DOLPHIN STATION PARK-AND-RIDE FACILITY
Miami-Dade County Board of County Commissioners adopted a resolution approving a State-Funded Grant Agreement with the Florida Department of Transportation (FDOT) for roadway improvements along NW 12 Street. The project involves widening and resurfacing NW 12 Street from NW 122nd Avenue near the SR 836 interchange and Dolphin Station Park-and-Ride facility to NW 114th Avenue. Improvements include adding dedicated bus-only lanes, increasing capacity for existing turn lanes, constructing new turn lanes, and enhancing Florida Turnpike exit ramps and the right-turn lane from Dolphin Mall at NW 114 Avenue. The total estimated project cost is $7,096,360, with FDOT providing up to $3,548,180 and the remaining 50% funded by Charter County Transportation Surtax funds. The project is anticipated to be completed by June 30, 2030.
- Board:
- Board of County Commissioners
- Date:
- 2026-06-16
- Type:
- Resolution
- Decision:
- Adopted
- Address:
- NW 12 Street from NW 122nd Avenue near the SR 836 interchange and Dolphin Station Park-and-Ride facility to NW 114th Avenue
- Applicant:
- Miami-Dade County
DOLPHIN STATION PARK-AND-RIDE FACILITY
Miami-Dade County Board of County Commissioners adopted a resolution approving a State-Funded Grant Agreement with the Florida Department of Transportation (FDOT) for roadway improvements along NW 12 Street. The project involves widening and resurfacing NW 12 Street from NW 122nd Avenue (near SR 836 interchange and Dolphin Station Park-and-Ride) to NW 114 Avenue. Improvements include adding dedicated bus-only lanes, increasing capacity for existing turn lanes, constructing new turn lanes, and enhancing Florida Turnpike exit ramps and the Dolphin Mall right-turn lane exit. The total estimated project cost is $7,096,360, with FDOT providing up to $3,548,180 and the remaining 50% funded by Charter County Transportation Surtax funds. The project aims to improve access and connectivity to the Dolphin Station Park-and-Ride facility. The anticipated completion date is June 30, 2030. No public comment or stakeholder sentiment was stated in the document.
- Board:
- Board of County Commissioners
- Date:
- 2026-06-16
- Type:
- Resolution
- Decision:
- Adopted
- Address:
- NW 12 Street from NW 122nd Avenue to NW 114 Avenue
- Applicant:
- Miami-Dade County
DOLPHIN STATION PARK-AND-RIDE FACILITY
Miami-Dade County Board of County Commissioners adopted a resolution approving a State-Funded Grant Agreement with the Florida Department of Transportation (FDOT) for roadway improvements along NW 12 Street. The project involves widening and resurfacing NW 12 Street to add dedicated bus-only lanes, increasing capacity for existing turn lanes, and constructing new turn lanes. Improvements will also be made to the Florida Turnpike exit ramps and the right-turn lane from Dolphin Mall at NW 114 Avenue. The goal is to improve access and connectivity to the Dolphin Station Park-and-Ride facility. The total estimated project cost is $7,096,360, with FDOT providing up to $3,548,180 and the remaining 50% funded by Charter County Transportation Surtax funds. The project is anticipated to be completed by June 30, 2030.
- Board:
- Board of County Commissioners
- Date:
- 2026-06-16
- Type:
- Resolution
- Decision:
- Adopted
- Address:
- NW 12 Street from Dolphin Park-and-Ride to NW 114 Avenue, including near the SR 836 interchange
- Applicant:
- Miami-Dade County
DOLPHIN STATION PARK-AND-RIDE FACILITY
Miami-Dade County Board of County Commissioners adopted a resolution approving a State-Funded Grant Agreement with the Florida Department of Transportation (FDOT) for roadway improvements along NW 12 Street. The project aims to widen and resurface NW 12 Street from NW 122nd Avenue (near SR 836 interchange and Dolphin Station Park-and-Ride) to NW 114th Avenue. Improvements include adding dedicated bus-only lanes, increasing capacity for existing turn lanes, constructing new turn lanes, and enhancing the Florida Turnpike exit ramps and the right-turn lane from Dolphin Mall at NW 114th Avenue. The total estimated project cost is $7,096,360, with FDOT providing up to $3,548,180 and the remaining 50% funded by Charter County Transportation Surtax funds. The project is anticipated to be completed by June 30, 2030. No public comment or stakeholder sentiment was stated in the document.
