CENTRAL CHILLER REPAIRS
Miami-Dade County Commission ratified an emergency contract for Central Chiller Plant Condenser Water Repairs (Phase 1) at Miami International Airport. The contract, valued at $305,228.00, was awarded to Botas Engineering, Inc. to address critical failures in the plant's condenser water system and structural deterioration of cooling towers, which were impacting the airport's cooling capacity and posing an operational emergency. Phase 2, involving construction services, is anticipated to have a budget of approximately $35 million and will be presented separately. The decision was made due to an operational emergency declared on December 12, 2025, impacting essential airport functions. No public comment was stated in the document.
- Board:
- Board of County Commissioners
- Date:
- 2026-06-02
- Type:
- Resolution
- Decision:
- Adopted
- Address:
- Miami International Airport
- Applicant:
- Miami-Dade Aviation Department
CENTRAL CHILLER REPAIRS
Miami-Dade County Board of County Commissioners ratified an emergency contract (E-10658, Phase 1) with Botas Engineering, Inc. for $305,228.00 to perform condenser water repairs at the Central Chiller Plant East (CCPE) for the Miami-Dade Aviation Department (MDAD) at Miami International Airport (MIA). The repairs are necessary due to failures in the condenser water system and structural deterioration of cooling towers, which are impacting the airport's cooling capacity and posing an operational emergency. Phase 2, involving construction services, will be presented separately with an anticipated budget of $35 million. No public comment was stated in the document.
- Board:
- Board of County Commissioners
- Date:
- 2026-06-02
- Type:
- Resolution
- Decision:
- Adopted
- Address:
- Miami International Airport (MIA)
- Applicant:
- Miami-Dade Aviation Department (MDAD)
CENTRAL CHILLER REPAIRS
Miami-Dade County Board of County Commissioners ratified an emergency contract (E-10658, Phase 1) with Botas Engineering, Inc. for $305,228.00 to perform condenser water repairs at the Central Chiller Plant East (CCPE) at Miami International Airport (MIA). The repairs are necessary due to failures in the condenser water system and structural deterioration of cooling towers, which are impacting the airport's cooling capacity and posing an operational emergency. Phase 2, involving construction services, will be presented separately with an anticipated budget of $35 million. No public comment was stated in the document.
- Board:
- Board of County Commissioners
- Date:
- 2026-06-02
- Type:
- Resolution
- Decision:
- Adopted
- Address:
- Miami International Airport (MIA)
- Applicant:
- Miami-Dade Aviation Department (MDAD)
CENTRAL CHILLER REPAIRS
Miami-Dade County Board of County Commissioners adopted Resolution R-488-26, ratifying Emergency Contract No. E-10658 for Central Chiller Plant Condenser Water Repairs (Phase 1) to Botas Engineering, Inc. for $305,228.00. This emergency action was necessary due to critical failures in the plant's condenser water system and structural deterioration of cooling towers at Miami International Airport, impacting essential cooling demands. Phase 1 involves engineering services, while Phase 2, estimated at $35 million, will address construction services and will be bid separately. The contract was adopted on June 2, 2026.
- Board:
- Board of County Commissioners
- Date:
- 2026-06-02
- Type:
- Resolution
- Decision:
- Adopted
- Address:
- Miami International Airport
- Applicant:
- Miami-Dade Aviation Department
CENTRAL CHILLER REPAIRS
Miami-Dade County Commissioners ratified an emergency contract (E-10658, Phase 1) with Botas Engineering, Inc. for $305,228.00 to perform condenser water repairs at the Central Chiller Plant East (CCPE) at Miami International Airport (MIA). This action addresses critical failures impacting the airport's cooling capacity, which has been reduced from 27,100 tons to 22,730 tons, leaving only 975 tons of spare capacity, below the required 4,000-ton threshold. The repairs are necessary to restore full cooling capacity, re-establish system redundancy, prevent operational disruptions, and ensure the continuity of essential airport functions. Phase 2, involving construction services, will be bid separately with an anticipated budget of approximately $35 million. The emergency was declared on December 12, 2025, due to system failures and structural deterioration of cooling towers CT-1, CT-2, CT-3, CT-5, CT-6, CT-7, and CT-8. Botas Engineering, Inc. was selected for Phase 1 due to their familiarity with the system. No public comment or stakeholder sentiment was stated in the document.
