July 14, 2026 Regular Meeting Agenda
Board of County Commissioners Regular Meeting · 2026-07-14 · agenda
[case ZON26-000018] Rezoning of 0.085 acres from R6M to R6C to permit one single-family detached residence. The Planning and Zoning Special Master recommended approval, and the Board of County Commissioners is considering this recommendation. [case ZON26-000020] Rezoning of 0.599 acres from R6M to R2C to permit one single-family detached residence. The Planning and Zoning Special Master recommended approval, and the Board of County Commissioners is considering this recommendation. [case LU26-000015] Amendment of the boundary line of Village Community Development District No. 9, adding 9.7 acres. Staff recommends approval. Public hearing to consider adoption of the Tourism Development Plan and an ordinance establishing a Tourism Development Tax for Sumter County. The Tourist Development Council recommends approval. [Sumter County C 466 at C 475N Roundabout; case ITB # 006-0-2024/RS] Approve Change Order #3 to ITB # 006-0-2024/RS with C.W. Roberts Contracting, Inc. for the Sumter County C 466 at C 475N Roundabout LAP Project. Staff recommends approval. [The Villages Community; case ITB 001-0-2026/RS] Enter into Contract with CWR Contracting, Inc. for ITB 001-0-2026/RS for the Sumter County The Villages Community Resurfacing Project. Staff recommends approval. [Sumter County; case RFP 011-0-2026/JV] Enter into Contract with DRC Emergency Services, LLC for RFP 011-0-2026/JV for Sumter County Disaster Debris Removal & Hauling Services. Staff recommends approval. [Sumter County; case RFP 009-0-2026/MS] Enter into Contract with Miner, Ltd. for RFP 009-0-2026/MS for Sumter County Overhead Door Maintenance and Repair Services. Staff recommends approval. [Sumter County; case RFP 010-0-2026/JV] Enter into Contract with Thompson Consulting Services, LLC for RFP 010-0-2026/JV for Sumter County Disaster Debris Monitoring Services. Staff recommends approval. [Sumter County; case RFP 019-0-2024/JV] Extension #1 of the Sumter County On-Call Plumbing Repairs & New Installation Agreement for RFP 019-0-2024/JV. Staff recommends approval. New Business Industry Incentive Agreement between Sumter County and Confidential Corporation-Project OnRamp. Staff recommends approval. [Lake Panasoffkee] Request for Temporary Road Closure and Assistance with the 2026 Lake Panasoffkee Christmas Parade. Staff recommends approval.
Agenda items
- 1. A description of and cause of noncompliance; and
- 1. A description of and cause of noncompliance; and
- 1. A description of and cause of noncompliance; and
- 1. Any monitoring or other information which indicates that any contaminant may cause an endangerment to an underground
- 1. Any monitoring or other information which indicates that any contaminant may cause an endangerment to an underground
- 1. Any monitoring or other information which indicates that any contaminant may cause an endangerment to an underground
- 1. Based on competent substantial evidence presented and considered during a
- General Contractor
- Site Prep, Grading & Hardscape
- Concrete & Masonry
- Electrical
- Plumbing
- HVAC & Climate Control
- Carpentry & Cabinetry
- Roofing
- Painting & Flooring
- Drywall & Insulation
- Building & Industrial Supply
- Real Estate Development
- Engineering & Architecture
- 1. Based on competent substantial evidence presented and considered during a
- General Contractor
- Site Prep, Grading & Hardscape
- Concrete & Masonry
- Carpentry & Cabinetry
- Electrical
- Plumbing
- HVAC & Climate Control
- Roofing
- Painting & Flooring
- Building & Industrial Supply
- Real Estate Development
- Engineering & Architecture
- 1. Based on competent substantial evidence presented and considered during a
- General Contractor
- Real Estate Development
- Engineering & Architecture
- Building & Industrial Supply
- Site Prep, Grading & Hardscape
- Concrete & Masonry
- Electrical
- Plumbing
- HVAC & Climate Control
- Carpentry & Cabinetry
- Roofing
- Painting & Flooring
- Drywall & Insulation
- Landscaping & Lawn Service
- 1. Based on competent substantial evidence presented and considered during a
- General Contractor
- Site Prep, Grading & Hardscape
- Concrete & Masonry
- Electrical
- Plumbing
- HVAC & Climate Control
- Carpentry & Cabinetry
- Roofing
- Painting & Flooring
- Building & Industrial Supply
- Real Estate Development
- Engineering & Architecture
- 1. Based on competent substantial evidence presented and considered during a
- General Contractor
- Site Prep, Grading & Hardscape
- Plumbing
- Electrical
- HVAC & Climate Control
- Concrete & Masonry
- Building & Industrial Supply
- Real Estate Development
- Engineering & Architecture
- 1. Based on competent substantial evidence presented and considered during a
- General Contractor
- Site Prep, Grading & Hardscape
- Engineering & Architecture
- Real Estate Development
- Building & Industrial Supply
- 1. Existing Injection Wells. Any permit issued for an existing injection well requiring corrective action shall include a
- 1. Existing Injection Wells. Any permit issued for an existing injection well requiring corrective action shall include a
- 1. Existing Injection Wells. Any permit issued for an existing injection well requiring corrective action shall include a
- 1. Group 1 – Thermal Exchange Process Wells.
- 1. Group 1 – Thermal Exchange Process Wells.
- 1. Group 1 – Thermal Exchange Process Wells.
- 1. Have access to and copy any records that must be kept under conditions of this permit;
- 1. Have access to and copy any records that must be kept under conditions of this permit;
- 1. Have access to and copy any records that must be kept under conditions of this permit;
- 1. Injection is prohibited until the permittee affirmatively demonstrates that the well has mechanical integrity. Prior to
- Utilities (Sub)
- Construction (Other)
- Engineering & Architecture
- Business Consulting
- 1. Injection is prohibited until the permittee affirmatively demonstrates that the well has mechanical integrity. Prior to
- 1. Injection is prohibited until the permittee affirmatively demonstrates that the well has mechanical integrity. Prior to
- 1. Into or above a formation which, within one quarter mile of the well, contains either an underground source of drinking
- 1. Into or above a formation which, within one quarter mile of the well, contains either an underground source of drinking
- 1. Into or above a formation which, within one quarter mile of the well, contains either an underground source of drinking
- 1. It does not currently serve as a source of drinking water; and
- 1. It does not currently serve as a source of drinking water; and
- 1. It does not currently serve as a source of drinking water; and
- 1. Mining of sulfur by the Frasch process;
- 1. Mining of sulfur by the Frasch process;
- 1. Mining of sulfur by the Frasch process;
- 1. Monitoring of the tubing -casing annulus pressure with sufficient frequency to be representative, as determined by the
- 1. Monitoring of the tubing -casing annulus pressure with sufficient frequency to be representative, as determined by the
- 1. Monitoring of the tubing -casing annulus pressure with sufficient frequency to be representative, as determined by the
- 1. Nature, volume, and injection rate of the injected fluid;
- 1. Nature, volume, and injection rate of the injected fluid;
- 1. Nature, volume, and injection rate of the injected fluid;
- 1. The permittee shall maintain the mechanical integrity of the well at all times.
- 1. The permittee shall maintain the mechanical integrity of the well at all times.
- 1. The permittee shall maintain the mechanical integrity of the well at all times.
