CONTRACT AWARD TO LEGO CONSTRUCTION
Miami-Dade County Board of County Commissioners adopted a resolution approving a contract award to LEGO Construction Co. for the Miami International Airport (MIA) Terminal Wide Re-roofing and Lightning System Upgrades Project (No. AA078A). The project involves replacing approximately 410,000 square feet of roofing across the North, Central, and South Terminals, upgrading the lightning protection system, and installing a Solar Photovoltaic (PV) system. The total contract amount is not to exceed $125,703,562.22, with a contract period of 1,460 consecutive calendar days. Commissioner Milian Orbis inquired about solar panels, and Mr. Cutie confirmed their inclusion, noting the project's phased approach over four years and potential expansion to parking garages. The project aims to enhance infrastructure, support passenger demand, and improve MIA's role as a leading U.S. airport. LEGO Construction Co. was determined to be fully qualified, with their base bid being within an acceptable range of the engineer's estimate. The contract includes a 10 percent contingency, an Inspector's General Fee, and dedicated allowance accounts for various repairs and temporary emergency repairs.
- Board:
- Board of County Commissioners
- Date:
- 2026-06-02
- Type:
- Resolution
- Decision:
- Adopted
- Address:
- Miami International Airport (MIA)
- Applicant:
- LEGO Construction Co.
CONTRACT AWARD TO LEGO CONSTRUCTION
Miami International Airport (MIA) Terminal Wide Re-roofing and Lightning System Upgrades Project No. AA078A has been approved. The project involves replacing approximately 410,000 square feet of roofing across North, Central, and South Terminals, upgrading lightning protection, and installing a Solar Photovoltaic (PV) system. The contract was awarded to LEGO Construction Co. for an amount not to exceed $125,703,562.22. The project duration is 1,460 calendar days. Commissioner Milian Orbis inquired about solar panels, and Mr. Cutie confirmed their inclusion, noting the project's goal to save money and reduce electricity bills. He also mentioned potential expansion of the solar program to parking garages.
- Board:
- Board of County Commissioners
- Date:
- 2026-06-02
- Type:
- Resolution
- Decision:
- Adopted
- Address:
- Miami International Airport (MIA)
- Applicant:
- LEGO Construction Co.
CONTRACT AWARD TO LEGO CONSTRUCTION
Miami-Dade County approved a contract for the Miami International Airport (MIA) Terminal Wide Re-roofing and Lightning System Upgrades Project No. AA078A. The project involves replacing approximately 410,000 square feet of roofing across North, Central, and South Terminals, upgrading lightning protection, and installing a Solar Photovoltaic (PV) system. The contract was awarded to LEGO Construction Co. for an amount not to exceed $125,703,562.22. The project duration is 1,460 calendar days. Commissioner Milian Orbis inquired about solar panels, and Mr. Cutie confirmed their inclusion, noting the project's phased approach over four years and potential for significant energy savings and airport power generation.
- Board:
- Board of County Commissioners
- Date:
- 2026-06-02
- Type:
- Resolution
- Decision:
- Adopted
- Address:
- Miami International Airport
- Applicant:
- LEGO Construction Co.
CONTRACT AWARD TO LEGO CONSTRUCTION
Miami-Dade County approved a contract for the Miami International Airport (MIA) Terminal Wide Re-roofing and Lightning System Upgrades Project No. AA078A. The project involves replacing approximately 410,000 square feet of roofing across North, Central, and South Terminals, upgrading the lightning protection system, and installing a Solar Photovoltaic (PV) system. The contract was awarded to LEGO Construction Co. for an amount not to exceed $125,703,562.22. The project duration is 1,460 consecutive calendar days. Commissioner Milian Orbis inquired about solar panels, and Mr. Cutie confirmed their inclusion, noting the project's phased approach over four years and potential for significant energy savings. The project aims to address leaks and deficiencies in the existing roofing systems, which are approximately 16 years old.
- Board:
- Board of County Commissioners
- Date:
- 2026-06-02
- Type:
- Resolution
- Decision:
- Adopted
- Address:
- Miami International Airport (MIA)
- Applicant:
- LEGO Construction Co.
