Browse City of Apopka civic records
Every published record for City of Apopka, newest first. Filter by board, year, or industry to jump straight to the records you want, and page through to reach the full archive.
1,642 records
2. AREA ESTIMATES
This item concerns a proposed development project located in the City of Apopka, Orange County. The project involves a total site area of 0.57 acres, with the entire 0.57 acres planned for disturbance. The specific proposed use or zoning is not detailed in the provided information. This agenda item is currently under review by the Development Review Committee. The project is in its early stages, meaning site clearing and grading would likely be among the first phases of work. This early stage presents an opportunity for local contractors, trades, suppliers, and service providers to engage with the project. Reaching out now, before detailed site plans, bids, and permits are finalized, can provide a competitive advantage.
- Board:
- Development Review Committee Meeting
- Date:
- 2026-05-13
- Type:
- Agenda_item
2. CSP-26-19 - Gospel Church Expansion - Construction Site Plan (CSP), 1st Submittal
Go Ministry Corporation Inc is proposing an expansion to their existing facility located at 4490 Rock Springs Road. The project involves the addition of a 9,600 square foot building. This construction site plan is currently under review as a first submittal. The project is in its early stages, offering an opportunity for contractors and suppliers to engage before final plans and bids are set. Work is expected to involve site preparation, foundation and concrete, framing, roofing, and interior finishing trades, along with necessary utility connections. Local contractors, tradespeople, and material suppliers are encouraged to connect early to understand the project's scope and potential needs as it moves through the review process.
- Board:
- Development Review Committee Meeting
- Date:
- 2026-05-13
- Type:
- Agenda_item
- Address:
- 4490 Rock Springs Road
- Applicant:
- Go Ministry Corporation Inc
2. CSP-26-19 - Gospel Church Expansion - Construction Site Plan (CSP), 1st Submittal
A construction site plan has been submitted for review for an expansion at Gospel Church, located at 4490 Rock Springs Road. The proposal includes adding a 9,600 square foot building to the existing property. This project is currently under review by the Development Review Committee. The work will involve site clearing and grading, installation of underground utilities, stormwater management systems, and paving. It will also include the construction of the new building's structure, mechanical systems, and finishes, followed by final landscaping. Local contractors, trades, suppliers, and service providers are encouraged to engage early, as this project is in its initial review phase, offering an opportunity to get involved before final plans and bids are set.
- Board:
- Development Review Committee Meeting
- Date:
- 2026-05-13
- Type:
- Agenda_item
- Address:
- 4490 Rock Springs Road
- Applicant:
- Go Ministry Corporation Inc
2. City Clerk — FY2027 Preliminary Budget Request Presentation
Budget Workshop Meeting listed this item on its agenda for 2026-05-13 in City of Apopka. The posted record gives the item title and nothing else, so there is no site, no size and no applicant on file for it yet. Local businesses that want to follow it can open the official agenda link above and watch for the fuller write-up the body posts as the meeting gets closer.
- Board:
- Budget Workshop Meeting
- Date:
- 2026-05-13
- Type:
- Agenda_item
2. City Clerk — FY2027 Preliminary Budget Request Presentation
Budget Workshop Meeting listed this item on its agenda for 2026-05-13 in City of Apopka. The posted record gives the item title and nothing else, so there is no site, no size and no applicant on file for it yet. Local businesses that want to follow it can open the official agenda link above and watch for the fuller write-up the body posts as the meeting gets closer.
- Board:
- Budget Workshop Meeting
- Date:
- 2026-05-13
- Type:
- Agenda_item
2. Rewrite of the Land Development Code (LDC) to be consistent with the adopted Comprehensive
The City of Apopka is planning to rewrite its Land Development Code. This rewrite is needed to make the code match the recently updated Comprehensive Plan. The city will hire a consultant with special knowledge in this field. This project is currently planned and has been included in the Fiscal Year 25/26 budget. The work will involve reviewing and updating land use regulations, zoning ordinances, and development standards. This process will likely include research, drafting new code language, and public review periods. Local businesses in professional services, particularly those with expertise in urban planning, legal services related to land use, and administrative support, could find opportunities. Engaging early before the consultant is selected or the detailed scope is finalized may provide an advantage.