- 1. There is no leak in the casing, tubing or packer; and
- 1. There is no leak in the casing, tubing or packer; and
- 1. There is no leak in the casing, tubing or packer; and
- 1. Upon request, the permittee shall furnish all records and plans required under Department Rules. During enforcement action s,
- 1. Upon request, the permittee shall furnish all records and plans required under Department Rules. During enforcement action s,
- 1. Upon request, the permittee shall furnish all records and plans required under Department Rules. During enforcement action s,
- 1. Wells used by generators of hazardous wastes or owners or operators of hazardous waste management facilities to inject
- 1. Wells used by generators of hazardous wastes or owners or operators of hazardous waste management facilities to inject
- 1. Wells used by generators of hazardous wastes or owners or operators of hazardous waste management facilities to inject
- 1. Which are brought to the surface in connection with conventional oil or natural gas production and may be commingled with
- 1. Which are brought to the surface in connection with conventional oil or natural gas production and may be commingled with
- 1. Which are brought to the surface in connection with conventional oil or natural gas production and may be commingled with
- 10. Life of injection well; and
- 10. Life of injection well; and
- 10. Life of injection well; and
- 11. Pressure considerations.
- 11. Pressure considerations.
- 11. Pressure considerations.
- 2. Any noncompliance with a permit condition or malfunction of the injection system which may cause fluid migration into or
- Legal Services
- Engineering & Architecture
- Utilities (Sub)
- Construction (Other)
- 2. Any noncompliance with a permit condition or malfunction of the injection system which may cause fluid migration into or
- 2. Any noncompliance with a permit condition or malfunction of the injection system which may cause fluid migration into or
- 2. For enhanced recovery of oil or natural gas; and
- 2. For enhanced recovery of oil or natural gas; and
- 2. For enhanced recovery of oil or natural gas; and
- 2. Group 2 – Aquifer Recharge Wells.
- 2. Group 2 – Aquifer Recharge Wells.
- 2. Group 2 – Aquifer Recharge Wells.
- 2. If the Department determines that the injection well lacks mechanical integrity, written notice shall be given to the perm ittee.
- 2. If the Department determines that the injection well lacks mechanical integrity, written notice shall be given to the perm ittee.
- 2. If the Department determines that the injection well lacks mechanical integrity, written notice shall be given to the perm ittee.
- 2. If the Department determines that the injection well lacks mechanical integrity, written notice shall be given to the perm ittee.
- 2. If the Department determines that the injection well lacks mechanical integrity, written notice shall be given to the perm ittee.
- 2. If the Department determines that the injection well lacks mechanical integrity, written notice shall be given to the perm ittee.
- 2. Inspect the facility, equipment, practices, or operations regulated or required under this permit; and
- 2. Inspect the facility, equipment, practices, or operations regulated or required under this permit; and
- 2. Inspect the facility, equipment, practices, or operations regulated or required under this permit; and
- 2. It cannot now and will not in the future serve as a source of drinking water because:
- 2. It cannot now and will not in the future serve as a source of drinking water because:
- 2. It cannot now and will not in the future serve as a source of drinking water because:
- 2. Nature of native fluids, or by-products of injection;
- 2. Nature of native fluids, or by-products of injection;
- 2. Nature of native fluids, or by-products of injection;
- 2. New Injection Wells. No owner or operator of a new injection well shall begin injection until all required corrective acti on
- 2. New Injection Wells. No owner or operator of a new injection well shall begin injection until all required corrective acti on
- 2. New Injection Wells. No owner or operator of a new injection well shall begin injection until all required corrective acti on
- 2. Other industrial and municipal (publicly or privately owned) disposal wells which inject fluids beneath the lowermost
- 2. Other industrial and municipal (publicly or privately owned) disposal wells which inject fluids beneath the lowermost
- 2. Other industrial and municipal (publicly or privately owned) disposal wells which inject fluids beneath the lowermost
- 2. Pressure test of inner casing or tubing.
- Utilities (Sub)
- General Contractor
- Concrete & Masonry
- Site Prep, Grading & Hardscape
- Engineering & Architecture
- Legal Services
- Waste Management
- 2. Pressure test of inner casing or tubing.
- Utilities (Sub)
- General Contractor
- Construction (Other)
- Engineering & Architecture
- Legal Services
- Waste Management
- 2. Pressure test of inner casing or tubing.
- Engineering & Architecture
- Utilities (Sub)
- Government Authority
- 2. Solution mining of minerals: (Note – Solution mining of minerals includes sodium chloride, potash, phosphate, copper,
- 2. Solution mining of minerals: (Note – Solution mining of minerals includes sodium chloride, potash, phosphate, copper,
- 2. Solution mining of minerals: (Note – Solution mining of minerals includes sodium chloride, potash, phosphate, copper,
- 2. The period of noncompliance, including dates and times; or, if not corrected the anticipated time the noncompliance is
- 2. The period of noncompliance, including dates and times; or, if not corrected the anticipated time the noncompliance is
- 2. The period of noncompliance, including dates and times; or, if not corrected the anticipated time the noncompliance is
- 2. The permittee shall hold at the facility or other location designated by this permit records of all monitoring information
- 2. The permittee shall hold at the facility or other location designated by this permit records of all monitoring information
- 2. The permittee shall hold at the facility or other location designated by this permit records of all monitoring information
- 2. There is no fluid movement into an underground source of drinking water through channels adjacent to the injection well
- 2. There is no fluid movement into an underground source of drinking water through channels adjacent to the injection well
- 2. There is no fluid movement into an underground source of drinking water through channels adjacent to the injection well
- 2. Which cannot be classified as a Class I well under paragraph 62 -528.300(1)(a), F.A.C., or as a Class IV well under
- 2. Which cannot be classified as a Class I well under paragraph 62 -528.300(1)(a), F.A.C., or as a Class IV well under
- 2. Which cannot be classified as a Class I well under paragraph 62 -528.300(1)(a), F.A.C., or as a Class IV well under
- 3. For storage of hydrocarbons which are liquid at standard temperature and pressure.
- 3. For storage of hydrocarbons which are liquid at standard temperature and pressure.
- 3. For storage of hydrocarbons which are liquid at standard temperature and pressure.
- 3. Group 3 – Domestic Wastewater Wells.
- 3. Group 3 – Domestic Wastewater Wells.
- 3. Group 3 – Domestic Wastewater Wells.
