Browse Miami-Dade County civic records
Every published record for Miami-Dade County, newest first. Filter by board, year, or industry to jump straight to the records you want, and page through to reach the full archive.
32,453 records
PSA WITH PREMIERE DESIGN SOLUTIONS, INC
Miami-Dade County Board of County Commissioners is considering a Resolution to approve a Professional Services Agreement (PSA) with Premiere Design Solutions, Inc. for architectural and engineering design services for the full repair of the airside tunnel concrete structure, riding surface, and associated structures at Miami International Airport, specifically MIA Bldg. 612 Airside Tunnel Structural & Life Safety Repairs. The contract is for a maximum amount of $2,696,852.32 for a term of eight years. The Aviation and Seaport Committee forwarded the item to the Board with a favorable recommendation on 9/8/2026. The item is scheduled for the Board of County Commissioners meeting on 10/6/2026 as agenda item 8A1. The project is in District 6, represented by Commissioner Natalie Milian Orbis, but the impact is county-wide. The scope includes repairs to lighting, security cameras, electrical systems, sewer pumping system, fire system, signing, paving and marking, traffic devices, storm drainage system, ventilation system, and other miscellaneous components. The contract is funded by the Miami International Airport (MIA) Airfield/Airside Subprogram, Program No. 2000001046, Project No. 3002146. The contract manager is Sylvia Novela and the project manager is Abel Oporto. The recommendation is to approve the contract.
- Board:
- Aviation and Seaport Committee
- Date:
- 2026-09-08
- Type:
- Resolution
- Decision:
- Forwarded to BCC with a favorable recommendation by the Aviation and Seaport Committee on 9/8/2026; pending before the Board of County Commissioners as of the document date.
- Address:
- Miami International Airport, MIA Bldg. 612 Airside Tunnel
- Applicant:
- Premiere Design Solutions, Inc.
PSA WITH PREMIERE DESIGN SOLUTIONS, INC
Resolution approving a Professional Services Agreement between Miami-Dade County and Premiere Design Solutions, Inc. for architectural and engineering design services for the full repair of the airside tunnel concrete structure, riding surface, and associated structures at Miami International Airport, specifically MIA Bldg. 612 Airside Tunnel Structural & Life Safety Repairs, Contract No. E25AV02. The contract is for a maximum amount of $2,696,852.32 with a term of eight years. The item was introduced on 8/14/2026, forwarded to the Board of County Commissioners with a favorable recommendation by the Aviation and Seaport Committee on 9/8/2026, and is scheduled for the Board agenda on 10/6/2026 as item 8A. The project is in District 6, represented by Commissioner Natalie Milian Orbis, but the impact is county-wide. The scope includes repairs and refurbishment of lighting, security cameras, electrical systems, sewer pumping system, fire system, signing, paving and marking, traffic devices, storm drainage system, ventilation system, and other components. The work will begin only after the Aviation Department issues a service order. The firm was evaluated and recommended by the Competitive Selection Committee. The contract includes a 10 percent contingency of $244,557.00 and $6,725.32 for the Office of the Inspector General. The funding source is the Miami International Airport Airfield/Airside Subprogram, Program No. 2000001046, Project No. 3002146. The vendor address is 11606 City Hall Promenade, Suite 200, Miramar, FL 33025, with a local address of 2050 Coral Way, Suite 505, Miami, FL 33145. The principal is Luis Jurado. Sub-consultants include Burns & McDonnell Engineering Company, Inc., GFT Infrastructure, Inc., DDA Engineers, PA, HP Consultants, Inc., and Louis J. Aguirre & Associates, Inc. The contract manager is Sylvia Novela and the project manager is Abel Oporto. The document does not state any public comment or stakeholder sentiment.
- Board:
- Aviation and Seaport Committee
- Date:
- 2026-09-08
- Type:
- Resolution
- Decision:
- Forwarded to the Board of County Commissioners with a favorable recommendation by the Aviation and Seaport Committee on 9/8/2026; pending before the Board as of the document date
- Address:
- Miami International Airport, MIA Bldg. 612 Airside Tunnel
- Applicant:
- Premiere Design Solutions, Inc.
PSA WITH PREMIERE DESIGN SOLUTIONS, INC
Miami-Dade County resolution approving a Professional Services Agreement (PSA) with Premiere Design Solutions, Inc. for architectural and engineering design services for the full repair of the airside tunnel concrete structure, riding surface, and associated structures at Miami International Airport (MIA), specifically MIA Bldg. 612 Airside Tunnel Structural & Life Safety Repairs, Contract No. E25AV02. The contract is for a maximum amount of $2,696,852.32 with a term of eight years. The project is part of MIA's Capital Improvement Program and the $12 billion 'Modernization In Action' program. The scope includes repairs and refurbishment of lighting, security cameras, electrical systems, sewer pumping system, fire system, signing, paving and marking, traffic devices, storm drainage system, ventilation system, and other miscellaneous components. The item was forwarded to the Board of County Commissioners with a favorable recommendation by the Aviation and Seaport Committee on 9/8/2026. The agenda date is 10/6/2026. The work will begin only after the Aviation Department issues a service order to PDS. The project is in District 6, represented by Commissioner Natalie Milian Orbis, but the impact is county-wide. The funding source is Miami International Airport (MIA) - Airfield/Airside Subprogram, Program No. 2000001046, Project No. 3002146. The contract manager is Sylvia Novela and the project manager is Abel Oporto. The firm was evaluated and recommended by the Competitive Selection Committee. One proposal was received. The sub-consultants are Burns & McDonnell Engineering Company, Inc., GFT Infrastructure, Inc., DDA Engineers, PA, HP Consultants, Inc., and Louis J. Aguirre & Associates, Inc. The principal is Luis Jurado. The contract includes a 10 percent contingency of $244,557.00 and $6,725.32 for the Office of the Inspector General. The base contract amount is $2,445,570.00. The Request to Advertise was filed on January 2, 2026, and the submittal deadline was April 13, 2026. The Competitive Selection Committee evaluated the proposal on May 11, 2026. Negotiations began and concluded on June 12, 2026. The Negotiation Committee was approved on June 3, 2026.