- Board:
- Budget Workshop Meeting
- Date:
- 2026-05-13
- Type:
- Agenda_item
3. Creation of new design standards.
The City of Apopka is planning to create new design standards because the current ones are outdated and hard to use. This project will involve hiring a consultant with expertise in this field. The process is in the early planning stages, as it is part of a budget workshop. This initiative will likely involve research, drafting, and public review phases. Local businesses specializing in consulting, urban planning, and legal services related to development could find opportunities here. Engaging early allows firms to understand the city's needs before formal requests for proposals are issued.
- Board:
- Budget Workshop Meeting
- Date:
- 2026-05-13
- Type:
- Agenda_item
3. Human Resources, Legal and Risk Management Department — FY2027 Preliminary Budget Request Presentation
Budget Workshop Meeting listed this item on its agenda for 2026-05-13 in City of Apopka. The posted record gives the item title and nothing else, so there is no site, no size and no applicant on file for it yet. Local businesses that want to follow it can open the official agenda link above and watch for the fuller write-up the body posts as the meeting gets closer.
- Board:
- Budget Workshop Meeting
- Date:
- 2026-05-13
- Type:
- Agenda_item
3. Human Resources, Legal and Risk Management Department — FY2027 Preliminary Budget Request Presentation
Budget Workshop Meeting listed this item on its agenda for 2026-05-13 in City of Apopka. The posted record gives the item title and nothing else, so there is no site, no size and no applicant on file for it yet. Local businesses that want to follow it can open the official agenda link above and watch for the fuller write-up the body posts as the meeting gets closer.
- Board:
- Budget Workshop Meeting
- Date:
- 2026-05-13
- Type:
- Agenda_item
3. RUNOFF DATA
Development Review Committee Meeting listed this item on its agenda for 2026-05-13 in City of Apopka. The posted record gives the item title and nothing else, so there is no site, no size and no applicant on file for it yet. Local businesses that want to follow it can open the official agenda link above and watch for the fuller write-up the body posts as the meeting gets closer.
- Board:
- Development Review Committee Meeting
- Date:
- 2026-05-13
- Type:
- Agenda_item
4. Information Technology Department — FY2027 Preliminary Budget Request Presentation
Budget Workshop Meeting listed this item on its agenda for 2026-05-13 in City of Apopka. The posted record gives the item title and nothing else, so there is no site, no size and no applicant on file for it yet. Local businesses that want to follow it can open the official agenda link above and watch for the fuller write-up the body posts as the meeting gets closer.
- Board:
- Budget Workshop Meeting
- Date:
- 2026-05-13
- Type:
- Agenda_item
4. Information Technology Department — FY2027 Preliminary Budget Request Presentation
Budget Workshop Meeting listed this item on its agenda for 2026-05-13 in City of Apopka. The posted record gives the item title and nothing else, so there is no site, no size and no applicant on file for it yet. Local businesses that want to follow it can open the official agenda link above and watch for the fuller write-up the body posts as the meeting gets closer.
- Board:
- Budget Workshop Meeting
- Date:
- 2026-05-13
- Type:
- Agenda_item
4. Remodel Planning office to be more modern, clean and inviting to the general public and
The City of Apopka is planning to remodel its Planning office to create a more modern, clean, and inviting space for the public and customers. This project includes upgrading technology and furniture to suit current working environments. The planning for this remodel is currently under review as part of the city's budget process. The work is expected to involve interior renovations, including demolition, installation of new finishes, technology integration, and furniture setup. This project presents an opportunity for contractors specializing in interior renovations, as well as suppliers of office furniture and technology equipment. Engaging early in the process, before final plans and permits are issued, could provide a competitive advantage for businesses looking to secure work on this civic improvement.