- 3. If needed to prevent fluid movement into an underground source of drinking water, the Department shall require as a permit
- Government Authority
- Engineering & Architecture
- Legal Services
- Utilities (Sub)
- 3. If needed to prevent fluid movement into an underground source of drinking water, the Department shall require as a permit
- Engineering & Architecture
- Business Consulting
- Utilities (Sub)
- 3. If needed to prevent fluid movement into an underground source of drinking water, the Department shall require as a permit
- Government Authority
- Engineering & Architecture
- Legal Services
- Utilities (Sub)
- Construction (Other)
- 3. Potentially affected population;
- 3. Potentially affected population;
- 3. Potentially affected population;
- 3. Radioactive waste disposal wells that inject fluids below the lowermost formation containing an underground source of
- 3. Radioactive waste disposal wells that inject fluids below the lowermost formation containing an underground source of
- 3. Radioactive waste disposal wells that inject fluids below the lowermost formation containing an underground source of
- 3. Records of monitoring information shall include:
- 3. Records of monitoring information shall include:
- 3. Records of monitoring information shall include:
- 3. Sample or monitor any substances or parameters at any location reasonably necessary to assure compliance with this permit
- 3. Sample or monitor any substances or parameters at any location reasonably necessary to assure compliance with this permit
- 3. Sample or monitor any substances or parameters at any location reasonably necessary to assure compliance with this permit
- 3. The total dissolved solids content of the ground water is more than 3,000 and less than 10,000 mg/L and it is not reasonab ly
- 3. The total dissolved solids content of the ground water is more than 3,000 and less than 10,000 mg/L and it is not reasonab ly
- 3. The total dissolved solids content of the ground water is more than 3,000 and less than 10,000 mg/L and it is not reasonab ly
- 3. Within 48 hours of receiving written notice that the well lacks mechanical integrity, unless the Department requires
- 3. Within 48 hours of receiving written notice that the well lacks mechanical integrity, unless the Department requires
- 3. Within 48 hours of receiving written notice that the well lacks mechanical integrity, unless the Department requires
- 3. Within 48 hours of receiving written notice that the well lacks mechanical integrity, unless the Department requires
- 3. Within 48 hours of receiving written notice that the well lacks mechanical integrity, unless the Department requires
- 3. Within 48 hours of receiving written notice that the well lacks mechanical integrity, unless the Department requires
- 39.PDF
- 39.PDF
- 39.PDF
- General Contractor
- Site Prep, Grading & Hardscape
- Concrete & Masonry
- Electrical
- HVAC & Climate Control
- Painting & Flooring
- Plumbing
- Roofing
- Drywall & Insulation
- Building & Industrial Supply
- Real Estate Development
- Engineering & Architecture
- 39.PDF
- Site Prep, Grading & Hardscape
- Concrete & Masonry
- General Contractor
- Electrical
- Plumbing
- HVAC & Climate Control
- Painting & Flooring
- Building & Industrial Supply
- Engineering & Architecture
- Landscaping & Lawn Service
- 39.PDF
- 39.PDF
- General Contractor
- Site Prep, Grading & Hardscape
- Concrete & Masonry
- Painting & Flooring
- Utilities (Sub)
- Building & Industrial Supply
- Engineering & Architecture
- 39.PDF
- 39.PDF
- 39.PDF
- 39.PDF
- 39.PDF
- 39.PDF
- 39.PDF
- 39.PDF
- 4. Class III Wells Only. When setting corrective action requirements, the Department shall consider the overall effect of the
- 4. Class III Wells Only. When setting corrective action requirements, the Department shall consider the overall effect of the
- 4. Class III Wells Only. When setting corrective action requirements, the Department shall consider the overall effect of the
- 4. Geology;
- 4. Geology;
- 4. Geology;
- 4. Group 4 – Nondomestic Wastewater Wells.
- 4. Group 4 – Nondomestic Wastewater Wells.
- 4. Group 4 – Nondomestic Wastewater Wells.
- 4. Has satisfied the following requirements in accordance with paragraph (b) above:
- 4. Has satisfied the following requirements in accordance with paragraph (b) above:
- 4. Has satisfied the following requirements in accordance with paragraph (b) above:
- 4. The Department shall allow the permittee to continue operation of a well that lacks mechanical integrity if the permittee has
- 4. The Department shall allow the permittee to continue operation of a well that lacks mechanical integrity if the permittee has
- Legal Services
- Engineering & Architecture
- Utilities (Sub)
- Site Prep, Grading & Hardscape
- Construction (Other)
- 4. The Department shall allow the permittee to continue operation of a well that lacks mechanical integrity if the permittee has
- Engineering & Architecture
- Utilities (Sub)
- 4. The Department shall allow the permittee to continue operation of a well that lacks mechanical integrity if the permittee has
- Utilities (Sub)
- Site Prep, Grading & Hardscape
- Engineering & Architecture
- Legal Services
- 4. The Department shall allow the permittee to continue operation of a well that lacks mechanical integrity if the permittee has
- Legal Services
- Engineering & Architecture
- Utilities (Sub)
- 4. The Department shall allow the permittee to continue operation of a well that lacks mechanical integrity if the permittee has
- Utilities (Sub)
- General Contractor
- Site Prep, Grading & Hardscape
- Engineering & Architecture
- Legal Services
- Waste Management
- 4. The permittee shall furnish to the Department, within the time requested in writing, any information which the Department
- 4. The permittee shall furnish to the Department, within the time requested in writing, any information which the Department
- 4. The permittee shall furnish to the Department, within the time requested in writing, any information which the Department
- 5. Group 5 – Mining or Mineral Extraction Wells.
- 5. Group 5 – Mining or Mineral Extraction Wells.
- 5. Group 5 – Mining or Mineral Extraction Wells.
- 5. Hydrology;
- 5. Hydrology;
- 5. Hydrology;
- 5. If the permittee becomes aware that relevant facts were not submitted or were incorrect in the permit application or in an y
- 5. If the permittee becomes aware that relevant facts were not submitted or were incorrect in the permit application or in an y
- 5. If the permittee becomes aware that relevant facts were not submitted or were incorrect in the permit application or in an y
- 6. Group 6 – Stormwater Wells. Wells used to drain surface fluid, primarily storm run -off or for lake level control, into a
- Utilities (Sub)
- Site Prep, Grading & Hardscape
- Construction (Other)
- Building & Industrial Supply
- 6. Group 6 – Stormwater Wells. Wells used to drain surface fluid, primarily storm run -off or for lake level control, into a
- Utilities (Sub)
- Site Prep, Grading & Hardscape
- Construction (Other)
- 6. Group 6 – Stormwater Wells. Wells used to drain surface fluid, primarily storm run -off or for lake level control, into a
- Utilities (Sub)
- Site Prep, Grading & Hardscape
- Construction (Other)
- Building & Industrial Supply
- 6. History of the injection operation;
- 6. History of the injection operation;
- 6. History of the injection operation;
- 7. Completion and plugging records for all wells;
- 7. Completion and plugging records for all wells;
- 7. Completion and plugging records for all wells;
- 7. Group 7 – Aquifer Storage and Recovery System Wells. Wells associated with an aquifer storage and recovery facility where
- 7. Group 7 – Aquifer Storage and Recovery System Wells. Wells associated with an aquifer storage and recovery facility where
- Utilities (Sub)
- General Contractor
- Site Prep, Grading & Hardscape
- Building & Industrial Supply
- Engineering & Architecture
- 8. Abandonment procedures in effect at the time the well was abandoned;
- 8. Abandonment procedures in effect at the time the well was abandoned;
- 8. Abandonment procedures in effect at the time the well was abandoned;
- 8. Group 8 – Class V Wells Regulated Under Additional Federal Requirements.
- 8. Group 8 – Class V Wells Regulated Under Additional Federal Requirements.
- 8. Group 8 – Class V Wells Regulated Under Additional Federal Requirements.
- 9. Group 9 – Other Class V Wells.
- 9. Group 9 – Other Class V Wells.
- 9. Group 9 – Other Class V Wells.