- Board:
- Board of County Commissioners
- Date:
- 2026-06-02
- Type:
- Resolution
- Decision:
- Adopted
- Address:
- Miami International Airport (MIA)
- Applicant:
- Miami-Dade Aviation Department (MDAD)
CENTRAL CHILLER REPAIRS
Miami-Dade County Commission adopted Resolution R-488-26, ratifying Emergency Contract No. E-10658 for Central Chiller Plant Condenser Water Repairs (Phase 1) to Botas Engineering, Inc. for $305,228.00. This emergency action was necessary due to critical failures in the plant's condenser water system and structural deterioration of cooling towers, impacting Miami International Airport's (MIA) ability to meet cooling demands. Phase 1 involves engineering assessment and re-design services. Phase 2, for construction services, will be presented separately with an anticipated budget of $35 million. The contract was adopted on June 2, 2026.
- Board:
- Board of County Commissioners
- Date:
- 2026-06-02
- Type:
- Resolution
- Decision:
- Adopted
- Address:
- Miami International Airport (MIA)
- Applicant:
- Miami-Dade Aviation Department (MDAD)
CENTRAL CHILLER REPAIRS
Miami-Dade County Commission ratified an emergency contract (E-10658, Phase 1) for Central Chiller Plant Condenser Water Repairs at Miami International Airport (MIA) to Botas Engineering, Inc. for $305,228. The repairs are necessary due to failures in the condenser water system and structural deterioration of cooling towers, impacting the airport's cooling capacity and potentially causing operational disruptions. Phase 1 involves engineering assessment and re-design services. Phase 2, for construction services, will be presented separately with an anticipated budget of approximately $35 million. The contract was declared an emergency on December 12, 2025, by MDAD's Director. The Aviation and Seaport Committee recommended forwarding the item to the Board of County Commissioners with a favorable recommendation. No public comment is stated in the document.
- Board:
- Board of County Commissioners
- Date:
- 2026-06-02
- Type:
- Resolution
- Decision:
- Adopted
- Address:
- Miami International Airport (MIA)
- Applicant:
- Miami-Dade Aviation Department (MDAD)
CENTRAL CHILLER REPAIRS
Miami-Dade County Commission ratified an emergency contract (E-10658, Phase 1) with Botas Engineering, Inc. for $305,228.00 to perform condenser water repairs at the Central Chiller Plant East (CCPE) at Miami International Airport (MIA). The repairs are necessary due to failures impacting the plant's ability to meet cooling demands, which has reduced total cooling output and system redundancy. Phase 1 involves engineering assessment and re-design services. Phase 2, for construction services, will be presented separately with an anticipated budget of approximately $35 million. The emergency was declared on December 12, 2025, due to critical safety issues and structural deterioration of cooling towers CT-1, CT-2, CT-3, CT-5, CT-6, CT-7, and CT-8. Botas Engineering, Inc. was selected for Phase 1 due to their familiarity with the system. The contract was adopted by the County Commission on June 2, 2026.
- Board:
- Board of County Commissioners
- Date:
- 2026-06-02
- Type:
- Resolution
- Decision:
- Adopted
- Address:
- Miami International Airport (MIA)
- Applicant:
- Miami-Dade Aviation Department (MDAD)
CENTRAL CHILLER REPAIRS
Miami-Dade County Commissioners adopted Resolution R-488-26, ratifying an emergency contract (E-10658) for Central Chiller Plant Condenser Water Repairs (Phase 1) to Botas Engineering, Inc. for $305,228.00. This action addresses critical failures in the condenser water system at Miami International Airport (MIA) that are impacting cooling demands and posing a risk to airport operations. Phase 1 involves engineering services, while Phase 2, estimated at $35 million, will involve construction services and will be bid separately. The emergency was declared on December 12, 2025, due to the inability of the system to meet cooling demands and structural deterioration of cooling towers.
- Board:
- Board of County Commissioners
- Date:
- 2026-06-02
- Type:
- Resolution
- Decision:
- Adopted
- Address:
- Miami International Airport (MIA)
- Applicant:
- Miami-Dade Aviation Department (MDAD)
CENTRAL CHILLER REPAIRS
Miami-Dade County Commission adopted Resolution R-488-26, ratifying Emergency Contract No. E-10658 for Central Chiller Plant Condenser Water Repairs (Phase 1) to Botas Engineering, Inc. for $305,228.00. This emergency action was necessary due to critical failures in the plant's condenser water system and structural deterioration of cooling towers at Miami International Airport, impacting essential cooling demands. Phase 1 involves engineering services, while Phase 2, estimated at $35 million, will involve construction services and will be bid separately. The contract was adopted on June 2, 2026.
