Amended Agenda Packet
Board of Commissioners Meeting · 2026-04-21 · agenda_packet
Taylor County Board of County Commissioners is considering awarding a contract to Walter Marine for the Artificial Reefs Construction Project. The project involves the fabrication, transport, and deployment of 36 marine matrix reef concrete modules, each 5'x5'x5'. Walter Marine submitted the sole bid of $59,998.92. The project is 100% funded by a $60,000 grant from the Florida Fish and Wildlife Conservation Commission (FWC) under Agreement No. 25016. Walter Marine has extensive experience in artificial reef construction and holds multiple patents. The company addressed concerns regarding workers' compensation insurance by stating they will not use subcontractors and their existing P&I/Jones Act and general liability insurance covers all project activities, as has been accepted by other Florida counties. The Bid Review Committee recommends awarding the contract to Walter Marine as a cost-effective, responsive bidder. [201 East Green Street, Perry, FL 32347 (for Taylor County Board of County Commissioners); case Agreement No. LW719, Amendment No. 3] Taylor County Board of County Commissioners is seeking approval for Amendment No. 3 to Agreement No. LW719 with the Florida Department of Environmental Protection. This amendment extends the grant agreement for the renovation of Hodges Park to November 1, 2026, with all close-out documents due by December 31, 2026. The original grant amount was $200,000, funded through the FDEP Land and Water Conservation Fund Program and a Restore Act POT 3 Grant. The renovation scope includes restrooms, picnic pavilions, a new parking area with permeable pavers, a playground with shade coverings, beach improvements, and a sand volleyball area. Grants staff are working on design/build bid documents with The Balmoral Group. The amendment also updates several attachments related to terms and conditions, work plans, and audit requirements. [21275 Keaton Beach Dr., Perry, FL 32348-0119; case LW719] This document outlines the special terms and conditions for the Hodges Park at Keaton Beach Renovation project, funded by the Land and Water Conservation Fund Program (LWCF). The project is a development project located at 21275 Keaton Beach Dr., Perry, FL 32348-0119. The total estimated project cost is $400,000, with a maximum grant award of $200,000 and a required grantee match of $200,000 (50%). The project completion date is November 1, 2026. Key tasks include developing commencement documentation and a cost analysis, followed by the renovation of playground facilities, beach access, restrooms, parking, a picnic facility, sand volleyball court, nature study signage, security lighting, a fishing pier boardwalk, sidewalk, and native landscaping. The agreement is cost reimbursement, with invoicing occurring after deliverable approval. Advance pay is not authorized. Equipment purchases and land acquisition are not funded. Retainage of up to 10% is permitted. The Grantee may subcontract work without prior consent, except for fixed-price subcontracts. The work will not be performed on State-owned land. The document also details various compliance requirements, including those related to unauthorized employment, convicted vendors, discriminatory vendors, antitrust violators, lobbying, record keeping, audits, conflict of interest, and compliance with federal, state, and local laws. It also specifies insurance requirements for the Grantee, including Commercial General Liability, Commercial Automobile, and Workers’ Compensation. [108 North Jefferson Street, Suite 102, Perry, Florida 32347; case I0183 (CDBG-MIT), MS045 (CDBG-DR), MS047 (CDBG-DR)] Taylor County Board of County Commissioners is seeking proposals for Grant Administration services for three Community Development Block Grant (CDBG) projects: DMH Hardening of Facility ($2,500,000), Steinhatchee Road Paving Project ($1,050,000), and Public Safety Complex-Emergency Shelter Project ($4,969,425). The services include environmental reviews and permitting. The administrative fees will be paid 100% from CDBG grant funds, with up to 5% of grant funds allowed for these services. This document outlines the Request for Proposals (RFP) process for Taylor County, Florida, specifically for Grant Administration Services. It details the timeline for proposal submission, evaluation, and award by the County Commission. Key requirements for respondents include adherence to legal and insurance stipulations, such as Errors and Omissions insurance ($2,000,000), Commercial