- Board:
- Board of County Commissioners
- Date:
- 2026-06-16
- Type:
- Resolution
- Decision:
- Adopted
- Address:
- NW 12 Street from NW 122nd Avenue to NW 114th Avenue
- Applicant:
- Miami-Dade County
DOLPHIN STATION PARK-AND-RIDE FACILITY
Miami-Dade County Board of County Commissioners adopted a resolution approving a State-Funded Grant Agreement with the Florida Department of Transportation (FDOT) for roadway improvements along NW 12 Street. The project involves widening and resurfacing NW 12 Street from NW 122nd Avenue near the SR 836 interchange and Dolphin Station Park-and-Ride facility to NW 114th Avenue. Improvements include adding dedicated bus-only lanes, increasing capacity for existing turn lanes, constructing new turn lanes, and enhancing Florida Turnpike exit ramps and the right-turn lane from Dolphin Mall at NW 114 Avenue. The total estimated project cost is $7,096,360, with FDOT providing up to $3,548,180 and the remaining 50% funded by Charter County Transportation Surtax funds. The project aims to improve access and connectivity to the Dolphin Station Park-and-Ride facility. The anticipated completion date is June 30, 2030.
- Board:
- Board of County Commissioners
- Date:
- 2026-06-16
- Type:
- Resolution
- Decision:
- Adopted
- Address:
- NW 12 Street from NW 122nd Avenue to NW 114th Avenue
- Applicant:
- Miami-Dade County (grant recipient), Florida Department of Transportation (grantor)
DOLPHIN STATION PARK-AND-RIDE FACILITY
Miami-Dade County Board of County Commissioners adopted a resolution approving a State-Funded Grant Agreement with the Florida Department of Transportation (FDOT) for roadway improvements along NW 12 Street. The project aims to widen and resurface NW 12 Street to add dedicated bus-only lanes, increase capacity for existing turn lanes, and construct new turn lanes. Improvements will also be made to Florida Turnpike exit ramps and the right-turn lane from Dolphin Mall at NW 114 Avenue. These enhancements will improve access to the Dolphin Station Park-and-Ride facility. The total estimated project cost is $7,096,360, with FDOT providing up to $3,548,180 and the remaining 50% funded by Charter County Transportation Surtax funds. The project is anticipated to be completed by June 30, 2030.
- Board:
- Board of County Commissioners
- Date:
- 2026-06-16
- Type:
- Resolution
- Decision:
- Adopted
- Address:
- NW 12 Street from Dolphin Park-and-Ride to NW 114 Avenue (also specified as NW 122nd Avenue near SR 836 interchange to NW 114th Avenue)
- Applicant:
- Miami-Dade County (grant recipient), Florida Department of Transportation (grant provider)
DOLPHIN STATION PARK-AND-RIDE FACILITY
Miami-Dade County Board of County Commissioners adopted a resolution approving a State-Funded Grant Agreement with the Florida Department of Transportation (FDOT) for roadway improvements along NW 12 Street. The project involves widening and resurfacing NW 12 Street from NW 122nd Avenue (near SR 836 interchange and Dolphin Station Park-and-Ride) to NW 114th Avenue. Improvements include adding dedicated bus-only lanes, increasing capacity for existing turn lanes, constructing new turn lanes, and enhancing Florida Turnpike exit ramps and the right-turn lane from Dolphin Mall at NW 114th Avenue. The total estimated project cost is $7,096,360, with FDOT providing up to $3,548,180 and the remaining 50% funded by Charter County Transportation Surtax funds. The project aims to improve access and connectivity to the Dolphin Station Park-and-Ride facility. Public comment is not stated in the document. The project is anticipated to be completed by June 30, 2030.