- Board:
- Aviation and Seaport Committee
- Date:
- 2026-09-08
- Type:
- Resolution
- Decision:
- Forwarded to the Board of County Commissioners with a favorable recommendation by the Aviation and Seaport Committee on 9/8/2026; pending before the Board with an agenda date of 10/6/2026
- Address:
- Miami International Airport (MIA), MIA Bldg. 612 Airside Tunnel
- Applicant:
- Miami-Dade County Aviation Department; Premiere Design Solutions, Inc.
PSA WITH PREMIERE DESIGN SOLUTIONS, INC
Miami-Dade County resolution approving a Professional Services Agreement with Premiere Design Solutions, Inc. for architectural and engineering design services for the full repair of the airside tunnel concrete structure, riding surface, and associated structures at Miami International Airport, specifically MIA Bldg. 612 Airside Tunnel Structural & Life Safety Repairs. Contract No. E25AV02, maximum amount $2,696,852.32, term of eight years. The project is in District 6, represented by Commissioner Natalie Milian Orbis, but the impact is county-wide as the airport is a regional asset. The Aviation and Seaport Committee forwarded the item to the Board of County Commissioners with a favorable recommendation on 9/8/2026. The Board agenda date is 10/6/2026. The resolution authorizes the County Mayor or designee to execute the contract and exercise termination provisions. The scope includes repair and refurbishment of lighting, security cameras, electrical systems, sewer pumping system, fire system, signing, paving and marking, traffic devices, storm drainage system, ventilation system, and miscellaneous components. The work will begin only after the Aviation Department issues a service order. The firm was evaluated and recommended by the Competitive Selection Committee. The contract includes a 10 percent contingency of $244,557.00 and $6,725.32 for the Office of the Inspector General. The funding source is Miami International Airport (MIA) Airfield/Airside Subprogram, Program No. 2000001046, Project No. #3002146. The vendor address is 11606 City Hall Promenade, Suite 200, Miramar, FL 33025, with a local address of 2050 Coral Way, Suite 505, Miami, FL 33145. The principal is Luis Jurado. Sub-consultants include Burns & McDonnell Engineering Company, Inc., GFT Infrastructure, Inc., DDA Engineers, PA, HP Consultants, Inc., and Louis J. Aguirre & Associates, Inc. The Request to Advertise was filed on January 2, 2026, and one proposal was received by April 13, 2026. The Competitive Selection Committee recommended PDS on May 11, 2026. Negotiations concluded on June 12, 2026. The contract manager is Sylvia Novela, 305-876-7048, and project manager is Abel Oporto, 305-869-3876. The document does not state any public comment or stakeholder sentiment.
- Board:
- Aviation and Seaport Committee
- Date:
- 2026-09-08
- Type:
- Resolution
- Decision:
- Forwarded to BCC with a favorable recommendation by the Aviation and Seaport Committee on 9/8/2026; pending before the Board of County Commissioners with an agenda date of 10/6/2026
- Address:
- Miami International Airport, MIA Bldg. 612 Airside Tunnel
- Applicant:
- Premiere Design Solutions, Inc.
PSA WITH PREMIERE DESIGN SOLUTIONS, INC
Resolution approving a Professional Services Agreement between Miami-Dade County and Premiere Design Solutions, Inc. for architectural and engineering design services for the full repair of the airside tunnel concrete structure, riding surface, and associated structures at Miami International Airport, specifically MIA Bldg. 612 Airside Tunnel Structural & Life Safety Repairs. The contract is valued at a maximum amount of $2,696,852.32 for a term of eight years. The project is part of the Miami-Dade Aviation Department's Capital Improvement Program. The item was introduced on 8/14/2026, forwarded to the Board of County Commissioners with a favorable recommendation by the Aviation and Seaport Committee on 9/8/2026, and is scheduled for the Board agenda on 10/6/2026. The resolution authorizes the County Mayor or designee to execute the contract and exercise its termination provisions. The scope includes repairs and refurbishment of lighting, security cameras, electrical systems, sewer pumping system, fire system, signing, paving and marking, traffic devices, storm drainage system, ventilation system, and other components. The recommended firm, Premiere Design Solutions, Inc., was the sole proposer and was evaluated and ranked first. The project is in the Adopted Budget and Multi-Year Capital Plan. The contract is non-exclusive. Public comment sentiment is not stated.
- Board:
- Aviation and Seaport Committee
- Date:
- 2026-09-08
- Type:
- Resolution
- Decision:
- Forwarded to BCC with a favorable recommendation
- Applicant:
- Premiere Design Solutions, Inc.
