Browse Pasco County civic records
Every published record for Pasco County, newest first. Filter by board, year, or industry to jump straight to the records you want, and page through to reach the full archive.
3,312 records
II. FY 2027 – 2031 TIP Safety Improvement Projects Map 103
The Metropolitan Planning Organization (MPO) Board is reviewing potential safety improvement projects for the Fiscal Year 2027-2031 Transportation Improvement Program (TIP). This item is currently under review, indicating an early stage in the planning process. While specific project details are not yet finalized, the inclusion of safety improvements in the TIP typically involves planning for road enhancements, intersection upgrades, and potentially pedestrian or bicycle safety measures. These types of projects often lead to work such as traffic studies, design, utility relocation, road construction, and final landscaping. Local contractors, trades, suppliers, and service providers are encouraged to monitor this agenda item as it progresses. Engaging early in the planning stages can provide valuable insight into future needs and opportunities before formal bid processes begin.
- Board:
- Metropolitan Planning Organization (MPO) Board Meeting
- Date:
- 2026-06-11
- Type:
- Agenda_item
III. FY 2027 – 2031 TIP Bicycle and Pedestrian Improvement Projects Map 104
The Metropolitan Planning Organization (MPO) Board is reviewing potential bicycle and pedestrian improvement projects for the Fiscal Year 2027-2031 Transportation Improvement Program (TIP). This review involves identifying and mapping projects across Pasco County. The process is currently in the planning and review stages, indicating early opportunities for local businesses. The project scope will likely involve planning, design, and eventual construction of new bicycle lanes, sidewalks, and related safety features. This could include site surveys, engineering design, utility coordination, paving, and landscaping. Local contractors, trades, suppliers, and service providers are encouraged to engage early in this planning process to understand potential future work and position themselves for upcoming bid opportunities before detailed plans and permits are finalized.
- Board:
- Metropolitan Planning Organization (MPO) Board Meeting
- Date:
- 2026-06-11
- Type:
- Agenda_item
IV. FY 2027 – 2031 TIP Highway Maintenance (Preservation) Improvement Projects Map 105
The Metropolitan Planning Organization (MPO) Board is reviewing highway maintenance and preservation projects for Fiscal Year 2027 through 2031. This is an early stage in the planning process. The projects will involve a range of activities aimed at maintaining and improving existing roadways. Work could include site preparation, grading, paving, and potentially utility upgrades. Contractors specializing in road construction, site preparation, and utility work may find opportunities. Suppliers of construction materials and equipment could also be involved. Engaging with the MPO early in this planning phase offers a chance to understand upcoming needs before specific bid packages and permits are finalized.
- Board:
- Metropolitan Planning Organization (MPO) Board Meeting
- Date:
- 2026-06-11
- Type:
- Agenda_item
Legal Counsel David Goldstein, Chief Assistant County Attorney
Planning Commission listed this item on its agenda for 2026-06-11 in Pasco County. The posted record gives the item title and nothing else, so there is no site, no size and no applicant on file for it yet. Local businesses that want to follow it can open the official agenda link above and watch for the fuller write-up the body posts as the meeting gets closer.
- Board:
- Planning Commission
- Date:
- 2026-06-11
- Type:
- Agenda_item
P12 Conditional Use (Regular) – Raymond R. Bohannon, Jr. and Patricia A.
A conditional use request has been filed for a 125-foot above-ground wireless communications tower in South East Pasco County. The proposed site is located on the west side of Lanier Road, about 1,300 feet south of Chancey Road. The property is currently zoned A-R Agricultural-Residential. This project is currently under review by the Planning Commission. If approved, the project would involve site preparation, foundation work, tower erection, and the installation of associated equipment. This early stage presents an opportunity for local contractors, suppliers, and service providers to engage with the applicant and understand the project's needs before final plans and permits are issued. Early involvement can provide a competitive advantage for businesses specializing in construction, electrical, and site development.
- Board:
- Planning Commission
- Date:
- 2026-06-11
- Type:
- Agenda_item
- Address:
- South East Pasco County
- Applicant:
- Raymond R. Bohannon, Jr.
P13 An Ordinance by the Pasco County Board of County Commissioners
The Pasco County Planning Commission is considering an ordinance to establish a temporary moratorium on new applications for building permits, site plans, development orders, and rezonings specifically for data centers and other large load customers. This ordinance, if approved, would pause the acceptance of these applications across all of unincorporated Pasco County. The purpose is to allow time for review and potential future regulations regarding such developments. The process is currently under review with a recommendation to approve. This pause in new applications could lead to future planning and development work once the moratorium is lifted or new regulations are established. Local contractors, suppliers, and service providers in construction, engineering, and related fields should monitor this item's progress. Engaging early with county planning staff could provide insights into potential future development opportunities and requirements once the moratorium period concludes.
