Inc. had 10 evaluations in the Capital Improvements Information System within the last 15 years, with an average evaluation score of 3.3 out of 4. No major safety issues were found. The existing segment of NW 58 Street features four lanes with a striped center turning lane, but lacks sidewalks, curbs and gutters, and dedicated bicycle facilities. The existing guardrail on the north side, adjacent to the canal, does not meet current resistance standards and must be upgraded. Traffic signals require timing optimization and other improvements, and new roadway lighting is necessary throughout the corridor. The corridor has experienced significant growth in recent years, and the improvements will ensure adequate mobility. The project is an east-west transportation corridor servicing the City of Doral. The document does not state any public comment or stakeholder sentiment.
- Board:
- Board of County Commissioners
- Date:
- 2026-07-21
- Type:
- Resolution
- Decision:
- Adopted
- Address:
- NW 58 Street from NW 97 Avenue to NW 79 Avenue
- Applicant:
- Horizon Contractors, Inc.
CONTRACT AWARD TO HORIZON CONTRACTORS INC.
The Board of County Commissioners adopted Resolution R-640-26, File Number 261131, approving a contract award to Horizon Contractors, Inc. for the Roadway Improvements to NW 58 Street from NW 97 Avenue to NW 79 Avenue, Project No. 20250068. The contract value is $17,933,304.63, inclusive of a construction contingency allowance of $1,618,298.15 and other allowances of $132,025.00, for a term of 730 calendar days. The project involves complete reconstruction of the existing roadway to a four-lane roadway with continuous center turning lane, bike lanes, sidewalks, curbs and gutters, storm drainage system, pavement markings and signage, upgraded traffic signalization, and roadway lighting. The project is located in District 12, represented by Commissioner Juan Carlos Bermudez, and is funded by Mobility Impact Fees. The base contract amount is $16,182,981.48. The project was advertised on October 16, 2025, and eight bids were received on October 17, 2025. Horizon Contractors, Inc. submitted the lowest base bid. The bid open date was 11/19/2025. The contract period is 730 calendar days with substantial completion occurring within 657 days from the Notice to Proceed. The project was initially planned as design-build but was cancelled due to utility conflicts; DTPW assumed the design contract and resolved the conflicts. The project manager is Fernando Mardones, DTPW Engineer III. The contract manager is Tiondra Wright, Chief. The project manager is Rene Idarraga, Chief. The company address for Horizon Contractors, Inc. is 8175 W 32 Ave, Suite #2, Hialeah, Florida 33018. The company principal and qualifier is Jose M. Sanchez. A 1.00% Small Business Development Goods & Services goal has been established. The annual estimated operations and maintenance costs are approximately $33,961.38. The project is associated with Project No. 77230. The program name is Arterial Roads - Countywide, Program Number 2000000538, funded in the FY 25-26 Adopted Budget and Multi-Year Capital Plan, Volume 2, Page 135. The project was forwarded to the BCC with a favorable recommendation by the Transportation Cmte on 7/14/2026. The final action was on 7/21/2026. The document does not state any public comment or stakeholder sentiment.
- Board:
- Board of County Commissioners
- Date:
- 2026-07-21
- Type:
- Resolution
- Decision:
- Adopted
- Address:
- NW 58 Street from NW 97 Avenue to NW 79 Avenue
- Applicant:
- Horizon Contractors, Inc.
CONTRACT AWARD TO HORIZON CONTRACTORS INC.
Miami-Dade County Board of County Commissioners adopted Resolution R-640-26 (File Number 261131) on July 21, 2026, approving a contract award to Horizon Contractors, Inc. for the Roadway Improvements to NW 58 Street from NW 97 Avenue to NW 79 Avenue, Project No. 20250068. The contract value is $17,933,304.63, inclusive of a construction contingency allowance of $1,618,298.15 and other allowances of $132,025.00, for a term of 730 calendar days. The project involves complete reconstruction of the existing roadway to a four-lane roadway with continuous center turning lane, bike lanes, sidewalks, curbs and gutters, storm drainage system, pavement markings and signage, upgraded traffic signalization, and roadway lighting. The project is located in District 12, represented by Commissioner Juan Carlos Bermudez, and is funded by Mobility Impact Fees. The project was advertised on October 16, 2025, and eight bids were received on October 17, 2025. Horizon Contractors, Inc. submitted the lowest base bid of $16,182,981.48. The bid opening date was November 19, 2025. The project was initially planned as design-build but was cancelled due to utility conflicts; DTPW assumed the design contract and resolved the conflicts. The contract includes a Small Business Development Goods & Services goal of 1.00%. No public comment or stakeholder sentiment is stated in the document.
- Board:
- Board of County Commissioners
- Date:
- 2026-07-21
- Type:
- Resolution
- Decision:
- Adopted
- Address:
- NW 58 Street from NW 97 Avenue to NW 79 Avenue
- Applicant:
- Horizon Contractors, Inc.
CONTRACT AWARD TO HORIZON CONTRACTORS INC.
Miami-Dade County Board of County Commissioners adopted Resolution R-640-26 (File Number 261131) on July 21, 2026, approving a contract award to Horizon Contractors, Inc. for the capital project titled Roadway Improvements to NW 58 Street from NW 97 Avenue to NW 79 Avenue, Project No. 20250068. The contract is for a term of 730 calendar days with a total value of $17,933,304.63, inclusive of a construction contingency allowance of $1,618,298.15 and other allowances of $132,025.00. The project involves complete reconstruction of the existing roadway to a four-lane roadway with continuous center turning lane, bike lanes, sidewalks, curbs and gutters, storm drainage system, pavement markings and signage, upgraded traffic signalization, and roadway lighting. The project is located primarily within District 12, represented by Commissioner Juan Carlos Bermudez, and is funded by Mobility Impact Fees. The project was advertised on October 16, 2025, and eight bids were received on October 17, 2025. Horizon Contractors, Inc. submitted the lowest base bid of $16,182,981.48, which is 0.55% below the County's cost estimate. The bid open date was November 19, 2025. The project was initially planned as a design-build but was cancelled due to utility conflicts; DTPW assumed the design contract and resolved the conflicts ahead of this procurement. The contract period is 730 calendar days with substantial completion occurring within 657 days from the Notice to Proceed. The project manager is Fernando Mardones, DTPW Engineer III. The contract manager is Tiondra Wright, Chief. The project manager is Rene Idarraga, Chief. The company street address for Horizon Contractors, Inc. is 8175 W 32 Ave, Suite #2, Hialeah, Florida 33018. The company principal and qualifier is Jose M. Sanchez. The annual estimated operations and maintenance costs are approximately $33,961.38. The project number is 77230. The program name is Arterial Roads - Countywide, program number 2000000538. The base contract amount is $16,182,981.48. The construction contingency allowance is 10% or $1,618,298.15. Other allowances include permit allowance of $4,000.00, off-duty law enforcement officer allowance of $80,000.00, bituminous materials adjustment allowance of $40,000.00, FPL connection allowance of $6,000.00, Utility Access Program (UAP) fee of $1,800.00, and Independent Private Sector Inspector General fee of $225.00. A 1.00% Small Business Development Goods & Services goal has been established for this project. The project was forwarded to the Board of County Commissioners with a favorable recommendation by the Transportation Committee on July 14, 2026, and again on July 20, 2026. The resolution was adopted on July 21, 2026. No public comment or stakeholder sentiment is stated in the document.
- Board:
- Board of County Commissioners
- Date:
- 2026-07-21
- Type:
- Resolution
- Decision:
- Adopted
- Address:
- NW 58 Street from NW 97 Avenue to NW 79 Avenue
- Applicant:
- Horizon Contractors, Inc.
CONTRACT AWARD TO HORIZON CONTRACTORS INC.
Miami-Dade County Board of County Commissioners adopted Resolution R-640-26 (File Number 261131) on July 21, 2026, approving a contract award to Horizon Contractors, Inc. for roadway improvements to NW 58 Street from NW 97 Avenue to NW 79 Avenue, Project No. 20250068. The contract value is $17,933,304.63, inclusive of a construction contingency allowance of $1,618,298.15 and other allowances of $132,025.00, for a term of 730 calendar days. The project involves complete reconstruction of the existing roadway to a four-lane roadway with continuous center turning lane, bike lanes, sidewalks, curbs and gutters, storm drainage system, pavement markings and signage, upgraded traffic signalization, and roadway lighting. The project is funded by Mobility Impact Fees. The base contract amount is $16,182,981.48. The project was advertised on October 16, 2025, and bids were opened on November 19, 2025, with eight bids received. Horizon Contractors, Inc. submitted the lowest base bid. The project is located primarily within District 12, represented by Commissioner Juan Carlos Bermudez. The project manager is Fernando Mardones, DTPW Engineer III. The contract manager is Tiondra Wright, Chief. The project manager is Rene Idarraga, Chief. The company address for Horizon Contractors, Inc. is 8175 W 32 Ave, Suite #2, Hialeah, Florida 33018. The company principal and qualifier is Jose M. Sanchez. The project was initially planned as design-build but was cancelled due to utility conflicts; DTPW assumed the design contract and resolved the conflicts. The existing segment of NW 58 Street features four lanes with a striped center turning lane but lacks sidewalks, curbs and gutters, and dedicated bicycle facilities. The existing guardrail on the north side, adjacent to the canal, does not meet current resistance standards and must be upgraded. Traffic signals require timing optimization and other improvements, and new roadway lighting is necessary. A 1.00% Small Business Development Goods & Services goal has been established for this project. No public comment or stakeholder sentiment is stated in the document.
- Board:
- Board of County Commissioners
- Date:
- 2026-07-21
- Type:
- Resolution
- Decision:
- Adopted
- Address:
- NW 58 Street from NW 97 Avenue to NW 79 Avenue
- Applicant:
- Horizon Contractors, Inc.
CONTRACT AWARD TO HORIZON CONTRACTORS INC.
Miami-Dade County Board of County Commissioners adopted Resolution R-640-26 (File Number 261131) on 7/21/2026, approving a contract award to Horizon Contractors, Inc. for the capital project 'Roadway Improvements to NW 58 Street from NW 97 Avenue to NW 79 Avenue' (Project No. 20250068). The contract value is $17,933,304.63, inclusive of a construction contingency allowance of $1,618,298.15 and other allowances of $132,025.00, for a term of 730 calendar days. The project involves complete reconstruction of the existing roadway to a four-lane roadway with continuous center turning lane, bike lanes, sidewalks, curbs and gutters, storm drainage system, pavement markings and signage, upgraded traffic signalization, and roadway lighting. The project is located primarily within District 12, represented by Commissioner Juan Carlos Bermudez. The project is funded by Mobility Impact Fees. The base contract amount is $16,182,981.48. The bid opening date was 11/19/2025, with 8 bids received. Horizon Contractors, Inc. submitted the lowest base bid. The project was initially planned as design-build but was cancelled due to utility conflicts; DTPW assumed the design contract and resolved the conflicts. The contract was recommended by the Transportation Committee on 7/14/2026 and forwarded to the BCC on 7/20/2026. The final action was adoption on 7/21/2026. The document does not state any public comment or stakeholder sentiment.
- Board:
- Board of County Commissioners
- Date:
- 2026-07-21
- Type:
- Resolution
- Decision:
- Adopted
- Address:
- NW 58 Street from NW 97 Avenue to NW 79 Avenue
- Applicant:
- Horizon Contractors, Inc.
CONTRACT AWARD TO HORIZON CONTRACTORS INC.
Miami-Dade County Commissioners approved the award of a contract to Horizon Contractors, Inc. for roadway improvements to NW 58 Street, between NW 97 Avenue and NW 79 Avenue. The project, with a total value of $17,933,304.63 and a term of 730 calendar days, involves reconstructing the existing four-lane roadway to include continuous center turning lanes, dedicated bike lanes, sidewalks, curbs and gutters, and a modern storm drainage system. Enhancements also include new pavement markings, signage, upgraded traffic signalization, and roadway lighting. The project is funded by Mobility Impact Fees. Eight bids were received, with Horizon Contractors, Inc. submitting the lowest base bid. The project was previously canceled due to utility conflicts, which have since been resolved by the Department of Transportation and Public Works.
- Board:
- Board of County Commissioners
- Date:
- 2026-07-21
- Type:
- Resolution
- Decision:
- Approved
- Address:
- NW 58 Street from NW 97 Avenue to NW 79 Avenue
- Applicant:
- Horizon Contractors, Inc.
CONTRACT AWARD TO HORIZON CONTRACTORS INC.
Miami-Dade County Board of County Commissioners adopted Resolution R-640-26 (File Number 261131) on July 21, 2026, approving a contract award to Horizon Contractors, Inc. for the capital project 'Roadway Improvements to NW 58 Street from NW 97 Avenue to NW 79 Avenue' (Project No. 20250068). The contract value is $17,933,304.63, inclusive of a construction contingency allowance of $1,618,298.15 and other allowances of $132,025.00, for a term of 730 calendar days. The project involves complete reconstruction of the existing roadway to a four-lane roadway with continuous center turning lane, bike lanes, sidewalks, curbs and gutters, storm drainage system, pavement markings and signage, upgraded traffic signalization, and roadway lighting. The project is located primarily within District 12, represented by Commissioner Juan Carlos Bermudez. The project is funded by Mobility Impact Fees. The project was advertised on October 16, 2025, and eight bids were received on November 19, 2025. Horizon Contractors, Inc. submitted the lowest base bid of $16,182,981.48. The contract period is 730 calendar days with substantial completion occurring within 657 days from the Notice to Proceed. The project manager is Fernando Mardones, DTPW Engineer III. The contract manager is Tiondra Wright, Chief. The project manager is Rene Idarraga, Chief. The contractor's address is 8175 W 32 Ave, Suite #2, Hialeah, Florida 33018. The company principal and qualifier is Jose M. Sanchez. A 1.00% Small Business Development Goods & Services goal has been established for this project. The project was initially planned as design-build but was cancelled due to utility conflicts; DTPW assumed the design contract and resolved the conflicts. The existing segment has four lanes with a striped center turning lane but lacks sidewalks, curbs and gutters, and dedicated bicycle facilities. The existing guardrail on the north side, adjacent to the canal, does not meet current resistance standards and must be upgraded. Traffic signals require timing optimization and other improvements, and new roadway lighting is necessary. No public comment or stakeholder sentiment is stated in the document.