- 9. Hydraulic connections with underground sources of drinking water;
- 9. Hydraulic connections with underground sources of drinking water;
- 9. Hydraulic connections with underground sources of drinking water;
- ANY PERSON WHO MAY FEEL THE NEED TO APPEAL A BOARD DECISION IS HEREBY NOTIFIED
- ANY PERSON WHO MAY FEEL THE NEED TO APPEAL A BOARD DECISION IS HEREBY NOTIFIED
- ANY PERSON WHO MAY FEEL THE NEED TO APPEAL A BOARD DECISION IS HEREBY NOTIFIED
- ANY PERSON WHO MAY FEEL THE NEED TO APPEAL A BOARD DECISION IS HEREBY NOTIFIED
- ANY PERSON WHO MAY FEEL THE NEED TO APPEAL A BOARD DECISION IS HEREBY NOTIFIED
- ANY PERSON WHO MAY FEEL THE NEED TO APPEAL A BOARD DECISION IS HEREBY NOTIFIED
- ANY PERSON WHO MAY FEEL THE NEED TO APPEAL A BOARD DECISION IS HEREBY NOTIFIED
- ANY PERSON WHO MAY FEEL THE NEED TO APPEAL A BOARD DECISION IS HEREBY NOTIFIED
- ANY PERSON WHO MAY FEEL THE NEED TO APPEAL A BOARD DECISION IS HEREBY NOTIFIED
- ANY PERSON WHO MAY FEEL THE NEED TO APPEAL A BOARD DECISION IS HEREBY NOTIFIED
- APPOINTMENTS
- APPOINTMENTS
- Legal Services
- Engineering & Architecture
- Government Authority
- APPOINTMENTS
- Legal Services
- Engineering & Architecture
- Government Authority
- APPOINTMENTS
- APPOINTMENTS
- APPOINTMENTS
- Legal Services
- Engineering & Architecture
- General Contractor
- Building & Industrial Supply
- Real Estate Development
- APPOINTMENTS
- Legal Services
- Engineering & Architecture
- General Contractor
- Real Estate Development
- APPOINTMENTS
- APPOINTMENTS
- Legal Services
- Engineering & Architecture
- Government Authority
- APPOINTMENTS
- APPOINTMENTS
- Legal Services
- Engineering & Architecture
- Government Authority
- APPOINTMENTS
- Legal Services
- Engineering & Architecture
- General Contractor
- Building & Industrial Supply
- Real Estate Development
- APPOINTMENTS
- Legal Services
- Government Authority
- APPOINTMENTS
- Legal Services
- Engineering & Architecture
- General Contractor
- Real Estate Development
- BOARD OF SUMTER COUNTY COMMISSIONERS
- BOARD OF SUMTER COUNTY COMMISSIONERS
- BOARD OF SUMTER COUNTY COMMISSIONERS
- BOARD OF SUMTER COUNTY COMMISSIONERS
- BOARD OF SUMTER COUNTY COMMISSIONERS
- BOARD OF SUMTER COUNTY COMMISSIONERS
- BOARD OF SUMTER COUNTY COMMISSIONERS
- BOARD OF SUMTER COUNTY COMMISSIONERS
- BOARD OF SUMTER COUNTY COMMISSIONERS
- General Contractor
- Site Prep, Grading & Hardscape
- Concrete & Masonry
- Electrical
- Plumbing
- HVAC & Climate Control
- Building & Industrial Supply
- Real Estate Development
- Engineering & Architecture
- BOARD OF SUMTER COUNTY COMMISSIONERS
- BOARDS MINUTES OR ANY PORTION THEREOF
- BOARDS MINUTES OR ANY PORTION THEREOF
- BOARDS MINUTES OR ANY PORTION THEREOF
- BOARDS MINUTES OR ANY PORTION THEREOF
- BOARDS MINUTES OR ANY PORTION THEREOF
- BOARDS MINUTES OR ANY PORTION THEREOF
- BOARDS MINUTES OR ANY PORTION THEREOF
- BOARDS MINUTES OR ANY PORTION THEREOF
- BOARDS MINUTES OR ANY PORTION THEREOF
- BOARDS MINUTES OR ANY PORTION THEREOF
- CONTRACTS AND AGREEMENTS
- General Contractor
- Site Prep, Grading & Hardscape
- Building & Industrial Supply
- Engineering & Architecture
- CONTRACTS AND AGREEMENTS
- General Contractor
- Site Prep, Grading & Hardscape
- Building & Industrial Supply
- Engineering & Architecture
- CONTRACTS AND AGREEMENTS
- General Contractor
- Site Prep, Grading & Hardscape
- Building & Industrial Supply
- CONTRACTS AND AGREEMENTS
- General Contractor
- Site Prep, Grading & Hardscape
- Building & Industrial Supply
- CONTRACTS AND AGREEMENTS
- General Contractor
- Site Prep, Grading & Hardscape
- Concrete & Masonry
- Painting & Flooring
- Building & Industrial Supply
- CONTRACTS AND AGREEMENTS
- General Contractor
- Site Prep, Grading & Hardscape
- Building & Industrial Supply
- Engineering & Architecture
- CONTRACTS AND AGREEMENTS
- General Contractor
- Site Prep, Grading & Hardscape
- Building & Industrial Supply
- CONTRACTS AND AGREEMENTS
- General Contractor
- Site Prep, Grading & Hardscape
- Building & Industrial Supply
- Engineering & Architecture
- Real Estate Development
- CONTRACTS AND AGREEMENTS
- General Contractor
- Site Prep, Grading & Hardscape
- Concrete & Masonry
- Painting & Flooring
- Building & Industrial Supply
- CONTRACTS AND AGREEMENTS
- General Contractor
- Site Prep, Grading & Hardscape
- Building & Industrial Supply
- Concrete & Masonry
- Painting & Flooring
- CONTRACTS AND AGREEMENTS
- General Contractor
- Site Prep, Grading & Hardscape
- Concrete & Masonry
- Painting & Flooring
- Building & Industrial Supply
- CONTRACTS AND AGREEMENTS
- General Contractor
- Site Prep, Grading & Hardscape
- Building & Industrial Supply
- Engineering & Architecture
- Cc: 'countyattorney.sumtercounty.fl' <countyattorney.sumtercounty.fl@hoganlawfirm .com>; Rodriguez, David
- Utilities (Sub)
- Site Prep, Grading & Hardscape
- Construction (Other)
- Engineering & Architecture
- Legal Services
- Government Authority
- Cc: 'countyattorney.sumtercounty.fl' <countyattorney.sumtercounty.fl@hoganlawfirm .com>; Rodriguez, David
- General Contractor
- Site Prep, Grading & Hardscape
- Utilities (Sub)
- Engineering & Architecture
- Legal Services
- Waste Management
- Cc: 'countyattorney.sumtercounty.fl' <countyattorney.sumtercounty.fl@hoganlawfirm .com>; Rodriguez, David
- Legal Services
- Engineering & Architecture
- Business Consulting
- Cc: Lobinske, Richard <Richard.Lobinske@FloridaDEP.gov>; Eaton, Jeremy A
- General Contractor
- Site Prep, Grading & Hardscape
- Concrete & Masonry
- Electrical
- Plumbing
- HVAC & Climate Control
- Construction (Other)
- Utilities (Sub)
- Building & Industrial Supply
- Engineering & Architecture
- Legal Services
- Real Estate Development
- Landscaping & Lawn Service
- Cc: Lobinske, Richard <Richard.Lobinske@FloridaDEP.gov>; Eaton, Jeremy A
- General Contractor
- Site Prep, Grading & Hardscape
- Engineering & Architecture
- Utilities (Sub)
- Cc: Lobinske, Richard <Richard.Lobinske@FloridaDEP.gov>; Eaton, Jeremy A
- Site Prep, Grading & Hardscape
- General Contractor
- Concrete & Masonry
- Construction (Other)
- Utilities (Sub)
- Engineering & Architecture
- Building & Industrial Supply
- Cc: Mike Eastburn <meastburn@cityofbushnellfl.com>; Morgan Wilson