General Liability ($1,000,000/$2,000,000 aggregate), Comprehensive Automobile Liability ($500,000), Worker's Compensation, and Umbrella/Excess Liability ($5,000,000). The document also covers terms related to public records, equal opportunity, non-collusion, drug-free workplace, indemnification, and domestic preference. It emphasizes that all awarded firms must comply with federal, state, and local laws, and that the County reserves the right to reject any or all responses. The document does not specify a particular project, address, or size, but rather the general procurement process for grant administration services. [Perry-Foley Airport; case G2V39] Taylor County Board of County Commissioners is considering an extension to Grant Contract G2V39 for Ready Power, LLC, to complete the installation of an 80KW generator for the electrical vault at Perry-Foley Airport. The contract is extended to December 30, 2026, due to long lead times for the generator and transfer switches. Preliminary site work is complete, with transfer switches scheduled to ship May 20, 2026, and the generator on August 25, 2026. The project is 100% grant funded by a FDOT Aviation Grant. [Taylor County, Florida; case RFP-Mosquito Control Services] Taylor County Board of County Commissioners is soliciting bids for comprehensive integrated mosquito management (IMM) services countywide. Services include adulticiding, larviciding, mosquito surveillance and monitoring, and public education and outreach. The contract term is one year with options to renew for two additional one-year periods. Bids are due by 4:00 PM on a date to be determined, and will be opened at the Taylor County Administrative Complex. The County reserves the right to reject any or all bids and award to the bidder offering the best overall service. Taylor County is an AA/EOE employer and requires compliance with Executive Order 11246. The County Administrator is LaWanda Pemberton, and Gary Wambolt is the Environmental Services Director. [Taylor County, Florida; case Task Assignment 2026-1] Taylor County Board of County Commissioners is considering a Task Work Order with North Florida Professional Services (NFPS) for development/engineering review of development applications and plans. This is under a Continuing Professional Services Agreement dated March 24, 2026. NFPS will review land development applications for consistency with the County's Comprehensive Plan and Land Development Code, coordinate additional professional reviews, conduct research, prepare reports, and attend meetings. Compensation is based on a flat fee schedule detailed in Exhibit A, which includes fees for DRI reviews, Comprehensive Plan amendments, zoning amendments, special exceptions, conditional use permits, variances, and subdivision/platting. The County Administrator is LaWanda Pemberton. [McDaniel Road from Wright Road at its South end to Pisgah Road at its North end] Taylor County Board of County Commissioners is considering a proposal from North Florida Professional Services, Inc. (NFPS) for Construction Engineering and Inspection (CEI) services for the McDaniel Road Reconstruction & Resurfacing Project. The project involves widening and resurfacing approximately 1.3 miles of McDaniel Road from Wright Road to Pisgah Road, including safety modifications, drainage improvements, pavement markings, and signage. The anticipated project duration is 220 days. Funding is from a FDOT Reimbursement Agreement. There is a concern that remaining funding may be insufficient to complete the project as proposed. The Board is recommended to approve NFPS's proposal for CEI services. [Perry-Foley Airport] Taylor County Board of County Commissioners will receive bids for the Taxiway Realignments Project at Perry-Foley Airport. The project has an estimated cost of $3,500,000, with $3,325,000 anticipated from the FAA and $175,000 from FDOT. The County will proceed once FAA funding is received. The realignment is a requirement of the FAA. [Taylor County; case Ordinance No. 2026-] Taylor County Board of County Commissioners will hold a public hearing on the passage of a proposed ordinance to call a referendum election for the approval of a one-half cent School Capital Outlay Sales Surtax. The referendum election is scheduled for November 3, 2026, in conjunction with the general election. If approved by voters, the surtax will be levied for ten years, from January 1, 2027, to December 31, 2036, to fund school facilities, safety, security, and technology infrastructure. [Steinhatchee