Browse Santa Rosa County civic records
Every published record for Santa Rosa County, newest first. Filter by board, year, or industry to jump straight to the records you want, and page through to reach the full archive.
1,842 records
2) Project signs: Nine (9) feet
Commission Special Rezoning Meeting listed this item on its agenda for 2026-05-21 in Santa Rosa County. The posted record gives the item title and nothing else, so there is no site, no size and no applicant on file for it yet. Local businesses that want to follow it can open the official agenda link above and watch for the fuller write-up the body posts as the meeting gets closer.
- Board:
- Commission Special Rezoning Meeting
- Date:
- 2026-05-21
- Type:
- Agenda_item
2. 2026-14-V APPEAL
A variance request has been made to allow a single-family residence at 2800 Block of Lido Blvd in Gulf Breeze. The request seeks to reduce the rear setback from 25 feet to 15 feet and the side setback from 15 feet to 6 feet. This item is currently under review by the Commission Special Rezoning Meeting. If approved, the project would involve site preparation and construction of a single-family home. Contractors specializing in residential construction, including site work, concrete, framing, electrical, plumbing, and HVAC, may find opportunities. Early engagement could be beneficial as plans develop.
- Board:
- Commission Special Rezoning Meeting
- Date:
- 2026-05-21
- Type:
- Agenda_item
- Decision:
- Howard Steele
- Address:
- 2800 Block of Lido Blvd, Gulf Breeze
- Applicant:
- Grant Davis
2. 2026-14-V APPEAL
This item concerns a variance request for a property located in the 2800 block of Lido Blvd in Gulf Breeze. The property is currently zoned R1, for single-family residential use. The applicant, Grant Davis, represented by Dave Meadows, sought to reduce the rear setback from 25 feet to 15 feet and the side setback from 15 feet to 6 feet. These changes were requested to accommodate the construction of a single-family residence. This item is currently under review by the Commission Special Rezoning Meeting. The project would involve site preparation, foundation work, framing, and the installation of utilities and finishes for a single-family home. Local contractors, trades, suppliers, and service providers should monitor this item as it progresses through the review process. Early engagement could provide an advantage before final plans and permits are issued.
- Board:
- Commission Special Rezoning Meeting
- Date:
- 2026-05-21
- Type:
- Agenda_item
- Address:
- 2800 Block of Lido Blvd, Gulf Breeze
- Applicant:
- Grant Davis
2. 2026-5-V
A variance request is under review for a property located at 6451 Mary Kitchens Road in Milton. The applicant, Daniel and Christina Odenthal, seeks to reduce the wetland buffer setback from 25 feet to 1 foot. This reduction is intended to allow for the construction of a single-family residence on land currently zoned AGRR (Rural Residential Agriculture). The request is currently under review by the Zoning Board, following a recent split vote on a motion to approve. The project involves building a single-family home, which may include site preparation, foundation work, framing, and utility connections. Given the proximity to wetlands and the need for a septic system, specialized site work and construction will be necessary. Contractors, suppliers, and service providers interested in potential work should engage early to understand the project's specific requirements as it moves through the review process.
- Board:
- Commission Committee Meeting
- Date:
- 2026-05-21
- Type:
- Agenda_item
- Address:
- 6451 Mary Kitchens Rd, Milton
- Applicant:
- Daniel & Christina Odenthal
2. 2026-9-RSS
Robert and Jennifer Youngblood are proposing a change to the zoning and future land use for a property located at 2755 Bud Diamond Road in Jay. The property is approximately 15.5 acres and is currently zoned AG2 (Agriculture District 2) with an Agriculture (AG) Future Land Use designation. The proposal is to rezone the property to AG1 (Estate Residential Agriculture) and change the Future Land Use to Agriculture Estate Residential (AGER). This item is currently under review, having received a recommendation for approval from the Zoning Board. If approved, this project would involve site preparation, potentially including clearing and grading, followed by the construction of estate-style residences. Contractors specializing in site work, residential construction, and related trades could find opportunities as this project moves through the planning and permitting stages. Engaging early allows businesses to understand the project scope before final plans and bids are established.
- Board:
- Commission Committee Meeting
- Date:
- 2026-05-21
- Type:
- Agenda_item
- Address:
- 2755 Bud Diamond Rd., Jay
- Applicant:
- Robert & Jennifer Youngblood
2. Disclaimer. Except as expressly provided in the Services Agreement, Altumint
Commission Committee Meeting listed this item on its agenda for 2026-05-21 in Santa Rosa County. The posted record gives the item title and nothing else, so there is no site, no size and no applicant on file for it yet. Local businesses that want to follow it can open the official agenda link above and watch for the fuller write-up the body posts as the meeting gets closer.
