Skip to main content

Be First, Build Lasting Relationships

May 27, 2026 Historic Preservation Board: May 2026

City of Mount Dora

1. Accept Staff’s Findings of Fact and Approve the application, as presented;

May 27, 2026 Historic Preservation Board listed this item on its agenda for 2026-05-27 in City of Mount Dora. The posted record gives the item title and nothing else, so there is no site, no size and no applicant on file for it yet. Local businesses that want to follow it can open the official agenda link above and watch for the fuller write-up the body posts as the meeting gets closer.

Board:
May 27, 2026 Historic Preservation Board
Date:
2026-05-27
Type:
Agenda_item

1. Complementary Expression: New construction should take inspiration from and be

May 27, 2026 Historic Preservation Board listed this item on its agenda for 2026-05-27 in City of Mount Dora. The posted record gives the item title and nothing else, so there is no site, no size and no applicant on file for it yet. Local businesses that want to follow it can open the official agenda link above and watch for the fuller write-up the body posts as the meeting gets closer.

Board:
May 27, 2026 Historic Preservation Board
Date:
2026-05-27
Type:
Agenda_item

1. Construct a covered porch with open courtyard along the western façade, fronting Clayton

The City of Mount Dora Historic Preservation Board is reviewing a proposal to construct a covered porch with an open courtyard. This project is planned for the western façade of a property fronting Clayton Street. The proposal is currently under review by the board. If approved, this project would involve site preparation, potentially including clearing and grading, followed by construction of the porch and courtyard structure. This could include concrete work, framing, roofing, and finishing trades. Local contractors, suppliers, and service providers are encouraged to engage early in the process. Understanding the project details before final site plans, bids, and permits are established can offer a competitive advantage.

Board:
May 27, 2026 Historic Preservation Board
Date:
2026-05-27
Type:
Agenda_item
Address:
Clayton Street

1. Constructing a covered porch with open courtyard along the western façade, fronting

A proposal is under review to construct a covered porch with an open courtyard. This project is planned for the western façade of a property that faces Clayton Street. The current use or zoning of the property is not stated. This item is currently under review by the Historic Preservation Board. The project would likely involve site preparation, concrete work for foundations and courtyards, framing for the porch structure, roofing, and finishing trades. Landscaping may also be part of the final phase. Local contractors, suppliers, and service providers should consider reaching out early to learn more about this project as it moves through the review process. Early engagement can provide an advantage before formal plans, bids, and permits are finalized.

Board:
May 27, 2026 Historic Preservation Board
Date:
2026-05-27
Type:
Agenda_item
Address:
Clayton Street

1. Identifying, retaining, and preserving masonry features that are important in defining the

This item concerns the preservation of masonry features on a historic building in Mount Dora. The focus is on identifying and retaining elements like walls, brackets, railings, cornices, window architraves, door pediments, steps, and columns. It also includes attention to joint and unit size, tooling and bonding patterns, coatings, and color. This agenda item is currently under review by the May 27, 2026 Historic Preservation Board. The work would involve careful assessment and potential repair or restoration of existing masonry. This early stage presents an opportunity for contractors specializing in historic masonry, restoration, and related trades to engage. Reaching out now, before detailed plans and permits are finalized, allows businesses to understand the project's scope and potentially influence its direction.

Board:
May 27, 2026 Historic Preservation Board
Date:
2026-05-27
Type:
Agenda_item

1. New Additions: Synthetic materials such as fiber cement board or composites may be used

The City of Mount Dora Historic Preservation Board is reviewing a proposal that would allow the use of synthetic materials, like fiber cement board or composites, to mimic wood siding and details. This is for new additions to the sides and rear of historic buildings. This item is currently under review by the board. If approved, this could lead to work involving the installation of new siding and exterior details on historic structures. Contractors specializing in exterior renovations, siding installation, and potentially carpentry for custom details could find opportunities. Reaching out to the city or the property owners involved early in the review process may provide an advantage before final plans are set.