Community, Taylor County, Florida] Taylor County Board of County Commissioners will receive bids for the USACE Floodplain Mitigation Drainage Project in the Steinhatchee Community, Taylor County, Florida. Tonya Benziger, Cast and Company, will discuss a benefit performance with the Board, scheduled for May 9, 2026. [Within the County] Taylor County Board of County Commissioners will consider approval of License and Hold Harmless Agreements for polling locations for the 2026 Election Cycle. [Taylor County] The Supervisor of Elections will inform Board Members of a special legislative session to redraw state congressional lines, which may affect Taylor County's congressional district representation and number, and could involve redistricting costs. [Taylor County] Taylor County Board of County Commissioners will consider the renewal of the agreement with Nabors, Giblin and Nickerson for Planning Board Attorney services. The current agreement has expired and has an allowance for a one-year extension. The agreement covers attending Planning Board meetings, advising on Land Development Regulations and the Comprehensive Plan, and researching planning questions. The renewal term would be through March 21, 2027. [Taylor County] Taylor County Board of County Commissioners will discuss the Sheriff's Office budget. [Steinhachee Community, Taylor County, Florida] Taylor County Board of County Commissioners will receive an update on the USACE Floodplain Mitigation Drainage Project - Steinhachee Community, Taylor County, Florida. The update is from Chet Thompson, Due Diligence Associates, regarding draft permit recommendations. [Former Georgia-Pacific Foley Mill site, Taylor County, Florida] The Board will receive a Foley Cellulose Draft Permit Update and Public Meeting Recommendations from Chet Thompson, Due Diligence Associates. The update concerns the permitting review and progress for the former Georgia-Pacific mill site. Key points include a draft permit to limit maximum daily discharge to 12 million gallons, potential use of D-002 if pipeline easement issues are resolved, and additional expertise engaged for groundwater protection and water quality impact evaluation. Public comments are due by April 30, 2026. The permit renewal is for a five-year period and involves expanded groundwater monitoring and ambient monitoring in the Fenholloway River. The closure and decommissioning activities are anticipated to take three to five years. Public input is encouraged through oral and written comments. [Perry-Foley Airport; case 443552-3-94-26] Taylor County Board of County Commissioners will consider approval of a Public Transportation Grant Agreement with the Florida Department of Transportation (FDOT) for $500,000. This grant is for the design and construction of the Taxiways Realignment Phase 2 Project at Perry-Foley Airport. The total estimated project cost is $6,250,000, with funding anticipated from the FAA ($5,625,000) and FDOT ($500,000). The county will be responsible for the remaining $125,000. The agreement term is from the effective date through March 31, 2029. [Perry-Foley Airport/Perry, FL; case PFL0014389] This document is a Public Transportation Grant Agreement between the State of Florida Department of Transportation and Taylor County for the PERRY-FOLEY APT DESIGN & CONSTRUCT TAXIWAY REALIGNMENT PH2 project. The project involves design and construction for taxiway realignment at the Perry-Foley Airport in Perry, FL. The total financial assistance awarded is $6,250,000.00, with $5,625,000.00 from FAA funds. The scope of work includes consultant and design fees, survey, geotechnical costs, permitting, construction inspection, material testing, mobilization, maintenance of traffic, erosion control, demolition, excavation, embankment, subgrade preparation, base course, surface course, joint construction, pavement enhancement/reconstruction, airfield lighting, signage, drainage, stormwater structures, fencing, gates, and sodding. The Agency is responsible for hiring qualified consultants and contractors, ensuring compliance with all applicable standards and regulations, and obtaining necessary permits. Construction on Department right-of-way requires specific procedures, including Department prequalified contractors and CEI services. The Agency must obtain a Notice to Proceed for the construction phase before commencing work. Public comment is not mentioned in this section of the document. [Perry-Foley Airport; case 446364-1-94-26] Taylor County Board of County Commissioners approved a Public Transportation