Browse Miami-Dade County civic records
Every published record for Miami-Dade County, newest first. Filter by board, year, or industry to jump straight to the records you want, and page through to reach the full archive.
29,460 records
MSA WITH FPL - FEASIBILITY REPORT #4
Legislative item File Number 261460 is a Resolution titled 'MSA WITH FPL - FEASIBILITY REPORT #4', introduced on 8/18/2026, with an agenda date of 10/6/2026 and agenda item number 2B3. The status is 'In Committee' (Infrastructure, Innovation & Technology Committee). The report is presented in response to Resolution No. R-1090-23, adopted by the Board of County Commissioners on December 12, 2023. The report covers Feasibility Report #4 - Group 2 for FPL Electrical On Site Power Solutions at Miami International Airport (MIA), specifically for Park 7 Dolphin, Low Terminal F (F1630 & F1634), Chiller Plant (East), and Building 845. The projects focus on maintenance of legally required backup generation systems, including projected replacements of five (5) generators, four (4) switchgear units, four (4) diesel system refurbishments, and other electrical device replacements. The work will be implemented through the Non-Residential Optional Power Supplemental Power Services (OSPS) Agreement, Supplemental Power Services Rider Pilot, and the Non-Residential Optional Supplemental Power Services Tariff Program SOW. Monthly service payment ranges over the 20-year term are stated: Park 7 Dolphin: $40,367 - $53,823; Low Terminal F: $157,576 - $210,101; Chiller Plant East Rm 214: $32,780 - $43,707; Building 845: $71,636 - $95,515. The MSA is for a 20-year term with automatic renewal periods of 12 months in an amount not to exceed $912,000,000.00. The report is to be placed on the next available IITC meeting agenda and the next available Board of County Commissioner's meeting agenda. No decision (approved/denied/deferred/recommended) is stated in the document. No public comment or stakeholder sentiment is stated in the document.
- Board:
- Infrastructure, Innovation & Technology Committee
- Date:
- 2026-09-10
- Type:
- Resolution
- Applicant:
- Miami-Dade County Mayor (Daniella Levine Cava) and Florida Power & Light Services, LLC
MSA WITH FPL - FEASIBILITY REPORT #4
This is a legislative item (File Number: 261460) regarding a report on Feasibility Report #4 - Group 2 completed pursuant to the Master Services Agreement (MSA) with Florida Power & Light Services, LLC. The report covers FPL Electrical On Site Power Solutions at Miami International Airport (MIA) locations: Park 7 Dolphin, Lower Terminal F (F1630 & F1634), Chiller Plant (East), and Building 845. The work includes five generator replacements, four switchgear unit replacements, four diesel system refurbishments, and other electrical device replacements. The MSA is for a 20-year term with automatic renewal periods of 12 months in an amount not to exceed $912,000,000.00. The report is presented in response to Resolution No. R-1090-23, adopted December 12, 2023. The status is 'In Committee' and the agenda date is 10/6/2026. The document does not state a decision (approved/denied/deferred/recommended) on the projects themselves, only that the report is being presented. Monthly service payment ranges are provided for each location. The document does not state a specific street address, parcel/folio, acreage, or zoning change. The document does not contain public comment or stakeholder sentiment.
- Board:
- Infrastructure, Innovation & Technology Committee
- Date:
- 2026-09-10
- Type:
- Resolution
MSA WITH FPL - FEASIBILITY REPORT #4
This is a legislative report regarding Feasibility Report #4 - Group 2 completed pursuant to the Master Services Agreement with Florida Power & Light Services, LLC. The report covers FPL Electrical On Site Power Solutions at Miami International Airport (MIA) for four locations: Park 7 Dolphin, Lower Terminal F (F1630 & F1634), Chiller Plant (East), and Building 845. The project focuses on maintenance for legally required backup generation systems, including five generator replacements, four switchgear unit replacements, four diesel system refurbishments, and other electrical device replacements. The report was received by the Infrastructure, Innovation & Technology Committee on 9/10/2026. The file number is 261460. The report is presented in response to Resolution No. R-1090-23, adopted December 12, 2023. The MSA is for a 20-year term with automatic renewal periods of 12 months in an amount not to exceed $912,000,000.00. Monthly service payment ranges are stated for each location. The report was introduced on 8/18/2026 and is scheduled for the agenda on 10/6/2026 as item 2B3. No public comment sentiment is stated in the document.
