CONTRACT AWARD TO LEGO CONSTRUCTION
Miami-Dade County approved a contract for the Miami International Airport (MIA) Terminal Wide Re-roofing and Lightning System Upgrades Project No. AA078A. The project involves replacing approximately 410,000 square feet of roofing across North, Central, and South Terminals, upgrading lightning protection, and installing a Solar Photovoltaic (PV) system. The contract was awarded to LEGO Construction Co. for an amount not to exceed $125,703,562.22. The project duration is 1,460 calendar days. Commissioner Milian Orbis inquired about solar panels, and Mr. Cutie confirmed their inclusion and explained the phased approach over four years, noting potential cost savings and reduced electricity bills. The project aims to enhance infrastructure reliability and sustainability.
- Board:
- Board of County Commissioners
- Date:
- 2026-06-02
- Type:
- Resolution
- Decision:
- Adopted
- Address:
- Miami International Airport (MIA)
- Applicant:
- LEGO Construction Co.
CONTRACT AWARD TO LEGO CONSTRUCTION
Miami-Dade County approved a contract with LEGO Construction Co. for the Miami International Airport (MIA) Terminal Wide Re-roofing and Lightning System Upgrades Project No. AA078A. The project involves replacing approximately 410,000 square feet of roofing in the North, Central, and South Terminals, upgrading lightning protection, and installing a Solar Photovoltaic (PV) system. The contract amount is not to exceed $125,703,562.22, with a contract term of 1,460 consecutive calendar days. The existing roofing systems, installed approximately 16 years ago, have exceeded their useful life and are experiencing leaks. The project aims to enhance infrastructure reliability, support growing passenger demand, and strengthen MIA's role as a leading U.S. airport. The contract was adopted by the Board of County Commissioners on June 2, 2026. No public comment or stakeholder sentiment was stated in the document.
- Board:
- Board of County Commissioners
- Date:
- 2026-06-02
- Type:
- Resolution
- Decision:
- Adopted
- Address:
- Miami International Airport
- Applicant:
- LEGO Construction Co.
CONTRACT AWARD TO LEGO CONSTRUCTION
Miami-Dade County Board of County Commissioners adopted a resolution approving a contract award to LEGO Construction Co. for the Miami International Airport (MIA) Terminal Wide Re-roofing and Lightning System Upgrades Project (No. AA078A). The project involves replacing approximately 410,000 square feet of roofing across the North, Central, and South Terminals, upgrading the lightning protection system, and installing a Solar Photovoltaic (PV) system. The contract amount is not to exceed $125,703,562.22, with a total contract period of 1,460 consecutive calendar days. Commissioner Milian Orbis inquired about solar panels, and Mr. Cutie confirmed their inclusion, explaining the phased approach and potential for MIA to become the highest power-generating airport in the state. The project aims to address leaks and deficiencies in the existing roofing systems, which have exceeded their useful life.
- Board:
- Board of County Commissioners
- Date:
- 2026-06-02
- Type:
- Resolution
- Decision:
- Adopted
- Address:
- Miami International Airport
- Applicant:
- LEGO Construction Co.
CONTRACT AWARD TO LEGO CONSTRUCTION
Miami-Dade County approved a contract for the Miami International Airport (MIA) Terminal Wide Re-roofing and Lightning System Upgrades Project No. AA078A. The project involves replacing approximately 410,000 square feet of roofing across North, Central, and South Terminals, upgrading lightning protection, and installing a Solar Photovoltaic (PV) system. The contract was awarded to LEGO Construction Co. for an amount not to exceed $125,703,562.22. The project is expected to take 1,460 consecutive calendar days. Commissioner Milian Orbis inquired about solar panels, and Mr. Cutie confirmed their inclusion, noting the project's aim to save money and reduce electric bills. He also mentioned potential expansion of the solar panel program to parking garages.
- Board:
- Board of County Commissioners
- Date:
- 2026-06-02
- Type:
- Resolution
- Decision:
- Adopted
- Address:
- Miami International Airport
- Applicant:
- LEGO Construction Co.