- Board:
- Board of County Commissioners
- Date:
- 2026-07-21
- Type:
- Resolution
- Decision:
- Adopted
- Address:
- NW 58 Street from NW 97 Avenue to NW 79 Avenue
- Applicant:
- Horizon Contractors, Inc.
CONTRACT AWARD TO HORIZON CONTRACTORS INC.
Miami-Dade County Board of County Commissioners adopted Resolution R-640-26 (File Number 261131) on July 21, 2026, approving a contract award to Horizon Contractors, Inc. for roadway improvements to NW 58 Street from NW 97 Avenue to NW 79 Avenue, Project No. 20250068. The contract value is $17,933,304.63, inclusive of a construction contingency allowance of $1,618,298.15 and other allowances of $132,025.00, for a term of 730 calendar days. The project involves complete reconstruction of the existing roadway to a four-lane roadway with continuous center turning lane, bike lanes, sidewalks, curbs and gutters, storm drainage system, pavement markings and signage, upgraded traffic signalization, and roadway lighting. The project is funded by Mobility Impact Fees. The project was advertised on October 16, 2025, and eight bids were received on November 19, 2025. Horizon Contractors, Inc. submitted the lowest base bid of $16,182,981.48, which is 0.55% below the County's cost estimate. The project is located primarily within District 12, represented by Commissioner Juan Carlos Bermudez, who is the Prime Sponsor. The Transportation Committee forwarded the item to the Board with a favorable recommendation on July 14, 2026. The contract period is 730 calendar days with substantial completion occurring within 657 days from the Notice to Proceed. The annual estimated operations and maintenance costs are approximately $33,961.38. A 1.00% Small Business Development Goods & Services goal has been established for this project. The project manager is Fernando Mardones, DTPW Engineer III. The contract manager is Tiondra Wright, Chief. The project manager is Rene Idarraga, Chief. The company principal and qualifier is Jose M. Sanchez. The company address is 8175 W 32 Ave, Suite #2, Hialeah, Florida 33018. The project was initially planned as a design-build but was cancelled due to utility conflicts; DTPW assumed the design contract and resolved the utility conflicts ahead of this procurement. The existing segment of NW 58 Street features four lanes with a striped center turning lane, but lacks sidewalks, curbs and gutters, and dedicated bicycle facilities. The existing guardrail on the north side, adjacent to the canal, does not meet current resistance standards and must be upgraded. Traffic signals require timing optimization and other improvements, and new roadway lighting is necessary throughout the corridor. The three lowest responsive and responsible bids were: Horizon Contractors, Inc. at $16,182,981.48 (0.55% below estimate), H&R Paving, Inc. at $16,662,061.25 (2.40% above estimate), and General Asphalt Co., Inc. at $18,655,434.96 (14.65% above estimate). Horizon Contractors, Inc. had 10 evaluations in the Capital Improvements Information System within the last 15 years, with an average evaluation score of 3.3 out of 4. No major safety issues were found. No public comment or stakeholder sentiment is stated in the document.
- Board:
- Board of County Commissioners
- Date:
- 2026-07-21
- Type:
- Resolution
- Decision:
- Adopted
- Address:
- NW 58 Street from NW 97 Avenue to NW 79 Avenue
- Applicant:
- Horizon Contractors, Inc.
CONTRACT AWARD TO HORIZON CONTRACTORS INC.
Miami-Dade County Board of County Commissioners adopted Resolution R-640-26 (File Number 261131) on July 21, 2026, approving a contract award to Horizon Contractors, Inc. for roadway improvements to NW 58 Street from NW 97 Avenue to NW 79 Avenue, Project No. 20250068. The contract value is $17,933,304.63, inclusive of a construction contingency allowance of $1,618,298.15 and other allowances of $132,025.00, for a term of 730 calendar days. The project entails complete reconstruction of the existing roadway to a four-lane roadway with continuous center turning lane, bike lanes, sidewalks, curbs and gutters, storm drainage system, pavement markings and signage, upgraded traffic signalization, and roadway lighting. The project is funded by Mobility Impact Fees. The base contract amount is $16,182,981.48. The project was advertised on October 16, 2025, and eight bids were received on November 19, 2025. Horizon Contractors, Inc. submitted the lowest base bid of $16,182,981.48, which is 0.55% below the County's cost estimate. The project is located primarily within District 12, represented by Commissioner Juan Carlos Bermudez. The project manager is Fernando Mardones, DTPW Engineer III. The contract manager is Tiondra Wright, Chief. The project manager is Rene Idarraga, Chief. The company address for Horizon Contractors, Inc. is 8175 W 32 Ave, Suite #2, Hialeah, Florida 33018. The company principal and qualifier is Jose M. Sanchez. The project was initially planned as design-build but was cancelled due to utility conflicts; DTPW assumed the design contract and resolved the conflicts. The existing segment of NW 58 Street features four lanes with a striped center turning lane, but lacks sidewalks, curbs and gutters, and dedicated bicycle facilities. The existing guardrail on the north side, adjacent to the canal, does not meet current resistance standards and must be upgraded. Traffic signals require timing optimization and other improvements, and new roadway lighting is necessary. A 1.00% Small Business Development Goods & Services goal has been established for this project. No public comment or stakeholder sentiment is stated in the document.
- Board:
- Board of County Commissioners
- Date:
- 2026-07-21
- Type:
- Resolution
- Decision:
- Adopted
- Address:
- NW 58 Street from NW 97 Avenue to NW 79 Avenue
- Applicant:
- Horizon Contractors, Inc.
CONTRACT AWARD TO HORIZON CONTRACTORS INC.
Miami-Dade County Commissioners approved the award of a contract for roadway improvements to NW 58 Street, from NW 97 Avenue to NW 79 Avenue (Project No. 20250068). The contract was awarded to Horizon Contractors, Inc. for $17,933,304.63 over a term of 730 calendar days. The project involves reconstructing the existing four-lane roadway to include continuous center turning lanes, dedicated bike lanes, sidewalks, curbs and gutters, and a modern storm drainage system, along with new pavement markings, signage, traffic signalization, and roadway lighting. The project is funded by Mobility Impact Fees. Eight bids were received, with Horizon Contractors, Inc. submitting the lowest base bid. The project was previously cancelled due to utility conflicts, which have since been resolved by the Department of Transportation and Public Works.
- Board:
- Board of County Commissioners
- Date:
- 2026-07-21
- Type:
- Resolution
- Decision:
- Approved
- Address:
- NW 58 Street from NW 97 Avenue to NW 79 Avenue
- Applicant:
- Horizon Contractors, Inc.
CONTRACT AWARD TO HORIZON CONTRACTORS INC.
Miami-Dade County Commission approved the award of a contract to Horizon Contractors, Inc. for roadway improvements to NW 58 Street from NW 97 Avenue to NW 79 Avenue. The project, identified as Project No. 20250068, involves the reconstruction of the existing roadway into a four-lane road with continuous center turning lanes, dedicated bike lanes, sidewalks, curbs and gutters, and a modern storm drainage system. Additional enhancements include new pavement markings and signage, upgraded traffic signalization, and roadway lighting. The contract value is $17,933,304.63 for a term of 730 calendar days. The project is funded by Mobility Impact Fees. Eight bids were received, with Horizon Contractors, Inc. submitting the lowest base bid. The project was previously cancelled due to utility conflicts, which have since been resolved by the Department of Transportation and Public Works.
- Board:
- Board of County Commissioners
- Date:
- 2026-07-21
- Type:
- Resolution
- Decision:
- Approved
- Address:
- NW 58 Street from NW 97 Avenue to NW 79 Avenue
- Applicant:
- Horizon Contractors, Inc.
CONTRACT AWARD TO HORIZON CONTRACTORS INC.
Miami-Dade County Board of County Commissioners adopted Resolution R-640-26 (File Number 261131) on July 21, 2026, approving a contract award to Horizon Contractors, Inc. for the complete reconstruction of NW 58 Street from NW 97 Avenue to NW 79 Avenue, Project No. 20250068. The contract value is $17,933,304.63, inclusive of a $1,618,298.15 construction contingency and $132,025.00 in other allowances, for a term of 730 calendar days. The project will reconstruct the existing roadway into a four-lane roadway with a continuous center turning lane, bike lanes, sidewalks, curbs and gutters, storm drainage system, pavement markings and signage, upgraded traffic signalization, and roadway lighting. The project is funded by Mobility Impact Fees. The project was advertised on October 16, 2025, and eight bids were received on November 19, 2025. Horizon Contractors, Inc. submitted the lowest base bid of $16,182,981.48. The project is located primarily within District 12, represented by Commissioner Juan Carlos Bermudez. The project was initially planned as design-build but was cancelled due to utility conflicts, which were resolved before this procurement. The project manager is Fernando Mardones, DTPW Engineer III. The contract manager is Tiondra Wright, Chief. The project manager is Rene Idarraga, Chief. The company principal and qualifier is Jose M. Sanchez. The company address is 8175 W 32 Ave, Suite #2, Hialeah, Florida 33018. The bid bond expires on May 19, 2026, and the bid is valid until November 19, 2026. The annual estimated operations and maintenance costs are approximately $33,961.38. The project number is 77230. The program name is Arterial Roads - Countywide, program number 2000000538, funded by Mobility Impact Fees. The base contract amount is $16,182,981.48. The construction contingency is 10% or $1,618,298.15. Other allowances include $4,000.00 for permit, $80,000.00 for off-duty law enforcement officer, $40,000.00 for bituminous materials adjustment, $6,000.00 for FPL connection, $1,800.00 for Utility Access Program fee, and $225.00 for Independent Private Sector Inspector General. The substantial completion must occur within 657 days from the Notice to Proceed. The project was forwarded to the Board of County Commissioners with a favorable recommendation by the Transportation Committee on July 14, 2026, and July 20, 2026. The resolution was introduced on June 22, 2026. The County Attorney was assigned on June 23, 2026. The Office of Agenda Coordination was assigned on June 22, 2026. The final action was on July 21, 2026. The project was advertised on Thursday, October 16, 2025. On Friday, October 17, 2025, eight contractors submitted bids. The three lowest responsive and responsible bids were Horizon Contractors, Inc. at $16,182,981.48, H&R Paving, Inc. at $16,662,061.25, and General Asphalt Co., Inc. at $18,655,434.96. Horizon Contractors, Inc. had 10 evaluations in the Capital Improvements Information System within the last 15 years, with an average evaluation score of 3.3 out of 4. No major safety issues were found. A 1.00% Small Business Development Goods & Services goal has been established for this project. The project is subject to Responsible Wages (Resolution No. R-54-10), Sea Level Rise (Ordinance 14-79), and Sustainable Buildings Ordinance (I.O. No. 8-8). The project requires a standard payment and performance bond. The review committee meeting date and signoff date was April 17, 2025. The project is in the City of Doral. The existing segment of NW 58 Street features four lanes with a striped center turning lane, but lacks sidewalks, curbs and gutters, and dedicated bicycle facilities. The existing guardrail on the north side, adjacent to the canal, does not meet current resistance standards and must be upgraded. Traffic signals require timing optimization and other improvements, and new roadway lighting is necessary throughout the corridor. No public comment or stakeholder sentiment is stated in the document.
- Board:
- Board of County Commissioners
- Date:
- 2026-07-21
- Type:
- Resolution
- Decision:
- Adopted
- Address:
- NW 58 Street from NW 97 Avenue to NW 79 Avenue
- Applicant:
- Horizon Contractors, Inc.
CONTRACT AWARD TO HORIZON CONTRACTORS INC.
Miami-Dade County approved the award of a contract to Horizon Contractors, Inc. for roadway improvements to NW 58 Street from NW 97 Avenue to NW 79 Avenue. The project, identified as Project No. 20250068, involves the reconstruction of the existing roadway into a four-lane road with center turning lanes, bike lanes, sidewalks, curbs and gutters, and a modern storm drainage system. The contract value is $17,933,304.63 for a term of 730 calendar days. The project is funded by Mobility Impact Fees. Eight bids were received, with Horizon Contractors, Inc. submitting the lowest base bid. The project was previously cancelled due to utility conflicts which have now been resolved by the Department of Transportation and Public Works.
- Board:
- Board of County Commissioners
- Date:
- 2026-07-21
- Type:
- Resolution
- Decision:
- Approved
- Address:
- NW 58 Street from NW 97 Avenue to NW 79 Avenue
- Applicant:
- Horizon Contractors, Inc.
CONTRACT AWARD TO HORIZON CONTRACTORS INC.
