CONTRACT AWARD FOR REPLACEMENT BRIDGE NO. 874178
Infrastructure, Innovation & Technology Committee · 2026-09-10 · resolution
Resolution awarding a construction contract to Interstate Construction, LLC for the Replacement Bridge No. 874178 along NE 10 Avenue over Canal A, Project No. 20240256. The contract amount is not to exceed $7,559,782.90, inclusive of a contingency allowance of $630,115.45. The project will replace the existing bridge, constructed in 1994, which is functionally obsolete and has structural deficiencies. The new bridge will meet current structural, safety, and multimodal design standards, including wider sidewalks, upgraded guardrails, and drainage improvements. The contract term is 1,090 calendar days. The project is funded through Mobility Impact Fees. The file status is Withdrawn as of 9/9/2026. The bid opening date was 8/20/2025. Two bids were received. The apparent low bid exceeded the Engineer's estimate by approximately 26 percent, which was evaluated and deemed reasonable. The project is located in Commission District 2. The estimated annual operations and maintenance cost is approximately $126,023. The asset life expectancy is a minimum of 75 years. The prime contractor is Interstate Construction, LLC, located at 2501 SW 160th Avenue, Ste 400, Miramar, Florida 33027. Sub-contractors and suppliers include Ranger Construction and Kiewit Infrastructure South Co. The staff recommendation is approval of the contract award.
Follow this across meetings
Applicants and firms
See the actual businesses behind these numbers
Get the real filings, with addresses and officers, backed by a 14-day money-back guarantee.
Create your account