PSA WITH PREMIERE DESIGN SOLUTIONS, INC
Resolution approving a Professional Services Agreement between Miami-Dade County and Premiere Design Solutions, Inc. for architectural and engineering design services for the full repair of the airside tunnel concrete structure, riding surface, and associated structures at Miami International Airport, including update and refurbishment of lighting, security cameras, electrical systems, sewer pumping system, fire system, signing, paving and marking, traffic devices, storm drainage system, ventilation system, and other components. Contract No. E25AV02, maximum amount $2,696,852.32, term of eight years. The item was forwarded to the Board of County Commissioners with a favorable recommendation by the Aviation and Seaport Committee on 9/8/2026. The agenda date is 10/6/2026. The project is in the Adopted Budget and Multi-Year Capital Plan. The work will begin only after the Aviation Department issues a service order. The firm was the sole proposer and was recommended by the Competitive Selection Committee. Public comment sentiment is not stated.
- Board:
- Aviation and Seaport Committee
- Date:
- 2026-09-08
- Type:
- Resolution
- Decision:
- Forwarded to BCC with a favorable recommendation
- Applicant:
- Premiere Design Solutions, Inc.
PSA WITH PREMIERE DESIGN SOLUTIONS, INC
Miami-Dade County resolution approving a Professional Services Agreement (PSA) with Premiere Design Solutions, Inc. for architectural and engineering design services for the full repair of the airside tunnel concrete structure, riding surface, and associated structures at Miami International Airport (MIA), specifically MIA Bldg. 612 Airside Tunnel Structural & Life Safety Repairs. Contract No. E25AV02, maximum amount $2,696,852.32, term of eight years. The project is located at Miami International Airport, which is in District 6, represented by Commissioner Natalie Milian Orbis, but the impact is county-wide. The resolution was forwarded to the Board of County Commissioners with a favorable recommendation by the Aviation and Seaport Committee on 9/8/2026, and is scheduled for the BCC agenda on 10/6/2026 as item 8A1. The scope includes repair and refurbishment of lighting, security cameras, electrical systems, sewer pumping system, fire system, signing, paving and marking, traffic devices, storm drainage system, ventilation system, and miscellaneous components. The contract is funded by Future Financing, Program No. 2000001046, Project No. 3002146. The vendor is Premiere Design Solutions, Inc., with principal address 11606 City Hall Promenade, Suite 200, Miramar, FL 33025 and local address 2050 Coral Way, Suite 505, Miami, FL 33145. The contract manager is Sylvia Novela, 305-876-7048, and project manager is Abel Oporto, 305-869-3876. The document does not state any public comment or stakeholder sentiment.
- Board:
- Aviation and Seaport Committee
- Date:
- 2026-09-08
- Type:
- Resolution
- Decision:
- Forwarded to BCC with a favorable recommendation by the Aviation and Seaport Committee on 9/8/2026; pending BCC action on 10/6/2026
- Address:
- Miami International Airport (MIA), MIA Bldg. 612 Airside Tunnel
- Applicant:
- Premiere Design Solutions, Inc.
PSA WITH PREMIERE DESIGN SOLUTIONS, INC
Resolution approving a Professional Services Agreement between Miami-Dade County and Premiere Design Solutions, Inc. for architectural and engineering design services for the full repair of the airside tunnel concrete structure, riding surface, and associated structures at Miami International Airport, MIA Bldg. 612, Contract No. E25AV02, in a maximum amount of $2,696,852.32 for a term of eight years. The project is in District 6, represented by Commissioner Natalie Milian Orbis, but the impact is county-wide. The scope includes lighting, security cameras, electrical systems, sewer pumping system, fire system, signing, paving and marking, traffic devices, storm drainage system, ventilation system, and other components. The firm was evaluated and recommended by the Competitive Selection Committee. The item was forwarded to the Board of County Commissioners with a favorable recommendation by the Aviation and Seaport Committee on 9/8/2026. The agenda date is 10/6/2026. The contract is for MIA Bldg. 612 Airside Tunnel Structural & Life Safety Repairs. The work will begin only after the Aviation Department issues a service order. The contract has a base amount of $2,445,570.00, a contingency of $244,557.00, and an Inspector General fee of $6,725.32. The funding source is the Miami International Airport (MIA) Airfield/Airside Subprogram, Program No. 2000001046, Project No. #3002146. The vendor is Premiere Design Solutions, Inc., with a principal address of 11606 City Hall Promenade, Suite 200, Miramar, FL 33025 and a local address of 2050 Coral Way, Suite 505, Miami, FL 33145. The principal is Luis Jurado. Sub-consultants include Burns & McDonnell Engineering Company, Inc., GFT Infrastructure, Inc., DDA Engineers, PA, HP Consultants, Inc., and Louis J. Aguirre & Associates, Inc. The Request to Advertise was filed on January 2, 2026. One proposal was received by the submittal deadline of April 13, 2026. The Competitive Selection Committee evaluated the proposal on May 11, 2026. Negotiations began and concluded on June 12, 2026. The contract manager is Sylvia Novela, 305-876-7048, and the project manager is Abel Oporto, 305-869-3876. The document does not state any public comment or stakeholder sentiment. The document does not state a specific street address, parcel, or folio for the project site, only that it is at Miami International Airport, MIA Bldg. 612. The document does not state the project size in acreage, number of units, or square footage. The document does not state a zoning or use change. The document does not state the final decision of the Board of County Commissioners, only that it is pending before the Board and was forwarded with a favorable recommendation from the Aviation and Seaport Committee. The document does not state a specific business opportunity beyond the contract itself.