Board:
May 27, 2026 Historic Preservation Board
Date:
2026-05-27
Type:
Agenda_item

1. New Wood Fencing : New wood fencing should be similar to existing historic fence

The City of Mount Dora Historic Preservation Board is reviewing a proposal for new wood fencing. This fencing is intended to match existing historic fence designs and configurations. Fencing located in front of or on the side of a house that adjoins a sidewalk should not exceed four feet in height. Wood picket fencing is suggested for the front of houses, while solid blockade fencing is not considered appropriate. This item is currently under review by the board. If approved, the project would involve site preparation for fencing installation, including potential minor grading, followed by the erection of new wood fencing. Contractors specializing in fencing, carpentry, and potentially site preparation could find opportunities. Early engagement with the city or applicant may provide insight into specific project requirements as plans develop.

Board:
May 27, 2026 Historic Preservation Board
Date:
2026-05-27
Type:
Agenda_item

1. Porch Additions: Porches should not be added to a primary façade if the building did not

The City of Mount Dora Historic Preservation Board is reviewing new guidelines for porch additions and new construction on historic properties. These guidelines focus on maintaining the historical integrity of primary facades by restricting new porches if none existed historically. New porches may be added to side or rear facades, provided they match the existing building's size, scale, and materials. This item is currently under review by the board. The potential work could involve site preparation, foundation work, framing, roofing, and finishing for new porch structures, as well as potential exterior renovations to ensure compatibility with historic elements. Contractors specializing in historic preservation, carpentry, concrete, roofing, and exterior finishing may find opportunities as these guidelines are finalized and projects are proposed. Early engagement with the city and property owners could provide an advantage.

Board:
May 27, 2026 Historic Preservation Board
Date:
2026-05-27
Type:
Agenda_item

1. Reject Staff’s Findings of Fact and Approve the application, as presented, after determining

This item concerns a property where the roof is determined to be beyond repair. The applicant proposes to replace the roof using slate tiles that will closely match the historic metal shingles in size, shape, profile, and general appearance. This project is currently under review by the Historic Preservation Board. If approved, the work would involve the removal of the existing roof and the installation of new roofing materials. This could create opportunities for roofing contractors, suppliers of roofing materials, and potentially general contractors overseeing the project. Early engagement with the project stakeholders could provide an advantage as plans and permits are finalized.

Board:
May 27, 2026 Historic Preservation Board
Date:
2026-05-27
Type:
Agenda_item

1. Removing or radically changing masonry features which are important in defining the

May 27, 2026 Historic Preservation Board listed this item on its agenda for 2026-05-27 in City of Mount Dora. The posted record gives the item title and nothing else, so there is no site, no size and no applicant on file for it yet. Local businesses that want to follow it can open the official agenda link above and watch for the fuller write-up the body posts as the meeting gets closer.

Board:
May 27, 2026 Historic Preservation Board
Date:
2026-05-27
Type:
Agenda_item

1. Secondary Entrances: Preserve and retain secondary entrances on the side or rear of

The City of Mount Dora Historic Preservation Board is reviewing proposed guidelines for secondary entrances on historic buildings. The aim is to preserve and retain these entrances on the side or rear of structures whenever possible. Any alterations to make these entrances more functional must match the building's original character. This review is currently planned and has not yet been approved. The project involves developing and implementing new preservation standards. This could lead to future work for contractors specializing in historic building restoration, carpentry, and exterior finishes. Suppliers of compatible building materials may also find opportunities. Engaging early allows businesses to understand the upcoming standards and prepare for potential projects as they move through the review process.

Board:
May 27, 2026 Historic Preservation Board
Date:
2026-05-27
Type:
Agenda_item

1. The Mount Dora Historic Design Standards state, ‘replace historic roofing materials such

May 27, 2026 Historic Preservation Board listed this item on its agenda for 2026-05-27 in City of Mount Dora. The posted record gives the item title and nothing else, so there is no site, no size and no applicant on file for it yet. Local businesses that want to follow it can open the official agenda link above and watch for the fuller write-up the body posts as the meeting gets closer.

Board:
May 27, 2026 Historic Preservation Board
Date:
2026-05-27
Type:
Agenda_item

1. The new metal roof shall be standing seam with a concealed fastener in an earthy or muted color;

May 27, 2026 Historic Preservation Board listed this item on its agenda for 2026-05-27 in City of Mount Dora. The posted record gives the item title and nothing else, so there is no site, no size and no applicant on file for it yet. Local businesses that want to follow it can open the official agenda link above and watch for the fuller write-up the body posts as the meeting gets closer.

