Skip to main content

Be First, Build Lasting Relationships

a. All vessels associated with the project shall operate at “Idle Speed/No Wake” at all times

Zoning Board · 2026-05-14 · agenda_item

This agenda item concerns operational requirements for vessels during a project, mandating "Idle Speed/No Wake" in work areas where vessel draft is less than four feet from the bottom. Vessels are also directed to use deep water routes when possible. While no specific project details like location, size, or proposed use are provided, these stipulations suggest a construction or infrastructure project involving marine work is planned or under review. The scope of work would likely involve site preparation, potentially including dredging or underwater construction, followed by the installation or repair of marine structures or utilities. Contractors specializing in marine construction, dredging, and related trades, along with suppliers of marine equipment and materials, could find opportunities. Early engagement is advisable as project specifics are still being determined.

Industries that could win this work

  • Site Prep, Grading & Hardscape
  • Utilities (Sub)
  • Construction (Other)

Follow this across meetings

See the actual businesses behind these numbers

Get the real filings, with addresses and officers, backed by a 14-day money-back guarantee.

Create your account