- Board:
- Planning Commission
- Date:
- 2026-06-11
- Type:
- Agenda_item
- Address:
- Unincorporated Pasco County
PC Addendum Agenda
This item concerns a potential development project that is currently under review by the Planning Commission. The specific details of the proposed project, including its nature, location, and size, are not provided in the available information. As the item is under review, the project has not yet moved into the construction or permitting phases. Consequently, the scope of work, such as site preparation, utility installation, or building construction, cannot be determined at this time. Local contractors, suppliers, and service providers are encouraged to monitor the progress of this item as it moves through the public review process. Early awareness of potential projects allows businesses to prepare and position themselves for future opportunities once detailed plans and bid information become available.
- Board:
- Planning Commission
- Date:
- 2026-06-11
- Type:
- Agenda_item
PC Addendum Agenda
A large development is planned for South East Pasco County, spanning 3,396.5 acres. The proposal includes 1,335,000 square feet for office and target industry uses, an equal amount for industrial purposes, and another 1,335,000 square feet for retail. Additionally, the plan calls for 300 beds in an assisted living facility, 480 hotel rooms, and a 35-acre recreational water park. This project is currently under review, with a continuance requested. The development would likely involve extensive site clearing and grading, followed by underground utility work, road construction, and the erection of various structures. Subcontractors and suppliers for concrete, framing, roofing, electrical, plumbing, and HVAC systems, as well as landscaping services, could find opportunities. Early engagement with the project stakeholders before final bids and permits are issued may offer a competitive advantage.
- Board:
- Planning Commission
- Date:
- 2026-06-11
- Type:
- Agenda_item
- Address:
- South East Pasco County, on the North and South Side of State Road 56 from Morris Bridge Road to Gall Boulevard
PC Addendum Agenda
Planning Commission listed this item on its agenda for 2026-06-11 in Pasco County. The posted record gives the item title and nothing else, so there is no site, no size and no applicant on file for it yet. Local businesses that want to follow it can open the official agenda link above and watch for the fuller write-up the body posts as the meeting gets closer.
- Board:
- Planning Commission
- Date:
- 2026-06-11
- Type:
- Agenda_item
PC Addendum Agenda
Planning Commission listed this item on its agenda for 2026-06-11 in Pasco County. The posted record gives the item title and nothing else, so there is no site, no size and no applicant on file for it yet. Local businesses that want to follow it can open the official agenda link above and watch for the fuller write-up the body posts as the meeting gets closer.
- Board:
- Planning Commission
- Date:
- 2026-06-11
- Type:
- Agenda_item
PC Addendum Agenda
Planning Commission listed this item on its agenda for 2026-06-11 in Pasco County. The posted record gives the item title and nothing else, so there is no site, no size and no applicant on file for it yet. Local businesses that want to follow it can open the official agenda link above and watch for the fuller write-up the body posts as the meeting gets closer.
- Board:
- Planning Commission
- Date:
- 2026-06-11
- Type:
- Agenda_item
PC10 Conditional Use Request (Consent) – Saint Joe Ranch LLC & BB Agritourism
Saint Joe Ranch LLC and BB Agritourism LLC are seeking to combine two existing conditional use permits into one unified permit for an amusement park. This project is planned for North Central Pasco County, located about 840 feet east of the intersection of St. Joe Road and Bellamy Brothers Boulevard. The site covers approximately 118 acres and is currently zoned A-C Agricultural District. The request is currently under review by the Planning Commission. If approved, this project would involve site preparation, construction of park facilities, and associated infrastructure. Businesses involved in site clearing, grading, utility work, concrete, framing, electrical, plumbing, HVAC, and landscaping could find opportunities. Early engagement with the applicants before final plans and permits are issued may provide a competitive advantage.
- Board:
- Planning Commission
- Date:
- 2026-06-11
- Type:
- Agenda_item
- Address:
- North Central Pasco County
- Applicant:
- Saint Joe Ranch LLC
PC11 Conditional Use Request (Consent) – Saint Joe Ranch LLC & BB Agritourism
Saint Joe Ranch LLC and BB Agritourism LLC are seeking a Conditional Use Permit to allow the sale and on-site consumption of beer, wine, and liquor. This permit would be in conjunction with an amusement park. The proposed location is in North Central Pasco County, about 840 feet east of the intersection of St. Joe Road and Bellamy Brothers Boulevard. The site covers approximately 118 acres and is currently zoned A-C Agricultural District. This item is currently under review, with a recommendation for approval with conditions. If approved, the project would involve site preparation, construction of facilities to support the amusement park and alcohol sales, and related infrastructure. This early stage presents an opportunity for contractors, suppliers, and service providers to engage with the applicants before final plans and permits are issued. Businesses specializing in site work, construction, hospitality services, and potentially landscaping could find opportunities as the project moves forward.