Board:
May 27, 2026 Historic Preservation Board
Date:
2026-05-27
Type:
Agenda_item

1. The request is consistent with the Mount Dora Historic Design Standards which

May 27, 2026 Historic Preservation Board listed this item on its agenda for 2026-05-27 in City of Mount Dora. The posted record gives the item title and nothing else, so there is no site, no size and no applicant on file for it yet. Local businesses that want to follow it can open the official agenda link above and watch for the fuller write-up the body posts as the meeting gets closer.

Board:
May 27, 2026 Historic Preservation Board
Date:
2026-05-27
Type:
Agenda_item

2. Applying compatible paint coating systems following proper surface preparation.

May 27, 2026 Historic Preservation Board listed this item on its agenda for 2026-05-27 in City of Mount Dora. The posted record gives the item title and nothing else, so there is no site, no size and no applicant on file for it yet. Local businesses that want to follow it can open the official agenda link above and watch for the fuller write-up the body posts as the meeting gets closer.

Board:
May 27, 2026 Historic Preservation Board
Date:
2026-05-27
Type:
Agenda_item

2. Applying paint or other coatings such as stucco to masonry that has been historically

The May 27, 2026 Historic Preservation Board of the City of Mount Dora is reviewing a proposal to apply paint or other coatings, such as stucco, to historically unpainted or uncoated masonry. This review is in its early stages, meaning contractors and suppliers can engage before final plans are set. The project would involve surface preparation of masonry, followed by the application of new coatings. This work could create opportunities for painting contractors, masonry specialists, and suppliers of coatings and related materials. Early engagement allows businesses to understand the project scope and potentially influence material choices or application methods before bids are finalized.

Board:
May 27, 2026 Historic Preservation Board
Date:
2026-05-27
Type:
Agenda_item

2. Appropriate Materials: Plastic or vinyl fencing and chain link fencing are not appropriate

May 27, 2026 Historic Preservation Board listed this item on its agenda for 2026-05-27 in City of Mount Dora. The posted record gives the item title and nothing else, so there is no site, no size and no applicant on file for it yet. Local businesses that want to follow it can open the official agenda link above and watch for the fuller write-up the body posts as the meeting gets closer.

Board:
May 27, 2026 Historic Preservation Board
Date:
2026-05-27
Type:
Agenda_item

2. Compatible New Design: New construction and additions can utilize modern technologies

The City of Mount Dora Historic Preservation Board is reviewing guidelines for new construction and additions within historic districts. The proposed guidelines suggest that new buildings can use modern technology and systems while still respecting the historic character of the area. New designs should be distinct from older structures, potentially through differences in details, materials, or proportions. These guidelines are currently under review by the board. If approved, this review could lead to future projects involving site preparation, new building construction, and the integration of modern building systems and materials that complement historic architecture. Contractors, suppliers, and service providers in construction, design, and material supply may find opportunities as these guidelines are implemented. Early engagement could provide an advantage as specific projects are planned.

Board:
May 27, 2026 Historic Preservation Board
Date:
2026-05-27
Type:
Agenda_item

2. Construct an entry pagoda;

May 27, 2026 Historic Preservation Board listed this item on its agenda for 2026-05-27 in City of Mount Dora. The posted record gives the item title and nothing else, so there is no site, no size and no applicant on file for it yet. Local businesses that want to follow it can open the official agenda link above and watch for the fuller write-up the body posts as the meeting gets closer.

Board:
May 27, 2026 Historic Preservation Board
Date:
2026-05-27
Type:
Agenda_item

2. Constructing an entry pagoda; and

May 27, 2026 Historic Preservation Board listed this item on its agenda for 2026-05-27 in City of Mount Dora. The posted record gives the item title and nothing else, so there is no site, no size and no applicant on file for it yet. Local businesses that want to follow it can open the official agenda link above and watch for the fuller write-up the body posts as the meeting gets closer.

Board:
May 27, 2026 Historic Preservation Board
Date:
2026-05-27
Type:
Agenda_item

2. Partially reject Staff’s Findings of Fact and Approve the application with conditions to

May 27, 2026 Historic Preservation Board listed this item on its agenda for 2026-05-27 in City of Mount Dora. The posted record gives the item title and nothing else, so there is no site, no size and no applicant on file for it yet. Local businesses that want to follow it can open the official agenda link above and watch for the fuller write-up the body posts as the meeting gets closer.