CONTRACT AWARD TO LEGO CONSTRUCTION
Miami-Dade County Board of County Commissioners adopted a resolution approving a contract award to LEGO Construction Co. for the Miami International Airport (MIA) Terminal Wide Re-roofing and Lightning System Upgrades Project No. AA078A. The project involves replacing approximately 410,000 square feet of roofing across the North, Central, and South Terminals, upgrading the lightning protection system, and installing a Solar Photovoltaic (PV) system. The contract amount is not to exceed $125,703,562.22, with a total contract period of 1,460 consecutive calendar days. Commissioner Milian Orbis inquired about solar panels, and Mr. Cutie confirmed their inclusion and explained the phased approach over four years, noting potential cost savings and reduced electric bills. The department is also considering expanding the solar panel program to parking garages. The project aims to address leaks and deficiencies in the existing roofing systems, which have exceeded their useful life.
- Board:
- Board of County Commissioners
- Date:
- 2026-06-02
- Type:
- Resolution
- Decision:
- Adopted
- Address:
- Miami International Airport (MIA)
- Applicant:
- LEGO Construction Co.
CONTRACT AWARD TO LEGO CONSTRUCTION
Miami-Dade County Board of County Commissioners adopted a resolution approving a contract award to LEGO Construction Co. for the Miami International Airport (MIA) Terminal Wide Re-roofing and Lightning System Upgrades Project No. AA078A. The project involves replacing approximately 410,000 square feet of roofing across the North, Central, and South Terminals, upgrading the lightning protection system, and installing a Solar Photovoltaic (PV) system. The total contract amount is not to exceed $125,703,562.22, with a contract period of 1,460 consecutive calendar days. Commissioner Milian Orbis inquired about solar panels, and Mr. Cutie confirmed their inclusion, noting the project's phased approach over four years and potential expansion to parking garages. The project aims to enhance infrastructure, support passenger demand, and strengthen MIA's role as a leading airport.
- Board:
- Board of County Commissioners
- Date:
- 2026-06-02
- Type:
- Resolution
- Decision:
- Adopted
- Address:
- Miami International Airport (MIA)
- Applicant:
- LEGO Construction Co.
CONTRACT AWARD TO LEGO CONSTRUCTION
Miami-Dade County approved a contract for the Miami International Airport (MIA) Terminal Wide Re-roofing and Lightning System Upgrades Project No. AA078A. The project involves replacing approximately 410,000 square feet of roofing across the North, Central, and South Terminals, upgrading the lightning protection system, and installing a Solar Photovoltaic (PV) system. The contract was awarded to LEGO Construction Co. for an amount not to exceed $125,703,562.22. The project is expected to take 1,460 consecutive calendar days. Commissioner Milian Orbis inquired about solar panels, and Mr. Cutie confirmed their inclusion, noting the project's phased approach over four years and potential cost savings. The project aims to enhance infrastructure reliability and support sustainability goals.
- Board:
- Board of County Commissioners
- Date:
- 2026-06-02
- Type:
- Resolution
- Decision:
- Adopted
- Address:
- Miami International Airport (MIA)
- Applicant:
- LEGO Construction Co.
CONTRACT AWARD TO LEGO CONSTRUCTION
Miami-Dade County approved a contract for the Miami International Airport (MIA) Terminal Wide Re-roofing and Lightning System Upgrades Project No. AA078A. The project involves replacing approximately 410,000 square feet of roofing across North, Central, and South Terminals, upgrading lightning protection, and installing a Solar Photovoltaic (PV) system. The contract was awarded to LEGO Construction Co. for an amount not to exceed $125,703,562.22. The project duration is 1,460 calendar days. Commissioner Milian Orbis inquired about solar panels, and Mr. Cutie confirmed their inclusion and explained the phased approach over four years, noting potential cost savings and reduced electricity bills. The project aims to enhance infrastructure reliability and support sustainability goals.
- Board:
- Board of County Commissioners
- Date:
- 2026-06-02
- Type:
- Resolution
- Decision:
- Adopted
- Address:
- Miami International Airport (MIA)
- Applicant:
- LEGO Construction Co.
CONTRACT AWARD TO LEGO CONSTRUCTION
Miami-Dade County Board of County Commissioners adopted a resolution approving a contract award to LEGO Construction Co. for the Miami International Airport (MIA) Terminal Wide Re-roofing and Lightning System Upgrades Project No. AA078A. The project involves replacing approximately 410,000 square feet of roofing across the North, Central, and South Terminals, upgrading the lightning protection system, and installing a Solar Photovoltaic (PV) system. The contract amount is not to exceed $125,703,562.22, with a total contract period of 1,460 consecutive calendar days. Commissioner Milian Orbis inquired about solar panels, and Mr. Cutie confirmed their inclusion, explaining the phased approach over four years and potential cost savings. The project aims to address leaks and deficiencies in the existing roofing systems, which are approximately 16 years old.