- Board:
- Infrastructure, Innovation & Technology Committee
- Date:
- 2026-09-10
- Type:
- Report
- Decision:
- Report Received by the Infrastructure, Innovation & Technology Committee on 9/10/2026
- Applicant:
- Miami-Dade County Mayor (Daniella Levine Cava) and Florida Power & Light Services, LLC
MSA WITH FPL - FEASIBILITY REPORT #4
Report regarding Feasibility Reports completed pursuant to the Master Services Agreement with Florida Power & Light Services, LLC - Directive No. 241760, Feasibility Report #4 - Group 2. The report covers projects at Miami International Airport: Park 7 Dolphin, Lower Terminal F (F1630 & F1634), Chiller Plant (East), and Building 845. The work includes five generator replacements, four switchgear unit replacements, four diesel system refurbishments, and other electrical device replacements. Monthly service payment ranges over the 20-year term: Park 7 Dolphin $40,367-$53,823, Low Terminal F $157,576-$210,101, Chiller Plant East Rm 214 $32,780-$43,707, Building 845 $71,636-$95,515. The report was received by the Infrastructure, Innovation & Technology Committee on 9/10/2026. The Board of County Commissioners agenda date is 10/6/2026, item 2B3. The MSA is for a 20-year term with automatic renewal periods of 12 months in an amount not to exceed $912,000,000.00. Resolution No. R-1090-23, adopted December 12, 2023, authorized the MSA and directed disclosure of feasibility reports prior to implementation. The report is presented in response to Resolution No. R-1090-23, sponsored by Commissioner Raquel A. Regalado. The projects are critical to resilience of electrical systems at MIA, reduce electrical risks to operations, and represent necessary end of life replacement of core systems. The work will be implemented through the Non-Residential Optional Power Supplemental Power Services (OSPS) Agreement, Supplemental Power Services Rider Pilot, and the Non-Residential Optional Supplemental Power Services Tariff Program SOW. Nothing in the memorandum is intended to support a net zero policy as defined in section 377.816, F.S. The report was introduced on 8/18/2026. The requester is the Mayor. The file number is 261460. The status is Before the Board. The version is 0. The agenda item number is 2B3. The committee agenda item was 7A on 9/10/2026. The action was Report Received. The report is attached as Exhibit 1. The costs and delegated authority were approved by Resolution No. R-1090-23 on December 12, 2023. The report includes no public comment or stakeholder sentiment.
- Board:
- Infrastructure, Innovation & Technology Committee
- Date:
- 2026-09-10
- Type:
- Report
- Decision:
- Report Received by Infrastructure, Innovation & Technology Committee on 9/10/2026; pending Board of County Commissioners agenda on 10/6/2026
- Address:
- Miami International Airport (MIA)
- Applicant:
- Miami-Dade County Mayor (Daniella Levine Cava) and Florida Power & Light Services, LLC
MSA WITH FPL - FEASIBILITY REPORT #4
The document is a legislative item from Miami-Dade County, file number 261460, a Resolution titled 'MSA WITH FPL - FEASIBILITY REPORT #4'. It is a report regarding Feasibility Reports completed pursuant to the Master Services Agreement with Florida Power & Light Services, LLC, specifically Feasibility Report #4 - Group 2. The report covers projects at Miami International Airport: Park 7 Dolphin, Low Terminal F (F1630 & F1634), Chiller Plant (East), and Building 845. The work includes five generator replacements, four switchgear unit replacements, four diesel system refurbishments, and other electrical device replacements. The report is presented in response to Resolution No. R-1090-23, adopted December 12, 2023. The status is 'In Committee'. The agenda date is 10/6/2026. The document does not state a decision (approved/denied/deferred/recommended). The document does not state a specific street address, parcel/folio, acreage, or number of units/lots. The document does not state the applicant/developer/owner name beyond the County Mayor and FPL. The document does not state a zoning or use change. The document does not state a business opportunity beyond the described projects. The document does not state any public comment or stakeholder sentiment.
