The City of Mount Dora is planning a project to provide backup power to the Wastewater Treatment Plant #1 Office Building. This project aims to protect the building and its operations from damage caused by severe weather or other hazards. The plan involves purchasing and installing a 30-kW diesel generator, or a size determined by a vendor and electrical engineer, along with an automatic transfer switch and a fuel tank. This system will be placed on a new concrete pad. The project is funded through the Hazard Mitigation Grant Program and is currently under review. Work will likely involve site preparation for the concrete pad, installation of underground electrical connections, generator and transfer switch setup, and final testing. Contractors specializing in electrical work, generator installation, concrete services, and potentially HVAC for enclosures could find opportunities. Reaching out to the City of Mount Dora early in the process, before bids are finalized, may offer an advantage.
- generator size
- 30 kW
- fuel tank size
- 120 gallon
Industries that could win this work
- Electrical
- Site Prep, Grading & Hardscape
- Building & Industrial Supply
- Engineering & Architecture
- Utilities (Sub)
Follow this across meetings
See the actual businesses behind these numbers
Get the real filings, with addresses and officers, backed by a 14-day money-back guarantee.
Create your account