Grant Agreement with the State of Florida Department of Transportation for the Design and Construction of a New Hangar at Perry-Foley Airport. The project has an estimated cost of $1,000,000, with FDOT providing a $500,000 grant and Taylor County providing a 50% match of $500,000. The agreement is for the period ending June 30, 2029. [Perry Foley Airport; case 443552-3-94-26] The Taylor County Board of County Commissioners adopted a resolution to enter into a Public Transportation Grant Agreement with the State of Florida Department of Transportation for the Design & Construction of the Taxiway Realignment Phase 2 at Perry-Foley Airport. The project has an estimated cost of $6,250,000, with FDOT funding a maximum of $500,000, and Taylor County eligible for 8% funding. The resolution authorizes the Chairman to execute the agreement. [Perry-Foley Airport; case PFL0015721] This document is a Public Transportation Grant Agreement between the State of Florida Department of Transportation and Taylor County for the Design & Construction of a New Hangar PFL0015721 at Perry-Foley Airport in Perry, FL. The total financial assistance awarded is $1,000,000.00, with $500,000.00 from the State and $500,000.00 in local matching funds. The project scope includes design and construction elements such as consultant fees, survey, geotechnical costs, permitting, construction inspection, demolition, pavement, drainage, utilities, building structure, MEP, fire prevention, pavement marking, lighting, signage, fencing, gates, landscaping, and security systems. The agreement outlines various terms and conditions for contractors, including prohibitions on using funds for lobbying, requirements for E-Verify, and insurance stipulations. It also details responsibilities for design, construction, and maintenance, including the need for a Notice to Proceed before construction begins. The agreement specifies that the Agency must hire a Department-prequalified contractor for construction on Department right-of-way and that Construction Engineering Inspection (CEI) services will be provided by a Department-prequalified consultant firm. The project must adhere to various state and federal standards, including the Florida Green Book and MUTCD. The agreement also includes provisions for indemnification, environmental regulations, and the use of state funds. [Perry Foley Airport; case 446364-1-94-26] Taylor County Board of County Commissioners is entering into a Public Transportation Grant Agreement with the State of Florida Department of Transportation for the Design & Construction of a New Hangar at the Perry Foley Airport. The project has an estimated cost of $1,000,000, with FDOT funding a maximum of $500,000. The agreement formalizes the arrangement between the parties. [Ash Street from Jefferson Street to Johnson Stripling Road, and along Johnson Stripling Road to the School network sidewalk.; case 435683-5-58-01, 435683-5-68-02] Taylor County Board of County Commissioners is considering approval of a Local Agency Program (LAP) Agreement with the Florida Department of Transportation (FDOT) for project oversight and construction of a sidewalk along Ash Street and Johnson Stripling Road. The project is funded by FDOT through the Transportation Alternatives Program, with $789,084 for construction and $11,836 for administration. The construction contractor is to be selected by December 8, 2026, and the project is to be completed by July 30, 2028. The agreement has no financial obligations for Taylor County. [CR136(ASH ST) FROM N. JEFFERSON ST TO CR2130(JOHNSON STRIPLING RD) AND CR2130(JOHNSON STRIPLING RD) FROM E ASH ST TO HIGH SCHOOL ENTRANCE; case 435683-5-58-01 & 435683-5-68-02] This document is a Local Agency Program Agreement between the State of Florida Department of Transportation and Taylor County for a sidewalk project. The project involves constructing sidewalks on CR136 (Ash St) from N. Jefferson St to CR2130 (Johnson Stripling Rd) and on CR2130 (Johnson Stripling Rd) from E Ash St to the High School Entrance. The total project cost is $800,920.00, with $789,084.00 allocated for construction and $11,836.00 for Construction Engineering and Inspection (CEI). Federal funds are the primary source of funding for construction and CEI. Taylor County is responsible for managing a CEI contract procured by the Department. Key dates include: Right-of-Way certification by 06/08/2026, construction contract letting by 12/08/2026, and construction completion by 06/30/2028. The agreement outlines various requirements for contractors, including compliance with federal and state laws, nondiscrimination policies (Title VI, ADA), insurance requirements, and indemnification clauses. Disadvantaged Business Enterprises (DBEs) are to be provided opportunities to participate. The agreement also details termination, suspension, and payment procedures. Taylor County will manage a CEI contract procured by the Department.