- Board:
- Budget Workshop Meeting
- Date:
- 2026-05-13
- Type:
- Agenda_item
4. SOIL DATA
This item concerns soil data for a site located in the City of Apopka, Orange County. The soils are described as very deep, well-drained, sandy soils on ridges, sometimes containing charcoal fragments. Due to the high sand content, the site has a significant potential for erosion. This means strict erosion and sediment control practices will be required for any future development. The item is currently under review by the Development Review Committee. This review stage suggests that planning for site preparation, including necessary erosion control measures, is an early consideration. Work could involve site clearing, grading, and the implementation of specialized erosion and sediment control systems. Contractors specializing in site preparation, grading, and environmental controls, as well as suppliers of related materials, may find opportunities. Engaging early in the review process allows businesses to understand project needs before formal bidding begins.
- Board:
- Development Review Committee Meeting
- Date:
- 2026-05-13
- Type:
- Agenda_item
5. ALL INLETS AND PIPE SHALL BE PROTECTED DURING CONSTRUCTION TO PREVENT SILTATION IN THE DRAINAGE SYSTEMS BY WAY OF TEMPORARY PLUGS AND PLYWOOD OR PLASTIC COVERS OVER THE INLETS. THE ENTIRE DRAINAGE SYSTEMS SHALL BE CLEANED OF ALL DEBRIS PRIOR TO FINAL ACCEPTANCE. ALL CONCRETE SHALL BE A MINIMUM 3,000 PSI. SOME LOCAL GOVERNMENT STORMWATER PROJECTS MAY REQUIRE TELEVISING OF THE STORM SEWER. CONTRACTOR SHOULD BE KNOWLEDGEABLE OF THIS REQUIREMENT PRIOR TO BIDDING OF THE PROJECT. 6. ALL PROPOSED ELEVATIONS REFER TO FINISHED GRADES. 7. THE CONTRACTOR MUST OBTAIN A WATER USE PERMIT PRIOR TO CONSTRUCTION DEWATERING UNLESS THE WORK QUALIFIES FOR A GENERAL PERMIT PURSUANT TO SUBSECTION 40E-20 302(4), F. A C.STORM SEWER NOTES 1. STANDARD SEPARATION FOR ALL WATER AND/OR WASTEWATER MAINS, HORIZONTAL AND VERTICAL, SHALL BE PER FDEP REQUIREMENTS, PROVISIONS OF F.A.C. RULE 62.604 AND TEN STATES STANDARD OR LOCAL MUNICIPALITIES, WHICHEVER IS MORE STRINGENT. 2. ALL DISTURBED OUTFALL DRAINAGE AREAS SHALL BE SODDED UPON COMPLETION OF GRADING AFTER AS-BUILT GRADE ELEVATIONS ARE APPROVED BY THE ENGINEER. 3. PRIOR TO FINAL PAYMENT FOR RETENTION, DETENTION AND DRAINAGE DITCH QUANTITIES, ALL SLOPES AND SWALES SHALL BE SODDED TO AVOID EROSION. 4. THERE IS TO BE NO OFF-SITE HAULING WITHOUT PRIOR APPROVAL AND ALL EXCAVATED MATERIAL SHALL BE USED ON-SITE. COORDINATION WITH THE OWNER IS REQUIRED FOR THE REMOVAL OF ANY UNSUITABLE MATERIALS. 