- Site Prep, Grading & Hardscape
- Utilities (Sub)
- Engineering & Architecture
- Building & Industrial Supply
- General Contractor
- Cc: Mike Eastburn <meastburn@cityofbushnellfl.com>; Morgan Wilson
- General Contractor
- Site Prep, Grading & Hardscape
- Utilities (Sub)
- Engineering & Architecture
- Building & Industrial Supply
- Cc: Mike Eastburn <meastburn@cityofbushnellfl.com>; Morgan Wilson
- Engineering & Architecture
- General Contractor
- Utilities (Sub)
- Cc: Mike Eastburn <meastburn@cityofbushnellfl.com>; Morgan Wilson
- Cc: Mike Eastburn <meastburn@cityofbushnellfl.com>; Morgan Wilson
- Site Prep, Grading & Hardscape
- Concrete & Masonry
- Construction (Other)
- Utilities (Sub)
- Building & Industrial Supply
- Engineering & Architecture
- Cc: Mike Eastburn <meastburn@cityofbushnellfl.com>; Morgan Wilson
- Government Authority
- Engineering & Architecture
- Utilities (Sub)
- Construction (Other)
- Building & Industrial Supply
- Cc: Mike Eastburn <meastburn@cityofbushnellfl.com>; Morgan Wilson
- Cc: Mike Eastburn <meastburn@cityofbushnellfl.com>; Morgan Wilson
- Utilities (Sub)
- General Contractor
- Construction (Other)
- Engineering & Architecture
- Legal Services
- Waste Management
- Cc: Mike Eastburn <meastburn@cityofbushnellfl.com>; Morgan Wilson
- Engineering & Architecture
- Utilities (Sub)
- Site Prep, Grading & Hardscape
- Construction (Other)
- Business Consulting
- FINANCIAL
- FINANCIAL
- FINANCIAL
- Real Estate Development
- Commercial Brokerage
- Residential Brokerage
- Legal Services
- Accounting & Tax
- FINANCIAL
- FINANCIAL
- FINANCIAL
- Real Estate Development
- Commercial Brokerage
- Residential Brokerage
- Engineering & Architecture
- Building & Industrial Supply
- Site Prep, Grading & Hardscape
- FINANCIAL
- Pest Control
- Building & Industrial Supply
- Utilities (Sub)
- FINANCIAL
- Utilities (Sub)
- FINANCIAL
- Pest Control
- Government Authority
- FINANCIAL
- Utilities (Sub)
- FINANCIAL
- Utilities (Sub)
- FINANCIAL
- Utilities (Sub)
- FINANCIAL
- FINANCIAL
- Utilities (Sub)
- FLAG SALUTE
- General Contractor
- Site Prep, Grading & Hardscape
- Concrete & Masonry
- Electrical
- Plumbing
- HVAC & Climate Control
- Roofing
- Painting & Flooring
- Real Estate Development
- Engineering & Architecture
- Building & Industrial Supply
- FLAG SALUTE
- Real Estate Development
- Engineering & Architecture
- Site Prep, Grading & Hardscape
- General Contractor
- Concrete & Masonry
- Carpentry & Cabinetry
- Electrical
- Plumbing
- HVAC & Climate Control
- Roofing
- Painting & Flooring
- Building & Industrial Supply
- Landscaping & Lawn Service
- FLAG SALUTE
- General Contractor
- Site Prep, Grading & Hardscape
- Concrete & Masonry
- Carpentry & Cabinetry
- Electrical
- Plumbing
- HVAC & Climate Control
- Roofing
- Building & Industrial Supply
- Engineering & Architecture
- Real Estate Development
- FLAG SALUTE
- General Contractor
- Site Prep, Grading & Hardscape
- Real Estate Development
- Engineering & Architecture
- Building & Industrial Supply
- Landscaping & Lawn Service
- FLAG SALUTE
- Real Estate Development
- Engineering & Architecture
- Site Prep, Grading & Hardscape
- General Contractor
- Concrete & Masonry
- Electrical
- Plumbing
- HVAC & Climate Control
- Roofing
- Painting & Flooring
- Drywall & Insulation
- Building & Industrial Supply
- Landscaping & Lawn Service
- Legal Services
- FLAG SALUTE
- Real Estate Development
- Site Prep, Grading & Hardscape
- Concrete & Masonry
- Carpentry & Cabinetry
- Electrical
- HVAC & Climate Control
- Plumbing
- Roofing
- Painting & Flooring
- Drywall & Insulation
- Building & Industrial Supply
- Engineering & Architecture
- Legal Services
- Landscaping & Lawn Service
- FLAG SALUTE
- General Contractor
- Site Prep, Grading & Hardscape
- Concrete & Masonry
- Carpentry & Cabinetry
- Electrical
- HVAC & Climate Control
- Plumbing
- Roofing
- Painting & Flooring
- Drywall & Insulation
- Windows, Doors & Glass
- Building & Industrial Supply
- Real Estate Development
- Engineering & Architecture
- Landscaping & Lawn Service
- FLAG SALUTE
- General Contractor
- Site Prep, Grading & Hardscape
- Concrete & Masonry
- Electrical
- Plumbing
- HVAC & Climate Control
- Roofing
- Painting & Flooring
- Building & Industrial Supply
- Real Estate Development
- Engineering & Architecture
- FLAG SALUTE
- General Contractor
- Site Prep, Grading & Hardscape
- Real Estate Development
- Engineering & Architecture
- Building & Industrial Supply
- Landscaping & Lawn Service
- FLAG SALUTE
- General Contractor
- Site Prep, Grading & Hardscape
- Concrete & Masonry
- Electrical
- Plumbing
- HVAC & Climate Control
- Roofing
- Painting & Flooring
- Real Estate Development
- Engineering & Architecture
- GENERAL ITEMS FOR CONSIDERATION
- Site Prep, Grading & Hardscape
- Trucking & Freight
- Waste Management
- Government Authority
- GENERAL ITEMS FOR CONSIDERATION
- Legal Services
- Business Consulting
- Accounting & Tax
- Government Authority
- GENERAL ITEMS FOR CONSIDERATION
- Site Prep, Grading & Hardscape
- Trucking & Freight
- Waste Management
- Building & Industrial Supply
- General Contractor
- Business Consulting
- GENERAL ITEMS FOR CONSIDERATION
- GENERAL ITEMS FOR CONSIDERATION
- GENERAL ITEMS FOR CONSIDERATION
- GENERAL ITEMS FOR CONSIDERATION
- GENERAL ITEMS FOR CONSIDERATION
- GENERAL ITEMS FOR CONSIDERATION
- GENERAL ITEMS FOR CONSIDERATION
- GENERAL ITEMS FOR CONSIDERATION
- GENERAL ITEMS FOR CONSIDERATION
- MEETING IS CALLED TO ORDER BY THE CHAIRMAN
- MEETING IS CALLED TO ORDER BY THE CHAIRMAN
- MEETING IS CALLED TO ORDER BY THE CHAIRMAN
- MEETING IS CALLED TO ORDER BY THE CHAIRMAN
- MEETING IS CALLED TO ORDER BY THE CHAIRMAN
- MEETING IS CALLED TO ORDER BY THE CHAIRMAN
- MEETING IS CALLED TO ORDER BY THE CHAIRMAN
- MEETING IS CALLED TO ORDER BY THE CHAIRMAN
- MEETING IS CALLED TO ORDER BY THE CHAIRMAN
- MEETING IS CALLED TO ORDER BY THE CHAIRMAN
- MINUTES
- MINUTES
- MINUTES
- MINUTES
- MINUTES
- MINUTES
- MINUTES
- MINUTES
- MINUTES
- MINUTES
- MINUTES
- MINUTES
- MINUTES
- MINUTES
- NEW BUSINESS - ACTION REQUIRED
- NEW BUSINESS - ACTION REQUIRED
- NEW BUSINESS - ACTION REQUIRED
- NEW BUSINESS - ACTION REQUIRED
- NEW BUSINESS - ACTION REQUIRED