Miami-Dade County Board of County Commissioners adopted Resolution R-640-26 (File Number 261131) on July 21, 2026, approving a contract award to Horizon Contractors, Inc. for the complete reconstruction of NW 58 Street from NW 97 Avenue to NW 79 Avenue, Project No. 20250068. The contract value is $17,933,304.63, inclusive of a construction contingency allowance of $1,618,298.15 and other allowances of $132,025.00, for a term of 730 calendar days. The project is funded by Mobility Impact Fees. The work includes reconstruction to a four-lane roadway with continuous center turning lane, bike lanes, sidewalks, curbs and gutters, storm drainage system, pavement markings and signage, upgraded traffic signalization, and roadway lighting. The project is located primarily within District 12, represented by Commissioner Juan Carlos Bermudez. The project was advertised on October 16, 2025, and eight bids were received. Horizon Contractors, Inc. submitted the lowest base bid of $16,182,981.48. The project was initially planned as design-build but was cancelled due to utility conflicts, which were resolved before this procurement. The estimated annual operations and maintenance costs are approximately $33,961.38. The project manager is Fernando Mardones, DTPW Engineer III. The contract manager is Tiondra Wright, Chief. The project manager is Rene Idarraga, Chief. The bid open date was November 19, 2025. The bid bond expires May 19, 2026. The bid is valid until November 19, 2026. The prime contractor is Horizon Contractors, Inc., with company principal and qualifier Jose M. Sanchez, located at 8175 W 32 Ave, Suite #2, Hialeah, Florida 33018. A 1.00% Small Business Development Goods & Services goal has been established for this project. The project was forwarded to the Board of County Commissioners with a favorable recommendation from the Transportation Committee on July 14, 2026, and July 20, 2026. The resolution was introduced on June 22, 2026. The final action was on July 21, 2026. The project is associated with Project No. 77230. The program name is Arterial Roads - Countywide, Program Number 2000000538, funded by FY 25-26 Adopted Budget and Multi-Year Capital Plan, Volume 2, Page 135, Mobility Impact Fees. The base contract amount is $16,182,981.48. The construction contingency allowance is 10% or $1,618,298.15. Other allowances include $4,000.00 for permit, $80,000.00 for off-duty law enforcement officer, $40,000.00 for bituminous materials adjustment, $6,000.00 for FPL connection, $1,800.00 for Utility Access Program (UAP) fee, and $225.00 for Independent Private Sector Inspector General. The contract period is 730 calendar days with substantial completion occurring within 657 days from the Notice to Proceed. The project is subject to Responsible Wages (Resolution No. R-54-10), Sea Level Rise (Ordinance 14-79), and Sustainable Buildings Ordinance (I.O. No. 8-8). The existing segment of NW 58 Street features four lanes with a striped center turning lane but lacks sidewalks, curbs and gutters, and dedicated bicycle facilities. The existing guardrail on the north side, adjacent to the canal, does not meet current resistance standards and must be upgraded. Traffic signals require timing optimization and other improvements, and new roadway lighting is necessary throughout the corridor. The project was bid on a unit price basis. The three lowest responsive and responsible bids were: Horizon Contractors, Inc. at $16,182,981.48 (0.55% below the County's cost estimate), H&R Paving, Inc. at $16,662,061.25 (2.40% above the County's cost estimate), and General Asphalt Co., Inc. at $18,655,434.96 (14.65% above the County's cost estimate). Horizon Contractors, Inc. had 10 evaluations in the Capital Improvements Information System within the last 15 years, with an average evaluation score of 3.3 out of 4. No major safety issues were found. The review committee meeting date and signoff date was April 17, 2025. The project is in the City of Doral. The project was procured under Capital Project No. 20250068. The contract number is 20250068. The user department and managing department is the Department of Transportation and Public Works. The resolution authorizes the County Mayor or County Mayor's designee to execute the contract and exercise the provisions contained therein, including termination provisions. The sponsor is Juan Carlos Bermudez. The requester is Transportation and Public Works. The legislative history shows the Board of County Commissioners adopted the item on July 21, 2026, with a pass vote. The Office of the Chairperson added the item on July 20, 2026. The Transportation Committee forwarded it to the BCC on July 20, 2026, and on July 14, 2026, forwarded it to the BCC with a favorable recommendation. The County Attorney was assigned on June 23, 2026, by Bruce Libhaber. Roy Coley assigned the item on June 22, 2026, to the Office of Agenda Coordination. The Office of Agenda Coordination assigned it to the County Attorney on June 22, 2026. The report notes the item has 11 pages. The fiscal impact is $17,933,304.63. The project is funded by Mobility Impact Fees. The project is located primarily within District 12. The project entails the complete reconstruction of the existing roadway along NW 58th Street, an east-west transportation corridor servicing the City of Doral. The improvements will result in a four-lane roadway with continuous center turning lanes, dedicated bike lanes, sidewalks, curbs and gutters, and a modern storm drainage system. Additional enhancements include new pavement markings and signage, upgraded traffic signalization, and roadway lighting. The corridor has experienced significant growth in recent years, and the improvements will ensure adequate mobility along this roadway. The project was initially planned as design-build but was cancelled due to utility conflicts. Following the contract cancellation, DTPW assumed the design contract and resolved the utility conflicts ahead of this procurement. The project was advertised on Thursday, October 16, 2025. On Friday, October 17, 2025, eight contractors submitted bids. The project was bid on a unit price basis. Due diligence was conducted in accordance with Procurement Guidelines to determine contractor responsibility, including verifying corporate status with the Florida Department of State's Division of Corporations and reviewing performance and compliance issues. Pursuant to Resolution No. R-1181-18, copies of Occupational Safety & Health Form 300 for the last three years are on file with DTPW. No major issue related to safety was found. The project is subject to a mandatory clearing house. The project has a standard payment and performance bond. The project does not exceed legal requirements. The project has no CWP goal. The project has an SBE-G&S goal of 1.00%. The project has no art in public places. The IG fee is included in the base contract. The project has no PTP funding, no GOB funding, and no ARRA funding. The project is associated with Project No. 77230. The project is funded through the following source: Program Name / Program Number County Budget Funding Source: Arterial Roads - Countywide / 2000000538 FY 25 - 26 Adopted Budget and Multi-Year Capital Plan, Volume 2, Page 135 Mobility Impact Fees. The project manager is Fernando Mardones, DTPW Engineer III. The contract manager is Tiondra Wright, Chief, (305) 375-4891, [email protected]. The project manager is Rene Idarraga, Chief, (305) 275-2111, [email protected]. The background states the existing segment of NW 58 Street features four lanes with a striped center turning lane. However, the roadway lacks sidewalks, curbs and gutters, and dedicated bicycle facilities. The existing guardrail on the north side, adjacent to the canal, does not meet current resistance standards and must be upgraded. Additionally, the traffic signals require timing optimization and other improvements, and new roadway lighting is necessary throughout the corridor to enhance safety and visibility. The document does not state any public comment or stakeholder sentiment.
- Board:
- Board of County Commissioners
- Date:
- 2026-07-21
- Type:
- Resolution
- Decision:
- Adopted
- Address:
- NW 58 Street from NW 97 Avenue to NW 79 Avenue
- Applicant:
- Horizon Contractors, Inc.
CONTRACT AWARD TO HORIZON CONTRACTORS INC.
Miami-Dade County Board of County Commissioners adopted Resolution R-640-26 (File Number 261131) on July 21, 2026, approving a contract award to Horizon Contractors, Inc. for the complete reconstruction of NW 58 Street from NW 97 Avenue to NW 79 Avenue, Project No. 20250068. The contract value is $17,933,304.63, inclusive of a construction contingency allowance of $1,618,298.15 and other allowances of $132,025.00, for a term of 730 calendar days. The project is funded by Mobility Impact Fees and is located primarily within District 12, represented by Commissioner Juan Carlos Bermudez. The work includes reconstruction to a four-lane roadway with continuous center turning lane, bike lanes, sidewalks, curbs and gutters, storm drainage system, pavement markings and signage, upgraded traffic signalization, and roadway lighting. The project was bid on a unit price basis with eight bids received; Horizon Contractors, Inc. submitted the lowest base bid of $16,182,981.48. The project was previously planned as design-build but was cancelled due to utility conflicts, which were resolved before this procurement. The project manager is Fernando Mardones, DTPW Engineer III. A 1.00% Small Business Development Goods & Services goal has been established. No public comment or stakeholder sentiment is stated in the document.
- Board:
- Board of County Commissioners
- Date:
- 2026-07-21
- Type:
- Resolution
- Decision:
- Adopted
- Address:
- NW 58 Street from NW 97 Avenue to NW 79 Avenue
- Applicant:
- Horizon Contractors, Inc.
CONTRACT AWARD TO HORIZON CONTRACTORS INC.
Miami-Dade County Board of County Commissioners resolution to approve a contract award to Horizon Contractors, Inc. for roadway improvements to NW 58 Street from NW 97 Avenue to NW 79 Avenue, Project No. 20250068, for a term of 730 calendar days and a value of $17,933,304.63. The project entails complete reconstruction of the existing roadway to a four-lane roadway with continuous center turning lane, bike lanes, sidewalks, curbs and gutters, storm drainage system, pavement markings and signage, upgraded traffic signalization, and roadway lighting. The project is located primarily within District 12, represented by Commissioner Juan Carlos Bermudez. The Transportation Committee forwarded the item to the Board with a favorable recommendation on 7/14/2026. The Board agenda date is 7/21/2026. The contract is funded by Mobility Impact Fees. The project was advertised on 10/16/2025, and eight contractors submitted bids on 10/17/2025. Horizon Contractors, Inc. submitted the lowest base bid of $16,182,981.48. The contract amount includes a construction contingency allowance of $1,618,298.15 and other allowances of $132,025.00. The base contract amount is $16,182,981.48. The bid open date was 11/19/2025. The project was initially planned as design-build but was cancelled due to utility conflicts; DTPW assumed the design contract and resolved the conflicts. The existing segment of NW 58 Street features four lanes with a striped center turning lane, but lacks sidewalks, curbs and gutters, and dedicated bicycle facilities. The existing guardrail on the north side, adjacent to the canal, does not meet current resistance standards and must be upgraded. Traffic signals require timing optimization and other improvements, and new roadway lighting is necessary throughout the corridor. The annual estimated operations and maintenance costs are approximately $33,961.38. A 1.00% Small Business Development Goods & Services goal has been established for this project. The project manager is Fernando Mardones, DTPW Engineer III. The contract manager is Tiondra Wright, Chief. The project manager is Rene Idarraga, Chief. The prime contractor is Horizon Contractors, Inc., with company principal Jose M. Sanchez, located at 8175 W 32 Ave, Suite #2, Hialeah, Florida 33018. The resolution was introduced on 6/22/2026. The sponsor is Juan Carlos Bermudez. The legislative history shows the Office of the Chairperson added the item on 7/20/2026, and the Transportation Committee forwarded it to the BCC on 7/20/2026. The County Attorney was assigned on 6/23/2026. The item was assigned to the Office of Agenda Coordination on 6/22/2026. The final action is not stated. The document does not state any public comment or stakeholder sentiment.
- Board:
- Board of County Commissioners
- Date:
- 2026-07-21
- Type:
- Resolution
- Decision:
- Transportation Committee forwarded to BCC with a favorable recommendation on 7/14/2026; final Board action not stated
- Address:
- NW 58 Street from NW 97 Avenue to NW 79 Avenue
- Applicant:
- Horizon Contractors, Inc.
CONTRACT AWARD TO HORIZON CONTRACTORS INC.
Miami-Dade County approved the award of a contract to Horizon Contractors, Inc. for roadway improvements to NW 58 Street from NW 97 Avenue to NW 79 Avenue. The project, identified as Project No. 20250068, involves the reconstruction of the existing roadway into a four-lane facility with continuous center turning lanes, dedicated bike lanes, sidewalks, curbs and gutters, and a modern storm drainage system. Additional enhancements include new pavement markings and signage, upgraded traffic signalization, and roadway lighting. The contract value is $17,933,304.63, with a term of 730 calendar days. The project is funded by Mobility Impact Fees. Eight bids were received, with Horizon Contractors, Inc. submitting the lowest base bid. The project was previously cancelled due to utility conflicts, which have since been resolved by the Department of Transportation and Public Works.
- Board:
- Board of County Commissioners
- Date:
- 2026-07-21
- Type:
- Resolution
- Decision:
- Approved
- Address:
- NW 58 Street from NW 97 Avenue to NW 79 Avenue
- Applicant:
- Horizon Contractors, Inc.
CONTRACT AWARD TO HORIZON CONTRACTORS INC.
Miami-Dade County Commission approved the award of a contract to Horizon Contractors, Inc. for roadway improvements to NW 58 Street from NW 97 Avenue to NW 79 Avenue. The project, identified as Project No. 20250068, involves the reconstruction of the existing roadway into a four-lane road with continuous center turning lanes, dedicated bike lanes, sidewalks, curbs and gutters, and a modern storm drainage system. Additional enhancements include new pavement markings and signage, upgraded traffic signalization, and roadway lighting. The contract value is $17,933,304.63 for a term of 730 calendar days. The project is funded by Mobility Impact Fees. Eight bids were received, with Horizon Contractors, Inc. submitting the lowest base bid. The project was previously cancelled due to utility conflicts, which have since been resolved by the Department of Transportation and Public Works.
- Board:
- Board of County Commissioners
- Date:
- 2026-07-21
- Type:
- Resolution
- Decision:
- Approved
- Address:
- NW 58 Street from NW 97 Avenue to NW 79 Avenue
- Applicant:
- Horizon Contractors, Inc.
CONTRACT AWARD TO HORIZON CONTRACTORS INC.
Miami-Dade County Commission approved the award of a contract to Horizon Contractors, Inc. for roadway improvements to NW 58 Street from NW 97 Avenue to NW 79 Avenue. The project, identified as Project No. 20250068, involves the reconstruction of the existing roadway into a four-lane road with continuous center turning lanes, dedicated bike lanes, sidewalks, curbs and gutters, and a modern storm drainage system. Additional enhancements include new pavement markings and signage, upgraded traffic signalization, and roadway lighting. The contract value is $17,933,304.63 for a term of 730 calendar days, funded by Mobility Impact Fees. The project was previously cancelled due to utility conflicts, which have since been resolved by the Department of Transportation and Public Works. Eight bids were received, with Horizon Contractors, Inc. submitting the lowest base bid. A 1.00% Small Business Development Goods & Services goal has been established for this project.