- Board:
- Board of County Commissioners
- Date:
- 2026-06-16
- Type:
- Resolution
- Decision:
- Adopted
- Address:
- NW 12 Street from NW 122nd Avenue to NW 114th Avenue
- Applicant:
- Miami-Dade County
DOLPHIN STATION PARK-AND-RIDE FACILITY
Miami-Dade County Commissioners adopted a resolution approving a state-funded grant agreement with the Florida Department of Transportation (FDOT) for roadway improvements along NW 12 Street. The project aims to widen and resurface NW 12 Street to add dedicated bus-only lanes, increase capacity for existing turn lanes, and construct new turn lanes. Improvements will also be made to Florida Turnpike exit ramps and the right-turn lane from Dolphin Mall at NW 114 Avenue. These enhancements are intended to improve access and connectivity to the Dolphin Station Park-and-Ride facility. The total estimated project cost is $7,096,360, with FDOT providing $3,548,180 and the remaining 50% funded by Charter County Transportation Surtax funds. The project is anticipated to be completed by June 30, 2030.
- Board:
- Board of County Commissioners
- Date:
- 2026-06-16
- Type:
- Resolution
- Decision:
- Adopted
- Address:
- NW 12 Street from Dolphin Park-and-Ride to NW 114 Avenue
- Applicant:
- Miami-Dade County
DOLPHIN STATION PARK-AND-RIDE FACILITY
Miami-Dade County Board of County Commissioners adopted a resolution approving a state-funded grant agreement with the Florida Department of Transportation (FDOT) for roadway improvements along NW 12 Street. The project aims to widen and resurface NW 12 Street from the Dolphin Park-and-Ride facility near NW 122nd Avenue to NW 114th Avenue, adding dedicated bus-only lanes, increasing capacity for existing turn lanes, and constructing new turn lanes. Improvements will also be made to Florida Turnpike exit ramps and the right-turn lane from Dolphin Mall at NW 114 Avenue. The total project cost is $7,096,360, with FDOT providing up to $3,548,180 and the remaining 50% funded by Charter County Transportation Surtax funds. The project is anticipated to be completed by June 30, 2030. No public comment or stakeholder sentiment was stated in the document.
- Board:
- Board of County Commissioners
- Date:
- 2026-06-16
- Type:
- Resolution
- Decision:
- Adopted
- Address:
- NW 12 Street from Dolphin Park-and-Ride to NW 114 Avenue
- Applicant:
- Miami-Dade County
DOLPHIN STATION PARK-AND-RIDE FACILITY
Resolution approving a state-funded grant agreement between Miami-Dade County and the Florida Department of Transportation for up to $3,548,180 for proposed improvements along NW 12 Street from Dolphin Park-and-Ride to NW 114 Avenue. The project consists of widening and resurfacing NW 12th Street to add dedicated bus-only lanes, increasing capacity for existing left- and right-turn lanes, constructing new turn lanes where needed, and improving Florida Turnpike exit ramps and the right-turn lane from Dolphin Mall at NW 114 Avenue. The estimated total project cost is $7,096,360, with FDOT providing $3,548,180 and the remaining 50 percent provided using Charter County Transportation Surtax funds. The project is anticipated to be completed by June 30, 2030. The resolution was adopted on 6/16/2026.