- Board:
- Infrastructure, Innovation & Technology Committee
- Date:
- 2026-09-10
- Type:
- Resolution
MSA WITH FPL - FEASIBILITY REPORT #4
This is a legislative report to the Miami-Dade Board of County Commissioners regarding Feasibility Report #4 - Group 2, completed pursuant to the Master Services Agreement (MSA) with Florida Power & Light Services, LLC. The report covers projects at Miami International Airport (MIA): Park 7 Dolphin, Low Terminal F (F1630 & F1634), Chiller Plant (East), and Building 845. The work includes five generator replacements, four switchgear unit replacements, four diesel system refurbishments, and other electrical device replacements. The projects are for legally required backup generation systems, prioritized due to aging equipment and critical backup power functions. The report was received by the Infrastructure, Innovation & Technology Committee on 9/10/2026, and is scheduled for the Board agenda on 10/6/2026. The MSA is for a 20-year term in an amount not to exceed $912,000,000.00. Monthly service payment ranges are stated for each project. The report is presented in response to Resolution No. R-1090-23, adopted December 12, 2023. The document does not state a specific street address, parcel/folio, acreage, or a zoning/use change. No public comment or stakeholder sentiment is stated.
- Board:
- Infrastructure, Innovation & Technology Committee
- Date:
- 2026-09-10
- Type:
- Report
- Decision:
- Report Received (by Infrastructure, Innovation & Technology Committee on 9/10/2026); Final action not stated
- Applicant:
- Miami-Dade County (Mayor Daniella Levine Cava); Florida Power & Light Services, LLC
MSA WITH FPL - FEASIBILITY REPORT #4
This is a legislative report to the Miami-Dade Board of County Commissioners regarding Feasibility Report #4 - Group 2, completed under the Master Services Agreement (MSA) with Florida Power & Light Services, LLC. The report covers electrical resiliency projects at Miami International Airport (MIA) locations: Park 7 Dolphin, Low Terminal F (F1630 & F1634), Chiller Plant (East), and Building 845. The projects involve maintenance of legally required backup generation systems, including five (5) generator replacements, four (4) switchgear unit replacements, four (4) diesel system refurbishments, and other electrical device replacements. The work will be implemented through the Non-Residential Optional Power Supplemental Power Services (OSPS) Agreement, Supplemental Power Services Rider Pilot, and the Non-Residential Optional Supplemental Power Services Tariff Program SOW. The report was received by the Infrastructure, Innovation & Technology Committee on 9/10/2026 and is scheduled for the Board agenda on 10/6/2026 as item 2B3. The MSA is for a 20-year term in an amount not to exceed $912,000,000.00. The report is presented in response to Resolution No. R-1090-23, adopted December 12, 2023. Monthly service payment ranges over the 20-year term are stated for each location. No public comment or stakeholder sentiment is stated in the document.
- Board:
- Infrastructure, Innovation & Technology Committee
- Date:
- 2026-09-10
- Type:
- Report
- Decision:
- Report Received (by Infrastructure, Innovation & Technology Committee on 9/10/2026); Final action not stated
- Applicant:
- Miami-Dade County Mayor (Daniella Levine Cava) and Florida Power & Light Services, LLC
MSA WITH FPL - FEASIBILITY REPORT #4
Legislative item File Number 261460 is a Resolution titled 'MSA WITH FPL - FEASIBILITY REPORT #4', introduced 8/18/2026, with an agenda date of 10/6/2026, agenda item number 2B3, status 'In Committee' in the Infrastructure, Innovation & Technology Committee. The report is presented in response to Resolution No. R-1090-23, adopted by the Board of County Commissioners on December 12, 2023. It covers Feasibility Report #4 - Group 2 for FPL Electrical On Site Power Solutions at Miami International Airport, including Park 7 Dolphin, Low Terminal F (F1630 & F1634), Chiller Plant (East), and Building 845. The projects involve maintenance for legally required backup generation systems, with projected replacements including five (5) generator replacements, four (4) switchgear unit replacements, four (4) diesel system refurbishments, and other electrical device replacements. Monthly service payment ranges over the 20-year term are stated: Park 7 Dolphin $40,367 - $53,823; Low Terminal F $157,576 - $210,101; Chiller Plant East Rm 214 $32,780 - $43,707; Building 845 $71,636 - $95,515. The MSA with FPL is for a 20-year term with automatic renewal periods of 12 months in an amount not to exceed $912,000,000.00. The staff recommendation is to present the report; no final decision is stated. The document does not state a specific street address, parcel or folio, acreage, or square footage. Public comment sentiment is not stated.