- Board:
- Board of County Commissioners
- Date:
- 2026-07-21
- Type:
- Resolution
- Decision:
- Approved
- Address:
- NW 58 Street from NW 97 Avenue to NW 79 Avenue
- Applicant:
- Horizon Contractors, Inc.
CONTRACT AWARD TO HORIZON CONTRACTORS INC.
Resolution adopted on 7/21/2026 approving contract award to Horizon Contractors, Inc. for roadway improvements to NW 58 Street from NW 97 Avenue to NW 79 Avenue, Project No. 20250068, for a term of 730 calendar days and a value of $17,933,304.63, inclusive of a construction contingency allowance of $1,618,298.15 and other allowances of $132,025.00. The project entails complete reconstruction of the existing roadway to a four-lane roadway with continuous center turning lane, bike lanes, sidewalks, curbs and gutters, storm drainage system, pavement markings and signage, upgraded traffic signalization, and roadway lighting. The project is located primarily within District 12, represented by Commissioner Juan Carlos Bermudez. The contract is funded by Mobility Impact Fees. The project was advertised on 10/16/2025, bids were received on 10/17/2025, and the bid open date was 11/19/2025. Horizon Contractors, Inc. submitted the lowest base bid of $16,182,981.48, which is 0.55% below the County's cost estimate. The project was initially planned as design-build but was cancelled due to utility conflicts; DTPW assumed the design contract and resolved the utility conflicts ahead of this procurement. The base contract amount is $16,182,981.48. The contract period is 730 calendar days with substantial completion occurring within 657 days from the Notice to Proceed. The annual estimated operations and maintenance costs are approximately $33,961.38. A 1.00% Small Business Development Goods & Services goal has been established for this project. The project manager is Fernando Mardones, DTPW Engineer III. The contract manager is Tiondra Wright, Chief. The project manager is Rene Idarraga, Chief. The prime contractor is Horizon Contractors, Inc., with company principal and qualifier Jose M. Sanchez, located at 8175 W 32 Ave, Suite #2, Hialeah, Florida 33018. The bid bond expires 05/19/2026 and the bid is valid until 11/19/2026. The review committee meeting date and signoff date was 04/17/2025. The project is subject to Responsible Wages (Resolution No. R-54-10), Sea Level Rise (Ordinance 14-79), and Sustainable Buildings Ordinance (I.O. No. 8-8). The existing segment of NW 58 Street features four lanes with a striped center turning lane, but lacks sidewalks, curbs and gutters, and dedicated bicycle facilities. The existing guardrail on the north side, adjacent to the canal, does not meet current resistance standards and must be upgraded. Traffic signals require timing optimization and other improvements, and new roadway lighting is necessary throughout the corridor. The project was forwarded to the BCC with a favorable recommendation by the Transportation Cmte on 7/14/2026 and 7/20/2026. The final action was on 7/21/2026. The item was introduced on 6/22/2026. The sponsor is Juan Carlos Bermudez, Prime Sponsor. The requester is Transportation and Public Works. The legislative history shows the Board of County Commissioners adopted the item on 7/21/2026. The County Attorney was assigned on 6/23/2026. The Office of Agenda Coordination was assigned on 6/22/2026. The report notes DTPW - Bruce Libhaber - no sponsor - pending July cmte - Attachment: Contract - item has 11 pages. The project is funded through the following source: Program Name / Program Number County Budget Funding Source: Arterial Roads - Countywide / 2000000538 FY 25 - 26 Adopted Budget and Multi-Year Capital Plan, Volume 2, Page 135 Mobility Impact Fees. The project number 77230 is associated with the roadway improvement project. The bid packages were issued via electronic download. Eight bids were received. The IG fee is included in the base contract. Art in Public Places is No. The permit allowance is $4,000.00. The off-duty law enforcement officer allowance is $80,000.00. The bituminous materials adjustment allowance is $40,000.00. The FPL connection allowance is $6,000.00. The reimbursement for cost associated with the Utility Access Program (UAP) Fee (2%) applied to all other allowances paid at invoice cost is $1,800.00. The reimbursement for cost associated with the Independent Private Sector Inspector General (0.25%) applied to all other allowances paid at invoice cost is $225.00. The total amount is $17,933,304.63. The project was bid on a unit price basis. The three lowest responsive and responsible bids were: Horizon Contractors, Inc. submitted the lowest base bid of $16,182,981.48, which is 0.55% below the County's cost estimate. H&R Paving, Inc. submitted the second lowest base bid of $16,662,061.25, which is 2.40% above the County's cost estimate. General Asphalt Co., Inc. submitted the third lowest base bid of $18,655,434.96, which is 14.65% above the County's cost estimate. Within the last 15 years, Horizon Contractors, Inc., had 10 evaluations in the Capital Improvements Information System, with an average evaluation score of 3.3 out of a maximum score of 4. Due diligence was conducted in accordance with Procurement Guidelines to determine contractor responsibility, including verifying corporate status with the Florida Department of State's Division of Corporations and reviewing performance and compliance issues. Pursuant to Resolution No. R-1181-18, copies of Occupational Safety & Health Form 300 - Log of Work-Related Injuries and Illnesses for the last three years are on file with DTPW and are available upon request. No major issue related to safety was found. According to the Small Business Development (SBD) Office and its database, there are no violations on record within the last three years for Horizon Contractors, Inc. The standard payment and performance bond is Yes. The mandatory clearing house is Yes. The project does not exceed legal requirements. The review committee assigned contract measures is No. The SBE-G&S goal is 1.00% and CWP is N/A. The project is located in District 12, Commissioner Juan Carlos Bermudez. The user department is Department of Transportation and Public Works. The managing department is Department of Transportation and Public Works. The approval path is Board of County Commissioners. The delegation of authority is consistent with those authorities granted under the County Code. The fiscal impact for the contract is $17,933,304.63, inclusive of a contingency allowance of $1,618,298.15 and $132,025.00 for other allowances. The annual estimated operations and maintenance costs are approximately $33,961.38, consisting of $24,796.76 for operations and $9,164.62 for maintenance. The project is funded by Mobility Impact Fees. The project was advertised on Thursday, October 16, 2025. On Friday, October 17, 2025, eight contractors submitted bids. The project was initially planned to be delivered as a design-build; however, the project was cancelled due to utility conflicts that could not be addressed. Following the contract cancellation, DTPW assumed the design contract and resolved the utility conflicts ahead of this procurement. The corridor has experienced significant growth in recent years, and the improvements will ensure adequate mobility along this roadway, which is essential to sustaining this growth, maintaining an acceptable level of service, and supporting the transportation needs of residents, businesses, and visitors within the surrounding communities. The project is located primarily within District 12, which is represented by Commissioner Juan Carlos Bermudez. The project name is Roadway Improvements to NW 58 Street from NW 97 Avenue to NW 79 Avenue. The DTPW project number is 20250068. The contract number is 20250068. The project description includes furnishing all supervision, materials, equipment, tools and performing all operations necessary for roadway improvements to NW 58 Street from NW 97 Avenue to NW 79 Avenue. The work consists of reconstruction of the existing road to a four-lane roadway with continuous center turning lane, bike lanes, sidewalks, curbs and gutters, storm drainage system, pavement markings and signage, upgraded traffic signalization, and roadway lighting. The project location is District 12, Commissioner Juan Carlos Bermudez. The approval path is Board of County Commissioners. The user department is Department of Transportation and Public Works. The managing department is Department of Transportation and Public Works. The delegation of authority is consistent with those authorities granted under the County Code. The fiscal impact for the contract is $17,933,304.63, inclusive of a contingency allowance of $1,618,298.15 and $132,025.00 for other allowances. The annual estimated operations and maintenance costs are approximately $33,961.38, consisting of $24,796.76 for operations and $9,164.62 for maintenance. Project No. 77230 is associated with the roadway improvement project along NW 58 Street from NW 97 Avenue to NW 79 Avenue. This contract is funded through the following source: Program Name / Program Number County Budget Funding Source: Arterial Roads - Countywide / 2000000538 FY 25 - 26 Adopted Budget and Multi-Year Capital Plan, Volume 2, Page 135 Mobility Impact Fees. PTP funding is No. GOB funding is No. ARRA funding is No. Bid packages were issued via electronic download. Eight bids were received. The contract period is 730 calendar days for all work required by the contract documents with substantial completion occurring within 657 days from the Notice to Proceed. The IG fee is included in the base contract. Art in Public Places is No. The base contract amount is $16,182,981.48. The contingency allowance (Section 2-8.1 Miami-Dade County Code) is construction 10% $1,618,298.15. The permit allowance is $4,000.00. The off-duty law enforcement officer allowance is $80,000.00. The bituminous materials adjustment allowance is $40,000.00. The FPL connection allowance is $6,000.00. For reimbursement of cost associated with the Utility Access Program (UAP) Fee (2%) applied to all other allowances paid at invoice cost: $1,800.00. For reimbursement of cost associated with the Independent Private Sector Inspector General (0.25%) applied to all other allowances paid at invoice cost: $225.00. The total amount is $17,933,304.63. The track record / monitor is Fernando Mardones, DTPW Engineer III, is the Project Manager. The explanation states that according to the Small Business Development (SBD) Office and its database, there are no violations on record within the last three years for Horizon Contractors, Inc., and a 1.00% Small Business Development Goods & Services goal has been established for this project. The project was advertised on Thursday, October 16, 2025. On Friday, October 17, 2025, eight contractors submitted bids. The three lowest responsive and responsible bids were as follows: Horizon Contractors, Inc. submitted the lowest base bid of $16,182,981.48, which is 0.55% below the County's cost estimate. H&R Paving, Inc. submitted the second lowest base bid of $16,662,061.25, which is 2.40% above the County's cost estimate. General Asphalt Co., Inc. submitted the third lowest base bid of $18,655,434.96, which is 14.65% above the County's cost estimate. This project was bid on a unit price basis. A copy of all bids, and the bid tabulation for this project, is available by contacting the Chief of Capital Improvements, DTPW. Within the last 15 years, Horizon Contractors, Inc., had 10 evaluations in the Capital Improvements Information System, with an average evaluation score of 3.3 out of a maximum score of 4. Due diligence was conducted in accordance with Procurement Guidelines to determine contractor responsibility, including verifying corporate status with the Florida Department of State's Division of Corporations and reviewing performance and compliance issues. Furthermore, pursuant to Resolution No. R-1181-18, copies of Occupational Safety & Health Form 300 - Log of Work-Related Injuries and Illnesses for the last three years are on file with DTPW and are available upon request. No major issue related to safety was found. The bid open date is 11/19/2025. The bid bond expires 05/19/2026. The bid is valid until 11/19/2026. The prime contractor is Horizon Contractors, Inc. The company principals are Jose M. Sanchez. The company qualifier is Jose M. Sanchez. The company email address is [email protected]. The company street address is 8175 W 32 Ave, Suite #2. The company city-state-zip is Hialeah, Florida 33018. Exceed legal requirements is No. Standard payment and performance bond is Yes. Review committee meeting date is 04/17/2025 and signoff date is 04/17/2025. Responsible wages (Resolution No. R-54-10) is applicable. Review committee assigned contract measures is No. Type goal SBE-G&S is 1.00% and CWP is N/A. Mandatory clearing house is Yes. Sea level rise (Ordinance 14-79) is Yes. Sustainable buildings ordinance (I.O. No. 8-8) is Yes. Contract manager name / phone / email is Tiondra Wright, Chief (305) 375-4891 [email protected]. Project manager name / phone / email is Rene Idarraga, Chief (305) 275-2111 [email protected]. The background states that the existing segment of NW 58 Street features four lanes with a striped center turning lane. However, the roadway lacks sidewalks, curbs and gutters, and dedicated bicycle facilities. The existing guardrail on the north side, adjacent to the canal, does not meet current resistance standards and must be upgraded. Additionally, the traffic signals require timing optimization and other improvements, and new roadway lighting is necessary throughout the corridor to enhance safety and visibility. The document is signed by Roy Coley, Deputy Mayor. The legislative history shows the Board of County Commissioners adopted the item on 7/21/2026. The Office of the Chairperson added the item on 7/20/2026. The Transportation Cmte forwarded to BCC on 7/20/2026. The Transportation Cmte forwarded to BCC with a favorable recommendation on 7/14/2026. The County Attorney was assigned on 6/23/2026. Roy Coley assigned the item on 6/22/2026. The Office of Agenda Coordination assigned the item on 6/22/2026. The report states DTPW - Bruce Libhaber - no sponsor - pending July cmte - Attachment: Contract - item has 11 pages. The item was introduced on 6/22/2026. The requester is Transportation and Public Works. The final action is 7/21/2026. The agenda date is 7/21/2026. The agenda item number is 8N6. The reference is R-640-26. The file type is Resolution. The status is Adopted. The version is 0. The control is County Commission. The file name is CONTRACT AWARD TO HORIZON CONTRACTORS INC. The sponsor is Juan Carlos Bermudez, Prime Sponsor. The sunset provision is No. The effective date is not stated. The expiration date is not stated. The registered lobbyist is None Listed. The cost is not stated. The indexes are NONE. The title is RESOLUTION APPROVING THE AWARD OF THE CONTRACT FOR THE CAPITAL