- Board:
- Aviation and Seaport Committee
- Date:
- 2026-09-08
- Type:
- Resolution
- Decision:
- Forwarded to BCC with a favorable recommendation by the Aviation and Seaport Committee on 9/8/2026; pending before the Board of County Commissioners as of the document date
- Address:
- Miami International Airport, MIA Bldg. 612
- Applicant:
- Premiere Design Solutions, Inc.
PSA WITH PREMIERE DESIGN SOLUTIONS, INC
Resolution approving a Professional Services Agreement between Miami-Dade County and Premiere Design Solutions, Inc. for architectural and engineering design services for the full repair of the airside tunnel concrete structure, riding surface, and associated structures at Miami International Airport, specifically MIA Bldg. 612 Airside Tunnel Structural & Life Safety Repairs, Contract No. E25AV02. The contract is for a maximum amount of $2,696,852.32 with a term of eight years. The Aviation and Seaport Committee forwarded the item to the Board of County Commissioners with a favorable recommendation on 9/8/2026. The agenda date is 10/6/2026. The project is in District 6, represented by Commissioner Natalie Milian Orbis, but the impact is county-wide. The scope includes repairs and refurbishment of lighting, security cameras, electrical systems, sewer pumping system, fire system, signing, paving and marking, traffic devices, storm drainage system, ventilation system, and other miscellaneous components. The work will begin only after the Aviation Department issues a service order. The firm was evaluated and recommended by the Competitive Selection Committee. The contract includes a 10 percent contingency of $244,557.00 and $6,725.32 for the Office of the Inspector General. The funding source is the Miami International Airport (MIA) Airfield/Airside Subprogram, Program No. 2000001046, Project No. 3002146. The vendor address is 11606 City Hall Promenade, Suite 200, Miramar, FL 33025, with a local address of 2050 Coral Way, Suite 505, Miami, FL 33145. The principal is Luis Jurado. Sub-consultants include Burns & McDonnell Engineering Company, Inc., GFT Infrastructure, Inc., DDA Engineers, PA, HP Consultants, Inc., and Louis J. Aguirre & Associates, Inc. The Request to Advertise was filed on January 2, 2026. One proposal was received by the April 13, 2026 deadline. Market research was performed on April 16, 2026, and the decision was to proceed with the sole proposer. The Competitive Selection Committee evaluated the proposal on May 11, 2026, and recommended PDS for negotiation. Negotiations began and concluded on June 12, 2026. The contract manager is Sylvia Novela, and the project manager is Abel Oporto. No public comment or stakeholder sentiment is stated in the document.
- Board:
- Aviation and Seaport Committee
- Date:
- 2026-09-08
- Type:
- Resolution
- Decision:
- Forwarded to BCC with a favorable recommendation by the Aviation and Seaport Committee on 9/8/2026; pending before the Board of County Commissioners
- Address:
- Miami International Airport, MIA Bldg. 612 Airside Tunnel
- Applicant:
- Premiere Design Solutions, Inc.
PSA WITH PREMIERE DESIGN SOLUTIONS, INC
Miami-Dade County resolution to approve a Professional Services Agreement (PSA) with Premiere Design Solutions, Inc. for architectural and engineering design services for the full repair of the airside tunnel concrete structure, riding surface, and associated structures at Miami International Airport (MIA), specifically MIA Bldg. 612 Airside Tunnel Structural & Life Safety Repairs, Contract No. E25AV02. The contract is for a maximum amount of $2,696,852.32, with a term of eight years. The project is in District 6, represented by Commissioner Natalie Milian Orbis, but the impact is county-wide. The resolution was introduced on 8/14/2026 and is scheduled for the Aviation and Seaport Committee agenda on 10/6/2026 as item 8A. The status is 'In Committee'. The recommendation is to approve the competitive award. The scope includes repair of the concrete structure, riding surface, and associated structures, plus update and refurbishment of lighting, security cameras, electrical systems, sewer pumping system, fire system, signing, paving and marking, traffic devices, storm drainage system, ventilation system, and miscellaneous components. The contract includes a 10 percent contingency of $244,557.00 and $6,725.32 for the Office of the Inspector General. The funding source is Miami International Airport (MIA) Airfield/Airside Subprogram, Program No. 2000001046, Project No. 3002146. The vendor is Premiere Design Solutions, Inc., with principal address 11606 City Hall Promenade, Suite 200, Miramar, FL 33025, and local address 2050 Coral Way, Suite 505, Miami, FL 33145. The contract manager is Sylvia Novela, 305-876-7048, and project manager is Abel Oporto, 305-869-3876. The procurement history notes one proposal was received, and the Competitive Selection Committee recommended PDS for negotiation. No public comment or stakeholder sentiment is stated in the document.
- Board:
- Aviation and Seaport Committee
- Date:
- 2026-09-08
- Type:
- Resolution
- Decision:
- Recommended for approval by staff; status is 'In Committee'
- Address:
- Miami International Airport (MIA), MIA Bldg. 612 Airside Tunnel
- Applicant:
- Premiere Design Solutions, Inc.