- NEW BUSINESS - ACTION REQUIRED
- NEW BUSINESS - ACTION REQUIRED
- NEW BUSINESS - ACTION REQUIRED
- NEW BUSINESS - ACTION REQUIRED
- NEW BUSINESS - ACTION REQUIRED
- NEW BUSINESS - ACTION REQUIRED
- NEW BUSINESS - ACTION REQUIRED
- NEW BUSINESS - ACTION REQUIRED
- NEW BUSINESS - ACTION REQUIRED
- REPORTS AND INPUT
- Real Estate Development
- Engineering & Architecture
- Site Prep, Grading & Hardscape
- Concrete & Masonry
- Carpentry & Cabinetry
- Roofing
- Electrical
- Plumbing
- HVAC & Climate Control
- Painting & Flooring
- Building & Industrial Supply
- Landscaping & Lawn Service
- REPORTS AND INPUT
- General Contractor
- Site Prep, Grading & Hardscape
- Concrete & Masonry
- Painting & Flooring
- Electrical
- Plumbing
- HVAC & Climate Control
- Building & Industrial Supply
- Engineering & Architecture
- Landscaping & Lawn Service
- REPORTS AND INPUT
- Real Estate Development
- Site Prep, Grading & Hardscape
- General Contractor
- Carpentry & Cabinetry
- Concrete & Masonry
- Electrical
- HVAC & Climate Control
- Painting & Flooring
- Plumbing
- Roofing
- Engineering & Architecture
- Building & Industrial Supply
- Landscaping & Lawn Service
- REPORTS AND INPUT
- Site Prep, Grading & Hardscape
- Concrete & Masonry
- General Contractor
- Painting & Flooring
- Construction (Other)
- Building & Industrial Supply
- Engineering & Architecture
- REPORTS AND INPUT
- Engineering & Architecture
- Site Prep, Grading & Hardscape
- Concrete & Masonry
- Construction (Other)
- General Contractor
- Lighting & Low-Voltage Systems
- Painting & Flooring
- Plumbing
- HVAC & Climate Control
- Electrical
- Building & Industrial Supply
- Real Estate Development
- Government Authority
- REPORTS AND INPUT
- Site Prep, Grading & Hardscape
- Utilities (Sub)
- Concrete & Masonry
- General Contractor
- Building & Industrial Supply
- Engineering & Architecture
- REPORTS AND INPUT
- Site Prep, Grading & Hardscape
- General Contractor
- Concrete & Masonry
- Painting & Flooring
- Electrical
- Plumbing
- HVAC & Climate Control
- Building & Industrial Supply
- Engineering & Architecture
- Landscaping & Lawn Service
- REPORTS AND INPUT
- Engineering & Architecture
- Site Prep, Grading & Hardscape
- Concrete & Masonry
- Construction (Other)
- Building & Industrial Supply
- Utilities (Sub)
- REPORTS AND INPUT
- Site Prep, Grading & Hardscape
- General Contractor
- Utilities (Sub)
- Building & Industrial Supply
- Engineering & Architecture
- REPORTS AND INPUT
- Engineering & Architecture
- Site Prep, Grading & Hardscape
- Utilities (Sub)
- Concrete & Masonry
- General Contractor
- Building & Industrial Supply
- REPORTS AND INPUT
- General Contractor
- Site Prep, Grading & Hardscape
- Concrete & Masonry
- Painting & Flooring
- Utilities (Sub)
- Engineering & Architecture
- Building & Industrial Supply
- REPORTS AND INPUT
- Site Prep, Grading & Hardscape
- Concrete & Masonry
- General Contractor
- Painting & Flooring
- Electrical
- Plumbing
- HVAC & Climate Control
- Building & Industrial Supply
- Engineering & Architecture
- Real Estate Development
- Landscaping & Lawn Service
- SET FUTURE PUBLIC HEARINGS OR MEETINGS
- Legal Services
- Business Consulting
- Government Authority
- SET FUTURE PUBLIC HEARINGS OR MEETINGS
- Government Authority
- Legal Services
- Business Consulting
- Accounting & Tax
- Lending & Credit
- Investment & Securities
- Building & Industrial Supply
- General Contractor
- Site Prep, Grading & Hardscape
- Waste Management
- Real Estate Development
- Commercial Brokerage
- Hotel & Lodging
- Full-Service Restaurant
- Quick-Service Restaurant
- SET FUTURE PUBLIC HEARINGS OR MEETINGS
- Event Planning & Rentals
- Hotel & Lodging
- Business Consulting
- Legal Services
- Government Authority
- SET FUTURE PUBLIC HEARINGS OR MEETINGS
- Legal Services
- Business Consulting
- Government Authority
- SET FUTURE PUBLIC HEARINGS OR MEETINGS
- Legal Services
- Accounting & Tax
- Business Consulting
- Government Authority
- SET FUTURE PUBLIC HEARINGS OR MEETINGS
- Government Authority
- Legal Services
- Business Consulting
- Hotel & Lodging
- Recreation (Other)
- SET FUTURE PUBLIC HEARINGS OR MEETINGS
- Legal Services
- Business Consulting
- Government Authority
- Event Planning & Rentals
- Hotel & Lodging
- Marketing & Advertising
- SET FUTURE PUBLIC HEARINGS OR MEETINGS
- Government Authority
- Legal Services
- Business Consulting
- Accounting & Tax
- Commercial & Business Insurance
- Hotel & Lodging
- Recreation (Other)
- Event Planning & Rentals
- SET FUTURE PUBLIC HEARINGS OR MEETINGS
- Legal Services
- Business Consulting
- Government Authority
- SET FUTURE PUBLIC HEARINGS OR MEETINGS
- Legal Services
- Business Consulting
- Government Authority
- SET FUTURE PUBLIC HEARINGS OR MEETINGS
- Event Planning & Rentals
- Hotel & Lodging
- Business Consulting
- Legal Services
- Government Authority
- SET FUTURE PUBLIC HEARINGS OR MEETINGS
- Full-Service Restaurant
- Hotel & Lodging
- Amusement & Attractions
- Sports Facility
- Event Planning & Rentals
- Business Consulting
- Legal Services
- Government Authority
- SET FUTURE PUBLIC HEARINGS OR MEETINGS
- Legal Services
- Marketing & Advertising
- Business Consulting
- Government Authority
- SET FUTURE PUBLIC HEARINGS OR MEETINGS
- Legal Services
- Business Consulting
- Government Authority
- THAT IT WILL BE NECESSARY FOR YOU TO PROVIDE YOUR OWN VERBATIM RECORDING OF THE
- THAT IT WILL BE NECESSARY FOR YOU TO PROVIDE YOUR OWN VERBATIM RECORDING OF THE
- THAT IT WILL BE NECESSARY FOR YOU TO PROVIDE YOUR OWN VERBATIM RECORDING OF THE
- THAT IT WILL BE NECESSARY FOR YOU TO PROVIDE YOUR OWN VERBATIM RECORDING OF THE
- THAT IT WILL BE NECESSARY FOR YOU TO PROVIDE YOUR OWN VERBATIM RECORDING OF THE
- THAT IT WILL BE NECESSARY FOR YOU TO PROVIDE YOUR OWN VERBATIM RECORDING OF THE
- THAT IT WILL BE NECESSARY FOR YOU TO PROVIDE YOUR OWN VERBATIM RECORDING OF THE
- THAT IT WILL BE NECESSARY FOR YOU TO PROVIDE YOUR OWN VERBATIM RECORDING OF THE
- THAT IT WILL BE NECESSARY FOR YOU TO PROVIDE YOUR OWN VERBATIM RECORDING OF THE
- THAT IT WILL BE NECESSARY FOR YOU TO PROVIDE YOUR OWN VERBATIM RECORDING OF THE
- a) Change of conditions, or absence of changed conditions.