Agenda items
- 1) T
- 1. Artificial Reef Bid Walter Marine 2026
- 1. Bid Contractual Services Acknowledgement Form (Cover sheet)
- 1. By signing and submitting this proposal, the prospective lower tier participant is providing the certification
- 1. Each Contractor must be authorized to do business in the State of Florida and, if a Corporation,
- 1. Entire Agreement.
- 1. PRAYER
- 1. PRAYER
- 1. Recitals. The recitals set forth above are true and correct and incorporated into the terms
- 1. The undersigned hereby certifies that neither it nor its principals are presently debarred, suspended,
- 1. This sworn statement is submitted with Bid, Proposal or Contract No.Av.fiBl..141 /'(a,.f: ~c..-Hollf
- 10. By signing the Certification, the participant is also certifying that neither it nor its principals are presently
- 10. THE BOARD TO CONSIDER APPROVAL OF PROPOSAL PACKAGE AND
- Pest Control
- Government Authority
- 10. THE BOARD TO CONSIDER APPROVAL OF PROPOSAL PACKAGE AND
- Pest Control
- Government Authority
- 11. THE BOARD TO CONSIDER APPROVAL OF TASK WORK ORDER WITH NORTH
- Engineering & Architecture
- Business Consulting
- Government Authority
- 11. THE BOARD TO CONSIDER APPROVAL OF TASK WORK ORDER WITH NORTH
- Engineering & Architecture
- Site Prep, Grading & Hardscape
- General Contractor
- Concrete & Masonry
- Electrical
- HVAC & Climate Control
- Painting & Flooring
- Plumbing
- Roofing
- Building & Industrial Supply
- Real Estate Development
- Legal Services
- Business Consulting
- 12. THE BOARD TO CONSIDER APPROVAL OF CONSTRUCTION ENGINEERING
- General Contractor
- Site Prep, Grading & Hardscape
- Concrete & Masonry
- Painting & Flooring
- Engineering & Architecture
- Building & Industrial Supply
- 12. THE BOARD TO CONSIDER APPROVAL OF CONSTRUCTION ENGINEERING
- General Contractor
- Site Prep, Grading & Hardscape
- Concrete & Masonry
- Painting & Flooring
- Utilities (Sub)
- Engineering & Architecture
- Building & Industrial Supply
- Real Estate Development
- 13. THE BOARD TO RECEIVE BIDS FOR THE TAXIWAY REALIGNMENTS
- Site Prep, Grading & Hardscape
- Concrete & Masonry
- Electrical
- Lighting & Low-Voltage Systems
- General Contractor
- Building & Industrial Supply
- Engineering & Architecture
- Government Authority
- 13. THE BOARD TO RECEIVE BIDS FOR THE TAXIWAY REALIGNMENTS
- Site Prep, Grading & Hardscape
- Concrete & Masonry
- General Contractor
- Building & Industrial Supply
- Government Authority
- 14. THE BOARD TO HOLD A PUBLIC HEARING, SET FOR THIS DATE AT 6:05
- Government Authority
- 14. THE BOARD TO HOLD A PUBLIC HEARING, SET FOR THIS DATE AT 6:05
- Building & Industrial Supply
- General Contractor
- Site Prep, Grading & Hardscape
- Concrete & Masonry
- Electrical
- HVAC & Climate Control
- Painting & Flooring
- Plumbing
- Roofing
- Carpentry & Cabinetry
- Drywall & Insulation
- Windows, Doors & Glass
- Engineering & Architecture
- Real Estate Development
- Landscaping & Lawn Service
- 15. THE BOARD TO RECEIVE BIDS FOR USACE FLOODPLAIN MITIGATION
- Site Prep, Grading & Hardscape
- Utilities (Sub)
- Building & Industrial Supply
- General Contractor
- 15. THE BOARD TO RECEIVE BIDS FOR USACE FLOODPLAIN MITIGATION
- Site Prep, Grading & Hardscape
- Concrete & Masonry
- Construction (Other)
- Utilities (Sub)
- Engineering & Architecture
- Building & Industrial Supply
- Government Authority
- 16. TONYA BENZIGER, CAST AND COMPANY TO DISCUSS WITH THE BOARD
- 16. TONYA BENZIGER, CAST AND COMPANY TO DISCUSS WITH THE BOARD
- 17. THE BOARD TO CONSIDER APPROVAL OF LICENSE AND HOLD HARMLESS
- 17. THE BOARD TO CONSIDER APPROVAL OF LICENSE AND HOLD HARMLESS
- 18. THE SUPERVISOR OF ELECTIONS TO INFORM BOARD MEMBERS OF
- 18. THE SUPERVISOR OF ELECTIONS TO INFORM BOARD MEMBERS OF
- 19. THE BOARD TO CONSIDER RENEWAL OF AGREEMENT WITH NABORS,
- 19. THE BOARD TO CONSIDER RENEWAL OF AGREEMENT WITH NABORS,
- 2) A
- 2. CRA Contract Revision James
- 2. Certification Regarding Debarment Form
- 2. Each Contractor must certify, and proof must be required, that it can carry out all the conditions
- General Contractor
- Site Prep, Grading & Hardscape
- Concrete & Masonry
- Construction (Other)
- 2. Grant Administration.