Board:
May 27, 2026 Historic Preservation Board
Date:
2026-05-27
Type:
Agenda_item

2. Partially reject Staff’s Findings of Fact and Approve the application with conditions to

May 27, 2026 Historic Preservation Board listed this item on its agenda for 2026-05-27 in City of Mount Dora. The posted record gives the item title and nothing else, so there is no site, no size and no applicant on file for it yet. Local businesses that want to follow it can open the official agenda link above and watch for the fuller write-up the body posts as the meeting gets closer.

Board:
May 27, 2026 Historic Preservation Board
Date:
2026-05-27
Type:
Agenda_item

2. Porch Trim, Balusters, and Related Balcony Features: Open-air porches and balconies

The City of Mount Dora Historic Preservation Board is reviewing a proposal regarding porch trim, balusters, and balcony features. This item addresses the potential for rot and moisture damage on open-air porches and balconies. The proposal suggests that non-structural wood elements could be replaced with synthetic materials like exterior PVC trim. Any custom trim or detail elements made from PVC or other composite materials would need to match the original wood in design, shape, and size. This review is currently planned and under consideration by the board. If approved, the project could involve work such as site preparation for material delivery, installation of new trim and balusters, and potentially minor repairs to existing structures. This early stage presents an opportunity for contractors specializing in carpentry, exterior finishes, and material supply to engage with the project. Reaching out now, before final plans and permits are set, allows businesses to understand the project's needs and potentially influence material selection and installation methods.

Board:
May 27, 2026 Historic Preservation Board
Date:
2026-05-27
Type:
Agenda_item

2. The Mount Dora Historic Design Standards state ‘When in-kind replacement of the historic

May 27, 2026 Historic Preservation Board listed this item on its agenda for 2026-05-27 in City of Mount Dora. The posted record gives the item title and nothing else, so there is no site, no size and no applicant on file for it yet. Local businesses that want to follow it can open the official agenda link above and watch for the fuller write-up the body posts as the meeting gets closer.

Board:
May 27, 2026 Historic Preservation Board
Date:
2026-05-27
Type:
Agenda_item

2. The request is consistent with the Mount Dora Historic Design Standards which state that

May 27, 2026 Historic Preservation Board listed this item on its agenda for 2026-05-27 in City of Mount Dora. The posted record gives the item title and nothing else, so there is no site, no size and no applicant on file for it yet. Local businesses that want to follow it can open the official agenda link above and watch for the fuller write-up the body posts as the meeting gets closer.

Board:
May 27, 2026 Historic Preservation Board
Date:
2026-05-27
Type:
Agenda_item

2. The windows on the western façade include the shutters and grid lines depicted in the application.

The City of Mount Dora Historic Preservation Board has approved an application for a property located in Mount Dora. The approved application includes details about window treatments, shutters, and grid lines on the western facade. Discussions during the meeting also covered the site plan, matching existing shingles, painting the residence the same color, a large tree on the lot, and pervious surface calculations. The project is now approved by the Historic Preservation Board, moving forward to the Building Department for potential further review. This approval sets the stage for work that will likely involve exterior painting and potentially window and shutter work. Contractors specializing in exterior finishes, painting, and window services may find opportunities as the project progresses through permitting and construction phases. Early engagement with the project stakeholders could provide an advantage before final bids and permits are issued.

Board:
May 27, 2026 Historic Preservation Board
Date:
2026-05-27
Type:
Agenda_item
Address:
510 N. Baker St. Mount Dora, FL 32757
Applicant:
Lisa Smith

3. Accept Staff’s Findings of Fact and Deny the application based on inconsistencies between

The City of Mount Dora Historic Preservation Board is reviewing an application concerning the property at 822 Alexander Street. The applicant is seeking approval for a project, but staff findings suggest inconsistencies with review standards. The board is scheduled to consider accepting these findings and potentially denying the application. This review stage means that any future development or preservation work is still under consideration. If approved, the project could involve site assessment, historical documentation, and potentially restoration or adaptive reuse work, depending on the final decision. Contractors specializing in historic preservation, general contracting, and related trades, along with suppliers of building materials, should monitor this item. Early engagement before final decisions and permit applications could provide an advantage for businesses interested in potential future work.