- Board:
- Board of County Commissioners
- Date:
- 2026-06-16
- Type:
- Resolution
- Decision:
- Adopted
- Address:
- NW 12th Street, from NW 122nd Avenue near the SR 836 interchange and the Dolphin Station Park-and-Ride facility to NW 114th Avenue
- Applicant:
- Miami-Dade County and the Florida Department of Transportation
DOLPHIN STATION PARK-AND-RIDE FACILITY
Miami-Dade County Board of County Commissioners adopted a resolution approving a State-Funded Grant Agreement with the Florida Department of Transportation (FDOT) for roadway improvements along NW 12 Street. The project involves widening and resurfacing NW 12 Street from NW 122nd Avenue near the SR 836 interchange and Dolphin Station Park-and-Ride facility to NW 114th Avenue. Improvements include adding dedicated bus-only lanes, increasing capacity for existing turn lanes, constructing new turn lanes, and enhancing Florida Turnpike exit ramps and the right-turn lane from Dolphin Mall at NW 114 Avenue. The total estimated project cost is $7,096,360, with FDOT providing up to $3,548,180 and the remaining 50% funded by Charter County Transportation Surtax funds. The project aims to improve access and connectivity to the Dolphin Station Park-and-Ride facility. The anticipated completion date is June 30, 2030.
- Board:
- Board of County Commissioners
- Date:
- 2026-06-16
- Type:
- Resolution
- Decision:
- Adopted
- Address:
- NW 12 Street from NW 122nd Avenue near the SR 836 interchange and Dolphin Station Park-and-Ride facility to NW 114th Avenue
- Applicant:
- Miami-Dade County
DOLPHIN STATION PARK-AND-RIDE FACILITY
Miami-Dade County Board of County Commissioners adopted a resolution approving a State-Funded Grant Agreement with the Florida Department of Transportation (FDOT) for roadway improvements along NW 12 Street. The project aims to widen and resurface NW 12 Street to add dedicated bus-only lanes, increase capacity for existing turn lanes, and construct new turn lanes. Improvements will also be made to Florida Turnpike exit ramps and the right-turn lane from Dolphin Mall at NW 114 Avenue. These enhancements are intended to improve access and connectivity to the Dolphin Station Park-and-Ride facility. The total estimated project cost is $7,096,360, with FDOT providing up to $3,548,180 and the remaining 50% funded by Charter County Transportation Surtax funds. The project is anticipated to be completed by June 30, 2030.
- Board:
- Board of County Commissioners
- Date:
- 2026-06-16
- Type:
- Resolution
- Decision:
- Adopted
- Address:
- NW 12 Street from Dolphin Park-and-Ride to NW 114 Avenue
- Applicant:
- Miami-Dade County
DOLPHIN STATION PARK-AND-RIDE FACILITY
Resolution approving a state-funded grant agreement between Miami-Dade County and the Florida Department of Transportation for up to $3,548,180 for proposed improvements along NW 12 Street from Dolphin Park-and-Ride to NW 114 Avenue. The project consists of widening and resurfacing NW 12th Street to add dedicated bus-only lanes, increasing capacity for existing left- and right-turn lanes, constructing new turn lanes where needed, and improvements to Florida Turnpike exit ramps and the right-turn lane from Dolphin Mall at NW 114 Avenue. The estimated total project cost is $7,096,360, with FDOT providing $3,548,180 and the remaining 50 percent provided using Charter County Transportation Surtax funds. The project is anticipated to be completed by June 30, 2030. The resolution was adopted by the Board of County Commissioners on 6/16/2026. The project is located within District 12, represented by Commissioner Juan Carlos 'JC' Bermudez. The project is part of the East-West Corridor Rapid Transit Project. No public comment or stakeholder sentiment is stated in the document.
- Board:
- Board of County Commissioners
- Date:
- 2026-06-16
- Type:
- Resolution
- Decision:
- Adopted
- Address:
- NW 12th Street, from NW 122nd Avenue near the SR 836 (Dolphin Expressway) interchange and the Dolphin Station Park-and-Ride facility to NW 114th Avenue
- Applicant:
- Miami-Dade County
DOLPHIN STATION PARK-AND-RIDE FACILITY
Miami-Dade County Board of County Commissioners adopted a resolution approving a State-Funded Grant Agreement with the Florida Department of Transportation (FDOT) for roadway improvements along NW 12 Street. The project involves widening and resurfacing NW 12 Street from NW 122nd Avenue (near SR 836 interchange and Dolphin Station Park-and-Ride) to NW 114 Avenue. Improvements include adding dedicated bus-only lanes, increasing capacity for existing turn lanes, constructing new turn lanes, and enhancing Florida Turnpike exit ramps and the right-turn lane from Dolphin Mall at NW 114 Avenue. The total estimated project cost is $7,096,360, with FDOT providing up to $3,548,180 and the remaining 50% funded by Charter County Transportation Surtax funds. The project aims to improve access and connectivity to the Dolphin Station Park-and-Ride facility. The anticipated completion date is June 30, 2030.