- 2. Terms and Conditions. The parties hereby acknowledge and agree that this Standard
- General Contractor
- Site Prep, Grading & Hardscape
- Concrete & Masonry
- Carpentry & Cabinetry
- Roofing
- Electrical
- Plumbing
- HVAC & Climate Control
- Painting & Flooring
- Landscaping & Lawn Service
- Building & Industrial Supply
- Real Estate Development
- Engineering & Architecture
- 2. The certification in this clause is a material representation of facts upon which reliance was placed when
- 2. The undersigned also certifies that,
- 2. This sworn statement is submitted by fN4 I k,v M~ Yl V1L I LL G
- 20. THE BOARD TO DISCUSS THE SHERIFF'S OFFICE BUDGET, AS AGENDAED
- 20. THE BOARD TO DISCUSS THE SHERIFF'S OFFICE BUDGET, AS AGENDAED
- 21. THE BOARD TO RECEIVE FOLEY CELLULOSE DRAFT PERMIT UPDATE AND
- 21. THE BOARD TO RECEIVE FOLEY CELLULOSE DRAFT PERMIT UPDATE AND
- 22. THE BOARD TO DISCUSS HODGES PARKER, AS AGENDAED BY
- 22. THE BOARD TO DISCUSS HODGES PARKER, AS AGENDAED BY
- 23. THE BOARD TO CONSIDER APPROVAL OF THE FLORIDA DEPARTMENT OF
- General Contractor
- Site Prep, Grading & Hardscape
- Concrete & Masonry
- Electrical
- Construction (Other)
- Building & Industrial Supply
- Engineering & Architecture
- Government Authority
- 23. THE BOARD TO CONSIDER APPROVAL OF THE FLORIDA DEPARTMENT OF
- Site Prep, Grading & Hardscape
- Concrete & Masonry
- Electrical
- General Contractor
- Engineering & Architecture
- Building & Industrial Supply
- Real Estate Development
- Government Authority
- 24. THE BOARD TO CONSIDER APPROVAL OF THE FLORIDA DEPARTMENT OF
- General Contractor
- Site Prep, Grading & Hardscape
- Concrete & Masonry
- Electrical
- Plumbing
- HVAC & Climate Control
- Roofing
- Building & Industrial Supply
- Engineering & Architecture
- Government Authority
- 24. THE BOARD TO CONSIDER APPROVAL OF THE FLORIDA DEPARTMENT OF
- General Contractor
- Concrete & Masonry
- Electrical
- HVAC & Climate Control
- Plumbing
- Engineering & Architecture
- Building & Industrial Supply
- 25. THE BOARD TO CONSIDER APPROVAL OF THE FDOT CONSTRUCTION PHASE
- Site Prep, Grading & Hardscape
- Concrete & Masonry
- General Contractor
- Building & Industrial Supply
- Engineering & Architecture
- Landscaping & Lawn Service
- 25. THE BOARD TO CONSIDER APPROVAL OF THE FDOT CONSTRUCTION PHASE
- Site Prep, Grading & Hardscape
- Concrete & Masonry
- General Contractor
- Building & Industrial Supply
- 26. THE COUNTY ADMINISTRATOR TO DISCUSS INFORMATIONAL ITEMS.
- Concrete & Masonry
- General Contractor
- Site Prep, Grading & Hardscape
- Building & Industrial Supply
- Engineering & Architecture
- 26. THE COUNTY ADMINISTRATOR TO DISCUSS INFORMATIONAL ITEMS.
- 3) A
- 3. Agreement Duration.
- 3. Contractor Qualification Form
- 3. Declaration Page from Workmen's Compensation Insurance (including
- 3. Mynameis ::,~w01v+ ~l-lGY and my relationship to the
- 3. The prospective lower tier participant shall provide immediate written notice to the person to which this
- 3. Updated Contract CRA
- Site Prep, Grading & Hardscape
- Concrete & Masonry
- General Contractor
- Electrical
- Plumbing
- Painting & Flooring
- Roofing
- Construction (Other)
- Building & Industrial Supply
- Landscaping & Lawn Service
- Engineering & Architecture
- Real Estate Development
- 4) A
- 4. Deliverables.
- 4. EXAMINATION AND APPROVAL OF INVOICES.
- 4. EXAMINATION AND APPROVAL OF INVOICES.
- 4. I understand that a "public entity crime" as defined in Paragraph 287.133(1 )(g), Florida
- 4. Public Entity Crimes Affidavit, signed and notarized, as required by
- Concrete & Masonry
- General Contractor
- Construction (Other)
- Building & Industrial Supply
- Trucking & Freight
- Engineering & Architecture
- Government Authority
- 4. References Form
- 4. The terms covered transaction , debarred, suspended, ineligible, lower tier covered transaction ,
- 5) A
- 5. I understand that "convicted" or "conviction" as defined in Paragraph 287.133(1 )(b), Florida
- 5. Performance Measures.
- 5. Public Entity Crimes Statement Form
- 5. THE BOARD TO CONSIDER AWARDING OF THE ARTIFICIAL REEFS
- General Contractor
- Site Prep, Grading & Hardscape
- Construction (Other)
- Building & Industrial Supply
- Utilities (Sub)
- 5. THE BOARD TO CONSIDER AWARDING OF THE ARTIFICIAL REEFS
- General Contractor
- Site Prep, Grading & Hardscape
- Building & Industrial Supply
- Utilities (Sub)
- 5. The prospective lower tier participant agrees by submitting this proposal that, should the proposed
- 6) Attachment 6, Program Specific Requirements (Rev. 05/06/2020), is hereby deleted in its entirety and
- 6. Acceptance of Deliverables.
- 6. Certification of Liability Insurance or Agent Statement as outlined in the General Considerations.