Board:
May 27, 2026 Historic Preservation Board
Date:
2026-05-27
Type:
Agenda_item
Address:
822 Alexander Street, Mount Dora, FL 32757

3. Architectural Detailing: New designs should incorporate architectural detailing visually

May 27, 2026 Historic Preservation Board listed this item on its agenda for 2026-05-27 in City of Mount Dora. The posted record gives the item title and nothing else, so there is no site, no size and no applicant on file for it yet. Local businesses that want to follow it can open the official agenda link above and watch for the fuller write-up the body posts as the meeting gets closer.

Board:
May 27, 2026 Historic Preservation Board
Date:
2026-05-27
Type:
Agenda_item

3. Construct wood slat fencing around the proposed courtyard; and

The May 27, 2026, Historic Preservation Board of the City of Mount Dora is reviewing a proposal that includes the construction of wood slat fencing around a proposed courtyard. This item is currently under review, indicating an early stage in the project's development. The scope of work would involve site preparation for the fencing installation, followed by the actual construction and finishing of the wood slat fencing. This project presents an opportunity for local contractors specializing in carpentry, site preparation, and potentially landscaping services to engage. Reaching out to the project stakeholders early, before final plans and permits are secured, could provide a competitive advantage for businesses seeking to offer their services.

Board:
May 27, 2026 Historic Preservation Board
Date:
2026-05-27
Type:
Agenda_item

3. Constructing wood slat fencing around the proposed courtyard.

The City of Mount Dora Historic Preservation Board is reviewing a proposal that includes constructing wood slat fencing around a proposed courtyard. Staff has no objection to placing wood trellises on the southern facade, provided they do not harm the historic masonry. This item is currently under review by the Board. If approved, the project would involve site preparation for the courtyard, installation of fencing and trellises, and potential masonry repair or reinforcement. This early stage presents an opportunity for contractors, suppliers, and service providers to engage with the project. Businesses specializing in fencing, carpentry, masonry, and landscape services could find opportunities as plans develop.

Board:
May 27, 2026 Historic Preservation Board
Date:
2026-05-27
Type:
Agenda_item

3. Reject Staff’s Findings of Fact and Deny the application based on inconsistencies between

A property owner at 822 Alexander Street is seeking approval to replace the existing metal shingle roof with composite slate tile. The current structure, built in 1923 in the Frame Vernacular style, is a 1.5-story residential building. This item is currently under review by the Historic Preservation Board, with a meeting scheduled for May 27, 2026. If approved, the project would involve the removal of old roofing materials and the installation of new composite slate tile. This work would likely require contractors specializing in roofing, potentially involving site preparation for material delivery and waste removal. Local contractors, suppliers, and service providers are encouraged to monitor this review process. Early engagement before final plans and permits are issued could offer an advantage in securing future work related to this property.

Board:
May 27, 2026 Historic Preservation Board
Date:
2026-05-27
Type:
Agenda_item
Address:
822 Alexander Street
Applicant:
Craig K Mello and Susan B Life Estate

3. Removing paint from historically painted masonry.

This item concerns the planned removal of paint from historically painted masonry. The project is currently under review by the City of Mount Dora's Historic Preservation Board. Work would involve specialized cleaning and surface preparation techniques to carefully remove paint without damaging the historic masonry. This early stage in the process means that contractors, suppliers, and service providers can engage now to understand the project's needs. Businesses specializing in historic restoration, masonry repair, and specialized coatings could find opportunities. Reaching out early allows companies to be considered before final plans and bids are set.

Board:
May 27, 2026 Historic Preservation Board
Date:
2026-05-27
Type:
Agenda_item

3. The Mount Dora Historic Design Standards state, ‘Original metal shingle roofs are scarce

The City of Mount Dora Historic Preservation Board is reviewing its Historic Design Standards. These standards encourage the retention and painting of original metal shingle roofs, noting that silver paint can extend their lifespan. If original roofs are not feasible to retain, the preferred replacement is a standing seam galvalume roof. This review is currently under consideration by the board. The potential for roof replacement or restoration work could involve site preparation, metal roofing installation, and related finishing trades. Local contractors, suppliers, and service providers in roofing, metal fabrication, and building materials may find opportunities as these standards are finalized. Engaging early could provide an advantage before specific projects are defined and bids are solicited.