- Board:
- Board of County Commissioners
- Date:
- 2026-06-02
- Type:
- Resolution
- Decision:
- Adopted
- Address:
- Miami International Airport
- Applicant:
- LEGO Construction Co.
CONTRACT AWARD TO LEGO CONSTRUCTION
Miami-Dade County approved a contract for the Miami International Airport (MIA) Terminal Wide Re-roofing and Lightning System Upgrades Project No. AA078A. The project involves replacing approximately 410,000 square feet of roofing across North, Central, and South Terminals, upgrading lightning protection, and installing a Solar Photovoltaic (PV) system. The contract was awarded to LEGO Construction Co. for an amount not to exceed $125,703,562.22. The project duration is 1,460 consecutive calendar days. Commissioner Milian Orbis inquired about solar panels, and Mr. Cutie confirmed their inclusion, noting the project's phased approach over four years and potential for MIA to become the highest power-generating airport in the state. The project aims to address leaks and deficiencies in the existing roofing systems, which are approximately 16 years old.
- Board:
- Board of County Commissioners
- Date:
- 2026-06-02
- Type:
- Resolution
- Decision:
- Adopted
- Address:
- Miami International Airport (MIA)
- Applicant:
- LEGO Construction Co.
CONTRACT AWARD TO LEGO CONSTRUCTION
Miami-Dade County Board of County Commissioners adopted a resolution approving a contract award to LEGO Construction Co. for the Miami International Airport (MIA) Terminal Wide Re-roofing and Lightning System Upgrades Project (No. AA078A). The project involves replacing approximately 410,000 square feet of roofing across the North, Central, and South Terminals, upgrading the lightning protection system, and installing a Solar Photovoltaic (PV) system. The contract amount is not to exceed $125,703,562.22, with a total contract period of 1,460 consecutive calendar days. Commissioner Milian Orbis inquired about solar panels, and Mr. Cutie confirmed their inclusion, explaining the phased installation and potential expansion to parking garages. The project aims to enhance infrastructure, support passenger demand, and improve MIA's role as a leading airport.
- Board:
- Board of County Commissioners
- Date:
- 2026-06-02
- Type:
- Resolution
- Decision:
- Adopted
- Address:
- Miami International Airport (MIA)
- Applicant:
- LEGO Construction Co.
CONTRACT AWARD TO LEGO CONSTRUCTION
Miami-Dade County Board of County Commissioners adopted a resolution approving a contract award to LEGO Construction Co. for the Miami International Airport (MIA) Terminal Wide Re-roofing and Lightning System Upgrades Project No. AA078A. The project involves replacing approximately 410,000 square feet of roofing across the North, Central, and South Terminals, upgrading the lightning protection system, and installing a Solar Photovoltaic (PV) system. The contract amount is not to exceed $125,703,562.22, with a contract term of 1,460 consecutive calendar days. Commissioner Milian Orbis inquired about solar panels, and Mr. Cutie confirmed their inclusion and explained the phased approach over four years, noting potential cost savings and reduced electric bills. The project also aims to make MIA the highest power-generating airport in the state. LEGO Construction Co. has a history of 20 years in business and an average evaluation rating of 3.7 out of 4.0 points in the SBD's CIIS database.
- Board:
- Board of County Commissioners
- Date:
- 2026-06-02
- Type:
- Resolution
- Decision:
- Adopted
- Address:
- Miami International Airport
- Applicant:
- LEGO Construction Co.
CONTRACT AWARD TO LEGO CONSTRUCTION
Miami-Dade County Board of County Commissioners adopted Resolution R-470-26 on June 2, 2026, approving a contract award to LEGO Construction Co. for the Miami International Airport (MIA) Terminal Wide Re-roofing and Lightning System Upgrades Project (No. AA078A). The project involves replacing approximately 410,000 square feet of roofing across the North, Central, and South Terminals, upgrading the lightning protection system, and installing a Solar Photovoltaic (PV) system. The total contract amount is not to exceed $125,703,562.22, with a contract period of 1,460 consecutive calendar days. Commissioner Milian Orbis inquired about solar panels, and Mr. Cutie confirmed their inclusion, noting the project's phased approach over four years and potential for MIA to become the highest power-generating airport in the state. The project aims to address leaks and deficiencies in the existing roofing systems, which are approximately 16 years old.