- Board:
- Planning Commission
- Date:
- 2026-06-11
- Type:
- Agenda_item
- Address:
- North Central Pasco County – Approximately 840ft East of the intersection of St. Joe Road & Bellamy Brothers Boulevard
- Applicant:
- Saint Joe Ranch LLC
PC6 Comprehensive Plan Amendment (Continuance) - CPA24(07) CPAL Two
This item concerns a proposed amendment to the Comprehensive Plan for the Two Rivers area. The applicant is seeking to change the Subarea Policy FLU 7.1.11, which relates to the Two Rivers Planned Development. This is a policy amendment, not a site-specific development proposal at this time. The Planning Commission has recommended a continuance for this item, meaning it is still under review and has not been decided. As this is an early stage of policy review, future development could involve planning, engineering, and legal services. Contractors, suppliers, and service providers are encouraged to monitor this policy change as it could influence future development projects in the Two Rivers area.
- Board:
- Planning Commission
- Date:
- 2026-06-11
- Type:
- Agenda_item
PC8 Zoning Amendment (Consent) – Mitras Family Extended LLC/Mitras Project
A zoning change is planned for approximately 40.96 acres in West Central Pasco County. The property, located on the west side of Kent Grove Drive, about one mile north of State Road 52, is currently zoned A-R Agricultural-Residential. The proposal is to change the zoning to R-4 High Density Residential. This item is currently under review by the Planning Commission. If approved, this change could lead to site clearing and grading, followed by underground utility work and road construction. Subsequent phases would likely involve vertical construction, including framing, roofing, and the installation of mechanical, electrical, and plumbing systems, as well as interior and exterior finishes. Contractors, suppliers, and service providers in residential development, site preparation, and building trades should monitor this project's progress. Early engagement before final site plans and permits are issued may offer a competitive advantage.
- Board:
- Planning Commission
- Date:
- 2026-06-11
- Type:
- Agenda_item
- Address:
- West side of Kent Grove Drive, approximately one mile north of State Road 52
- Applicant:
- Mitras Family Extended LLC
PC9 Zoning Amendment (Consent) – 52 & BELLAMY INVESTMENT GROUP LLC /
Bellamy Investment Group LLC is proposing a change in zoning for a parcel of land located in central Pasco County. The property is situated at the southeast corner of the intersection of State Road 52 and Bellamy Brothers Boulevard. Currently zoned I-1 Light Industrial Park District, the proposal seeks to change it to a C-2 General Commercial District. This change would affect approximately 1.51 acres. The Planning Commission has recommended approval for this rezoning amendment. If approved, this project would likely involve site preparation, potential utility work, and construction of commercial structures. Local contractors, suppliers, and service providers should consider reaching out to Bellamy Investment Group LLC early to understand potential needs as the project moves forward before final site plans and permits are established.
- Board:
- Planning Commission
- Date:
- 2026-06-11
- Type:
- Agenda_item
- Address:
- Southeast Corner of the Intersection of State Road 52 and Bellamy Brothers Boulevard
- Applicant:
- Bellamy Investment Group LLC
Pasco County
Planning Commission listed this item on its agenda for 2026-06-11 in Pasco County. The posted record gives the item title and nothing else, so there is no site, no size and no applicant on file for it yet. Local businesses that want to follow it can open the official agenda link above and watch for the fuller write-up the body posts as the meeting gets closer.
- Board:
- Planning Commission
- Date:
- 2026-06-11
- Type:
- Agenda_item
R. Gessman
Metropolitan Planning Organization (MPO) Board Meeting listed this item on its agenda for 2026-06-11 in Pasco County. The posted record gives the item title and nothing else, so there is no site, no size and no applicant on file for it yet. Local businesses that want to follow it can open the official agenda link above and watch for the fuller write-up the body posts as the meeting gets closer.
- Board:
- Metropolitan Planning Organization (MPO) Board Meeting
- Date:
- 2026-06-11
- Type:
- Agenda_item
S. Cassin
Metropolitan Planning Organization (MPO) Board Meeting listed this item on its agenda for 2026-06-11 in Pasco County. The posted record gives the item title and nothing else, so there is no site, no size and no applicant on file for it yet. Local businesses that want to follow it can open the official agenda link above and watch for the fuller write-up the body posts as the meeting gets closer.
- Board:
- Metropolitan Planning Organization (MPO) Board Meeting
- Date:
- 2026-06-11
- Type:
- Agenda_item
S. Ferry
The Metropolitan Planning Organization (MPO) Board is reviewing the 2050 SIS Unfunded Needs Plan. This plan discusses potential transportation projects and their funding. The Board has directed staff to draft a letter to various state and federal officials, including the USDOT and the President, to advocate for consideration of these needs and potential savings. The discussion also touched on specific road projects like U.S. 41 and S.R. 54, a transit facility on Ridge Road, and the gap between U.S. 19 and Suncoast Boulevard. This item is currently under review, with the Board requesting staff to draft a letter. The scope of work would involve advocacy and communication efforts. Future phases could involve detailed planning and potential project implementation if funding is secured. Contractors, suppliers, and service providers interested in future transportation infrastructure projects or related advocacy services should monitor MPO communications for potential opportunities as plans develop.
- Board:
- Metropolitan Planning Organization (MPO) Board Meeting
- Date:
- 2026-06-11
- Type:
- Agenda_item
See the actual businesses behind these numbers
Get the real filings, with addresses and officers, backed by a 14-day money-back guarantee.
Create your account