Board:
May 27, 2026 Historic Preservation Board
Date:
2026-05-27
Type:
Agenda_item

3. The request promotes visual compatibility with the exterior architectural of adjacent,

May 27, 2026 Historic Preservation Board listed this item on its agenda for 2026-05-27 in City of Mount Dora. The posted record gives the item title and nothing else, so there is no site, no size and no applicant on file for it yet. Local businesses that want to follow it can open the official agenda link above and watch for the fuller write-up the body posts as the meeting gets closer.

Board:
May 27, 2026 Historic Preservation Board
Date:
2026-05-27
Type:
Agenda_item

4. Dramatic Contrast: While new buildings should clearly be distinguished from historic

May 27, 2026 Historic Preservation Board listed this item on its agenda for 2026-05-27 in City of Mount Dora. The posted record gives the item title and nothing else, so there is no site, no size and no applicant on file for it yet. Local businesses that want to follow it can open the official agenda link above and watch for the fuller write-up the body posts as the meeting gets closer.

Board:
May 27, 2026 Historic Preservation Board
Date:
2026-05-27
Type:
Agenda_item

4. Place composite wood trellises on the southern façade.

A Certificate of Appropriateness is under review for exterior modifications at 751 E 5th Avenue. The proposal includes placing composite wood trellises on the southern façade and making other exterior changes such as a covered porch, open courtyard, entry pagoda, wood slat fencing, and stuccoed pillars and half wall on the western façade. The project is currently under review by the Historic Preservation Board. This project would involve site preparation, installation of new exterior features, and potentially painting. Contractors specializing in carpentry, exterior finishes, and general construction could find opportunities. Early engagement may be beneficial as plans are still being finalized.

Board:
May 27, 2026 Historic Preservation Board
Date:
2026-05-27
Type:
Agenda_item
Address:
751 E 5th Avenue

4. Radically changing the type of paint or coating or its color.

May 27, 2026 Historic Preservation Board listed this item on its agenda for 2026-05-27 in City of Mount Dora. The posted record gives the item title and nothing else, so there is no site, no size and no applicant on file for it yet. Local businesses that want to follow it can open the official agenda link above and watch for the fuller write-up the body posts as the meeting gets closer.

Board:
May 27, 2026 Historic Preservation Board
Date:
2026-05-27
Type:
Agenda_item

4. Slate Shingles are not compatible with the architectural style of the building; and

A Certificate of Appropriateness is under review for a reroof project at 822 Alexander Street. The proposal involves replacing existing slate shingles with new slate shingles. This item is currently under review by the City of Mount Dora Historic Preservation Board. If approved, the project would involve the removal of old roofing materials and the installation of new slate shingles. This work would likely require contractors specializing in roofing and potentially carpentry for any necessary structural repairs. Local suppliers of roofing materials and related hardware could also see opportunities. Engaging with the project early, before final approvals and bidding, could provide businesses with an advantage.

Board:
May 27, 2026 Historic Preservation Board
Date:
2026-05-27
Type:
Agenda_item
Address:
822 Alexander Street

5. Applying waterproof, water-repellent, or non-historic coatings such as stucco to masonry

This item concerns a review of exterior modifications proposed for 751 E 5th Avenue. The proposal involves applying waterproof, water-repellent, or non-historic coatings to masonry as an alternative to repointing and repairs. The Historic Preservation Board will evaluate this application based on the U.S. Secretary of Interior's Standards for Historic Rehabilitation and the Mount Dora Historic Preservation Design Guidelines. This review is currently under consideration. The project could involve work related to masonry repair, repointing, and potentially the application of specialized coatings. Contractors specializing in historic building restoration, masonry work, and exterior finishing trades may find opportunities. Engaging early in the review process allows businesses to understand the project scope and requirements before formal bidding begins.

Board:
May 27, 2026 Historic Preservation Board
Date:
2026-05-27
Type:
Agenda_item
Address:
751 E 5th Avenue

5. Proportion of Additions : Additions should be subordinate to, and not overwhelm, the

May 27, 2026 Historic Preservation Board listed this item on its agenda for 2026-05-27 in City of Mount Dora. The posted record gives the item title and nothing else, so there is no site, no size and no applicant on file for it yet. Local businesses that want to follow it can open the official agenda link above and watch for the fuller write-up the body posts as the meeting gets closer.