PROJECT TITLED ROADWAY IMPROVEMENTS TO NW 58 STREET FROM NW 97 AVENUE TO NW 79 AVENUE, PROJECT NO. 20250068, TO HORIZON CONTRACTORS, INC., FOR A TERM OF 730 CALENDAR DAYS AND A VALUE OF $17,933,304.63, INCLUSIVE OF A CONSTRUCTION CONTINGENCY ALLOWANCE OF $1,618,298.15, AND OTHER ALLOWANCES OF $132,025.00; AUTHORIZING THE COUNTY MAYOR OR COUNTY MAYOR'S DESIGNEE TO EXECUTE SAME AND EXERCISE THE PROVISIONS CONTAINED THEREIN. The body states that the Board approves the contract award between Miami-Dade County and Horizon Contractors, Inc., for the roadway improvements to NW 58 Street from NW 97 Avenue to NW 79 Avenue in an amount not to exceed $17,933,304.63, inclusive of a construction contingency allowance of $1,618,298.15, and $132,025.00 for other allowances and authorizes the County Mayor or County Mayor's designee to execute the same and to exercise the provisions contained therein, including termination provisions. The header is from Daniella Levine Cava, Mayor, to Honorable Chairman Anthony Rodriguez and Members, Board of County Commissioners, subject Contract Award Recommendation in the Amount of $17,933,304.63 to Horizon Contractors, Inc. for Roadway Improvements to NW 58 Street from NW 97 Avenue to NW 79 Avenue. The staff recommendation executive summary states the purpose of this item is to gain approval of the Board of County Commissioners (Board) to execute a contract award recommendation for the project titled 'Roadway Improvements to NW 58 Street from NW 97 Avenue to NW 79 Avenue, Capital Project No. 20250068,' in the amount of $17,933,304.63 to Horizon Contractors, Inc., for a 730-day term. This project is being funded by Mobility Impact Fees. This project entails the complete reconstruction of the existing roadway along NW 58th Street, an east-west transportation corridor servicing the City of Doral. The improvements will result in a four-lane roadway with continuous center turning lanes, dedicated bike lanes, sidewalks, curbs and gutters, and a modern storm drainage system. Additional enhancements include new pavement markings and signage, upgraded traffic signalization, and roadway lighting. The corridor has experienced significant growth in recent years, and the improvements will ensure adequate mobility along this roadway, which is essential to sustaining this growth, maintaining an acceptable level of service, and supporting the transportation needs of residents, businesses, and visitors within the surrounding communities. The Department of Transportation and Public Works (DTPW) initially planned to deliver the project as a 'design-build;' however, the project was cancelled due to utility conflicts that could not be addressed. Following the contract cancellation, DTPW assumed the design contract and resolved the utility conflicts ahead of this procurement. The recommendation states this contract award recommendation is for the project titled 'Roadway Improvements to NW 58 Street from NW 97 Avenue to NW 79 Avenue, procured under Capital Project No. 20250068, between Miami-Dade County and Horizon Contractors, Inc., in the amount of $17,933,304.63 for a 730-day term. The scope states the project is located primarily within District 12, which is represented by Commissioner Juan Carlos Bermudez. The project name is Roadway Improvements to NW 58 Street from NW 97 Avenue to NW 79 Avenue. The DTPW project number is 20250068. The contract number is 20250068. The project description includes furnishing all supervision, materials, equipment, tools and performing all operations necessary for roadway improvements to NW 58 Street from NW 97 Avenue to NW 79 Avenue. The work consists of reconstruction of the existing road to a four-lane roadway with continuous center turning lane, bike lanes, sidewalks, curbs and gutters, storm drainage system, pavement markings and signage, upgraded traffic signalization, and roadway lighting. The project location is District 12, Commissioner Juan Carlos Bermudez. The approval path is Board of County Commissioners. The user department is Department of Transportation and Public Works. The managing department is Department of Transportation and Public Works. The delegation of authority is consistent with those authorities granted under the County Code. The fiscal impact for the contract is $17,933,304.63, inclusive of a contingency allowance of $1,618,298.15 and $132,025.00 for other allowances. The annual estimated operations and maintenance costs are approximately $33,961.38, consisting of $24,796.76 for operations and $9,164.62 for maintenance. Project No. 77230 is associated with the roadway improvement project along NW 58 Street from NW 97 Avenue to NW 79 Avenue. This contract is funded through the following source: Program Name / Program Number County Budget Funding Source: Arterial Roads - Countywide / 2000000538 FY 25 - 26 Adopted Budget and Multi-Year Capital Plan, Volume 2, Page 135 Mobility Impact Fees. PTP funding is No. GOB funding is No. ARRA funding is No. Bid packages were issued via electronic download. Eight bids were received. The contract period is 730 calendar days for all work required by the contract documents with substantial completion occurring within 657 days from the Notice to Proceed. The IG fee is included in the base contract. Art in Public Places is No. The base contract amount is $16,182,981.48. The contingency allowance (Section 2-8.1 Miami-Dade County Code) is construction 10% $1,618,298.15. The permit allowance is $4,000.00. The off-duty law enforcement officer allowance is $80,000.00. The bituminous materials adjustment allowance is $40,000.00. The FPL connection allowance is $6,000.00. For reimbursement of cost associated with the Utility Access Program (UAP) Fee (2%) applied to all other allowances paid at invoice cost: $1,800.00. For reimbursement of cost associated with the Independent Private Sector Inspector General (0.25%) applied to all other allowances paid at invoice cost: $225.00. The total amount is $17,933,304.63. The track record / monitor is Fernando Mardones, DTPW Engineer III, is the Project Manager. The explanation states that according to the Small Business Development (SBD) Office and its database, there are no violations on record within the last three years for Horizon Contractors, Inc., and a 1.00% Small Business Development Goods & Services goal has been established for this project. The project was advertised on Thursday, October 16, 2025. On Friday, October 17, 2025, eight contractors submitted bids. The three lowest responsive and responsible bids were as follows: Horizon Contractors, Inc. submitted the lowest base bid of $16,182,981.48, which is 0.55% below the County's cost estimate. H&R Paving, Inc. submitted the second lowest base bid of $16,662,061.25, which is 2.40% above the County's cost estimate. General Asphalt Co., Inc. submitted the third lowest base bid of $18,655,434.96, which is 14.65% above the County's cost estimate. This project was bid on a unit price basis. A copy of all bids, and the bid tabulation for this project, is available by contacting the Chief of Capital Improvements, DTPW. Within the last 15 years, Horizon Contractors, Inc., had 10 evaluations in the Capital Improvements Information System, with an average evaluation score of 3.3 out of a maximum score of 4. Due diligence was conducted in accordance with Procurement Guidelines to determine contractor responsibility, including verifying corporate status with the Florida Department of State's Division of Corporations and reviewing performance and compliance issues. Furthermore, pursuant to Resolution No. R-1181-18, copies of Occupational Safety & Health Form 300 - Log of Work-Related Injuries and Illnesses for the last three years are on file with DTPW and are available upon request. No major issue related to safety was found. The bid open date is 11/19/2025. The bid bond expires 05/19/2026. The bid is valid until 11/19/2026. The prime contractor is Horizon Contractors, Inc. The company principals are Jose M. Sanchez. The company qualifier is Jose M. Sanchez. The company email address is [email protected]. The company street address is 8175 W 32 Ave, Suite #2. The company city-state-zip is Hialeah, Florida 33018. Exceed legal requirements is No. Standard payment and performance bond is Yes. Review committee meeting date is 04/17/2025 and signoff date is 04/17/2025. Responsible wages (Resolution No. R-54-10) is applicable. Review committee assigned contract measures is No. Type goal SBE-G&S is 1.00% and CWP is N/A. Mandatory clearing house is Yes. Sea level rise (Ordinance 14-79) is Yes. Sustainable buildings ordinance (I.O. No. 8-8) is Yes. Contract manager name / phone / email is Tiondra Wright, Chief (305) 375-4891 [email protected]. Project manager name / phone / email is Rene Idarraga, Chief (305) 275-2111 [email protected]. The background states that the existing segment of NW 58 Street features four lanes with a striped center turning lane. However, the roadway lacks sidewalks, curbs and gutters, and dedicated bicycle facilities. The existing guardrail on the north side, adjacent to the canal, does not meet current resistance standards and must be upgraded. Additionally, the traffic signals require timing optimization and other improvements, and new roadway lighting is necessary throughout the corridor to enhance safety and visibility. The document is signed by Roy Coley, Deputy Mayor.
- Board:
- Board of County Commissioners
- Date:
- 2026-07-21
- Type:
- Resolution
- Decision:
- Adopted
- Address:
- NW 58 Street from NW 97 Avenue to NW 79 Avenue
- Applicant:
- Horizon Contractors, Inc.
CONTRACT AWARD TO HORIZON CONTRACTORS INC.
Miami-Dade County Board of County Commissioners adopted Resolution R-640-26 (File Number 261131) on July 21, 2026, approving a contract award to Horizon Contractors, Inc. for the capital project 'Roadway Improvements to NW 58 Street from NW 97 Avenue to NW 79 Avenue' (Project No. 20250068). The contract is for a term of 730 calendar days with a total value of $17,933,304.63, including a construction contingency allowance of $1,618,298.15 and other allowances of $132,025.00. The project involves complete reconstruction of the existing roadway along NW 58th Street in the City of Doral, resulting in a four-lane roadway with continuous center turning lanes, dedicated bike lanes, sidewalks, curbs and gutters, and a modern storm drainage system, plus new pavement markings, signage, upgraded traffic signalization, and roadway lighting. The project is funded by Mobility Impact Fees. The base contract amount is $16,182,981.48. The project was advertised on October 16, 2025, and eight bids were received on November 19, 2025. Horizon Contractors, Inc. submitted the lowest base bid. The project is located primarily within District 12, represented by Commissioner Juan Carlos Bermudez. The Transportation Committee forwarded the item to the Board with a favorable recommendation on July 14, 2026. The contract manager is Tiondra Wright, and the project manager is Rene Idarraga. The project manager for monitoring is Fernando Mardones. The company principal and qualifier is Jose M. Sanchez. The company address is 8175 W 32 Ave, Suite #2, Hialeah, Florida 33018. A 1.00% Small Business Development Goods & Services goal has been established. The estimated annual operations and maintenance costs are approximately $33,961.38. The existing segment of NW 58 Street features four lanes with a striped center turning lane, but lacks sidewalks, curbs and gutters, and dedicated bicycle facilities. The existing guardrail on the north side, adjacent to the canal, does not meet current resistance standards and must be upgraded. Traffic signals require timing optimization and other improvements, and new roadway lighting is necessary throughout the corridor. The project was initially planned as a design-build but was cancelled due to utility conflicts; DTPW assumed the design contract and resolved the conflicts. No public comment or stakeholder sentiment is stated in the document.
- Board:
- Board of County Commissioners
- Date:
- 2026-07-21
- Type:
- Resolution
- Decision:
- Adopted
- Address:
- NW 58 Street from NW 97 Avenue to NW 79 Avenue
- Applicant:
- Horizon Contractors, Inc.
CONTRACT AWARD TO HORIZON CONTRACTORS INC.
Miami-Dade County Board of County Commissioners adopted Resolution R-640-26 (File Number 261131) on July 21, 2026, approving a contract award to Horizon Contractors, Inc. for the Roadway Improvements to NW 58 Street from NW 97 Avenue to NW 79 Avenue, Project No. 20250068. The contract value is $17,933,304.63, inclusive of a construction contingency allowance of $1,618,298.15 and other allowances of $132,025.00, for a term of 730 calendar days. The project involves complete reconstruction of the existing roadway to a four-lane roadway with continuous center turning lane, bike lanes, sidewalks, curbs and gutters, storm drainage system, pavement markings and signage, upgraded traffic signalization, and roadway lighting. The project is funded by Mobility Impact Fees. The project was advertised on October 16, 2025, and bids were opened on November 19, 2025, with eight bids received. Horizon Contractors, Inc. submitted the lowest base bid of $16,182,981.48. The project is located primarily within District 12, represented by Commissioner Juan Carlos Bermudez. The contract period is 730 calendar days with substantial completion occurring within 657 days from the Notice to Proceed. The project was initially planned as design-build but was cancelled due to utility conflicts; DTPW assumed the design contract and resolved the conflicts. The estimated annual operations and maintenance costs are approximately $33,961.38. A 1.00% Small Business Development Goods & Services goal has been established. The project manager is Fernando Mardones, DTPW Engineer III. The contract manager is Tiondra Wright, Chief. The project manager is Rene Idarraga, Chief. The prime contractor is Horizon Contractors, Inc., with company principal Jose M. Sanchez, located at 8175 W 32 Ave, Suite #2, Hialeah, Florida 33018. The existing segment of NW 58 Street features four lanes with a striped center turning lane, but lacks sidewalks, curbs and gutters, and dedicated bicycle facilities. The existing guardrail on the north side, adjacent to the canal, does not meet current resistance standards and must be upgraded. Traffic signals require timing optimization and other improvements, and new roadway lighting is necessary throughout the corridor. The Transportation Committee forwarded the item to the BCC with a favorable recommendation on July 14, 2026. The Board of County Commissioners adopted the resolution on July 21, 2026. No public comment or stakeholder sentiment is stated in the document.
- Board:
- Board of County Commissioners
- Date:
- 2026-07-21
- Type:
- Resolution
- Decision:
- Adopted
- Address:
- NW 58 Street from NW 97 Avenue to NW 79 Avenue
- Applicant:
- Horizon Contractors, Inc.
CONTRACT AWARD TO HORIZON CONTRACTORS INC.