CONTRACT AWARD TO LEGO CONSTRUCTION
Miami-Dade County approved a contract for the Miami International Airport (MIA) Terminal Wide Re-roofing and Lightning System Upgrades Project No. AA078A. The project involves replacing approximately 410,000 square feet of roofing across North, Central, and South Terminals, upgrading lightning protection, and installing a Solar Photovoltaic (PV) system. The contract was awarded to LEGO Construction Co. for an amount not to exceed $125,703,562.22. The project duration is 1,460 consecutive calendar days. Commissioner Milian Orbis inquired about solar panels, and Mr. Cutie confirmed their inclusion and explained the phased installation over four years, aiming for cost savings and reduced electricity bills. The project also aims to make MIA the highest power-generating airport in the state.
- Board:
- Board of County Commissioners
- Date:
- 2026-06-02
- Type:
- Resolution
- Decision:
- Adopted
- Address:
- Miami International Airport (MIA)
- Applicant:
- LEGO Construction Co.
CONTRACT AWARD TO LEGO CONSTRUCTION
Miami-Dade County approved a contract for the Miami International Airport (MIA) Terminal Wide Re-roofing and Lightning System Upgrades Project No. AA078A. The project involves replacing approximately 410,000 square feet of roofing across North, Central, and South Terminals, upgrading lightning protection, and installing a Solar Photovoltaic (PV) system. The contract was awarded to LEGO Construction Co. for an amount not to exceed $125,703,562.22. The project duration is 1,460 calendar days. Commissioner Milian Orbis inquired about solar panel integration, and Mr. Cutie confirmed their inclusion, noting the project's phased approach over four years and potential for MIA to become the highest power-generating airport in the state. The project aims to address leaks and deficiencies in the existing roofing systems, which are approximately 16 years old.
- Board:
- Board of County Commissioners
- Date:
- 2026-06-02
- Type:
- Resolution
- Decision:
- Adopted
- Address:
- Miami International Airport (MIA)
- Applicant:
- LEGO Construction Co.
CONTRACT AWARD TO LEGO CONSTRUCTION
Miami-Dade County approved a contract for the Miami International Airport (MIA) Terminal Wide Re-roofing and Lightning System Upgrades Project No. AA078A with LEGO Construction Co. The project involves replacing approximately 410,000 square feet of roofing across North, Central, and South Terminals, upgrading lightning protection, and installing a Solar Photovoltaic (PV) system. The contract amount is not to exceed $125,703,562.22, with a contract term of 1,460 calendar days. Commissioner Milian Orbis inquired about solar panels, and Mr. Cutie confirmed their inclusion, noting the project's phased approach over four years and potential for MIA to become the highest power-generating airport in the state. The project aims to address leaks and deficiencies in the existing roofing systems, which are approximately 16 years old.
- Board:
- Board of County Commissioners
- Date:
- 2026-06-02
- Type:
- Resolution
- Decision:
- Adopted
- Address:
- Miami International Airport (MIA)
- Applicant:
- LEGO Construction Co.
CONTRACT AWARD TO LEGO CONSTRUCTION
Miami-Dade County approved a contract for the Miami International Airport (MIA) Terminal Wide Re-roofing and Lightning System Upgrades Project No. AA078A. The project involves replacing approximately 410,000 square feet of roofing across North, Central, and South Terminals, upgrading lightning protection, and installing a Solar Photovoltaic (PV) system. The contract was awarded to LEGO Construction Co. for an amount not to exceed $125,703,562.22. The project duration is 1,460 calendar days. Commissioner Milian Orbis inquired about solar panels, and Mr. Cutie confirmed their inclusion and explained the phased approach over four years, noting potential cost savings and reduced electric bills. The project also aims to make MIA the highest power-generating airport in the state.
- Board:
- Board of County Commissioners
- Date:
- 2026-06-02
- Type:
- Resolution
- Decision:
- Adopted
- Address:
- Miami International Airport
- Applicant:
- LEGO Construction Co.