- Board:
- Board of County Commissioners
- Date:
- 2026-06-02
- Type:
- Resolution
- Decision:
- Adopted
- Address:
- Miami International Airport (MIA)
- Applicant:
- LEGO Construction Co.
CONTRACT AWARD TO LEGO CONSTRUCTION
Miami-Dade County Board of County Commissioners adopted a resolution approving a contract award to LEGO Construction Co. for the Miami International Airport (MIA) Terminal Wide Re-roofing and Lightning System Upgrades Project (No. AA078A). The project involves replacing approximately 410,000 square feet of roofing across the North, Central, and South Terminals, upgrading the lightning protection system, and installing a Solar Photovoltaic (PV) system. The contract amount is not to exceed $125,703,562.22, with a total contract period of 1,460 consecutive calendar days. Commissioner Milian Orbis inquired about solar panels, and Mr. Cutie confirmed their inclusion and explained the phased approach over four years, noting potential savings and expansion plans to parking garages. The project aims to address leaks and deficiencies in the existing roofing systems, which have exceeded their useful life.
- Board:
- Board of County Commissioners
- Date:
- 2026-06-02
- Type:
- Resolution
- Decision:
- Adopted
- Address:
- Miami International Airport
- Applicant:
- LEGO Construction Co.
CONTRACT AWARD TO LEGO CONSTRUCTION
Miami-Dade County Board of County Commissioners adopted a resolution approving a contract award to LEGO Construction Co. for the Miami International Airport (MIA) Terminal Wide Re-roofing and Lightning System Upgrades Project No. AA078A. The project involves replacing approximately 410,000 square feet of roofing systems in the North, Central, and South Terminals, upgrading the lightning protection system, and installing a Solar Photovoltaic (PV) system. The total contract amount is not to exceed $125,703,562.22, with a contract period of 1,460 consecutive calendar days. The existing roofing systems, installed approximately 16 years ago, have exceeded their useful life and are experiencing leaks. The project aims to enhance infrastructure reliability, support growing passenger demand, and strengthen MIA's role as a leading U.S. airport. Public comment is not stated in the document.
- Board:
- Board of County Commissioners
- Date:
- 2026-06-02
- Type:
- Resolution
- Decision:
- Adopted
- Address:
- Miami International Airport (MIA)
- Applicant:
- LEGO Construction Co.
CONTRACT AWARD TO LEGO CONSTRUCTION
Miami-Dade County Board of County Commissioners adopted a resolution approving a contract award to LEGO Construction Co. for the Miami International Airport (MIA) Terminal Wide Re-roofing and Lightning System Upgrades Project No. AA078A. The project involves replacing approximately 410,000 square feet of roofing across the North, Central, and South Terminals, upgrading the lightning protection system, and installing a Solar Photovoltaic (PV) system. The contract amount is not to exceed $125,703,562.22, with a total contract period of 1,460 consecutive calendar days. Commissioner Milian Orbis inquired about solar panels, and Mr. Cutie confirmed their inclusion and explained the phased approach over four years, noting potential cost savings and reduced electricity bills. The project also includes provisions for temporary emergency repairs and aims to enhance energy efficiency and resilience. LEGO Construction Co. was determined to be qualified for the award, with their base bid being within an acceptable range of the engineer's estimate. The project adheres to sustainable building ordinances and the Buy American Iron and Steel Procurement Program.
- Board:
- Board of County Commissioners
- Date:
- 2026-06-02
- Type:
- Resolution
- Decision:
- Adopted
- Address:
- Miami International Airport
- Applicant:
- LEGO Construction Co.