Miami-Dade County Board of County Commissioners adopted Resolution R-640-26 (File Number 261131) on July 21, 2026, approving a contract award to Horizon Contractors, Inc. for roadway improvements to NW 58 Street from NW 97 Avenue to NW 79 Avenue, Project No. 20250068. The contract value is $17,933,304.63, inclusive of a construction contingency allowance of $1,618,298.15 and other allowances of $132,025.00, for a term of 730 calendar days. The project involves complete reconstruction of the existing roadway to a four-lane roadway with continuous center turning lane, bike lanes, sidewalks, curbs and gutters, storm drainage system, pavement markings and signage, upgraded traffic signalization, and roadway lighting. The project is located primarily within District 12, represented by Commissioner Juan Carlos Bermudez. The project is funded by Mobility Impact Fees. The contract was awarded to Horizon Contractors, Inc., who submitted the lowest base bid of $16,182,981.48. The project was bid on a unit price basis, with eight bids received. The bid open date was November 19, 2025. The contract period is 730 calendar days with substantial completion occurring within 657 days from the Notice to Proceed. The project manager is Fernando Mardones, DTPW Engineer III. The contract manager is Tiondra Wright, Chief. The project manager is Rene Idarraga, Chief. The company address for Horizon Contractors, Inc. is 8175 W 32 Ave, Suite #2, Hialeah, Florida 33018. The company principal and qualifier is Jose M. Sanchez. A 1.00% Small Business Development Goods & Services goal has been established for this project. The project was initially planned as a design-build but was cancelled due to utility conflicts, after which DTPW assumed the design contract and resolved the utility conflicts. The existing segment of NW 58 Street features four lanes with a striped center turning lane, but lacks sidewalks, curbs and gutters, and dedicated bicycle facilities. The existing guardrail on the north side, adjacent to the canal, does not meet current resistance standards and must be upgraded. Traffic signals require timing optimization and other improvements, and new roadway lighting is necessary throughout the corridor. The annual estimated operations and maintenance costs are approximately $33,961.38, consisting of $24,796.76 for operations and $9,164.62 for maintenance. Project No. 77230 is associated with the roadway improvement project. The project was advertised on Thursday, October 16, 2025. On Friday, October 17, 2025, eight contractors submitted bids. The three lowest responsive and responsible bids were: Horizon Contractors, Inc. at $16,182,981.48 (0.55% below the County's cost estimate), H&R Paving, Inc. at $16,662,061.25 (2.40% above the County's cost estimate), and General Asphalt Co., Inc. at $18,655,434.96 (14.65% above the County's cost estimate). Within the last 15 years, Horizon Contractors, Inc. had 10 evaluations in the Capital Improvements Information System, with an average evaluation score of 3.3 out of a maximum score of 4. No major issue related to safety was found. The bid bond expires on May 19, 2026. The bid is valid until November 19, 2026. The review committee meeting date and signoff date was April 17, 2025. The project has a sea level rise designation (Ordinance 14-79) and a sustainable buildings ordinance designation (I.O. No. 8-8). The project includes a standard payment and performance bond. The project includes an IG fee in the base contract. The project does not include art in public places. The project does not have PTP funding, GOB funding, or ARRA funding. The project has a mandatory clearing house. The project does not exceed legal requirements. The project has responsible wages (Resolution No. R-54-10). The project has no assigned contract measures from the review committee. The project has a SBE-G&S goal of 1.00% and CWP goal of N/A. The project has a permit allowance of $4,000.00, off-duty law enforcement officer allowance of $80,000.00, bituminous materials adjustment allowance of $40,000.00, FPL connection allowance of $6,000.00, reimbursement for Utility Access Program (UAP) fee (2%) applied to all other allowances paid at invoice cost of $1,800.00, and reimbursement for Independent Private Sector Inspector General (0.25%) applied to all other allowances paid at invoice cost of $225.00. The base contract amount is $16,182,981.48. The construction contingency allowance is 10% or $1,618,298.15. The total amount is $17,933,304.63. The project is funded through the following source: Arterial Roads - Countywide / 2000000538 FY 25 - 26 Adopted Budget and Multi-Year Capital Plan, Volume 2, Page 135 Mobility Impact Fees. The legislative history shows the Transportation Cmte forwarded the item to the BCC with a favorable recommendation on July 14, 2026, and the Board of County Commissioners adopted the resolution on July 21, 2026. The item was introduced on June 22, 2026. The requester is Transportation and Public Works. The sponsor is Juan Carlos Bermudez, Prime Sponsor. The County Attorney assigned Bruce Libhaber on June 23, 2026. Roy Coley assigned the item to the Office of Agenda Coordination on June 22, 2026. The Office of Agenda Coordination assigned the item to the County Attorney on June 22, 2026. The Clerk of the Board received notice that the proposed resolution was placed on the July 21, 2026 Board agenda. The document does not state any public comment or stakeholder sentiment.
- Board:
- Board of County Commissioners
- Date:
- 2026-07-21
- Type:
- Resolution
- Decision:
- Adopted
- Address:
- NW 58 Street from NW 97 Avenue to NW 79 Avenue
- Applicant:
- Horizon Contractors, Inc.
CONTRACT AWARD TO HORIZON CONTRACTORS INC.
Miami-Dade County Board of County Commissioners adopted Resolution R-640-26 (File Number 261131) on 7/21/2026, approving a contract award to Horizon Contractors, Inc. for the complete reconstruction of NW 58 Street from NW 97 Avenue to NW 79 Avenue, Project No. 20250068. The contract value is $17,933,304.63, inclusive of a $1,618,298.15 construction contingency allowance and $132,025.00 in other allowances, for a term of 730 calendar days. The project is funded by Mobility Impact Fees. The work includes a four-lane roadway with continuous center turning lane, bike lanes, sidewalks, curbs and gutters, storm drainage system, pavement markings and signage, upgraded traffic signalization, and roadway lighting. The project is located primarily within District 12, represented by Commissioner Juan Carlos Bermudez. The base contract amount is $16,182,981.48. Eight bids were received; Horizon Contractors, Inc. submitted the lowest base bid. The bid open date was 11/19/2025. The project was advertised on 10/16/2025. The contract period is 730 calendar days with substantial completion within 657 days from Notice to Proceed. The project manager is Fernando Mardones, DTPW Engineer III. The contract manager is Tiondra Wright, Chief. The project manager is Rene Idarraga, Chief. The company address for Horizon Contractors, Inc. is 8175 W 32 Ave, Suite #2, Hialeah, Florida 33018. The company principal and qualifier is Jose M. Sanchez. A 1.00% Small Business Development Goods & Services goal has been established for this project. The estimated annual operations and maintenance costs are approximately $33,961.38. The project was initially planned as design-build but was cancelled due to utility conflicts; DTPW assumed the design contract and resolved the conflicts. The existing roadway has four lanes with a striped center turning lane but lacks sidewalks, curbs and gutters, and dedicated bicycle facilities. The existing guardrail on the north side adjacent to the canal does not meet current resistance standards. Traffic signals require timing optimization and other improvements. New roadway lighting is necessary. No public comment or stakeholder sentiment is stated in the document.
- Board:
- Board of County Commissioners
- Date:
- 2026-07-21
- Type:
- Resolution
- Decision:
- Adopted
- Address:
- NW 58 Street from NW 97 Avenue to NW 79 Avenue
- Applicant:
- Horizon Contractors, Inc.
CONTRACT AWARD TO HORIZON CONTRACTORS INC.
Miami-Dade County Board of County Commissioners adopted Resolution R-640-26 (File Number 261131) on July 21, 2026, approving a contract award to Horizon Contractors, Inc. for the complete reconstruction of NW 58 Street from NW 97 Avenue to NW 79 Avenue, Project No. 20250068. The contract value is $17,933,304.63, inclusive of a construction contingency allowance of $1,618,298.15 and other allowances of $132,025.00, for a term of 730 calendar days. The project will result in a four-lane roadway with continuous center turning lane, bike lanes, sidewalks, curbs and gutters, storm drainage system, pavement markings and signage, upgraded traffic signalization, and roadway lighting. The project is funded by Mobility Impact Fees. The base contract amount is $16,182,981.48. The project was advertised October 16, 2025, and eight bids were received on November 19, 2025. Horizon Contractors, Inc. submitted the lowest base bid. The project is located primarily within District 12, represented by Commissioner Juan Carlos Bermudez, who is the Prime Sponsor. The project was forwarded to the Board with a favorable recommendation by the Transportation Committee on July 14, 2026. No public comment or stakeholder sentiment is stated in the document.
- Board:
- Board of County Commissioners
- Date:
- 2026-07-21
- Type:
- Resolution
- Decision:
- Adopted
- Address:
- NW 58 Street from NW 97 Avenue to NW 79 Avenue
- Applicant:
- Horizon Contractors, Inc.
CONTRACT AWARD TO HORIZON CONTRACTORS INC.
Miami-Dade County Board of County Commissioners adopted Resolution R-640-26 (File Number 261131) on July 21, 2026, approving a contract award to Horizon Contractors, Inc. for the capital project 'Roadway Improvements to NW 58 Street from NW 97 Avenue to NW 79 Avenue' (Project No. 20250068). The contract value is $17,933,304.63, inclusive of a construction contingency allowance of $1,618,298.15 and other allowances of $132,025.00, for a term of 730 calendar days. The project involves complete reconstruction of the existing roadway to a four-lane roadway with continuous center turning lane, bike lanes, sidewalks, curbs and gutters, storm drainage system, pavement markings and signage, upgraded traffic signalization, and roadway lighting. The project is located primarily within District 12, represented by Commissioner Juan Carlos Bermudez. The project is funded by Mobility Impact Fees. The base contract amount is $16,182,981.48. The project was advertised on October 16, 2025, and eight bids were received on October 17, 2025. Horizon Contractors, Inc. submitted the lowest base bid. The bid open date was November 19, 2025. The contract period is 730 calendar days with substantial completion occurring within 657 days from the Notice to Proceed. The project manager is Fernando Mardones, DTPW Engineer III. The contract manager is Tiondra Wright, Chief. The project manager contact is Rene Idarraga, Chief. The annual estimated operations and maintenance costs are approximately $33,961.38. The project was initially planned as design-build but was cancelled due to utility conflicts; DTPW assumed the design contract and resolved the conflicts. A 1.00% Small Business Development Goods & Services goal has been established. The document does not state any public comment or stakeholder sentiment.
- Board:
- Board of County Commissioners
- Date:
- 2026-07-21
- Type:
- Resolution
- Decision:
- Adopted
- Address:
- NW 58 Street from NW 97 Avenue to NW 79 Avenue
- Applicant:
- Horizon Contractors, Inc. (Prime Contractor); Jose M. Sanchez (Company Principal and Qualifier); Miami-Dade County (Contract Award)
CONTRACT AWARD TO HORIZON CONTRACTORS INC.
Miami-Dade County Commission approved the award of a contract to Horizon Contractors, Inc. for roadway improvements to NW 58 Street, specifically from NW 97 Avenue to NW 79 Avenue. The project, with number 20250068, involves reconstructing the existing four-lane roadway to include continuous center turning lanes, dedicated bike lanes, sidewalks, curbs and gutters, and a modern storm drainage system. Additional enhancements include new pavement markings, signage, upgraded traffic signalization, and roadway lighting. The contract value is $17,933,304.63, with a term of 730 calendar days. The project is funded by Mobility Impact Fees. Eight bids were received, with Horizon Contractors, Inc. submitting the lowest base bid. A 1.00% Small Business Development Goods & Services goal has been established.
- Board:
- Board of County Commissioners
- Date:
- 2026-07-21
- Type:
- Resolution
- Decision:
- Approved
- Address:
- NW 58 Street from NW 97 Avenue to NW 79 Avenue
- Applicant:
- Horizon Contractors, Inc.
CONTRACT AWARD TO HORIZON CONTRACTORS INC.
Miami-Dade County Board of County Commissioners adopted Resolution R-640-26 (File Number 261131) on July 21, 2026, approving a contract award to Horizon Contractors, Inc. for the complete reconstruction of NW 58 Street from NW 97 Avenue to NW 79 Avenue, Project No. 20250068. The contract value is $17,933,304.63, inclusive of a $1,618,298.15 construction contingency allowance and $132,025.00 in other allowances, for a term of 730 calendar days. The project will reconstruct the existing roadway into a four-lane roadway with a continuous center turning lane, bike lanes, sidewalks, curbs and gutters, storm drainage system, pavement markings and signage, upgraded traffic signalization, and roadway lighting. The project is funded by Mobility Impact Fees. The base contract amount is $16,182,981.48. The project is located primarily within District 12, represented by Commissioner Juan Carlos Bermudez, who is the Prime Sponsor. The Transportation Committee forwarded the item to the BCC with a favorable recommendation on July 14, 2026. The bid opening date was November 19, 2025, and eight bids were received. Horizon Contractors, Inc. submitted the lowest base bid of $16,182,981.48, which is 0.55% below the County's cost estimate. The project was initially planned as design-build but was cancelled due to utility conflicts; DTPW assumed the design contract and resolved the conflicts. The project manager is Fernando Mardones, DTPW Engineer III. The contract manager is Tiondra Wright, Chief. The project manager is Rene Idarraga, Chief. The company address for Horizon Contractors, Inc. is 8175 W 32 Ave, Suite #2, Hialeah, Florida 33018. The company principal and qualifier is Jose M. Sanchez. A 1.00% Small Business Development Goods & Services goal has been established. The annual estimated operations and maintenance costs are approximately $33,961.38. The project number 77230 is associated with the roadway improvement project. The document does not state any public comment or stakeholder sentiment.
- Board:
- Board of County Commissioners
- Date:
- 2026-07-21
- Type:
- Resolution
- Decision:
- Adopted
- Address:
- NW 58 Street from NW 97 Avenue to NW 79 Avenue
- Applicant:
- Horizon Contractors, Inc.