CONTRACT AWARD TO LEGO CONSTRUCTION
Miami-Dade County Board of County Commissioners adopted a resolution approving a contract award to LEGO Construction Co. for the Miami International Airport (MIA) Terminal Wide Re-roofing and Lightning System Upgrades Project No. AA078A. The project involves replacing approximately 410,000 square feet of roofing across the North, Central, and South Terminals, upgrading the lightning protection system, and installing a Solar Photovoltaic (PV) system. The contract amount is not to exceed $125,703,562.22, with a total contract period of 1,460 consecutive calendar days. Commissioner Milian Orbis inquired about solar panels, and Mr. Cutie confirmed their inclusion and explained the phased approach over four years, noting potential cost savings and reduced electric bills. The project also aims to expand solar panel programs to parking garages. The contract was approved by the Aviation and Seaport Committee with a favorable recommendation.
- Board:
- Board of County Commissioners
- Date:
- 2026-06-02
- Type:
- Resolution
- Decision:
- Adopted
- Address:
- Miami International Airport
- Applicant:
- LEGO Construction Co.
CONTRACT AWARD TO LEGO CONSTRUCTION
Miami-Dade County approved a contract for the Miami International Airport (MIA) Terminal Wide Re-roofing and Lightning System Upgrades Project No. AA078A. The project involves replacing approximately 410,000 square feet of roofing across North, Central, and South Terminals, upgrading lightning protection, and installing a Solar Photovoltaic (PV) system. The contract was awarded to LEGO Construction Co. for an amount not to exceed $125,703,562.22. The project duration is 1,460 calendar days. Commissioner Milian Orbis inquired about solar panels, and Mr. Cutie confirmed their inclusion and explained the phased approach over four years, noting potential cost savings and reduced electricity bills. The project aims to enhance infrastructure reliability and sustainability.
- Board:
- Board of County Commissioners
- Date:
- 2026-06-02
- Type:
- Resolution
- Decision:
- Adopted
- Address:
- Miami International Airport (MIA)
- Applicant:
- LEGO Construction Co.
CONTRACT AWARD TO LEGO CONSTRUCTION
Miami-Dade County approved a contract with LEGO Construction Co. for the Miami International Airport (MIA) Terminal Wide Re-roofing and Lightning System Upgrades Project No. AA078A. The project involves replacing approximately 410,000 square feet of roofing in the North, Central, and South Terminals, upgrading lightning protection, and installing a Solar Photovoltaic (PV) system. The contract amount is not to exceed $125,703,562.22, with a contract term of 1,460 consecutive calendar days. The existing roofing systems, installed approximately 16 years ago, have exceeded their useful life and are experiencing leaks. The project aims to enhance infrastructure reliability, support growing passenger demand, and strengthen MIA's role as a leading U.S. airport. The contract was adopted by the Board of County Commissioners on June 2, 2026. No public comment or stakeholder sentiment was stated in the document.
- Board:
- Board of County Commissioners
- Date:
- 2026-06-02
- Type:
- Resolution
- Decision:
- Adopted
- Address:
- Miami International Airport
- Applicant:
- LEGO Construction Co.
CONTRACT AWARD TO LEGO CONSTRUCTION
Miami-Dade County Board of County Commissioners adopted a resolution approving a contract award to LEGO Construction Co. for the Miami International Airport (MIA) Terminal Wide Re-roofing and Lightning System Upgrades Project (No. AA078A). The project involves replacing approximately 410,000 square feet of roofing across the North, Central, and South Terminals, upgrading the lightning protection system, and installing a Solar Photovoltaic (PV) system. The contract amount is not to exceed $125,703,562.22, with a total contract period of 1,460 consecutive calendar days. Commissioner Milian Orbis inquired about solar panels, and Mr. Cutie confirmed their inclusion, explaining the phased approach and potential for MIA to become the highest power-generating airport in the state. The project aims to address leaks and deficiencies in the existing roofing systems, which have exceeded their useful life.
- Board:
- Board of County Commissioners
- Date:
- 2026-06-02
- Type:
- Resolution
- Decision:
- Adopted
- Address:
- Miami International Airport
- Applicant:
- LEGO Construction Co.