CONTRACT AWARD TO LEGO CONSTRUCTION
Miami-Dade County Board of County Commissioners adopted a resolution approving a contract award to LEGO Construction Co. for the Miami International Airport (MIA) Terminal Wide Re-roofing and Lightning System Upgrades Project (No. AA078A). The project involves replacing approximately 410,000 square feet of roofing across the North, Central, and South Terminals, upgrading the lightning protection system, and installing a Solar Photovoltaic (PV) system. The contract amount is not to exceed $125,703,562.22, with a total contract period of 1,460 consecutive calendar days. Commissioner Milian Orbis inquired about solar panels, and Mr. Cutie confirmed their inclusion, noting the project's phased approach over four years and potential expansion to parking garages. The project aims to enhance infrastructure, support passenger demand, and strengthen MIA's role as a leading airport. LEGO Construction Co. was determined to be qualified for the award, with their base bid being within an acceptable range of the engineer's estimate. The contract includes a 10 percent contingency, an Inspector's General Fee, and two dedicated allowance accounts for various repairs and temporary emergency repairs. The project will adhere to sustainable building practices and the Buy American Iron and Steel Procurement Program.
- Board:
- Board of County Commissioners
- Date:
- 2026-06-02
- Type:
- Resolution
- Decision:
- Adopted
- Address:
- Miami International Airport (MIA)
- Applicant:
- LEGO Construction Co.
CONTRACT AWARD TO LEGO CONSTRUCTION
Miami-Dade County Board of County Commissioners adopted a resolution approving a contract award to LEGO Construction Co. for the Miami International Airport (MIA) Terminal Wide Re-roofing and Lightning System Upgrades Project No. AA078A. The project involves replacing approximately 410,000 square feet of roofing across the North, Central, and South Terminals, upgrading the lightning protection system, and installing a Solar Photovoltaic (PV) system. The contract amount is not to exceed $125,703,562.22, with a contract period of 1,460 consecutive calendar days. Commissioner Milian Orbis inquired about solar panels, and Mr. Cutie confirmed their inclusion and discussed potential expansion to parking garages. The project aims to improve infrastructure, support passenger demand, and enhance MIA's role as a leading airport.
- Board:
- Board of County Commissioners
- Date:
- 2026-06-02
- Type:
- Resolution
- Decision:
- Adopted
- Address:
- Miami International Airport
- Applicant:
- LEGO Construction Co.
CONTRACT AWARD TO LEGO CONSTRUCTION
Miami-Dade County approved a contract for the Miami International Airport (MIA) Terminal Wide Re-roofing and Lightning System Upgrades Project No. AA078A. The project involves replacing approximately 410,000 square feet of roofing across North, Central, and South Terminals, upgrading lightning protection, and installing a Solar Photovoltaic (PV) system. The contract was awarded to LEGO Construction Co. for an amount not to exceed $125,703,562.22. The project duration is 1,460 calendar days. Commissioner Milian Orbis inquired about solar panels, and Mr. Cutie confirmed their inclusion and explained the phased installation over four years, aiming for cost savings and reduced electricity bills. The project also includes upgrades to structural elements, MEP-FP systems, and rooftop utilities, with a focus on sustainability and energy resilience. LEGO Construction Co. has a history of 20 years in business and an average evaluation rating of 3.7 out of 4.0 points from SBD.
- Board:
- Board of County Commissioners
- Date:
- 2026-06-02
- Type:
- Resolution
- Decision:
- Adopted
- Address:
- Miami International Airport (MIA)
- Applicant:
- LEGO Construction Co.
CONTRACT AWARD TO LEGO CONSTRUCTION
Miami-Dade County approved a contract for the Miami International Airport (MIA) Terminal Wide Re-roofing and Lightning System Upgrades Project No. AA078A. The project involves replacing approximately 410,000 square feet of roofing across North, Central, and South Terminals, upgrading lightning protection, and installing a Solar Photovoltaic (PV) system. The contract was awarded to LEGO Construction Co. for an amount not to exceed $125,703,562.22. The project duration is 1,460 consecutive calendar days. Commissioner Milian Orbis inquired about solar panels, and Mr. Cutie confirmed their inclusion, noting the project's phased approach over four years and potential cost savings. The project aims to enhance infrastructure reliability and support sustainability goals. LEGO Construction Co. has a history of 20 years in business and an average evaluation rating of 3.7 out of 4.0 points in the SBD's CIIS database.
- Board:
- Board of County Commissioners
- Date:
- 2026-06-02
- Type:
- Resolution
- Decision:
- Adopted
- Address:
- Miami International Airport
- Applicant:
- LEGO Construction Co.
See the actual businesses behind these numbers
Get the real filings, with addresses and officers, free for 7 days. No credit card required.
Start your free trial