- Board:
- Board of County Commissioners
- Date:
- 2026-06-02
- Type:
- Resolution
- Decision:
- Adopted
- Address:
- Miami International Airport
- Applicant:
- Miami-Dade Aviation Department
CENTRAL CHILLER REPAIRS
Miami-Dade County Commissioners ratified an emergency contract (E-10658, Phase 1) for Central Chiller Plant Condenser Water Repairs at Miami International Airport (MIA) to Botas Engineering, Inc. for $305,228. The repairs are necessary due to failures in the condenser water system and structural deterioration of cooling towers, impacting the airport's cooling capacity and potentially causing operational disruptions. Phase 1 involves engineering services, while Phase 2, estimated at $35 million for construction, will be presented separately. The contract was declared an operational emergency on December 12, 2025, by MDAD's Director.
- Board:
- Board of County Commissioners
- Date:
- 2026-06-02
- Type:
- Resolution
- Decision:
- Adopted
- Address:
- Miami International Airport (MIA)
- Applicant:
- Miami-Dade Aviation Department (MDAD)
CENTRAL CHILLER REPAIRS
Miami-Dade County Board of County Commissioners adopted Resolution R-488-26, ratifying Emergency Contract No. E-10658 for Central Chiller Plant Condenser Water Repairs (Phase 1) to Botas Engineering, Inc. for $305,228.00. This emergency action was necessary due to critical failures in the plant's condenser water system and structural deterioration of cooling towers at Miami International Airport, impacting essential cooling demands. Phase 1 involves engineering services, while Phase 2, estimated at $35 million, will involve construction services and will be bid separately. The contract was adopted on June 2, 2026.
- Board:
- Board of County Commissioners
- Date:
- 2026-06-02
- Type:
- Resolution
- Decision:
- Adopted
- Address:
- Miami International Airport
- Applicant:
- Miami-Dade Aviation Department (MDAD)
CENTRAL CHILLER REPAIRS
This legislative item ratifies an emergency contract for Phase 1 of Central Chiller Plant Condenser Water Repairs at Miami International Airport (MIA) for the Miami-Dade Aviation Department. The contract, awarded to Botas Engineering, Inc. for $305,228.00, addresses critical failures in the condenser water system and structural deterioration of cooling towers, which are impacting the airport's ability to meet cooling demands. Phase 1 involves engineering services, while Phase 2, a construction phase with an anticipated budget of $35 million, will be presented separately. The emergency was declared on December 12, 2025, due to an operational emergency impacting essential airport functions. The Aviation and Seaport Committee recommended forwarding this to the Board of County Commissioners with a favorable recommendation.
- Board:
- Board of County Commissioners
- Date:
- 2026-06-02
- Type:
- Resolution
- Decision:
- Adopted
- Address:
- Miami International Airport
- Applicant:
- Miami-Dade Aviation Department
CENTRAL CHILLER REPAIRS
Miami-Dade County Commissioners adopted Resolution R-488-26, ratifying an emergency contract (E-10658) for Central Chiller Plant Condenser Water Repairs (Phase 1) to Botas Engineering, Inc. for $305,228.00. This action addresses critical failures in the condenser water system at Miami International Airport (MIA), impacting cooling capacity and posing operational and safety risks. Phase 1 involves engineering services, while Phase 2, estimated at $35 million, will cover construction services and will be bid separately. The emergency was declared on December 12, 2025, due to reduced cooling output and structural deterioration of cooling towers.
- Board:
- Board of County Commissioners
- Date:
- 2026-06-02
- Type:
- Resolution
- Decision:
- Adopted
- Address:
- Miami International Airport (MIA)
- Applicant:
- Miami-Dade Aviation Department (MDAD)
CENTRAL CHILLER REPAIRS
Miami-Dade County Commissioners adopted Resolution R-488-26, ratifying an emergency contract (E-10658) for Central Chiller Plant Condenser Water Repairs (Phase 1) to Botas Engineering, Inc. for $305,228.00. The repairs are for the Miami-Dade Aviation Department at Miami International Airport to address critical failures in the condenser water system and structural deterioration of cooling towers, which are impacting the airport's cooling capacity and posing an operational emergency. Phase 2 construction services, with an anticipated budget of $35 million, will be presented separately. The contract was adopted on June 2, 2026, following an emergency declaration on December 12, 2025.