PSA WITH PREMIERE DESIGN SOLUTIONS, INC
Resolution approving a Professional Services Agreement between Miami-Dade County and Premiere Design Solutions, Inc. for architectural and engineering design services for the full repair of the airside tunnel concrete structure, riding surface, and associated structures at Miami International Airport, specifically MIA Bldg. 612 Airside Tunnel Structural & Life Safety Repairs, Contract No. E25AV02. The contract has a maximum amount of $2,696,852.32 and a term of eight years. The project is part of the Miami-Dade Aviation Department's Capital Improvement Program. The resolution was introduced on 8/14/2026, forwarded to the Board of County Commissioners with a favorable recommendation by the Aviation and Seaport Committee on 9/8/2026, and is scheduled for the Board agenda on 10/6/2026. The work will begin only after the Aviation Department issues a service order. The scope includes repair of the tunnel and update/refurbishment of lighting, security cameras, electrical systems, sewer pumping system, fire system, signing, paving and marking, traffic devices, storm drainage system, ventilation system, and other components. The recommended firm is Premiere Design Solutions, Inc., located at 11606 City Hall Promenade, Suite 200, Miramar, FL 33025, with a local address at 2050 Coral Way, Suite 505, Miami, FL 33145. The contract manager is Sylvia Novela and the project manager is Abel Oporto. The project is in the Adopted Budget and Multi-Year Capital Plan, funded by Miami International Airport (MIA) - Airfield/Airside Subprogram, Program No. 2000001046, Project No. 3002146. The fiscal impact is $2,696,852.32, with a base contract amount of $2,445,570.00, a contingency allowance of $244,557.00, and an Inspector General fee of $6,725.32. The procurement history notes that one proposal was received, and the Competitive Selection Committee recommended PDS for negotiation. The resolution authorizes the County Mayor or designee to execute the contract and exercise termination provisions. The document does not state a final decision by the Board of County Commissioners, as the item was 'Before the Board' with an agenda date of 10/6/2026. The document does not state any public comment or stakeholder sentiment.
- Board:
- Aviation and Seaport Committee
- Date:
- 2026-09-08
- Type:
- Resolution
- Decision:
- Forwarded to BCC with a favorable recommendation by the Aviation and Seaport Committee on 9/8/2026; final decision by the Board of County Commissioners is pending as of the document date (agenda date 10/6/2026)
- Address:
- Miami International Airport, MIA Bldg. 612 (Airside Tunnel)
- Applicant:
- Miami-Dade Aviation Department; Premiere Design Solutions, Inc. (recommended firm)
PSA WITH PREMIERE DESIGN SOLUTIONS, INC
Resolution approving a Professional Services Agreement between Miami-Dade County and Premiere Design Solutions, Inc. for architectural and engineering design services for the full repair of the airside tunnel concrete structure, riding surface, and associated structures at Miami International Airport, specifically MIA Bldg. 612 Airside Tunnel Structural & Life Safety Repairs, Contract No. E25AV02. The contract has a maximum amount of $2,696,852.32 and a term of eight years. The project is in District 6, represented by Commissioner Natalie Milian Orbis, but the impact is county-wide. The resolution was forwarded to the Board of County Commissioners with a favorable recommendation by the Aviation and Seaport Committee on 9/8/2026, and is scheduled for the Board agenda on 10/6/2026. The work will begin only after the Aviation Department issues a service order. The scope includes repairs and refurbishment of lighting, security cameras, electrical systems, sewer pumping system, fire system, signing, paving and marking, traffic devices, storm drainage system, ventilation system, and other miscellaneous components. The recommended firm is Premiere Design Solutions, Inc., with a principal address of 11606 City Hall Promenade, Suite 200, Miramar, FL 33025 and a local address of 2050 Coral Way, Suite 505, Miami, FL 33145. The sub-consultants are Burns & McDonnell Engineering Company, Inc., GFT Infrastructure, Inc., DDA Engineers, PA, HP Consultants, Inc., and Louis J. Aguirre & Associates, Inc. The contract includes a 10 percent contingency of $244,557.00 and $6,725.32 for the Office of the Inspector General. The funding source is Miami International Airport (MIA) - Airfield/Airside Subprogram, Program No. 2000001046, Project No. 3002146. The contract manager is Sylvia Novela and the project manager is Abel Oporto. The procurement history notes that only one proposal was received, and the Competitive Selection Committee recommended PDS for negotiation. The document does not state any public comment or stakeholder sentiment.
- Board:
- Aviation and Seaport Committee
- Date:
- 2026-09-08
- Type:
- Resolution
- Decision:
- Forwarded to BCC with a favorable recommendation by the Aviation and Seaport Committee on 9/8/2026; pending before the Board of County Commissioners on 10/6/2026
- Address:
- Miami International Airport, MIA Bldg. 612 Airside Tunnel
- Applicant:
- Premiere Design Solutions, Inc.
PSA WITH PREMIERE DESIGN SOLUTIONS, INC
Resolution approving a Professional Services Agreement (PSA) between Miami-Dade County and Premiere Design Solutions, Inc. (PDS) for architectural and engineering design services for the full repair of the airside tunnel concrete structure, riding surface, and associated structures at Miami International Airport (MIA), specifically MIA Bldg. 612 Airside Tunnel Structural & Life Safety Repairs. The contract is valued at a maximum amount of $2,696,852.32 for a term of eight years. The scope includes repair and refurbishment of lighting, security cameras, electrical systems, sewer pumping system, fire system, signing, paving and marking, traffic devices, storm drainage system, ventilation system, and other components. The project is part of MIA's Capital Improvement Program and the $12 billion 'Modernization In Action' (M.I.A.) program. The work will begin only after the Aviation Department issues a service order. The firm was the sole proposer and was recommended by the Competitive Selection Committee. The item was forwarded to the Board of County Commissioners (BCC) with a favorable recommendation from the Aviation and Seaport Committee. The agenda date is 10/6/2026. The document does not state any public comment or stakeholder sentiment.