- a) Change of conditions, or absence of changed conditions.
- General Contractor
- Site Prep, Grading & Hardscape
- Building & Industrial Supply
- Real Estate Development
- Engineering & Architecture
- a) Change of conditions, or absence of changed conditions.
- General Contractor
- Site Prep, Grading & Hardscape
- Building & Industrial Supply
- Engineering & Architecture
- Real Estate Development
- a) Change of conditions, or absence of changed conditions.
- Real Estate Development
- General Contractor
- Site Prep, Grading & Hardscape
- Utilities (Sub)
- Engineering & Architecture
- a) Change of conditions, or absence of changed conditions.
- a) Change of conditions, or absence of changed conditions.
- General Contractor
- Site Prep, Grading & Hardscape
- Building & Industrial Supply
- Real Estate Development
- Engineering & Architecture
- a) Change of conditions, or absence of changed conditions: The subject parcel changed
- a) Change of conditions, or absence of changed conditions: The subject parcel changed
- a) Change of conditions, or absence of changed conditions: The subject parcel changed
- Real Estate Development
- General Contractor
- Site Prep, Grading & Hardscape
- Utilities (Sub)
- Concrete & Masonry
- Carpentry & Cabinetry
- Electrical
- Plumbing
- HVAC & Climate Control
- Roofing
- Painting & Flooring
- Building & Industrial Supply
- Appraisal & Inspection
- Engineering & Architecture
- Landscaping & Lawn Service
- a) Change of conditions, or absence of changed conditions: The subject parcel changed
- a) Change of conditions, or absence of changed conditions: The subject parcel changed
- a) Change of conditions, or absence of changed conditions: The subject parcel changed
- a. A major aquifer exemption has been approved by the Environmental Protection Agency; or
- a. A major aquifer exemption has been approved by the Environmental Protection Agency; or
- a. A major aquifer exemption has been approved by the Environmental Protection Agency; or
- a. Air conditioning return flow wells used to return to any aquifer the water used for heating or cooling. An air conditionin g
- a. Air conditioning return flow wells used to return to any aquifer the water used for heating or cooling. An air conditionin g
- a. Air conditioning return flow wells used to return to any aquifer the water used for heating or cooling. An air conditionin g
- a. Dry wells used for the injection of wastes into a subsurface formation;
- a. Dry wells used for the injection of wastes into a subsurface formation;
- a. Dry wells used for the injection of wastes into a subsurface formation;
- a. Exploratory wells;
- a. Exploratory wells;
- a. Exploratory wells;
- a. It is mineral, hydrocarbon, or geothermal energy producing, or can be demonstrated by a permit applicant for a Class III
- a. It is mineral, hydrocarbon, or geothermal energy producing, or can be demonstrated by a permit applicant for a Class III
- a. It is mineral, hydrocarbon, or geothermal energy producing, or can be demonstrated by a permit applicant for a Class III
- a. Large capacity cesspools including multiple dwelling, community or regional cesspools, or other devices that receive sanit ary
- a. Large capacity cesspools including multiple dwelling, community or regional cesspools, or other devices that receive sanit ary
- a. Large capacity cesspools including multiple dwelling, community or regional cesspools, or other devices that receive sanit ary
- a. Recharge wells used to replenish, augment, or store water in an aquifer;
- a. Recharge wells used to replenish, augment, or store water in an aquifer;
- a. Recharge wells used to replenish, augment, or store water in an aquifer;
- a. The date, exact place, and time of sampling or measurements;
- a. The date, exact place, and time of sampling or measurements;
- a. The date, exact place, and time of sampling or measurements;
- a. Wells used to inject spent brine into the same formation from which it was withdrawn after extraction of halogens or their
- a. Wells used to inject spent brine into the same formation from which it was withdrawn after extraction of halogens or their
- a. Wells used to inject spent brine into the same formation from which it was withdrawn after extraction of halogens or their
- a. Wells which are part of domestic wastewater treatment systems excluding wells which are defined as Class I wells under
- a. Wells which are part of domestic wastewater treatment systems excluding wells which are defined as Class I wells under
- Utilities (Sub)
- Site Prep, Grading & Hardscape
- Plumbing
- Construction (Other)
- Engineering & Architecture
- Legal Services
- a. Wells which are part of domestic wastewater treatment systems excluding wells which are defined as Class I wells under
- b) Community need, or lack of community need.
- b) Community need, or lack of community need.
- b) Community need, or lack of community need.
- b) Community need, or lack of community need.
- b) Community need, or lack of community need.
- b) Community need, or lack of community need.
- b) Community need, or lack of community need: The rezoning addresses a personal need of
- b) Community need, or lack of community need: The rezoning addresses a personal need of
- b) Community need, or lack of community need: The rezoning addresses a personal need of
- b) Community need, or lack of community need: The rezoning addresses a personal need of
- b) Community need, or lack of community need: The rezoning addresses a personal need of
- b) Community need, or lack of community need: The rezoning addresses a personal need of
- b. A minor aquifer exemption has not been disapproved by the Environmental Protection Agency.
- Mining & Extraction
- Utilities (Sub)
- Site Prep, Grading & Hardscape
- Engineering & Architecture
- Legal Services
- Business Consulting
- Government Authority
- b. A minor aquifer exemption has not been disapproved by the Environmental Protection Agency.
- Engineering & Architecture
- Utilities (Sub)
- Business Consulting
- b. A minor aquifer exemption has not been disapproved by the Environmental Protection Agency.