- Board:
- Infrastructure, Innovation & Technology Committee
- Date:
- 2026-09-10
- Type:
- Resolution
PACKET-MEMORANDUM OF AGREEMENT WITH FDOT
The document is a legislative item for a resolution approving a Memorandum of Agreement between Miami-Dade County and the Florida Department of Transportation for the Bear Cut Bridge over Biscayne Bay Project Development and Environment Study. The project is located within Commission District 7. The bridge is Bridge No. 874544, constructed in 1944, widened in 1983 and 2013, and is currently classified as functionally obsolete. The study will evaluate rehabilitation or replacement of the bridge. The resolution authorizes the County Mayor or designee to execute the agreement. The Infrastructure, Innovation & Technology Committee forwarded it to the BCC with a favorable recommendation on 9/10/2026. The agenda date is 10/6/2026. The PD&E Study is fully funded with Rickenbacker Causeway Toll Revenues. No public comment or stakeholder sentiment is stated in the document.
- Board:
- Infrastructure, Innovation & Technology Committee
- Date:
- 2026-09-10
- Type:
- Resolution
- Decision:
- Forwarded to BCC with a favorable recommendation
- Applicant:
- Miami-Dade County Department of Transportation and Public Works (DTPW)
PACKET-MEMORANDUM OF AGREEMENT WITH FDOT
Resolution approving a Memorandum of Agreement between Miami-Dade County and the Florida Department of Transportation for the Bear Cut Bridge over Biscayne Bay Project Development and Environment Study. The agreement formalizes the County's obligation to conduct the PD&E Study in accordance with NEPA, with FDOT as lead federal agency. The study will evaluate rehabilitation or replacement of Bear Cut Bridge. The PD&E Study is fully funded with Rickenbacker Causeway Toll Revenues. No immediate fiscal impact. The project is located within Commission District 7. Introduced 8/6/2026, agenda date 10/6/2026, agenda item number 8N, status before the Board. Sponsor: Raquel A. Regalado. Requester: Transportation and Public Works. The document does not state a decision (approved/denied/deferred/recommended).
- Board:
- Infrastructure, Innovation & Technology Committee
- Date:
- 2026-09-10
- Type:
- Resolution
- Applicant:
- Miami-Dade County and Florida Department of Transportation
PACKET-MEMORANDUM OF AGREEMENT WITH FDOT
Resolution approving a Memorandum of Agreement between Miami-Dade County and the Florida Department of Transportation for the Bear Cut Bridge over Biscayne Bay Project Development and Environment (PD&E) Study. The agreement formalizes the County's obligation to conduct the PD&E Study in accordance with NEPA. The project is located within Commission District 7. The PD&E Study is fully funded with Rickenbacker Causeway Toll Revenues. The bridge is classified as functionally obsolete. The resolution authorizes the County Mayor or designee to execute the agreement. The Infrastructure, Innovation & Technology Committee forwarded the item to the BCC with a favorable recommendation on 9/10/2026. The item is scheduled for the Board of County Commissioners on 10/6/2026. No public comment or stakeholder sentiment is stated in the document.