CONTRACT AWARD TO LEMARTEC-NV2A FOR CONCOURSE F TO H
The Miami-Dade Board of County Commissioners adopted Resolution R-612-26 (File Number 261146) on July 21, 2026, approving a contract between Miami-Dade County and Lemartec-NV2A JV, LLC for the Miami International Airport (MIA) Concourse F to H Interconnector, Contract No. CA004A, in the maximum amount of $50,930,968.00. The project is located at MIA and involves construction of post-security interconnectivity between concourses, including a new four-story structure connecting Concourse G to Concourse H (Package 1), tenant relocations (Package 2), and reconfiguring office spaces into a secure/sterile corridor connecting Concourse F to H and Concourse G to H (Package 3). The contract term is 820 consecutive calendar days. The base award amount is $35,999,471.00, with a total contract award amount of $50,930,968.00 including a 10% contingency, IG fee, APP fee, and dedicated allowances. Funding sources are Future Financing ($30,930,968.00) and a Federal Aviation Administration Grant ($20,000,000.00). The project was advertised on February 24, 2026, and closed on April 16, 2026, with four bids received. Lemartec-NV2A was the lowest responsive and responsible bidder. The contract was approved by the Aviation and Seaport Committee on July 13, 2026, with a favorable recommendation, and forwarded to the BCC on July 20, 2026. The document does not state any public comment or stakeholder sentiment.
- Board:
- Board of County Commissioners
- Date:
- 2026-07-21
- Type:
- Resolution
- Decision:
- Adopted
- Address:
- Miami International Airport (MIA)
- Applicant:
- Lemartec-NV2A JV, LLC
CONTRACT AWARD TO LEMARTEC-NV2A FOR CONCOURSE F TO H
Miami-Dade County Board of County Commissioners adopted Resolution R-612-26 (File Number 261146) on July 21, 2026, approving a contract between Miami-Dade County and Lemartec-NV2A JV, LLC for the Miami International Airport (MIA) Concourse F to H Interconnector, Contract No. CA004A, in the maximum amount of $50,930,968.00. The project is located at MIA, within District 6, and is described as countywide in impact. The work scope includes three design packages: Package 1 is a new four-story structure for a Concourse G to Concourse H domestic interconnector with escalators, elevators, and a circulation connector; Package 2 includes Concourse F to Concourse H tenant relocations; Package 3 reconfigures existing office spaces into a secure/sterile corridor connecting Concourse F to Concourse H (sterile portion) and Concourse G to Concourse H (secure portion). The base award amount is $35,999,471.00, with a total contract award amount of $50,930,968.00 including a 10% contingency of $3,599,947.00, an Inspector General Fee of $125,133.00, an Art in Public Places Fee of $752,674.00, and three Dedicated Allowance Accounts ($100,000.00 for contaminated soil treatment and disposal; $10,000,000.00 for TSA office relocation and refurbishment of existing airline space; and $353,743.00 for permitting costs). The contract term is 820 consecutive calendar days from the effective date of the Notice to Proceed. The project was advertised on February 24, 2026, and closed on April 16, 2026, with four bids received. The Architect of Record is Carty Architecture, and the cost consultant is RIB US Cost, Inc. The project is funded by Future Financing ($30,930,968.00, 61%) and a Federal Aviation Administration Grant ($20,000,000.00, 39%). The County Mayor is Daniella Levine Cava, the Prime Sponsor is Danielle Cohen Higgins, and the project manager is Felix Pereira. The company principal is Gilberto Neves, and the company location is 3390 Mary Street, Suite 166, Coconut Grove, FL 33133. The document does not state any public comment or stakeholder sentiment.
- Board:
- Board of County Commissioners
- Date:
- 2026-07-21
- Type:
- Resolution
- Decision:
- Adopted
- Address:
- Miami International Airport (MIA), not stated
- Applicant:
- Lemartec-NV2A JV, LLC
CONTRACT AWARD TO LEMARTEC-NV2A FOR CONCOURSE F TO H
Miami-Dade County Board of County Commissioners adopted Resolution R-612-26 (File Number 261146) on July 21, 2026, approving a contract between Miami-Dade County and Lemartec-NV2A JV, LLC for the Miami International Airport (MIA) Concourse F to H Interconnector, Contract No. CA004A, in the maximum amount of $50,930,968.00. The project is located at MIA, within District 6, and is described as countywide in impact. The work scope includes three design packages: Package 1 (Concourse G to H domestic interconnector, a new four-story structure with escalators, elevators, and a circulation connector), Package 2 (Concourse F to H tenant relocations), and Package 3 (reconfiguring existing office spaces into a secure/sterile corridor connecting Concourse F to H for international arrivals and Concourse G to H for all other passengers). The contract term is 820 consecutive calendar days from the Notice to Proceed. The base award amount was $35,999,471.00, with a total contract award amount of $50,930,968.00 including a 10% contingency, Inspector General Fee, Art in Public Places Fee, and three dedicated allowances. The project is funded by Future Financing ($30,930,968.00, 61%) and a Federal Aviation Administration Grant ($20,000,000.00, 39%). The project was advertised on February 24, 2026, and closed on April 16, 2026, with four bids received. The Architect of Record, Carty Architecture, confirmed the low bidder qualifies for award. The project must comply with Davis-Bacon Wages, the Sustainable Buildings Ordinance, and Sea Level Rise Ordinance. Public comment sentiment is not stated in the document.
- Board:
- Board of County Commissioners
- Date:
- 2026-07-21
- Type:
- Resolution
- Decision:
- Adopted
- Address:
- Miami International Airport (MIA), not stated
- Applicant:
- Lemartec-NV2A JV, LLC
CONTRACT AWARD TO LEMARTEC-NV2A FOR CONCOURSE F TO H
Miami-Dade County Board of County Commissioners adopted Resolution R-612-26 (File Number 261146) on July 21, 2026, approving a contract between Miami-Dade County and Lemartec-NV2A JV, LLC for the Miami International Airport (MIA) Concourse F to H Interconnector, Contract No. CA004A, in the maximum amount of $50,930,968.00. The project is located at MIA, within District 6, and the impact is countywide. The contract term is 820 consecutive calendar days from the Notice to Proceed. The work includes three design packages: Package 1 is a new four-story structure for a Concourse G to Concourse H domestic interconnector; Package 2 involves tenant relocations for Concourse F to Concourse H; Package 3 reconfigures existing office spaces into a secure/sterile corridor connecting Concourse F to Concourse H (sterile) and Concourse G to Concourse H (secure). The base bid was $35,999,471.00, which is 35 percent below the base estimate of $54,974,729.00. The total contract award includes a 10 percent contingency of $3,599,947.00, an Inspector General Fee of $125,133.00, an Art in Public Places Fee of $752,674.00, and three Dedicated Allowance Accounts ($100,000.00 for contaminated soil treatment and disposal; $10,000,000.00 for TSA office relocation and refurbishment of existing airline space; and $353,743.00 for permitting costs). Funding sources are Future Financing ($30,930,968.00, 61%) and a Federal Aviation Administration Grant ($20,000,000.00, 39%). The project was advertised on February 24, 2026, and closed on April 16, 2026, with four bids received. A Responsibility Review was held on April 30, 2026, confirming Lemartec-NV2A is capable of delivering the project. The Architect of Record, Carty Architecture, confirmed the recommended low bidder qualifies for award in a letter dated May 11, 2026. The Aviation and Seaport Committee forwarded the item to the BCC with a favorable recommendation on July 13, 2026. The Office of the Chairperson added the item on July 20, 2026. The Board adopted the resolution on July 21, 2026. The contract manager is Sylvia Novela, Assistant Aviation Director, and the project manager is Felix Pereira, Chief of Design, Facilities Development. The company principal is Gilberto Neves, and the company location is 3390 Mary Street, Suite 166, Coconut Grove, FL 33133. The project complies with Davis Bacon Wages, the Sustainable Buildings Ordinance, and Sea Level Rise Ordinance 14-79. Liquidated damages are $1,098.98 per calendar day for delay, and liquidated indirect costs recoverable by Lemartec-NV2A are $1,922.88 per day. The annualized cost of routine maintenance is $245,655.00. The life expectancy of the asset is 20 years. The project is part of the $12 billion Modernization In Action (M.I.A.) Plan. The document does not state any public comment or stakeholder sentiment.
- Board:
- Board of County Commissioners
- Date:
- 2026-07-21
- Type:
- Resolution
- Decision:
- Adopted
- Address:
- Miami International Airport (MIA), not stated
- Applicant:
- Lemartec-NV2A JV, LLC
CONTRACT AWARD TO LEMARTEC-NV2A FOR CONCOURSE F TO H
Resolution approving a contract between Miami-Dade County and Lemartec-NV2A JV, LLC for the Miami International Airport (MIA) Concourse F to H Interconnector, Contract No. CA004A, in the maximum amount of $50,930,968.00. The project involves construction services for post-security interconnectivity between multiple concourses at MIA, including a new four-story structure connecting Concourse G to H, tenant relocations for Concourse F to H, and reconfiguring office spaces into a secure/sterile corridor. The contract term is 820 consecutive calendar days. The resolution was adopted by the Board of County Commissioners on July 21, 2026. The base award amount is $35,999,471.00, with a total contract award amount of $50,930,968.00 including contingency, fees, and allowances. Funding sources are Future Financing ($30,930,968.00) and a Federal Aviation Administration Grant ($20,000,000.00). The project is located at MIA, within District 6, and the impact is countywide. The applicant is the Miami-Dade Aviation Department. The contract was advertised on February 24, 2026, and closed on April 16, 2026, with four bids received. Lemartec-NV2A submitted the lowest responsive and responsible base bid. A Responsibility Review was held on April 30, 2026, confirming the firm's capability. The Architect of Record is Carty Architecture. The project complies with Davis Bacon Wages, the Sustainable Buildings Ordinance, and Sea Level Rise Ordinance. The contract manager is Sylvia Novela and the project manager is Felix Pereira. The company principal is Gilberto Neves, located at 3390 Mary Street, Suite 166, Coconut Grove, FL 33133. The firm has been in business for 3 years. Liquidated damages are $1,098.98 per calendar day for delay, and liquidated indirect costs recoverable by Lemartec-NV2A are $1,922.88 per day. The project has a life expectancy of 20 years. The total engineer's estimate is $72,169,809.00. Operations costs are $763,964.00 and annualized maintenance costs are $245,655.00.
- Board:
- Board of County Commissioners
- Date:
- 2026-07-21
- Type:
- Resolution
- Decision:
- Adopted
- Address:
- Miami International Airport (MIA)
- Applicant:
- Miami-Dade Aviation Department (MDAD)
CONTRACT AWARD TO LEMARTEC-NV2A FOR CONCOURSE F TO H
Miami-Dade County Board of County Commissioners adopted Resolution R-612-26 (File Number 261146) on July 21, 2026, approving a contract between Miami-Dade County and Lemartec-NV2A JV, LLC for the Miami International Airport (MIA) Concourse F to H Interconnector, Contract No. CA004A, in the maximum amount of $50,930,968.00. The project is located at MIA, within District 6, and the impact is countywide. The contract term is 820 consecutive calendar days from the effective date of the Notice to Proceed. The project scope includes three design packages: Package 1 is a new four story structure for the Concourse G to Concourse H domestic interconnector with escalators, elevators, and a circulation connector; Package 2 includes Concourse F to Concourse H tenant relocations; Package 3 reconfigures existing office spaces into a secure/sterile corridor connecting Concourse F to Concourse H (sterile portion) and Concourse G to Concourse H (secure portion). The base award amount is $35,999,471.00, with a total contract award amount of $50,930,968.00 including a 10% contingency of $3,599,947.00, an Inspector General Fee of $125,133.00, an Art in Public Places Fee of $752,674.00, and three dedicated allowances ($100,000.00 for contaminated soil treatment and disposal; $10,000,000.00 for TSA office relocation and refurbishment of existing airline space; and $353,743.00 for permitting costs). Funding sources are Future Financing at $30,930,968.00 (61%) and Federal Aviation Administration Grant at $20,000,000.00 (39%). The project was advertised on February 24, 2026, closed on April 16, 2026, with four bids received. The Architect of Record is Carty Architecture, and Leo A. Daly prepared Design Package 2. The project manager is Felix Pereira, and the contract manager is Sylvia Novela. The company principal is Gilberto Neves, and the company location is 3390 Mary Street, Suite 166, Coconut Grove, FL 33133. The project complies with Davis Bacon Wages, the Sustainable Buildings Ordinance, and Sea Level Rise Ordinance 14-79. The project is part of the $12 billion Modernization In Action (M.I.A.) Plan. The Aviation and Seaport Committee forwarded the item to the BCC with a favorable recommendation on July 13, 2026. The item was introduced on June 23, 2026. The final action was on July 21, 2026. The document does not state any public comment or stakeholder sentiment.
- Board:
- Board of County Commissioners
- Date:
- 2026-07-21
- Type:
- Resolution
- Decision:
- Adopted
- Address:
- Miami International Airport (MIA)
- Applicant:
- Lemartec-NV2A JV, LLC
CONTRACT AWARD TO LEMARTEC-NV2A FOR CONCOURSE F TO H
Miami-Dade County Board of County Commissioners adopted Resolution R-612-26 on July 21, 2026, approving a contract between Miami-Dade County and Lemartec-NV2A JV, LLC for the Miami International Airport (MIA) Concourse F to H Interconnector, Contract No. CA004A, in the maximum amount of $50,930,968.00. The project involves construction services for post-security interconnectivity between multiple concourses at MIA, including a new four-story structure connecting Concourse G to Concourse H, tenant relocations, and reconfiguring existing office spaces into a secure/sterile corridor. The contract term is 820 consecutive calendar days. The base award amount is $35,999,471.00, with a total contract award amount of $50,930,968.00 including a 10% contingency, Inspector General Fee, Art in Public Places Fee, and three Dedicated Allowance Accounts. The project is funded by Future Financing ($30,930,968.00) and a Federal Aviation Administration Grant ($20,000,000.00). The project was advertised on February 24, 2026, and closed on April 16, 2026, with four bids received. The contract was approved by the Aviation and Seaport Committee on July 13, 2026, with a favorable recommendation, and forwarded to the BCC on July 20, 2026. The final action was adoption on July 21, 2026. No public comment or stakeholder sentiment is stated in the document.
