Executed Minutes_06.09.26
Project Review Committee · 2026-06-09 · minutes
[case 25-3741- SP] The Project Review Committee approved the Indian Oaks Self Storage project, which involves a change in parking space requirements and the substitution of canopy trees for understory trees. The project is related to a water main extension and potential pioneering credits. The developers' agreement is being drafted by the City Attorney. [25-1500 Preston Place; case 25-1500] The Project Review Committee approved the Preston Place Commercial Site project. The project involves proposed building elevations that will maintain the aesthetics of existing commercial buildings. The plan is for one tenant to rent the entire building, requiring only one sewer and water connection.
Agenda items
- 1) ALL DIMENSIONS MEASURED TO THE EDGE OF PAVEMENT.
- 1) WATER AND IRRIGATION METERS WILL BE CONSTRUCTED
- Utilities (Sub)
- Plumbing
- Site Prep, Grading & Hardscape
- 1. 25-3061 (PLAT) Northern Pines Subdivision Improvement Plat
- Site Prep, Grading & Hardscape
- General Contractor
- Concrete & Masonry
- Electrical
- Plumbing
- HVAC & Climate Control
- Painting & Flooring
- Roofing
- Building & Industrial Supply
- Real Estate Development
- Engineering & Architecture
- Landscaping & Lawn Service
- 1. 25-3741- SP - Indian Oaks Self Storage
- Site Prep, Grading & Hardscape
- Concrete & Masonry
- General Contractor
- Electrical
- Plumbing
- Construction (Other)
- Building & Industrial Supply
- Engineering & Architecture
- Real Estate Development
- 1. 25-3741- SP - Indian Oaks Self Storage
- General Contractor
- Site Prep, Grading & Hardscape
- Concrete & Masonry
- Electrical
- HVAC & Climate Control
- Plumbing
- Roofing
- Painting & Flooring
- Building & Industrial Supply
- Real Estate Development
- Engineering & Architecture
- Landscaping & Lawn Service
- 1. ALL EXISTING UTILITIES, INCLUDING
- 1. ALL GRADES ARE TO THE EDGE OF PAVEMENT UNLESS OTHERWISE
- 1. Briefly describe your waiver request.
- Site Prep, Grading & Hardscape
- Engineering & Architecture
- Landscaping & Lawn Service
- 1. Project Review Committee Regular Meeting April 14, 2026, at 10:00 AM.
- 1. Project Review Committee Regular Meeting May 12, 2026, at 10:00 AM.
- 1. Project Review Committee Regular Meeting May 12, 2026, at 10:00 AM.
- 1. REPRODUCTION OF THESE PLANS IS NOT VALID UNLESS SIGNED BY
- 2) ALL RADIUS IS 5 FEET, UNLESS OTHERWISE NOTED.
- Site Prep, Grading & Hardscape
- Concrete & Masonry
- General Contractor
- Plumbing
- Lighting & Low-Voltage Systems
- Building & Industrial Supply
- Real Estate Development
- Engineering & Architecture
- 2) WATER IS PRIVATE UP UNTIL THE METER. SEWER IS PRIVATE
- 2. 25-1500 Preston Place Commercial Site
- General Contractor
- Site Prep, Grading & Hardscape
- Concrete & Masonry
- Electrical
- Plumbing
- HVAC & Climate Control
- Drywall & Insulation
- Painting & Flooring
- Roofing
- Building & Industrial Supply
- Engineering & Architecture
- Real Estate Development
- Landscaping & Lawn Service
- 2. 25-1500 Preston Place Commercial Site
- General Contractor
- Site Prep, Grading & Hardscape
- Concrete & Masonry
- Electrical
- HVAC & Climate Control
- Painting & Flooring
- Plumbing
- Roofing
- Building & Industrial Supply
- Engineering & Architecture
- Real Estate Development
- Landscaping & Lawn Service
- 2. 25-4838 SPM - The Wash Saloon
- Site Prep, Grading & Hardscape
- Utilities (Sub)
- Concrete & Masonry
- Engineering & Architecture
- Legal Services
- 2. ALL SIDEWALK CONSTRUCTION SHALL HAVE A MAXIMUM CROSS SLOPE OF
- 2. COPIES OF THESE PLANS AS DESIGNED BY THE PROFESSIONAL
- General Contractor
- Site Prep, Grading & Hardscape
- Concrete & Masonry
- Electrical
- Plumbing
- HVAC & Climate Control
- Painting & Flooring
- Building & Industrial Supply
- Engineering & Architecture
- Real Estate Development
- Landscaping & Lawn Service
- 2. Please cite the subsection of the Land Development Regulations of which you
- 2. REFER TO THE TOPOGRAPHIC SURVEY FOR
- Site Prep, Grading & Hardscape
- Concrete & Masonry
- General Contractor
- Construction (Other)
- Building & Industrial Supply
- Waste Management
- Engineering & Architecture
- 3) NO TREE SHALL BE PLANTED IN A LOCATION WHERE THE
- Site Prep, Grading & Hardscape
- Concrete & Masonry
- General Contractor
- Electrical
- Plumbing
- HVAC & Climate Control
- Building & Industrial Supply
- Engineering & Architecture
- Landscaping & Lawn Service
- 3. 26-0689 (SP) 708 N Main Modification
- Engineering & Architecture
- Government Authority
- 3. Please provide the justification for your waiver request.
- General Contractor
- Site Prep, Grading & Hardscape
- Concrete & Masonry
- Electrical
- HVAC & Climate Control
- Painting & Flooring
- Plumbing
- Roofing
- Building & Industrial Supply
- Engineering & Architecture
- Real Estate Development
- Landscaping & Lawn Service
- 3. UNLESS SPECIFICALLY NOTED STORM PIPE MATERIALS SHALL BE A-2000
- Utilities (Sub)
- Site Prep, Grading & Hardscape
- Concrete & Masonry
- Building & Industrial Supply
- 4. 26-1168 (SP) VOSO Phase 31YZ Master Plan
- General Contractor
- Site Prep, Grading & Hardscape
- Building & Industrial Supply
- Engineering & Architecture
- Real Estate Development
- Government Authority
- 4. ALL FINAL STORM DRAIN MATERIALS SHALL BE APPROVED BY THE ENGINEER
- Site Prep, Grading & Hardscape
- Utilities (Sub)
- Building & Industrial Supply
- Engineering & Architecture
- 5. ALL DISTURBED AREAS IN THE RIGHT-OF-WAY TO BE SODDED WITH BAHIA
- Site Prep, Grading & Hardscape
- Landscaping & Lawn Service
- 6. ROOF DRAIN CONNECTION SERVICE PIPES TO MAINTAIN 1.00% MINIMUM
- Site Prep, Grading & Hardscape
- Utilities (Sub)
- Plumbing
- Concrete & Masonry
- Engineering & Architecture
- III. APPROVAL OF SUMMARY MINUTES
- III. APPROVAL OF SUMMARY MINUTES
- III. APPROVAL OF SUMMARY MINUTES
- LLC. FOR BEARINGS & DISTANCES, MONUMENTATION,
Follow this across meetings
Applicants and firms
Locations
See the actual businesses behind these numbers
Get the real filings, with addresses and officers, backed by a 14-day money-back guarantee.
Create your account