- Board:
- Infrastructure, Innovation & Technology Committee
- Date:
- 2026-09-10
- Type:
- Resolution
- Decision:
- Forwarded to BCC with a favorable recommendation by the Infrastructure, Innovation & Technology Committee on 9/10/2026; pending before the Board of County Commissioners as of the document date
- Applicant:
- Miami-Dade County Department of Transportation and Public Works (DTPW); Florida Department of Transportation (FDOT) as lead federal agency
PACKET-MEMORANDUM OF AGREEMENT WITH FDOT
Resolution approving a Memorandum of Agreement between Miami-Dade County and the Florida Department of Transportation for the Bear Cut Bridge over Biscayne Bay Project Development and Environment (PD&E) Study. The agreement formalizes the County's obligation to conduct the PD&E Study under NEPA, with FDOT as lead federal agency. The project is located within Commission District 7. The PD&E Study is fully funded with Rickenbacker Causeway Toll Revenues. The bridge is currently classified as functionally obsolete. The item was introduced on 8/6/2026, assigned to the County Attorney, and is scheduled for the Infrastructure, Innovation & Technology Committee agenda on 10/6/2026 as item 8N. The resolution authorizes the County Mayor or designee to execute the agreement. No decision is stated; status is 'In Committee'.
- Board:
- Infrastructure, Innovation & Technology Committee
- Date:
- 2026-09-10
- Type:
- Resolution
- Decision:
- not stated; status is 'In Committee'
- Address:
- Bear Cut Bridge over Biscayne Bay, providing sole vehicular access between the mainland and Key Biscayne via the Rickenbacker Causeway
- Applicant:
- Miami-Dade County Department of Transportation and Public Works (DTPW); Florida Department of Transportation (FDOT) as lead federal agency; Prime Sponsor: Commissioner Raquel A. Regalado
PACKET-MEMORANDUM OF AGREEMENT WITH FDOT
The document is a legislative item for a resolution approving a Memorandum of Agreement between Miami-Dade County and the Florida Department of Transportation for the Bear Cut Bridge over Biscayne Bay Project Development and Environment Study. The project is located within Commission District 7. The agreement formalizes the County's obligation to conduct the PD&E Study in accordance with the National Environmental Policy Act. The PD&E Study is fully funded with Rickenbacker Causeway Toll Revenues. The Bear Cut Bridge (Bridge No. 874544) is the sole vehicular access between the mainland and Key Biscayne via the Rickenbacker Causeway. Constructed in 1944, widened in 1983 and 2013, it is classified as functionally obsolete. The study will evaluate rehabilitation or replacement of the bridge. The item was introduced on 8/6/2026, assigned to the County Attorney, and is scheduled for the Board of County Commissioners agenda on 10/6/2026 as item 8N. The status is 'Before the Board' with no final action stated. The sponsor is Commissioner Raquel A. Regalado. The staff recommendation is to approve the resolution. No public comment or stakeholder sentiment is stated in the document.
- Board:
- Infrastructure, Innovation & Technology Committee
- Date:
- 2026-09-10
- Type:
- Resolution
- Decision:
- Pending before the Board; staff recommendation is approval
- Address:
- Bear Cut Bridge over Biscayne Bay, via Rickenbacker Causeway, Commission District 7
- Applicant:
- Miami-Dade County and Florida Department of Transportation
PACKET-MEMORANDUM OF AGREEMENT WITH FDOT
Resolution approving a Memorandum of Agreement between Miami-Dade County and the Florida Department of Transportation for the Bear Cut Bridge over Biscayne Bay Project Development and Environment (PD&E) Study. The agreement formalizes the County's obligation to conduct the PD&E Study under NEPA, with FDOT as lead federal agency. The project is located within Commission District 7. The PD&E Study is fully funded with Rickenbacker Causeway Toll Revenues. The resolution authorizes the County Mayor or designee to execute the agreement. The Infrastructure, Innovation & Technology Committee forwarded it to the BCC with a favorable recommendation on 9/10/2026. The agenda date is 10/6/2026. The bridge is Bridge No. 874544, constructed in 1944, widened in 1983 and 2013, and is currently classified as functionally obsolete. The study will evaluate rehabilitation or replacement of the bridge. No public comment sentiment is stated in the document.