- Mining & Extraction
- Utilities (Sub)
- Site Prep, Grading & Hardscape
- Engineering & Architecture
- Business Consulting
- Legal Services
- Government Authority
- b. Cooling water return flow wells used to inject water previously used for cooling;
- b. Cooling water return flow wells used to inject water previously used for cooling;
- b. Cooling water return flow wells used to inject water previously used for cooling;
- b. Injection wells associated with an aquifer remediation project;
- b. Injection wells associated with an aquifer remediation project;
- b. Injection wells associated with an aquifer remediation project;
- b. Injection wells associated with the recovery of geothermal energy for heating, aquaculture and production of electric powe r;
- b. Injection wells associated with the recovery of geothermal energy for heating, aquaculture and production of electric powe r;
- b. Injection wells associated with the recovery of geothermal energy for heating, aquaculture and production of electric powe r;
- b. It is situated at a depth or location which makes recovery of water for drinking water purposes economically or
- b. It is situated at a depth or location which makes recovery of water for drinking water purposes economically or
- b. It is situated at a depth or location which makes recovery of water for drinking water purposes economically or
- b. Motor vehicle waste disposal wells that receive or have received fluids from vehicular repair or maintenance activities, s uch
- b. Motor vehicle waste disposal wells that receive or have received fluids from vehicular repair or maintenance activities, s uch
- b. Motor vehicle waste disposal wells that receive or have received fluids from vehicular repair or maintenance activities, s uch
- Utilities (Sub)
- General Contractor
- Site Prep, Grading & Hardscape
- Building & Industrial Supply
- Trucking & Freight
- Engineering & Architecture
- Legal Services
- Waste Management
- Auto Repair & Service
- b. Salt water intrusion barrier wells used to inject water into a fresh water aquifer to prevent the intrusion of salt water into the
- b. Salt water intrusion barrier wells used to inject water into a fresh water aquifer to prevent the intrusion of salt water into the
- b. Salt water intrusion barrier wells used to inject water into a fresh water aquifer to prevent the intrusion of salt water into the
- b. Sand backfill wells used to inject a mixture of water and sand, tailings or other solids into mined out portions of subsur face
- b. Sand backfill wells used to inject a mixture of water and sand, tailings or other solids into mined out portions of subsur face
- b. Sand backfill wells used to inject a mixture of water and sand, tailings or other solids into mined out portions of subsur face
- b. Septic system wells used to inject the waste from a multiple dwelling, business establishment, community, or regional
- b. Septic system wells used to inject the waste from a multiple dwelling, business establishment, community, or regional
- b. Septic system wells used to inject the waste from a multiple dwelling, business establishment, community, or regional
- b. The person responsible for performing the sampling or measurements;
- b. The person responsible for performing the sampling or measurements;
- b. The person responsible for performing the sampling or measurements;
- c) Benefits to the community: The range of uses permitted in the requested zoning district is
- Real Estate Development
- General Contractor
- Site Prep, Grading & Hardscape
- Utilities (Sub)
- Concrete & Masonry
- Carpentry & Cabinetry
- Electrical
- Plumbing
- HVAC & Climate Control
- Roofing
- Painting & Flooring
- Building & Industrial Supply
- Engineering & Architecture
- Appraisal & Inspection
- Title & Settlement Services
- c) Benefits to the community: The range of uses permitted in the requested zoning district is
- c) Benefits to the community: The range of uses permitted in the requested zoning district is
- c) Benefits to the community: The range of uses permitted in the requested zoning district is
- Real Estate Development
- General Contractor
- Site Prep, Grading & Hardscape
- Concrete & Masonry
- Carpentry & Cabinetry
- Electrical
- Plumbing
- HVAC & Climate Control
- Roofing
- Painting & Flooring
- Drywall & Insulation
- Building & Industrial Supply
- Engineering & Architecture
- Legal Services
- Landscaping & Lawn Service
- c) Benefits to the community: The range of uses permitted in the requested zoning district is
- c) Benefits to the community: The range of uses permitted in the requested zoning district is
- c) Whether the entire range of permitted uses in the requested zoning district is more
- Real Estate Development
- General Contractor
- Site Prep, Grading & Hardscape
- Concrete & Masonry
- Carpentry & Cabinetry
- Electrical
- Plumbing
- HVAC & Climate Control
- Roofing
- Painting & Flooring
- Drywall & Insulation
- Building & Industrial Supply
- Engineering & Architecture
- Landscaping & Lawn Service
- c) Whether the entire range of permitted uses in the requested zoning district is more
- Real Estate Development
- Engineering & Architecture
- Site Prep, Grading & Hardscape
- General Contractor
- Concrete & Masonry
- Electrical
- HVAC & Climate Control
- Plumbing
- Roofing
- Painting & Flooring
- Building & Industrial Supply
- Landscaping & Lawn Service
- c) Whether the entire range of permitted uses in the requested zoning district is more
- Real Estate Development
- Engineering & Architecture
- Site Prep, Grading & Hardscape
- General Contractor
- Electrical
- Plumbing
- HVAC & Climate Control
- Carpentry & Cabinetry
- Drywall & Insulation
- Painting & Flooring
- Roofing
- Building & Industrial Supply
- Landscaping & Lawn Service
- Legal Services
- c) Whether the entire range of permitted uses in the requested zoning district is more
- Real Estate Development
- General Contractor
- Site Prep, Grading & Hardscape
- Concrete & Masonry
- Electrical
- Plumbing
- HVAC & Climate Control
- Carpentry & Cabinetry
- Roofing
- Painting & Flooring
- Drywall & Insulation
- Building & Industrial Supply
- Engineering & Architecture
- Legal Services
- Landscaping & Lawn Service
- c) Whether the entire range of permitted uses in the requested zoning district is more
- Real Estate Development
- Engineering & Architecture
- Site Prep, Grading & Hardscape
- General Contractor
- Carpentry & Cabinetry
- Concrete & Masonry
- Drywall & Insulation
- Electrical
- HVAC & Climate Control
- Painting & Flooring
- Plumbing
- Roofing
- Building & Industrial Supply
- Landscaping & Lawn Service
- Legal Services
- c) Whether the entire range of permitted uses in the requested zoning district is more
- Real Estate Development
- Engineering & Architecture
- Legal Services
- Site Prep, Grading & Hardscape
- General Contractor
- Concrete & Masonry
- Electrical
- HVAC & Climate Control
- Plumbing
- Roofing
- Painting & Flooring
- Drywall & Insulation
- Building & Industrial Supply
- Residential Brokerage
- Title & Settlement Services
- c. Injection wells used for in situ recovery of phosphate, uraniferous sandstone, clay, sand, and other minerals extracted by the
- c. Injection wells used for in situ recovery of phosphate, uraniferous sandstone, clay, sand, and other minerals extracted by the
- c. Injection wells used for in situ recovery of phosphate, uraniferous sandstone, clay, sand, and other minerals extracted by the
- c. It is so contaminated that it would be economically or technologically impractical to render that water fit for human
- c. It is so contaminated that it would be economically or technologically impractical to render that water fit for human
- c. It is so contaminated that it would be economically or technologically impractical to render that water fit for human
- c. Subsidence control wells (not used for the purpose of oil or natural gas production) used to inject fluids into a zone whi ch
- c. Subsidence control wells (not used for the purpose of oil or natural gas production) used to inject fluids into a zone whi ch
- Utilities (Sub)
- Site Prep, Grading & Hardscape
- Construction (Other)
- Engineering & Architecture
- c. Subsidence control wells (not used for the purpose of oil or natural gas production) used to inject fluids into a zone whi ch
- c. Swimming pool drainage wells;
- c. Swimming pool drainage wells;
- c. Swimming pool drainage wells;
- c. The dates analyses were performed;
- c. The dates analyses were performed;
- c. The dates analyses were performed;
- c. Wells other than Class I or Class IV used to inject radioactive waste, provided the concentrations of the waste do not exc eed
- c. Wells other than Class I or Class IV used to inject radioactive waste, provided the concentrations of the waste do not exc eed
- c. Wells other than Class I or Class IV used to inject radioactive waste, provided the concentrations of the waste do not exc eed
Follow this across meetings
Applicants and firms
See the actual businesses behind these numbers
Get the real filings, with addresses and officers, backed by a 14-day money-back guarantee.
Create your account