- Board:
- Board of County Commissioners
- Date:
- 2026-06-16
- Type:
- Resolution
- Decision:
- Adopted
- Address:
- NW 12 Street from NW 122nd Avenue to NW 114 Avenue
- Applicant:
- Miami-Dade County
DOLPHIN STATION PARK-AND-RIDE FACILITY
Resolution approving a State-Funded Grant Agreement between Miami-Dade County and the Florida Department of Transportation for up to $3,548,180 for proposed improvements along NW 12 Street from Dolphin Park-and-Ride to NW 114 Avenue. The project consists of widening and resurfacing NW 12th Street to add dedicated bus-only lanes, increasing capacity for existing left- and right-turn lanes, constructing new turn lanes, and improving Florida Turnpike exit ramps and the right-turn lane from Dolphin Mall at NW 114 Avenue. The total project cost is $7,096,360, with FDOT providing $3,548,180 and the remaining 50 percent from Charter County Transportation Surtax funds. The project is anticipated to be completed by June 30, 2030. The resolution was adopted by the Board of County Commissioners on 6/16/2026. The project is located within District 12, represented by Commissioner Juan Carlos 'JC' Bermudez, who is the Prime Sponsor. The staff recommendation was to approve. No public comment or stakeholder sentiment is stated in the document.
- Board:
- Board of County Commissioners
- Date:
- 2026-06-16
- Type:
- Resolution
- Decision:
- Adopted
- Address:
- NW 12th Street, from NW 122nd Avenue near the SR 836 (Dolphin Expressway) interchange and the Dolphin Station Park-and-Ride facility to NW 114th Avenue
- Applicant:
- Miami-Dade County
DOLPHIN STATION PARK-AND-RIDE FACILITY
Miami-Dade County Board of County Commissioners adopted a resolution approving a State-Funded Grant Agreement with the Florida Department of Transportation (FDOT) for roadway improvements along NW 12 Street. The project involves widening and resurfacing NW 12 Street to add dedicated bus-only lanes, increasing capacity for existing turn lanes, and constructing new turn lanes. Improvements will also be made to the Florida Turnpike exit ramps and the right-turn lane from Dolphin Mall at NW 114 Avenue. The goal is to enhance access and connectivity to the Dolphin Station Park-and-Ride facility. The total estimated project cost is $7,096,360, with FDOT providing up to $3,548,180 and the remaining 50% funded by Charter County Transportation Surtax funds. The project is anticipated to be completed by June 30, 2030.
- Board:
- Board of County Commissioners
- Date:
- 2026-06-16
- Type:
- Resolution
- Decision:
- Adopted
- Address:
- NW 12 Street from Dolphin Park-and-Ride to NW 114 Avenue, near NW 122nd Avenue and SR 836 interchange
- Applicant:
- Miami-Dade County
DOLPHIN STATION PARK-AND-RIDE FACILITY
Miami-Dade County Commissioners adopted a resolution approving a state-funded grant agreement with the Florida Department of Transportation (FDOT) for roadway improvements along NW 12 Street. The project aims to widen and resurface NW 12 Street to add dedicated bus-only lanes, increase capacity for existing turn lanes, and construct new turn lanes. Improvements will also be made to Florida Turnpike exit ramps and the right-turn lane from Dolphin Mall at NW 114 Avenue. These enhancements are intended to improve access and connectivity to the Dolphin Station Park-and-Ride facility. The total estimated project cost is $7,096,360, with FDOT providing up to $3,548,180 and the remaining 50% funded by Charter County Transportation Surtax funds. The project is anticipated to be completed by June 30, 2030.