- Board:
- Board of County Commissioners
- Date:
- 2026-07-21
- Type:
- Resolution
- Decision:
- Adopted
- Address:
- Miami International Airport (MIA), not stated
- Applicant:
- Lemartec-NV2A JV, LLC
CONVEYANCE FROM 18640 LLC
Miami-Dade County is accepting a conveyance of property interests from 18640 LLC for road purposes. The property is located at the northwest corner of the intersection of SW 104 Court and SW 186 Terrace. This conveyance is to satisfy a requirement for rounding property lines at street intersections with a 25-foot radius. The Board of County Commissioners is set to approve this resolution. Annual maintenance costs are estimated at $10.
- Board:
- Board of County Commissioners
- Date:
- 2026-07-21
- Type:
- Resolution
- Decision:
- Resolution accepting conveyance is in draft, pending BCC Assignment. Staff recommends acceptance.
- Address:
- Northwest corner of the intersection of SW 104 Court and SW 186 Terrace
- Applicant:
- 18640 LLC
CONVEYANCE FROM 18640 LLC
Resolution accepting a conveyance of property interests from 18640 LLC to Miami-Dade County for road purposes at the northwest corner of the intersection of SW 104 Court and SW 186 Terrace. The property is located at 18640 SW 104th Court. The conveyance is needed to satisfy a Chapter 28 requirement that property lines at street intersections be rounded with a radius of 25 feet. The resolution was adopted on 7/21/2026. The applicant/grantor is 18640 LLC. The case/file number is 261120, reference R-639-26. The estimated annual maintenance cost is $10. The resolution states Miami-Dade County is not obligated to construct any improvements within the property. No public comment or stakeholder sentiment is stated in the document.
- Board:
- Board of County Commissioners
- Date:
- 2026-07-21
- Type:
- Resolution
- Decision:
- Adopted
- Address:
- 18640 SW 104th Court, Miami-Dade County, Florida
- Applicant:
- 18640 LLC
CONVEYANCE FROM 18640 LLC
Miami-Dade County Board of County Commissioners is set to accept a conveyance of property interests from 18640 LLC for road purposes. The property is located at the northwest corner of SW 104 Court and SW 186 Terrace. This conveyance is required to satisfy a Chapter 28 requirement for rounded property lines at street intersections with a 25-foot radius. The annual maintenance cost for the acquired right-of-way is estimated at $10, funded by the Department of Transportation and Public Works (DTPW) General Fund. The resolution authorizes the County Mayor or designee to execute the acceptance and record the instrument. No public comment is mentioned in the document.
- Board:
- Board of County Commissioners
- Date:
- 2026-07-21
- Type:
- Resolution
- Decision:
- In Draft (Pending BCC Assignment)
- Address:
- 18640 SW 104th Court
- Applicant:
- 18640 LLC
CONVEYANCE FROM 18640 LLC
Resolution accepting a conveyance of property interests from 18640 LLC to Miami-Dade County for road purposes at the northwest corner of the intersection of SW 104th Court and SW 186th Terrace. The property is located at 18640 SW 104th Court in Miami-Dade County, Florida. The conveyance is needed to satisfy a Chapter 28 requirement that property lines at street intersections shall be rounded with a radius of twenty-five feet. The resolution was adopted on 7/21/2026. The grantor is 18640 LLC. The file number is 261120. The resolution number is R-639-26. The annual maintenance cost is estimated to be $10. The property is within District 9, represented by Vice Chairman Kionne L. McGhee. The Department of Transportation and Public Works recommends acceptance. The County is not obligated to construct any improvements within the property. The instrument will be recorded in the Public Records of Miami-Dade County. The person responsible for monitoring is Maria D. Molina, P.E., Chief, Right-of-Way Division. The file reference is File 20260015.
- Board:
- Board of County Commissioners
- Date:
- 2026-07-21
- Type:
- Resolution
- Decision:
- Adopted
- Address:
- 18640 SW 104th Court, Miami-Dade County, Florida
- Applicant:
- 18640 LLC
CONVEYANCE FROM 18640 LLC
Miami-Dade County Board of County Commissioners adopted Resolution R-639-26 (File Number 261120) accepting a conveyance of property interests from 18640 LLC to Miami-Dade County for road purposes. The property is located at 18640 SW 104th Court, Miami-Dade County, Florida, specifically the Radius Return at the northwest corner of the intersection of SW 104th Court and SW 186th Terrace. The conveyance is needed to satisfy a Chapter 28 requirement that property lines at street intersections shall be rounded with a radius of 25 feet (File 20260015). The grantor is 18640 LLC. The case number is 261120. The decision was Adopted on 7/21/2026. The resolution was introduced on 6/18/2026. The annual maintenance cost is estimated at $10. The property is located within District 9, represented by Vice Chairman Kionne L. McGhee. The Department of Transportation and Public Works recommended acceptance. The County is not obligated to construct any improvements within the conveyed property. The County Mayor or designee is authorized to execute the acceptance and record the instrument within 30 days of execution. The resolution delegates authority to the County Mayor or designee. The person responsible for monitoring is Maria D. Molina, P.E., Chief, Right-of-Way Division. The fiscal impact is $10 annually, funded through DTPW's General Fund allocation. The conveyance is being obtained to fulfill zoning and land development requirements to effectuate improvements needed within the public right-of-way to meet Miami-Dade County roadway standards. No public comment or stakeholder sentiment is stated in the document.
- Board:
- Board of County Commissioners
- Date:
- 2026-07-21
- Type:
- Resolution
- Decision:
- Adopted
- Address:
- 18640 SW 104th Court, Miami-Dade County, Florida
- Applicant:
- 18640 LLC
CONVEYANCE FROM 18640 LLC
The Board of County Commissioners adopted Resolution R-639-26 accepting a conveyance of property interests from 18640 LLC to Miami-Dade County for road purposes. The property is located at the northwest corner of the intersection of SW 104th Court and SW 186th Terrace, with the grantor's parcel at 18640 SW 104th Court. The conveyance is needed to satisfy a Chapter 28 requirement that property lines at street intersections be rounded with a radius of 25 feet. The estimated annual maintenance cost is $10. The resolution was introduced on 6/18/2026 and adopted on 7/21/2026. The applicant is 18640 LLC. The case file number is 261120. The decision was adopted. No public comment or stakeholder sentiment is stated in the document.
- Board:
- Board of County Commissioners
- Date:
- 2026-07-21
- Type:
- Resolution
- Decision:
- Adopted
- Address:
- 18640 SW 104th Court, Miami-Dade County, Florida; intersection of SW 104th Court and SW 186th Terrace
- Applicant:
- 18640 LLC
CONVEYANCE FROM 18640 LLC
Miami-Dade County Board of County Commissioners is set to accept a conveyance of property interests from 18640 LLC for road purposes. The property is located at the northwest corner of SW 104 Court and SW 186 Terrace. This conveyance is required to satisfy zoning and land development requirements for street intersection radius rounding. The annual maintenance cost for the acquired right-of-way is estimated at $10, funded by the Department of Transportation and Public Works (DTPW) General Fund. The resolution authorizes the County Mayor or designee to execute the acceptance and record the instrument. No construction improvements are guaranteed within the conveyed property.
- Board:
- Board of County Commissioners
- Date:
- 2026-07-21
- Type:
- Resolution
- Decision:
- In Draft (Pending BCC Assignment)
- Address:
- 18640 SW 104th Court
- Applicant:
- 18640 LLC
CONVEYANCE FROM 18640 LLC
Miami-Dade County Board of County Commissioners adopted Resolution R-639-26 (File Number 261120) accepting a conveyance of property interests from 18640 LLC for road purposes. The property is located at 18640 SW 104th Court, Miami-Dade County, Florida, specifically the Radius Return at the northwest corner of the intersection of SW 104th Court and SW 186th Terrace. The conveyance is needed to satisfy a Chapter 28 requirement that property lines at street intersections shall be rounded with a radius of twenty-five (25) feet. The grantor is 18640 LLC. The case/file number is 261120. The decision was Adopted on 7/21/2026. The resolution was introduced on 6/18/2026. The annual maintenance cost is estimated to be $10. The resolution authorizes the County Mayor or designee to execute the acceptance and record the instrument. The County is not obligated to construct any improvements within the conveyed property. The property is located within District 9, represented by Vice Chairman Kionne L. McGhee. The Department of Transportation and Public Works (DTPW) recommended acceptance. The person responsible for monitoring is Maria D. Molina, P.E., Chief, Right-of-Way Division. The file reference is File 20260015. No public comment or stakeholder sentiment is stated in the document.
- Board:
- Board of County Commissioners
- Date:
- 2026-07-21
- Type:
- Resolution
- Decision:
- Adopted
- Address:
- 18640 SW 104th Court, Miami-Dade County, Florida
- Applicant:
- 18640 LLC
CONVEYANCE FROM 18640 LLC
Miami-Dade County Board of County Commissioners adopted Resolution R-639-26 accepting a conveyance of property interests from 18640 LLC for road purposes at the northwest corner of the intersection of SW 104th Court and SW 186th Terrace. The property is located at 18640 SW 104th Court in Miami-Dade County, Florida. The conveyance is needed to satisfy a Chapter 28 requirement that property lines at street intersections be rounded with a radius of 25 feet. The grantor is 18640 LLC. The case/file number is 261120, with reference R-639-26. The decision was adopted on 7/21/2026. The resolution authorizes the County Mayor or designee to execute acceptance and record the instrument. Annual maintenance cost is estimated at $10. The property is in District 9, represented by Vice Chairman Kionne L. McGhee. The staff recommendation from the Department of Transportation and Public Works was to accept the conveyance. No public comment or stakeholder sentiment is stated in the document.
- Board:
- Board of County Commissioners
- Date:
- 2026-07-21
- Type:
- Resolution
- Decision:
- Adopted
- Address:
- 18640 SW 104th Court, Miami-Dade County, Florida
- Applicant:
- 18640 LLC
CONVEYANCE FROM 18640 LLC
Miami-Dade County is accepting a conveyance of property interests from 18640 LLC for road purposes. The property is located at the northwest corner of SW 104 Court and SW 186 Terrace. This conveyance is to satisfy a requirement for rounding property lines at street intersections with a 25-foot radius. The estimated annual maintenance cost for the acquired right-of-way is $10, funded by the DTPW General Fund. The Board of County Commissioners is expected to approve this resolution.
- Board:
- Board of County Commissioners
- Date:
- 2026-07-21
- Type:
- Resolution
- Decision:
- In Draft, Pending BCC Assignment, Resolution accepting conveyance is in draft
- Address:
- northwest corner of the intersection of SW 104 Court and SW 186 Terrace
- Applicant:
- 18640 LLC
CONVEYANCE FROM 18640 LLC
Miami-Dade County is accepting a conveyance of property interests from 18640 LLC for road purposes. The property is located at the northwest corner of the intersection of SW 104 Court and SW 186 Terrace. This conveyance is to satisfy a requirement for rounded property lines at street intersections. The estimated annual maintenance cost for the acquired right-of-way is $10. The Board of County Commissioners is set to consider this resolution on July 21, 2026. No public comment is stated in the document.
- Board:
- Board of County Commissioners
- Date:
- 2026-07-21
- Type:
- Resolution
- Decision:
- In Draft (Pending BCC Assignment)
- Address:
- Northwest corner of the intersection of SW 104 Court and SW 186 Terrace
- Applicant:
- 18640 LLC
CONVEYANCE FROM 18640 LLC
Resolution accepting one conveyance of property interests from 18640 LLC to Miami-Dade County for road purposes at the northwest corner of the intersection of SW 104 Court and SW 186 Terrace. The property is located at 18640 SW 104th Court in Miami-Dade County, Florida. The conveyance is needed to satisfy a Chapter 28 requirement that property lines at street intersections shall be rounded with a radius of twenty-five (25) feet. The resolution was adopted on 7/21/2026. The grantor is 18640 LLC. The file number is 261120. The reference is R-639-26. The annual maintenance cost is estimated to be $10. The resolution states Miami-Dade County is not obligated to construct any improvements within the property. No public comment or stakeholder sentiment is stated in the document.
- Board:
- Board of County Commissioners
- Date:
- 2026-07-21
- Type:
- Resolution
- Decision:
- Adopted
- Address:
- 18640 SW 104th Court, Miami-Dade County, Florida
- Applicant:
- 18640 LLC
CONVEYANCE FROM 18640 LLC
Miami-Dade County Board of County Commissioners is set to accept a conveyance of property interests from 18640 LLC for road purposes. The property is located at the northwest corner of SW 104 Court and SW 186 Terrace. This conveyance is required to meet Miami-Dade County roadway standards, specifically to round property lines at street intersections with a 25-foot radius. The annual maintenance cost for this right-of-way is estimated at $10, funded by the Department of Transportation and Public Works (DTPW) General Fund. The resolution authorizes the County Mayor or designee to execute the acceptance and record the instrument. No public comment is stated in the document.
- Board:
- Board of County Commissioners
- Date:
- 2026-07-21
- Type:
- Resolution
- Decision:
- In Draft (Pending BCC Assignment)
- Address:
- 18640 SW 104th Court
- Applicant:
- 18640 LLC
CONVEYANCE FROM 18640 LLC
Miami-Dade County adopted a resolution accepting a property interest conveyance from 18640 LLC for road purposes. The property is located at the northwest corner of SW 104 Court and SW 186 Terrace. This conveyance is to satisfy a requirement for rounding property lines at street intersections with a 25-foot radius. The county is not obligated to construct improvements on the conveyed property. Annual maintenance costs are estimated at $10.
- Board:
- Board of County Commissioners
- Date:
- 2026-07-21
- Type:
- Resolution
- Decision:
- Adopted
- Address:
- 18640 SW 104th Court
- Applicant:
- 18640 LLC