- Board:
- Aviation and Seaport Committee
- Date:
- 2026-09-08
- Type:
- Resolution
- Decision:
- Forwarded to BCC with a favorable recommendation (from Aviation and Seaport Committee); Pending BCC Assignment
- Address:
- Miami International Airport (MIA), MIA Bldg. 612 Airside Tunnel
- Applicant:
- Miami-Dade Aviation Department (MDAD); Premiere Design Solutions, Inc. (PDS)
PSA WITH PREMIERE DESIGN SOLUTIONS, INC
Resolution approving a Professional Services Agreement between Miami-Dade County and Premiere Design Solutions, Inc. for architectural and engineering design services for the full repair of the airside tunnel concrete structure, riding surface, and associated structures at Miami International Airport, Building 612, Contract No. E25AV02, in a maximum amount of $2,696,852.32 for a term of eight years. The project is part of MIA's Capital Improvement Program and the $12 billion 'Modernization In Action' program. The scope includes repairs and refurbishment of lighting, security cameras, electrical systems, sewer pumping system, fire system, signing, paving and marking, traffic devices, storm drainage system, ventilation system, and other components. The work will begin only after the Aviation Department issues a service order. The firm was evaluated and recommended by the Competitive Selection Committee. The item was forwarded to the Board of County Commissioners with a favorable recommendation by the Aviation and Seaport Committee on 9/8/2026. The agenda date is 10/6/2026. The project is in District 6, but the impact is county-wide. The contract manager is Sylvia Novela and the project manager is Abel Oporto. The funding source is the Miami International Airport Airfield/Airside Subprogram, Program No. 2000001046, Project No. 3002146. The base contract amount is $2,445,570.00, with a contingency of $244,557.00 and an Inspector General fee of $6,725.32. The vendor's principal address is 11606 City Hall Promenade, Suite 200, Miramar, FL 33025, with a local address of 2050 Coral Way, Suite 505, Miami, FL 33145. Sub-consultants include Burns & McDonnell Engineering Company, Inc., GFT Infrastructure, Inc., DDA Engineers, PA, HP Consultants, Inc., and Louis J. Aguirre & Associates, Inc. The Request to Advertise was filed on January 2, 2026, one proposal was received by April 13, 2026, and the Competitive Selection Committee recommended PDS on May 11, 2026. Negotiations concluded on June 12, 2026. The resolution authorizes the County Mayor or designee to execute the contract and exercise termination provisions.
- Board:
- Aviation and Seaport Committee
- Date:
- 2026-09-08
- Type:
- Resolution
- Decision:
- Forwarded to the Board of County Commissioners with a favorable recommendation by the Aviation and Seaport Committee on 9/8/2026; pending before the Board with an agenda date of 10/6/2026
- Address:
- Miami International Airport, Building 612 (Airside Tunnel)
- Applicant:
- Premiere Design Solutions, Inc.
PSA WITH PREMIERE DESIGN SOLUTIONS, INC
Resolution approving a Professional Services Agreement between Miami-Dade County and Premiere Design Solutions, Inc. for architectural and engineering design services for the full repair of the airside tunnel concrete structure, riding surface, and associated structures at Miami International Airport, including update and refurbishment of lighting, security cameras, electrical systems, sewer pumping system, fire system, signing, paving and marking, traffic devices, storm drainage system, ventilation system, and other components. Contract No. E25AV02, maximum amount $2,696,852.32, term of eight years. The Aviation and Seaport Committee forwarded it to the BCC with a favorable recommendation on 9/8/2026. Agenda date is 10/6/2026. The project is in the Adopted Budget and Multi-Year Capital Plan. The firm was evaluated and recommended. One proposal was received. The Competitive Selection Committee recommended PDS for negotiation. The Negotiation Committee began and concluded negotiations on June 12, 2026. The work will begin only after the Aviation Department issues a service order. The impact is county-wide as the airport is a regional asset. The project is in District 6, represented by Commissioner Natalie Milian Orbis. The contract manager is Sylvia Novela and the project manager is Abel Oporto. The vendor address is 11606 City Hall Promenade, Suite 200, Miramar, FL 33025 and local address is 2050 Coral Way, Suite 505, Miami, FL 33145. The principal is Luis Jurado. Sub-consultants are Burns & McDonnell Engineering Company, Inc., GFT Infrastructure, Inc., DDA Engineers, PA, HP Consultants, Inc., and Louis J. Aguirre & Associates, Inc. The base contract amount is $2,445,570.00, contingency allowance is $244,557.00, and Inspector General fee is $6,725.32. Funding source is Miami International Airport (MIA) - Airfield/Airside Subprogram, Program No. 2000001046, Project No. #3002146. The Request to Advertise was filed on January 2, 2026. The submittal deadline was April 13, 2026. Market research was performed on April 16, 2026. The Strategic Procurement Department review was on April 30, 2026. The OIG notified on April 20, 2026. The COE responded on April 27, 2026. The First-Tier meeting was on May 11, 2026. The Negotiation Committee was approved on June 3, 2026. Negotiations were on June 12, 2026. The firm has an average evaluation score of 3.8 out of 4.0. Within the last three years, PDS has received two contracts as a Prime Contractor with a value of $4,312,071. For the period May 2012 October 2023, PDS received eleven contracts as a Prime Contractor with a value of $6,818,629, for a total of $11,130,700. The SBE - A&E measure is 15 percent. Sea Level Rise will be considered as part of the planning and design work. MDAD determined it does not have the in-house capabilities to perform design and construction inspection services. The document does not state a specific street address for the project site, parcel or folio number, acreage, or number of units. The document does not state any public comment or stakeholder sentiment. The document does not state a final decision by the Board of County Commissioners, only a favorable recommendation from the Aviation and Seaport Committee. The document does not state a specific business opportunity beyond the contract itself.