- Board:
- Board of County Commissioners
- Date:
- 2026-06-16
- Type:
- Resolution
- Decision:
- Adopted
- Address:
- NW 12 Street from Dolphin Park-and-Ride to NW 114 Avenue
- Applicant:
- Miami-Dade County
DOLPHIN STATION PARK-AND-RIDE FACILITY
Miami-Dade County Board of County Commissioners adopted a resolution approving a state-funded grant agreement with the Florida Department of Transportation (FDOT) for roadway improvements along NW 12 Street. The project aims to widen and resurface NW 12 Street from the Dolphin Park-and-Ride facility near NW 122nd Avenue to NW 114th Avenue, adding dedicated bus-only lanes, increasing capacity for existing turn lanes, and constructing new turn lanes. Improvements will also be made to Florida Turnpike exit ramps and the right-turn lane from Dolphin Mall at NW 114th Avenue. The total estimated project cost is $7,096,360, with FDOT providing up to $3,548,180 and the remaining 50% funded by Charter County Transportation Surtax funds. The project is anticipated to be completed by June 30, 2030.
- Board:
- Board of County Commissioners
- Date:
- 2026-06-16
- Type:
- Resolution
- Decision:
- Adopted
- Address:
- NW 12 Street from Dolphin Park-and-Ride to NW 114 Avenue (also mentions NW 122nd Avenue near SR 836 interchange)
- Applicant:
- Miami-Dade County
DOLPHIN STATION PARK-AND-RIDE FACILITY
Miami-Dade County Board of County Commissioners adopted a resolution approving a State-Funded Grant Agreement with the Florida Department of Transportation (FDOT) for roadway improvements along NW 12 Street. The project involves widening and resurfacing NW 12 Street from NW 122nd Avenue near the SR 836 interchange and Dolphin Station Park-and-Ride facility to NW 114th Avenue. Improvements include adding dedicated bus-only lanes, increasing capacity for existing turn lanes, constructing new turn lanes, and enhancing Florida Turnpike exit ramps and the right-turn lane from Dolphin Mall at NW 114 Avenue. The total estimated project cost is $7,096,360, with FDOT providing up to $3,548,180 and the remaining 50% funded by Charter County Transportation Surtax funds. The project aims to improve access and connectivity to the Dolphin Station Park-and-Ride facility. The anticipated completion date is June 30, 2030.
- Board:
- Board of County Commissioners
- Date:
- 2026-06-16
- Type:
- Resolution
- Decision:
- Adopted
- Address:
- NW 12 Street from NW 122nd Avenue to NW 114th Avenue
- Applicant:
- Miami-Dade County
DOLPHIN STATION PARK-AND-RIDE FACILITY
Miami-Dade County Board of County Commissioners adopted a resolution approving a state-funded grant agreement with the Florida Department of Transportation (FDOT) for roadway improvements along NW 12 Street. The project aims to widen and resurface NW 12 Street from the Dolphin Park-and-Ride facility near NW 122nd Avenue to NW 114th Avenue, adding dedicated bus-only lanes, increasing capacity for existing turn lanes, and constructing new turn lanes. Improvements will also be made to Florida Turnpike exit ramps and the right-turn lane from Dolphin Mall at NW 114th Avenue. The total project cost is $7,096,360, with FDOT providing up to $3,548,180 and the remaining 50% funded by Charter County Transportation Surtax funds. The project is anticipated to be completed by June 30, 2030.
- Board:
- Board of County Commissioners
- Date:
- 2026-06-16
- Type:
- Resolution
- Decision:
- Adopted
- Address:
- NW 12 Street from Dolphin Park-and-Ride to NW 114 Avenue
- Applicant:
- Miami-Dade County
See the actual businesses behind these numbers
Get the real filings, with addresses and officers, free for 7 days. No credit card required.
Start your free trial