- Board:
- Commission Committee Meeting
- Date:
- 2026-05-21
- Type:
- Agenda_item
2. The location of such facility shall not unreasonably increase traffic on streets in the impacted
Commission Special Rezoning Meeting listed this item on its agenda for 2026-05-21 in Santa Rosa County. The posted record gives the item title and nothing else, so there is no site, no size and no applicant on file for it yet. Local businesses that want to follow it can open the official agenda link above and watch for the fuller write-up the body posts as the meeting gets closer.
- Board:
- Commission Special Rezoning Meeting
- Date:
- 2026-05-21
- Type:
- Agenda_item
2. The location of such facility shall not unreasonably increase traffic on streets in the impacted
Commission Special Rezoning Meeting listed this item on its agenda for 2026-05-21 in Santa Rosa County. The posted record gives the item title and nothing else, so there is no site, no size and no applicant on file for it yet. Local businesses that want to follow it can open the official agenda link above and watch for the fuller write-up the body posts as the meeting gets closer.
- Board:
- Commission Special Rezoning Meeting
- Date:
- 2026-05-21
- Type:
- Agenda_item
2. The proposed Variance is necessary to preserve a substantial property right where such property
Commission Special Rezoning Meeting listed this item on its agenda for 2026-05-21 in Santa Rosa County. The posted record gives the item title and nothing else, so there is no site, no size and no applicant on file for it yet. Local businesses that want to follow it can open the official agenda link above and watch for the fuller write-up the body posts as the meeting gets closer.
- Board:
- Commission Special Rezoning Meeting
- Date:
- 2026-05-21
- Type:
- Agenda_item
2. The proposed Variance is necessary to preserve a substantial property right where such property
Commission Special Rezoning Meeting listed this item on its agenda for 2026-05-21 in Santa Rosa County. The posted record gives the item title and nothing else, so there is no site, no size and no applicant on file for it yet. Local businesses that want to follow it can open the official agenda link above and watch for the fuller write-up the body posts as the meeting gets closer.
- Board:
- Commission Special Rezoning Meeting
- Date:
- 2026-05-21
- Type:
- Agenda_item
2. The proposed use shall not reasonably increase traffic on local residential streets in the impacted
Commission Special Rezoning Meeting listed this item on its agenda for 2026-05-21 in Santa Rosa County. The posted record gives the item title and nothing else, so there is no site, no size and no applicant on file for it yet. Local businesses that want to follow it can open the official agenda link above and watch for the fuller write-up the body posts as the meeting gets closer.
- Board:
- Commission Special Rezoning Meeting
- Date:
- 2026-05-21
- Type:
- Agenda_item
2. The proposed use shall not reasonably increase traffic on local residential streets in the impacted area.
Commission Special Rezoning Meeting listed this item on its agenda for 2026-05-21 in Santa Rosa County. The posted record gives the item title and nothing else, so there is no site, no size and no applicant on file for it yet. Local businesses that want to follow it can open the official agenda link above and watch for the fuller write-up the body posts as the meeting gets closer.
- Board:
- Commission Special Rezoning Meeting
- Date:
- 2026-05-21
- Type:
- Agenda_item
2. Two signs per residential subdivision entrance, identifying said subdivision, of not
This agenda item concerns proposed regulations for residential subdivision entrance signs in Santa Rosa County. The proposal outlines specific rules for the number, size, and placement of these signs. For each subdivision entrance, up to two signs are allowed, not exceeding thirty-two square feet each and six feet in height. If multiple subdivisions share an entrance, a combined sixty-four square feet of signage is permitted. These signs may be placed on the right-of-way with approval from the Planning and Zoning Department and the Engineering and Road and Bridge Department. The item is currently under review by the Commission Special Rezoning Meeting. This process could lead to the need for sign fabrication and installation services. Contractors specializing in signage, site preparation, and potentially concrete work for foundations may find opportunities as these regulations are finalized and implemented. Early engagement with the county departments involved could provide insight into specific project timelines and requirements.
- Board:
- Commission Special Rezoning Meeting
- Date:
- 2026-05-21
- Type:
- Agenda_item
- Decision:
- Planning and Zoning Department
20) OMB - Budget Amendment 2026-045 MIP Waste Water Treatment Plant Loan Payment
Santa Rosa County is considering a budget amendment to cover an annual loan payment for the Milton Interchange Park wastewater treatment plant. The proposed amendment, number 2026-045, would use $1,018,000 from General Fund reserves for this payment. This item is currently under review as part of the regular agenda. The project involves the financial allocation for an existing wastewater treatment facility, which may lead to future needs for maintenance, upgrades, or related services. Contractors, suppliers, and service providers in the utility and construction sectors should monitor this item. Early engagement could provide an advantage as plans for any related work are developed.