CONTRACT AWARD TO LEGO CONSTRUCTION
Miami-Dade County approved a contract for the Miami International Airport (MIA) Terminal Wide Re-roofing and Lightning System Upgrades Project No. AA078A. The project involves replacing approximately 410,000 square feet of roofing across North, Central, and South Terminals, upgrading lightning protection, and installing a Solar Photovoltaic (PV) system. The contract was awarded to LEGO Construction Co. for an amount not to exceed $125,703,562.22. The project is expected to take 1,460 consecutive calendar days. Commissioner Milian Orbis inquired about solar panels, and Mr. Cutie confirmed their inclusion, noting the project's aim to save money and reduce electric bills. He also mentioned potential expansion of the solar panel program to parking garages.
- Board:
- Board of County Commissioners
- Date:
- 2026-06-02
- Type:
- Resolution
- Decision:
- Adopted
- Address:
- Miami International Airport
- Applicant:
- LEGO Construction Co.
CONTRACT AWARD TO LEGO CONSTRUCTION
Miami-Dade County Board of County Commissioners adopted a resolution approving a contract award to LEGO Construction Co. for the Miami International Airport (MIA) Terminal Wide Re-roofing and Lightning System Upgrades Project No. AA078A. The project involves replacing approximately 410,000 square feet of roofing across the North, Central, and South Terminals, upgrading the lightning protection system, and installing a Solar Photovoltaic (PV) system. The contract amount is not to exceed $125,703,562.22, with a total contract period of 1,460 consecutive calendar days. Commissioner Milian Orbis inquired about solar panels, and Mr. Cutie confirmed their inclusion and explained the phased approach over four years, noting potential cost savings and reduced electric bills. The department is also considering expanding the solar panel program to parking garages. The project aims to address leaks and deficiencies in the existing roofing systems, which have exceeded their useful life.
- Board:
- Board of County Commissioners
- Date:
- 2026-06-02
- Type:
- Resolution
- Decision:
- Adopted
- Address:
- Miami International Airport (MIA)
- Applicant:
- LEGO Construction Co.
CONTRACT AWARD TO LEGO CONSTRUCTION
Miami-Dade County Board of County Commissioners adopted a resolution approving a contract award to LEGO Construction Co. for the Miami International Airport (MIA) Terminal Wide Re-roofing and Lightning System Upgrades Project No. AA078A. The project involves replacing approximately 410,000 square feet of roofing across the North, Central, and South Terminals, upgrading the lightning protection system, and installing a Solar Photovoltaic (PV) system. The total contract amount is not to exceed $125,703,562.22, with a contract period of 1,460 consecutive calendar days. Commissioner Milian Orbis inquired about solar panels, and Mr. Cutie confirmed their inclusion, noting the project's phased approach over four years and potential expansion to parking garages. The project aims to enhance infrastructure, support passenger demand, and strengthen MIA's role as a leading airport.
- Board:
- Board of County Commissioners
- Date:
- 2026-06-02
- Type:
- Resolution
- Decision:
- Adopted
- Address:
- Miami International Airport (MIA)
- Applicant:
- LEGO Construction Co.
CONTRACT AWARD TO LEGO CONSTRUCTION
Miami-Dade County approved a contract for the Miami International Airport (MIA) Terminal Wide Re-roofing and Lightning System Upgrades Project No. AA078A. The project involves replacing approximately 410,000 square feet of roofing across the North, Central, and South Terminals, upgrading the lightning protection system, and installing a Solar Photovoltaic (PV) system. The contract was awarded to LEGO Construction Co. for an amount not to exceed $125,703,562.22. The project is expected to take 1,460 consecutive calendar days. Commissioner Milian Orbis inquired about solar panels, and Mr. Cutie confirmed their inclusion, noting the project's phased approach over four years and potential cost savings. The project aims to enhance infrastructure reliability and support sustainability goals.
- Board:
- Board of County Commissioners
- Date:
- 2026-06-02
- Type:
- Resolution
- Decision:
- Adopted
- Address:
- Miami International Airport (MIA)
- Applicant:
- LEGO Construction Co.