Board:
May 27, 2026 Historic Preservation Board
Date:
2026-05-27
Type:
Agenda_item

5. The request does not promote visual compatibility with the exterior architectural of

May 27, 2026 Historic Preservation Board listed this item on its agenda for 2026-05-27 in City of Mount Dora. The posted record gives the item title and nothing else, so there is no site, no size and no applicant on file for it yet. Local businesses that want to follow it can open the official agenda link above and watch for the fuller write-up the body posts as the meeting gets closer.

Board:
May 27, 2026 Historic Preservation Board
Date:
2026-05-27
Type:
Agenda_item

6. Compatibility: Materials should be of a complementary type, size, texture, color and level

May 27, 2026 Historic Preservation Board listed this item on its agenda for 2026-05-27 in City of Mount Dora. The posted record gives the item title and nothing else, so there is no site, no size and no applicant on file for it yet. Local businesses that want to follow it can open the official agenda link above and watch for the fuller write-up the body posts as the meeting gets closer.

Board:
May 27, 2026 Historic Preservation Board
Date:
2026-05-27
Type:
Agenda_item

7. Traditional Materials: The continued use of traditional materials such as wood, stone,

This item concerns the preferred use of traditional building materials for historic properties. The City of Mount Dora's Historic Preservation Board is reviewing guidelines that favor materials like wood, stone, brick, or block. These materials should visually complement existing historic structures, though they do not need to be identical. This review is currently planned and represents an early stage in the public process. While no specific project is detailed, the discussion points toward future renovation, restoration, or new construction projects within historic districts. Such projects would likely involve site preparation, material selection, and construction trades. Contractors, suppliers, and service providers specializing in historic preservation, traditional building materials, and related trades could find opportunities by engaging early. Understanding these preferences before detailed plans are drawn can provide a competitive advantage.

Board:
May 27, 2026 Historic Preservation Board
Date:
2026-05-27
Type:
Agenda_item

8. Decks and Patios : Outdoor decks and patios should be located to the side and rear of

The City of Mount Dora Historic Preservation Board is reviewing guidelines for outdoor decks and patios. The proposed rules suggest these structures should be placed on the side and rear of buildings, with minimal visibility from the street. Paving for gardens and landscape designs in front yards might be allowed, but these should not be the main visual feature. The board is also considering rules for fencing and walls. This item is currently under review. The project would involve site preparation, grading, and construction of decks, patios, paving, fencing, and walls. Landscaping services would also be needed. Local contractors, suppliers, and service providers can benefit by engaging with the city early in this review process, before final plans and permits are established, to understand potential project needs and requirements.

Board:
May 27, 2026 Historic Preservation Board
Date:
2026-05-27
Type:
Agenda_item

A. 110 N Clayton Street – New Garage

A new garage is proposed for 110 N Clayton Street in Mount Dora. This project is currently under review by the City of Mount Dora's Historic Preservation Board. The scope of work would likely involve site preparation, concrete foundation, framing, roofing, and finishing trades for the garage structure. Local contractors, suppliers, and service providers are encouraged to engage early to understand the project's details as it moves through the review process, before final plans and permits are issued. This early engagement can provide a competitive advantage for securing future work.

Board:
May 27, 2026 Historic Preservation Board
Date:
2026-05-27
Type:
Agenda_item
Address:
110 N Clayton Street

Agenda

The City of Mount Dora Historic Preservation Board is scheduled to meet on May 27, 2026, at 3:00 PM to consider Certificates of Appropriateness. Two projects are on the agenda: exterior improvements at 751 E Fifth Avenue and a re-roof at 822 Alexander Street. Public comment will be heard for both items. The agenda also includes approval of minutes, public participation for non-agenda items, and board updates. The next meeting is scheduled for June 24, 2026.