- 6. I understand that an "affiliate" as defined in Paragraph 287.133(1 )(a), Florida Statutes,
- 6. THE BOARD TO CONSIDER APPROVAL OF THE ARCHITECTURAL DESIGN
- General Contractor
- Engineering & Architecture
- Building & Industrial Supply
- Site Prep, Grading & Hardscape
- Concrete & Masonry
- Electrical
- HVAC & Climate Control
- Plumbing
- Carpentry & Cabinetry
- Roofing
- Drywall & Insulation
- Painting & Flooring
- Windows, Doors & Glass
- Landscaping & Lawn Service
- Business Consulting
- 6. THE BOARD TO CONSIDER APPROVAL OF THE ARCHITECTURAL DESIGN
- General Contractor
- Engineering & Architecture
- Building & Industrial Supply
- 6. The prospective lower tier participant further agrees by submitting this proposal that it will include this
- 7) Attachment 8, Contract Provisions for DOI-Funded Agreements (Rev. 09/09/2020), is hereby deleted in its
- 7. A participant in a covered transaction may rely upon a certification of a prospective participant in a lower
- 7. Declaration Page from Workmen's Compensation Insurance (including Long Shoreman's).
- 7. Financial Consequences for Nonperformance.
- 7. I understand that a "person" as defined in Paragraph 287.133(1 )(g)€, Florida Statutes, means
- 7. THE BOARD TO CONSIDER APPROVAL OF AMENDMENT NO. 3 TO
- Site Prep, Grading & Hardscape
- General Contractor
- Engineering & Architecture
- 7. THE BOARD TO CONSIDER APPROVAL OF AMENDMENT NO. 3 TO
- Site Prep, Grading & Hardscape
- General Contractor
- Building & Industrial Supply
- Engineering & Architecture
- Landscaping & Lawn Service
- 8) All other terms and conditions
- Legal Services
- 8. Based on information and belief, the statement , which I have marked below, is true in relation
- Concrete & Masonry
- Site Prep, Grading & Hardscape
- Building & Industrial Supply
- Trucking & Freight
- Engineering & Architecture
- 8. Contractor's Proposal Price Sheet
- 8. Nothing contained in the foregoing shall be construed to require establishme:i t of a system of records in
- 8. Payment.
- 8. THE BOARD TO CONSIDER APPROVAL OF THE REQUEST FOR PROPOSALS
- Legal Services
- Engineering & Architecture
- Business Consulting
- Admin Services (Other)
- 8. THE BOARD TO CONSIDER APPROVAL OF THE REQUEST FOR PROPOSALS
- Legal Services
- Engineering & Architecture
- Business Consulting
- Government Authority
- 9. Except for transactions authorized under paragraph 5 of these instructions, if a participant in a covered
- 9. THE BOARD TO CONSIDER APPROVAL OF EXTENSION TO GRANT CONTRACT
- Electrical
- General Contractor
- Government Authority
- 9. THE BOARD TO CONSIDER APPROVAL OF EXTENSION TO GRANT CONTRACT
- Electrical
- General Contractor
- Building & Industrial Supply
- A) $60,000 = 8 pts
- A) 3 ft high or 1 Ton = 10 pts
- A) 36 to 40 modules = 10
- General Contractor
- Carpentry & Cabinetry
- Concrete & Masonry
- Drywall & Insulation
- Electrical
- HVAC & Climate Control
- Painting & Flooring
- Plumbing
- Roofing
- Site Prep, Grading & Hardscape
- Building & Industrial Supply
- Real Estate Development
- Engineering & Architecture
- A. A predecessor or successor of a person convicted of a public entity crime: or
- B) $59,999 to $57,001 = 9 pts
- B) 3’10” to 7 ft high or >2 Ton = 15 pts
- B) 41 to 45 modules = 12
- General Contractor
- Site Prep, Grading & Hardscape
- Concrete & Masonry
- Carpentry & Cabinetry
- Electrical
- Plumbing
- HVAC & Climate Control
- Roofing
- Painting & Flooring
- Building & Industrial Supply
- Real Estate Development
- B. An entity under the control of any natural person who is active in the management of
- C) 46+ modules = 15 pts
- C) <= $57,000 = 10 pts
- General Contractor
- Construction (Other)
- Building & Industrial Supply
- C) >= 8 ft high, 2+ Ton or a combination of types = 10 pts
- I. Coordination with officials will
- I. The MARANATHAII will
- II. Satellite communication will
- Engineering & Architecture
- General Contractor
- Concrete & Masonry
- Carpentry & Cabinetry
- Electrical
- HVAC & Climate Control
- Plumbing
- Roofing
- Painting & Flooring
- Drywall & Insulation
- Site Prep, Grading & Hardscape
- Building & Industrial Supply
- Real Estate Development
- II. The reef units will be lifted and
- III. The computer program is