CONTRACT AWARD TO LEGO CONSTRUCTION
Miami-Dade County approved a contract for the Miami International Airport (MIA) Terminal Wide Re-roofing and Lightning System Upgrades Project No. AA078A. The project involves replacing approximately 410,000 square feet of roofing across North, Central, and South Terminals, upgrading lightning protection, and installing a Solar Photovoltaic (PV) system. The contract was awarded to LEGO Construction Co. for an amount not to exceed $125,703,562.22. The project duration is 1,460 calendar days. Commissioner Milian Orbis inquired about solar panels, and Mr. Cutie confirmed their inclusion and explained the phased approach over four years, noting potential cost savings and reduced electricity bills. The project aims to enhance infrastructure reliability and support sustainability goals.
- Board:
- Board of County Commissioners
- Date:
- 2026-06-02
- Type:
- Resolution
- Decision:
- Adopted
- Address:
- Miami International Airport (MIA)
- Applicant:
- LEGO Construction Co.
CONTRACT AWARD TO LEGO CONSTRUCTION
Miami-Dade County Board of County Commissioners adopted a resolution approving a contract award to LEGO Construction Co. for the Miami International Airport (MIA) Terminal Wide Re-roofing and Lightning System Upgrades Project No. AA078A. The project involves replacing approximately 410,000 square feet of roofing across the North, Central, and South Terminals, upgrading the lightning protection system, and installing a Solar Photovoltaic (PV) system. The contract amount is not to exceed $125,703,562.22, with a total contract period of 1,460 consecutive calendar days. Commissioner Milian Orbis inquired about solar panels, and Mr. Cutie confirmed their inclusion, explaining the phased approach over four years and potential cost savings. The project aims to address leaks and deficiencies in the existing roofing systems, which are approximately 16 years old.
- Board:
- Board of County Commissioners
- Date:
- 2026-06-02
- Type:
- Resolution
- Decision:
- Adopted
- Address:
- Miami International Airport
- Applicant:
- LEGO Construction Co.
CONTRACT AWARD TO LEGO CONSTRUCTION
Miami-Dade County approved a contract for the Miami International Airport (MIA) Terminal Wide Re-roofing and Lightning System Upgrades Project No. AA078A. The project involves replacing approximately 410,000 square feet of roofing across North, Central, and South Terminals, upgrading lightning protection, and installing a Solar Photovoltaic (PV) system. The contract was awarded to LEGO Construction Co. for an amount not to exceed $125,703,562.22. The project duration is 1,460 consecutive calendar days. Commissioner Milian Orbis inquired about solar panels, and Mr. Cutie confirmed their inclusion, noting the project's phased approach over four years and potential for MIA to become the highest power-generating airport in the state. The project aims to address leaks and deficiencies in the existing roofing systems, which are approximately 16 years old.
- Board:
- Board of County Commissioners
- Date:
- 2026-06-02
- Type:
- Resolution
- Decision:
- Adopted
- Address:
- Miami International Airport (MIA)
- Applicant:
- LEGO Construction Co.
CONTRACT AWARD TO LEGO CONSTRUCTION
Miami-Dade County Board of County Commissioners adopted a resolution approving a contract award to LEGO Construction Co. for the Miami International Airport (MIA) Terminal Wide Re-roofing and Lightning System Upgrades Project (No. AA078A). The project involves replacing approximately 410,000 square feet of roofing across the North, Central, and South Terminals, upgrading the lightning protection system, and installing a Solar Photovoltaic (PV) system. The contract amount is not to exceed $125,703,562.22, with a total contract period of 1,460 consecutive calendar days. Commissioner Milian Orbis inquired about solar panels, and Mr. Cutie confirmed their inclusion, explaining the phased installation and potential expansion to parking garages. The project aims to enhance infrastructure, support passenger demand, and improve MIA's role as a leading airport.
- Board:
- Board of County Commissioners
- Date:
- 2026-06-02
- Type:
- Resolution
- Decision:
- Adopted
- Address:
- Miami International Airport (MIA)
- Applicant:
- LEGO Construction Co.
See the actual businesses behind these numbers
Get the real filings, with addresses and officers, free for 7 days. No credit card required.
Start your free trial