- Board:
- Board of County Commissioners
- Date:
- 2026-06-02
- Type:
- Resolution
- Decision:
- Adopted
- Address:
- Miami International Airport
- Applicant:
- Miami-Dade Aviation Department
CENTRAL CHILLER REPAIRS
Miami-Dade County Commission adopted Resolution R-488-26, ratifying Emergency Contract No. E-10658 for Central Chiller Plant Condenser Water Repairs (Phase 1) to Botas Engineering, Inc. for $305,228.00. This emergency action addresses critical failures in the condenser water system at Miami International Airport (MIA), impacting cooling capacity and posing a risk to airport operations. Phase 1 involves engineering services, while Phase 2, estimated at $35 million, will involve construction services and will be bid separately. The contract was ratified on June 2, 2026.
- Board:
- Board of County Commissioners
- Date:
- 2026-06-02
- Type:
- Resolution
- Decision:
- Adopted
- Address:
- Miami International Airport (MIA)
- Applicant:
- Miami-Dade Aviation Department (MDAD)
CENTRAL CHILLER REPAIRS
Miami-Dade County Commission ratified an emergency contract for Central Chiller Plant Condenser Water Repairs (Phase 1) to Botas Engineering, Inc. for $305,228.00. This action addresses critical failures in the plant's condenser water system at Miami International Airport, which is impacting the airport's cooling capacity and poses a risk to essential operations. Phase 1 involves engineering services, while Phase 2, anticipated to cost approximately $35 million, will involve construction services and will be presented separately. The emergency was declared on December 12, 2025, due to the inability of the system to meet cooling demands and structural deterioration of cooling towers. Public comment is not stated in this document.
- Board:
- Board of County Commissioners
- Date:
- 2026-06-02
- Type:
- Resolution
- Decision:
- Adopted
- Address:
- Miami International Airport
- Applicant:
- Miami-Dade Aviation Department (MDAD)
CENTRAL CHILLER REPAIRS
Miami-Dade County Commissioners adopted Resolution R-488-26, ratifying an emergency contract (E-10658) for Central Chiller Plant Condenser Water Repairs (Phase 1) to Botas Engineering, Inc. for $305,228.00. The repairs are for the Miami-Dade Aviation Department at Miami International Airport to address critical failures in the condenser water system and structural deterioration of cooling towers, which are impacting the airport's cooling capacity and operational reliability. Phase 2, for construction services, is anticipated to cost approximately $35 million and will be bid separately. The emergency was declared on December 12, 2025, due to the system operating near maximum capacity and posing a risk of widespread operational disruptions.
- Board:
- Board of County Commissioners
- Date:
- 2026-06-02
- Type:
- Resolution
- Decision:
- Adopted
- Address:
- Miami International Airport
- Applicant:
- Miami-Dade Aviation Department
CENTRAL CHILLER REPAIRS
Miami-Dade County Commission adopted Resolution R-488-26, ratifying Emergency Contract No. E-10658 for Central Chiller Plant Condenser Water Repairs (Phase 1) to Botas Engineering, Inc. for $305,228.00. This emergency action addresses critical failures in the condenser water system at Miami International Airport (MIA), impacting cooling capacity and posing a risk to airport operations. Phase 1 involves engineering services, while Phase 2, an anticipated $35 million construction phase, will be bid separately. The contract was ratified on June 2, 2026.
- Board:
- Board of County Commissioners
- Date:
- 2026-06-02
- Type:
- Resolution
- Decision:
- Adopted
- Address:
- Miami International Airport (MIA)
- Applicant:
- Miami-Dade Aviation Department (MDAD)
CHANGE ORDER NO. 2 WITH JOHN BELL CONSTRUCTION, INC.
Miami-Dade County approved Change Order No. 2 for the Coconut Grove Playhouse Phase 1 project, increasing the contract amount by $1,812,258.98 due to unforeseen deterioration of the historic gateway building's facade walls and revised structural bracing needs. The total contract amount is now $6,805,189.97. Funding comes from Convention Development Tax Bonds (Special Obligation Bond Series 2005). The original contract and Change Order No. 1 were approved under delegated authority, but this increase required Board approval. The work involves repairing facade walls, structural stabilization, and mitigating a tree threatening the foundation. No additional time extension was granted with this change order.
- Board:
- Board of County Commissioners
- Date:
- 2026-06-02
- Type:
- Resolution
- Decision:
- Adopted
- Address:
- 3500 Main Highway, Miami, FL, 33133
- Applicant:
- John Bell Construction, Inc.