5. THE CONTRACTOR SHALL CONSTRUCT THE STORMWATER MANAGEMENT SYSTEM IN A MANNER SO AS TO MINIMIZE ANY ADVERSEIMPACTS OF THE WORKS ON FISH, WILDLIFE, NATURAL ENVIRONMENTAL VALUES AND WATER QUALITY ON OR OFF-SITE. THECONTRACTOR SHALL INSTITUTE NECESSARY MEASURES DURING THE CONSTRUCTION PERIOD, INCLUDING FULL COMPACTION OF ANYFILL MATERIAL PLACED AROUND NEWLY INSTALLED STRUCTURES TO REDUCE EROSION, TURBIDITY, NUTRIENT LOADING ANDSEDIMENTATION IN THE RECEIVING WATERS. 6. WITHIN THIRTY (30) DAYS AFTER COMPLETION OF CONSTRUCTION OF THE SURFACE WATER MANAGEMENT SYSTEM, THE CONTRACTOR SHALL ASSIST THE DESIGN ENGINEER TO PROVIDE A WRITTEN STATEMENT OF COMPLETION AND CERTIFICATION BY A FLORIDA PROFESSIONAL ENGINEER. THESE STATEMENTS MUST SPECIFY THE ACTUAL DATE OF CONSTRUCTION COMPLETION AND MUST CERTIFY THAT ALL FACILITIES HAVE BEEN CONSTRUCTED IN SUBSTANTIAL CONFORMANCE WITH THE PLANS AND SPECIFICATIONS. THE CONSTRUCTION COMPLETION CERTIFICATION MUST INCLUDE, AT A MINIMUM EXISTING ELEVATIONS, LOCATIONS AND DIMENSIONS OF THE COMPONENTS OF THE SURFACE WATER MANAGEMENT FACILITIES. ADDITIONALLY, IF DEVIATIONS FROM THE APPROVED DRAWINGS ARE DISCOVERED DURING THE CERTIFICATION PROCESS, THE CERTIFICATION MUST BE ACCOMPANIED BY A COPY OF THE APPROVED PERMIT DRAWINGS WITH DEVIATIONS NOTED. SEE ALSO AS-BUILT REQUIREMENTS. 7. A STABLE PERMANENT AND ACCESSIBLE ELEVATION REFERENCE SHALL BE ESTABLISHED ON OR WITHIN ONE HUNDRED (100) FEET OF ALL PERMITTED DISCHARGE STRUCTURES NO LATER THAN THE SUBMISSION OF THE CERTIFICATION TO THE WATER MANAGEMENT DISTRICT. THE LOCATION OF THE ELEVATION REFERENCE MUST BE NOTED ON OR WITHIN THE CERTIFICATION REPORT. 8. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE CORRECTION OF ANY EROSION OR SHOALING OF THE WATER QUALITY MANAGEMENT SYSTEM. 9. INLETS (PER F.D.O.T. ROAD AND BRIDGE CONSTRUCTION SPECIFICATIONS 425 / 430): INCLUDES THE LIST OF MATERIALS / INSTALLATION / DEWATERING STABILIZATION / AS-BUILT SURVEYING / TESTING. ALL STRUCTURES WILL REQUIRE THREE (3) COMPACTION TESTS AT DIFFERENT LOCATIONS AND UNDER STRUCTURES OR PER LOCAL APPROVING AUTHORITY, WHICHEVER IS MORE STRINGENT.10. PIPE CULVERTS AND STORM SEWERS SHALL BE CONSTRUCTED AND INSTALLED IN ACCORDANCE WITH SECTION 430 F.D.O.T. STANDARD SPECIFICATIONS FOR ROAD AND BRIDGE CONSTRUCTION.11. HDPE (HIGH DENSITY POLYETHYLENE) CULVERT SHALL BE N-12 INSTALLED PER MANUFACTURER RECOMMENDATIONS. MANUFACTURER IS ADS (ADVANCED DRAINAGE SYSTEMS, INC.) AIR ENTRENCHED PIPE.12. REINFORCED CONCRETE PIPE SHALL BE ASTM C-76 CLASS III IN ACCORDANCE WITH SECTION 941 OF THE