- Board:
- Aviation and Seaport Committee
- Date:
- 2026-09-08
- Type:
- Resolution
- Decision:
- Forwarded to BCC with a favorable recommendation by the Aviation and Seaport Committee on 9/8/2026; final decision not stated
- Applicant:
- Premiere Design Solutions, Inc.
PSA WITH PREMIERE DESIGN SOLUTIONS, INC
Resolution approving a Professional Services Agreement between Miami-Dade County and Premiere Design Solutions, Inc. for architectural and engineering design services for the full repair of the airside tunnel concrete structure, riding surface, and associated structures at Miami International Airport (MIA), specifically MIA Bldg. 612 Airside Tunnel Structural & Life Safety Repairs. Contract No. E25AV02, maximum amount $2,696,852.32, term of eight years. Status: In Committee, agenda date 10/6/2026. The project is in District 6, represented by Commissioner Natalie Milian Orbis, but impact is county-wide. The scope includes repair and refurbishment of lighting, security cameras, electrical systems, sewer pumping system, fire system, signing, paving and marking, traffic devices, storm drainage system, ventilation system, and miscellaneous components. The firm was evaluated and recommended by the Competitive Selection Committee. The work will begin only after the Aviation Department issues a service order. Public comment sentiment: not stated.
- Board:
- Aviation and Seaport Committee
- Date:
- 2026-09-08
- Type:
- Resolution
- Decision:
- In Committee; recommended for approval by staff; final action not stated
- Address:
- Miami International Airport, MIA Bldg. 612 Airside Tunnel
- Applicant:
- Premiere Design Solutions, Inc. (PDS); Requester: Aviation Department
PSA WITH PREMIERE DESIGN SOLUTIONS, INC
Resolution approving a Professional Services Agreement between Miami-Dade County and Premiere Design Solutions, Inc. for architectural and engineering design services for the full repair of the airside tunnel concrete structure, riding surface, and associated structures at Miami International Airport, specifically MIA Bldg. 612 Airside Tunnel Structural & Life Safety Repairs, Contract No. E25AV02. The contract has a maximum amount of $2,696,852.32 and a term of eight years. The Aviation and Seaport Committee forwarded it to the Board of County Commissioners with a favorable recommendation on 9/8/2026. The Board agenda date is 10/6/2026. The project is in District 6, represented by Commissioner Natalie Milian Orbis, but the impact is county-wide. The scope includes repair and refurbishment of lighting, security cameras, electrical systems, sewer pumping system, fire system, signing, paving and marking, traffic devices, storm drainage system, ventilation system, and miscellaneous components. The work will begin only after the Aviation Department issues a service order. The firm was evaluated and is the recommended firm. One proposal was received. The Competitive Selection Committee recommended PDS for negotiation. The Negotiation Committee concluded negotiations on 6/12/2026. The contract includes a 10 percent contingency of $244,557.00 and $6,725.32 for the Office of the Inspector General. The project is in the Adopted Budget and Multi-Year Capital Plan, funded by Miami International Airport (MIA) Airfield/Airside Subprogram, Program No. 2000001046, Project No. 3002146. The contract manager is Sylvia Novela and the project manager is Abel Oporto. The vendor address is 11606 City Hall Promenade, Suite 200, Miramar, FL 33025, with a local address of 2050 Coral Way, Suite 505, Miami, FL 33145. The principal is Luis Jurado. Sub-consultants include Burns & McDonnell Engineering Company, Inc., GFT Infrastructure, Inc., DDA Engineers, PA, HP Consultants, Inc., and Louis J. Aguirre & Associates, Inc. The vendor has an average evaluation score of 3.8 out of 4.0. The Request to Advertise was filed on 1/2/2026, the proposal submittal deadline was 4/13/2026, and the First-Tier meeting was on 5/11/2026. The document does not state any public comment or stakeholder sentiment.
- Board:
- Aviation and Seaport Committee
- Date:
- 2026-09-08
- Type:
- Resolution
- Decision:
- Forwarded to BCC with a favorable recommendation by the Aviation and Seaport Committee on 9/8/2026; pending before the Board of County Commissioners as of the document date
- Address:
- Miami International Airport, MIA Bldg. 612 Airside Tunnel
- Applicant:
- Premiere Design Solutions, Inc.
PSA WITH PREMIERE DESIGN SOLUTIONS, INC
Miami-Dade County resolution approving a Professional Services Agreement (PSA) with Premiere Design Solutions, Inc. for architectural and engineering design services for the full repair of the airside tunnel concrete structure, riding surface, and associated structures at Miami International Airport (MIA) Building 612, Contract No. E25AV02, in a maximum amount of $2,696,852.32 for a term of eight years. The Aviation and Seaport Committee forwarded the item to the Board of County Commissioners with a favorable recommendation on 9/8/2026. The Board agenda date is 10/6/2026. The project is in the Adopted Budget and Multi-Year Capital Plan, funded by Future Financing under Program No. 2000001046, Project No. 3002146. The scope includes repair and refurbishment of lighting, security cameras, electrical systems, sewer pumping system, fire system, signing, paving and marking, traffic devices, storm drainage system, ventilation system, and miscellaneous components. The contract is non-exclusive, and work begins only after the Aviation Department issues a service order. The recommended firm, Premiere Design Solutions, Inc., is located at 11606 City Hall Promenade, Suite 200, Miramar, FL 33025, with a local address at 2050 Coral Way, Suite 505, Miami, FL 33145. Sub-consultants include Burns & McDonnell Engineering Company, Inc., GFT Infrastructure, Inc., DDA Engineers, PA, HP Consultants, Inc., and Louis J. Aguirre & Associates, Inc. The Competitive Selection Committee recommended PDS for negotiation. The Negotiation Committee concluded negotiations on 6/12/2026. The contract includes a 10 percent contingency of $244,557.00 and an Inspector General fee of $6,725.32. The project is in District 6, represented by Commissioner Natalie Milian Orbis, but the impact is county-wide. No public comment or stakeholder sentiment is stated in the document.