- Board:
- Infrastructure, Innovation & Technology Committee
- Date:
- 2026-09-10
- Type:
- Resolution
- Decision:
- Forwarded to BCC with a favorable recommendation by the Infrastructure, Innovation & Technology Committee on 9/10/2026; pending before the Board of County Commissioners as of the document text.
- Applicant:
- Miami-Dade County Department of Transportation and Public Works (DTPW)
PACKET-MEMORANDUM OF AGREEMENT WITH FDOT
Resolution approving a Memorandum of Agreement between Miami-Dade County and the Florida Department of Transportation for the Bear Cut Bridge over Biscayne Bay Project Development and Environment Study. The agreement formalizes the County's obligation to conduct the PD&E Study under NEPA. The project is located within Commission District 7. The PD&E Study is fully funded with Rickenbacker Causeway Toll Revenues. The bridge is classified as functionally obsolete. The resolution was introduced on 8/6/2026, forwarded to the BCC with a favorable recommendation by the Infrastructure, Innovation & Technology Committee on 9/10/2026, and is scheduled for the BCC agenda on 10/6/2026 as item 8N4. The status is 'Before the Board'.
- Board:
- Infrastructure, Innovation & Technology Committee
- Date:
- 2026-09-10
- Type:
- Resolution
- Decision:
- Pending BCC Assignment; Forwarded to BCC with a favorable recommendation
- Address:
- Bear Cut Bridge over Biscayne Bay, via Rickenbacker Causeway, Key Biscayne
- Applicant:
- Miami-Dade County Department of Transportation and Public Works (DTPW); Prime Sponsor: Commissioner Raquel A. Regalado
PACKET-MEMORANDUM OF AGREEMENT WITH FDOT
Resolution approving a Memorandum of Agreement between Miami-Dade County and the Florida Department of Transportation for the Bear Cut Bridge over Biscayne Bay Project Development and Environment (PD&E) Study. The agreement formalizes the County's obligation to conduct the PD&E Study under NEPA. The project is located within Commission District 7. The PD&E Study is fully funded with Rickenbacker Causeway Toll Revenues. The resolution was introduced on 8/6/2026, forwarded to the BCC with a favorable recommendation by the Infrastructure, Innovation & Technology Committee on 9/10/2026, and is scheduled for the Board of County Commissioners agenda on 10/6/2026 as item 8N4. The bridge is Bridge No. 874544, constructed in 1944, widened in 1983 and 2013, and is currently classified as functionally obsolete. The study will evaluate rehabilitation or replacement of the bridge. The resolution authorizes the County Mayor or designee to execute the agreement. The sponsor is Commissioner Raquel A. Regalado. The file number is 261401.
- Board:
- Infrastructure, Innovation & Technology Committee
- Date:
- 2026-09-10
- Type:
- Resolution
- Decision:
- Forwarded to BCC with a favorable recommendation
- Applicant:
- Miami-Dade County Department of Transportation and Public Works (DTPW)
PACKET-MEMORANDUM OF AGREEMENT WITH FDOT
Resolution approving a Memorandum of Agreement between Miami-Dade County and the Florida Department of Transportation for the Bear Cut Bridge over Biscayne Bay Project Development and Environment Study. The agreement formalizes the County's obligation to conduct the PD&E Study under NEPA, with FDOT as lead federal agency. The study will evaluate rehabilitation or replacement of the bridge. The resolution authorizes the County Mayor to execute the agreement. The item was introduced on 8/6/2026, assigned to the County Attorney, and is scheduled for the Infrastructure, Innovation & Technology Committee agenda on 10/6/2026 as item 8N. Status is 'In Committee'. No final action is stated. The PD&E Study is fully funded with Rickenbacker Causeway Toll Revenues. No public comment sentiment is stated.