- Board:
- Commission Committee Meeting
- Date:
- 2026-05-21
- Type:
- Agenda_item
- Address:
- Milton Interchange Park
20) Public Works - RR Crossing Signal Upgrades Agreements
Santa Rosa County is planning improvements to railroad crossings at Industrial Blvd. and Deaton Bridge Road. These upgrades are part of two Tri-Party Railroad Reimbursement Agreements between the County, FDOT, and Florida Gulf and Atlantic Railroad, LLC. The project is currently under review, indicating an early stage in the public process. Work is expected to involve signal system upgrades at the railroad crossings. This project could create opportunities for contractors specializing in electrical systems, signal installation, and potentially site preparation and concrete work related to the crossing infrastructure. Early engagement with county and railroad representatives may provide insight into specific project timelines and requirements before formal bidding begins.
- Board:
- Commission Committee Meeting
- Date:
- 2026-05-21
- Type:
- Agenda_item
- Address:
- Industrial Blvd.
- Applicant:
- Santa Rosa County
20) Public Works - RR Crossing Signal Upgrades Agreements
Santa Rosa County is planning to upgrade railroad crossing signals at two locations: Industrial Blvd. and Deaton Bridge Road. These upgrades are part of agreements between Santa Rosa County, the Florida Department of Transportation (FDOT), and Florida Gulf and Atlantic Railroad, LLC. The project is currently under review, with agreements being considered for approval. This project will likely involve site preparation, signal installation, and potentially some road work near the crossings. Contractors specializing in civil engineering, electrical work, and general construction may find opportunities. Reaching out to the county or FDOT early could provide insight into the project timeline and specific needs before formal bidding begins.
- Board:
- Commission Committee Meeting
- Date:
- 2026-05-21
- Type:
- Agenda_item
- Address:
- Industrial Blvd.
- Applicant:
- Santa Rosa County
21) OMB - Opioid Abatement 2025-2026 Amendment
This item concerns an amendment to the Opioid Abatement 2025-2026 plan for Santa Rosa County. The amendment will allow for more funds to be distributed from the managing entity, the Department of Children and Families (DCF), to the county. This is currently under review by the Commission Committee. While no specific construction project is detailed, the increased distribution of funds could support various county initiatives and services. Local contractors, suppliers, and service providers should monitor future announcements regarding how these funds will be allocated and utilized within the county. Early engagement with county departments could provide insight into potential opportunities as plans develop.
- Board:
- Commission Committee Meeting
- Date:
- 2026-05-21
- Type:
- Agenda_item
21) OMB - Opioid Abatement 2025-2026 Amendment
This item concerns an amendment to the Opioid Abatement plan for 2025-2026. The amendment will allow for more funds to be given to Santa Rosa County from the managing entity for the Department of Children and Families. This is currently under review by the Commission Committee. The project involves the distribution of funds, which may lead to future opportunities for local businesses involved in public administration and financial services. Reaching out early to understand the scope of fund allocation could provide an advantage.
- Board:
- Commission Committee Meeting
- Date:
- 2026-05-21
- Type:
- Agenda_item
22) OMB - Point Baker Water System Subrecipient Agreement for FDEP Water Supply Grant
Santa Rosa County is planning a new water system project. This project involves installing a new well capable of pumping 1,000 gallons per minute and constructing a new elevated water tank with a capacity of 750,000 gallons. The county is seeking approval for a subrecipient agreement related to a FDEP water supply grant to fund these improvements. This project is currently under review, indicating an early stage in the planning process. The work is expected to involve site preparation, drilling and well construction, tank fabrication and erection, and the installation of associated water distribution piping and controls. Contractors specializing in water infrastructure, well drilling, tank construction, and utility installation may find opportunities. Engaging early could provide an advantage as plans develop and before bids are finalized.
- Board:
- Commission Committee Meeting
- Date:
- 2026-05-21
- Type:
- Agenda_item
22) OMB - Point Baker Water System Subrecipient Agreement for FDEP Water Supply Grant
Santa Rosa County is planning a water system improvement project. The project involves a new 1,000 gallon per minute well and a new 750,000 gallon elevated water tank. This item is currently under review. The work will likely involve site preparation, drilling and well construction, tank fabrication and erection, and the installation of related water distribution piping and controls. Contractors specializing in water infrastructure, well drilling, tank construction, and underground utilities could find opportunities. Early engagement is advised before final plans and permits are issued.
- Board:
- Commission Committee Meeting
- Date:
- 2026-05-21
- Type:
- Agenda_item
See the actual businesses behind these numbers
Get the real filings, with addresses and officers, backed by a 14-day money-back guarantee.
Create your account