- Board:
- Aviation and Seaport Committee
- Date:
- 2026-09-08
- Type:
- Resolution
- Decision:
- Forwarded to BCC with a favorable recommendation by the Aviation and Seaport Committee on 9/8/2026; pending before the Board of County Commissioners as of the document date
- Address:
- Miami International Airport, MIA Building 612, Airside Tunnel
- Applicant:
- Premiere Design Solutions, Inc.
PSA WITH PREMIERE DESIGN SOLUTIONS, INC
Resolution approving a Professional Services Agreement between Miami-Dade County and Premiere Design Solutions, Inc. for architectural and engineering design services for the full repair of the airside tunnel concrete structure, riding surface, and associated structures at Miami International Airport, MIA Bldg. 612, Contract No. E25AV02, in a maximum amount of $2,696,852.32 for a term of eight years. The Aviation and Seaport Committee forwarded it to the Board of County Commissioners with a favorable recommendation on 9/8/2026. The agenda date is 10/6/2026. The project is in District 6, represented by Commissioner Natalie Milian Orbis, but the impact is county-wide. The work will begin only after the Aviation Department issues a service order. The scope includes repair and refurbishment of lighting, security cameras, electrical systems, sewer pumping system, fire system, signing, paving and marking, traffic devices, storm drainage system, ventilation system, and other components. The firm was evaluated and recommended by the Competitive Selection Committee. One proposal was received. The contract includes a 10 percent contingency of $244,557.00 and $6,725.32 for the Office of the Inspector General. The funding source is Miami International Airport (MIA) - Airfield/Airside Subprogram, Program No. 2000001046, Project No. #3002146. The contract manager is Sylvia Novela and the project manager is Abel Oporto. The vendor address is 11606 City Hall Promenade, Suite 200, Miramar, FL 33025, with a local address of 2050 Coral Way, Suite 505, Miami, FL 33145. The principal is Luis Jurado. Sub-consultants include Burns & McDonnell Engineering Company, Inc., GFT Infrastructure, Inc., DDA Engineers, PA, HP Consultants, Inc., and Louis J. Aguirre & Associates, Inc. The document does not state any public comment or stakeholder sentiment.
- Board:
- Aviation and Seaport Committee
- Date:
- 2026-09-08
- Type:
- Resolution
- Decision:
- Forwarded to BCC with a favorable recommendation by the Aviation and Seaport Committee on 9/8/2026; pending BCC assignment
- Address:
- Miami International Airport, MIA Bldg. 612 (Airside Tunnel)
- Applicant:
- Premiere Design Solutions, Inc.
PSA WITH PREMIERE DESIGN SOLUTIONS, INC
Resolution approving a Professional Services Agreement (PSA) between Miami-Dade County and Premiere Design Solutions, Inc. for architectural and engineering design services for the full repair of the airside tunnel concrete structure, riding surface, and associated structures at Miami International Airport, specifically MIA Bldg. 612 Airside Tunnel Structural & Life Safety Repairs, Contract No. E25AV02. The contract has a maximum amount of $2,696,852.32 and a term of eight years. The project is in the Adopted Budget and Multi-Year Capital Plan, funded by Miami International Airport (MIA) Airfield/Airside Subprogram, Program No. 2000001046, Project No. #3002146. The recommendation is to approve the contract award. The item was introduced on 8/14/2026, assigned to the County Attorney on 8/17/2026, and is scheduled for the Aviation and Seaport Committee agenda on 10/6/2026 as item 8A. The status is 'In Committee'. The scope includes repair of the concrete structure, riding surface, and associated structures, plus update and refurbishment of lighting, security cameras, electrical systems, sewer pumping system, fire system, signing, paving and marking, traffic devices, storm drainage system, ventilation system, and other components. The firm was evaluated and recommended by the Competitive Selection Committee. One proposal was received. The vendor address is 11606 City Hall Promenade, Suite 200, Miramar, FL 33025, with a local address of 2050 Coral Way, Suite 505, Miami, FL 33145. The principal is Luis Jurado. Sub-consultants include Burns & McDonnell Engineering Company, Inc., GFT Infrastructure, Inc., DDA Engineers, PA, HP Consultants, Inc., and Louis J. Aguirre & Associates, Inc. The contract manager is Sylvia Novela and the project manager is Abel Oporto. No public comment or stakeholder sentiment is stated in the document.
- Board:
- Aviation and Seaport Committee
- Date:
- 2026-09-08
- Type:
- Resolution
- Decision:
- Recommended for approval
- Applicant:
- Premiere Design Solutions, Inc.
See the actual businesses behind these numbers
Get the real filings, with addresses and officers, backed by a 14-day money-back guarantee.
Create your account