Board:
May 27, 2026 Historic Preservation Board
Date:
2026-05-27
Type:
Agenda
Address:
751 E Fifth Avenue; 822 Alexander Street

Agenda Packet

[751 E Fifth Avenue; case Tab 1 – Certificate of Appropriateness] The Historic Preservation Board reviewed a Certificate of Appropriateness for exterior improvements at 751 E Fifth Avenue. The proposed work includes constructing a covered porch with an open courtyard, an entry pagoda, wood slat fencing, and composite wood trellises. Staff recommended approval, finding the request consistent with design standards for porches, fencing, and visual compatibility. The board's decision is not stated in this document excerpt. [822 Alexander Street; case Tab 2 – Certificate of Appropriateness] The Historic Preservation Board reviewed a Certificate of Appropriateness for a re-roofing project at 822 Alexander Street. The applicant proposed replacing existing metal shingles with composite slate tile. Staff found the application inconsistent with historic design guidelines, recommending repair of metal shingles or replacement with metal shingles or a standing seam metal roof, as slate is not compatible with the building's Frame Vernacular style. The board's decision is not stated in this document excerpt. [110 N Clayton Street] The Historic Preservation Board approved an application for renovation at 110 N Clayton Street. The project involves removing an existing deck and shed and constructing a concrete block garage addition with a patio on top. The applicant, Jason Malk, represented by his father Don Malak, aims to restore the farmhouse. The board voted unanimously to approve the application as presented. [351 W 10th Street] The Historic Preservation Board approved an application for renovation at 351 W 10th Street. The project involves window installation on the second story with white vinyl windows. The contractor, John Wilbur, explained the need for repairs due to water damage to the upper porch flooring. The board voted unanimously to approve the application as presented. [606 N McDonald Street] The Historic Preservation Board approved an application for an addition at 606 N McDonald Street with two conditions: the new metal roof must be standing seam with concealed fasteners in an earthy or muted color, and windows on the western façade must include shutters and grid lines as depicted. Lisa Smith from Eco Construction was present. The board voted unanimously to approve the application as presented. [729 E 8th Avenue] The Historic Preservation Board denied an application for window replacement at 729 E 8th Avenue. The staff recommended approval with a condition to replicate grid lines on new windows. However, the board denied the application unanimously, citing inconsistency with standards that discourage vinyl, as the applicant, Diane Hartwell, expressed frustration with the contractor who wanted to use vinyl windows. Ms. Hartwell withdrew the application.

Board:
May 27, 2026 Historic Preservation Board
Date:
2026-05-27
Type:
Agenda_packet
Decision:
Approved
Address:
751 E Fifth Avenue
Applicant:
Austin Guenther, G3 Development (Applicant); Montessori at Roseborough Inc. (Owners)

B. 115 W 3rd Avenue - Renovation

A renovation project is planned for 115 W 3rd Avenue in Mount Dora. The Historic Preservation Board will review this proposal. The project involves updating an existing structure. This review is early in the planning process. Work could include structural repairs, updating building systems, and interior and exterior finishing. Local contractors, trades, suppliers, and service providers are encouraged to learn more about this project as it moves forward. Engaging early can provide an advantage before bids and permits are finalized.

Board:
May 27, 2026 Historic Preservation Board
Date:
2026-05-27
Type:
Agenda_item
Address:
115 W 3rd Avenue

C. 351 W 10th Street - Renovation

A renovation project is planned for 351 W 10th Street in Mount Dora. The project involves updating the existing structure at this location. The Historic Preservation Board is reviewing this proposal. This renovation will likely involve interior and exterior work, including potential structural repairs, updating of mechanical systems, and finishing trades. Contractors and suppliers who can provide services for historic building renovations, including carpentry, electrical, plumbing, HVAC, painting, and roofing, may find opportunities. Early engagement with the project stakeholders could be beneficial as plans develop.

Board:
May 27, 2026 Historic Preservation Board
Date:
2026-05-27
Type:
Agenda_item
Address:
351 W 10th Street

D. 606 N McDonald Street - Addition

A proposal is under review for an addition at 606 N McDonald Street in Mount Dora. The current use of the property is not stated. The project involves adding to an existing structure. This item is currently under review by the Historic Preservation Board. The work would likely involve site preparation, foundation work, framing, roofing, and interior and exterior finishing trades. Contractors, suppliers, and service providers interested in potential work should reach out early. Engaging before final plans and permits are set can provide an advantage in securing future project opportunities.

Board:
May 27, 2026 Historic Preservation Board
Date:
2026-05-27
Type:
Agenda_item
Address:
606 N McDonald Street

See the actual businesses behind these numbers

Get the real filings, with addresses and officers, backed by a 14-day money-back guarantee.

Create your account