- IV. Very accurate patterns can be
- P. 0 . Box 998 INSURER D:
- Site Prep, Grading & Hardscape
- Utilities (Sub)
- Building & Industrial Supply
- Legal Services
- Commercial & Business Insurance
- Real Estate Development
- Waste Management
- Marine Services & Boat Repair
- a. Acceptance Process. All deliverables must be received and accepted in writing by Department’s Grant Manager
- a. Order of Precedence. If there are conflicting provisions among the documents that make up the Agreement, the
- a. Payment Process. Subject to the terms and conditions established by the Agreement, the pricing per deliverable
- a. Withholding Payment. In addition to the specific consequences explained in the Grant Work Plan and/or
- b. All approvals, written or verbal, and other written communication among the parties, including all notices, shall
- b. Invoice reduction
- b. Rejection of Deliverables. The Department reserves the right to reject deliverables, as outlined in the Grant
- Legal Services
- b. Taxes. The Department is exempted from payment of State sales, use taxes and Federal excise taxes. The Grantee,
- Legal Services
- Building & Industrial Supply
- Payroll & Employee Leasing (PEO)
- c. Corrective Action Plan. If Grantee fails to correct all the deficiencies in a rejected deliverable within the specified
- c. If a different Grant Manager is designated by either party after execution of this Agreement, notice of the name
- c. Maximum Amount of Agreement . The maximum amount of compensation under this Agreement, without an
- d. Reimbursement for Costs. The Grantee shall be paid on a cost reimbursement basis for all eligible Project costs
- d. This Agreement may be amended, through a formal amendment or a change order, only by a written agreement
- e. All days in this Agreement are calendar days unless otherwise specified.
- e. Rural Communities and Rural Areas of Opportunity. If Grantee is a county or municipality that qualifies as a
- i. Grantee demonstrates that it is a county or municipality that qualifies as a "rural community" or
- i. Standard Grant Agreement
- i. The Grantee shall submit a CAP within ten (10) days of the date of the written request from
- ii. Attachments other than Attachment 1, in numerical order as designated in the Standard Grant
- ii. Upon Department’s notice of acceptance of a proposed CAP, Grantee shall have ten (10) days to
- iii. Attachment 1, Standard Terms and Conditions
- iii. Failure to respond to a Department request for a CAP or failure to correct a deficiency in the
- iv. The Exhibits in the order designated in the Standard Grant Agreement
- o. of Pages: 2
- Concrete & Masonry
- Site Prep, Grading & Hardscape
- Building & Industrial Supply
- Engineering & Architecture
Follow this across meetings
Applicants and firms
- Walter Marine
- Taylor County Board of County Commissioners
- Taylor County Board of Commissioners
- Taylor County Board of County Commissioners (BOCC)
- Ready Power, LLC
- North Florida Professional Services Inc.
- North Florida Professional Services, Inc. (NFPS)
- School Board of Taylor County, Florida
- Tonya Benziger, Cast and Company
- Supervisor of Elections
- Nabors, Giblin and Nickerson P.A.
- Chet Thompson, Due Diligence Associates
- Georgia-Pacific (former Foley Mill site), Chet Thompson (Due Diligence Associates)
- Taylor County
Locations
- 201 East Green Street, Perry, FL 32347 (for Taylor County Board of County Commissioners)
- 21275 Keaton Beach Dr., Perry, FL 32348-0119
- 108 North Jefferson Street, Suite 102, Perry, Florida 32347
- Perry-Foley Airport
- Taylor County, Florida
- McDaniel Road from Wright Road at its South end to Pisgah Road at its North end
- Taylor County
- Steinhatchee Community, Taylor County, Florida
- Within the County
- Steinhachee Community, Taylor County, Florida
- Former Georgia-Pacific Foley Mill site, Taylor County, Florida
- Perry-Foley Airport/Perry, FL
- Perry Foley Airport
- Ash Street from Jefferson Street to Johnson Stripling Road, and along Johnson Stripling Road to the School network sidewalk.
- CR136(ASH ST) FROM N. JEFFERSON ST TO CR2130(JOHNSON STRIPLING RD) AND CR2130(JOHNSON STRIPLING RD) FROM E ASH ST TO HIGH SCHOOL ENTRANCE