- Board:
- Infrastructure, Innovation & Technology Committee
- Date:
- 2026-09-10
- Type:
- Resolution
- Decision:
- In Committee; no final action stated
- Address:
- Bear Cut Bridge over Biscayne Bay, sole vehicular access between the mainland and Key Biscayne via the Rickenbacker Causeway
- Applicant:
- Miami-Dade County Department of Transportation and Public Works (DTPW); sponsor Commissioner Raquel A. Regalado
PACKET-MEMORANDUM OF AGREEMENT WITH FDOT
Resolution approving a Memorandum of Agreement between Miami-Dade County and the Florida Department of Transportation for the Bear Cut Bridge over Biscayne Bay Project Development and Environment Study. The agreement formalizes the County's obligation to conduct the PD&E Study under NEPA, with FDOT as lead federal agency. The study will evaluate rehabilitation or replacement of the bridge. The resolution authorizes the County Mayor or designee to execute the agreement. The item was introduced on 8/6/2026, assigned to the County Attorney, and is scheduled for the Infrastructure, Innovation & Technology Committee agenda on 10/6/2026. Status is In Committee. No decision is stated. No public comment is stated.
- Board:
- Infrastructure, Innovation & Technology Committee
- Date:
- 2026-09-10
- Type:
- Resolution
- Address:
- Bear Cut Bridge over Biscayne Bay, sole vehicular access between mainland and Key Biscayne via Rickenbacker Causeway
- Applicant:
- Miami-Dade County Department of Transportation and Public Works (DTPW); sponsor Commissioner Raquel A. Regalado
PACKET-MEMORANDUM OF AGREEMENT WITH FDOT
Resolution approving a Memorandum of Agreement between Miami-Dade County and the Florida Department of Transportation for the Bear Cut Bridge over Biscayne Bay Project Development and Environment Study. The agreement formalizes the County's obligation to conduct a PD&E Study for the Bear Cut Bridge Major Project in accordance with NEPA. The study is fully funded with Rickenbacker Causeway Toll Revenues. The bridge is located within Commission District 7. The resolution authorizes the County Mayor or designee to execute the agreement and implement commitments in the final NEPA document. The item was introduced on 8/6/2026 and is scheduled for the Infrastructure, Innovation & Technology Committee agenda on 10/6/2026 as item 8N. Status is 'In Committee'. No decision is stated. No public comment is stated.
- Board:
- Infrastructure, Innovation & Technology Committee
- Date:
- 2026-09-10
- Type:
- Resolution
- Decision:
- not stated (status: In Committee)
- Applicant:
- Miami-Dade County Department of Transportation and Public Works (DTPW); Florida Department of Transportation (FDOT) as lead federal agency
PACKET-MEMORANDUM OF AGREEMENT WITH FDOT
Resolution approving a Memorandum of Agreement between Miami-Dade County and the Florida Department of Transportation for the Bear Cut Bridge over Biscayne Bay Project Development and Environment Study. The agreement formalizes the County's obligation to conduct the PD&E Study under NEPA, with FDOT as lead federal agency. The study will evaluate rehabilitation or replacement of the bridge. The resolution authorizes the County Mayor to execute the agreement. The item was introduced on 8/6/2026, assigned to the County Attorney, and is scheduled for the Infrastructure, Innovation & Technology Committee agenda on 10/6/2026 as item 8N. Status is 'In Committee'. No decision (approved/denied/deferred) is stated. The PD&E Study is fully funded with Rickenbacker Causeway Toll Revenues. No public comment sentiment is stated.
- Board:
- Infrastructure, Innovation & Technology Committee
- Date:
- 2026-09-10
- Type:
- Resolution
- Decision:
- not stated (status: In Committee; introduced 8/6/2026; agenda date 10/6/2026)
- Address:
- Bear Cut Bridge over Biscayne Bay, sole vehicular access between the mainland and Key Biscayne via the Rickenbacker Causeway
- Applicant:
- Miami-Dade County Department of Transportation and Public Works (DTPW); Florida Department of Transportation (FDOT) as lead federal agency; Prime Sponsor Commissioner Raquel A. Regalado
See the actual businesses behind these numbers
Get the real filings, with addresses and officers, backed by a 14-day money-back guarantee.
Create your account