F.D.O.T. STANDARD SPECIFICATIONS.FILTER FABRIC (STORM PIPE JOINTS)THE CONTRACTOR SHALL WRAP ALL STORM PIPE JOINTS. CONSTRUCTION SHALL BE PER F.D.O.T. INDEX NO. 280 WITH WOVEN GEOTEXTILETYPE D-3 (FLORIDA EROSION AND SEDIMENT CONTROL MANUAL), SECURED W / STRAPPING. ALL JOINTS SHALL BE WRAPPED FOR A MINIMUM OF188 INCHES FROM THE BAND OR JOINT OR BELL AND SPIGOT AS APPLICABLE.DEWATERINGSTORM SEWER PIPES AND STRUCTURES AND UTILITIES SHALL BE LAID "IN THE DRY", UNLESS OTHERWISE APPROVED IN WRITING BY THEUTILITY AND ENGINEER OF RECORD. THE CONTRACTOR, AT NO DIRECT COST TO THE OWNER, SHALL PERFORM ALL DEWATERING ACTIVITY.TRENCH EXCAVATIONS SHALL BE DEWATERED BY USING ONE OR MORE OF THE FOLLOWING METHODS: SOCK DRAINS, WELL POINTSYSTEM, SUMP PUMPS OR OTHER METHOD(S) AS APPROVED BY THE ENGINEER. DEWATERING SYSTEMS SHALL BE UTILIZED INACCORDANCE WITH GOOD STANDARD PRACTICE AND MUST BE EFFICIENT ENOUGH TO LOWER THE WATER LEVEL IN ADVANCE OF THEEXCAVATION AND MAINTAIN IT CONTINUOUSLY TO KEEP THE TRENCH BOTTOM AND SIDES FIRM AND DRY. IF THE MATERIAL ENCOUNTEREDAT TRENCH GRADE IS SUITABLE FOR THE PASSAGE OF WATER WITHOUT DESTROYING THE SIDES OR UTILITY FOUNDATION OF THE TRENCH,SUMPS MAY BE PROVIDED AT INTERVALS AT THE SIDE OF THE MAIN TRENCH EXCAVATION, WITH PUMPS USED TO LOWER THE WATER LEVELBY TAKING THEIR SUCTION FROM SAID SUMPS. DISCHARGE FROM DEWATERING SHALL BE DISPOSED OF IN SUCH A MANNER THAT IT WILLNOT INTERFERE WITH NORMAL DRAINAGE OF THE AREA IN WHICH THE WORK IS BEING PERFORMED, CREATE A PUBLIC NUISANCE OR FORMPONDING. ALL DISCHARGE SHALL BE IN ACCORDANCE WITH ANY SFWMD ISSUED PERMITS. THE OPERATIONS SHALL NOT CAUSE INJURY TOANY PORTION OF THE WORK COMPLETED OR IN PROGRESS OR TO THE SURFACE OF STREETS OR TO PRIVATE PROPERTY. THE ENGINEEROF RECORD AND NECESSARY REGULATORY AGENCIES, PRIOR TO CONSTRUCTION, SHALL APPROVE THE PROPOSED DEWATERINGMETHOD(S) AND SCHEDULE. ADDITIONALLY, WHERE PRIVATE PROPERTY WILL BE INVOLVED, THE CONTRACTOR SHALL OBTAIN ADVANCEPERMISSION FROM THE PROPERTY OWNER.CONFLICTSIT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO BECOME ACQUAINTED WITH EXISTING CONDITIONS AND TO LOCATE STRUCTURESAND STORM PIPES ALONG THE PROPOSED STORM PIPE ALIGNMENT IN ORDER TO AVOID CONFLICTS. WHERE ACTUAL CONFLICTS AREUNAVOIDABLE, WORK SHALL BE COORDINATED WITH THE FACILITY OWNER AND PERFORMED SO AS TO CAUSE AS LITTLE INTERFERENCE ASPOSSIBLE WITH THE SERVICE RENDERED BY THE FACILITY DISTURBED. ALL AFFECTED UTILITIES SHALL BE NOTIFIED PRIOR TO EXCAVATIONIN THEIR VICINITY. CONTRACTOR TO POTHOLE ALL CONFLICTS OF EXISTING UTILITIES AND PROPOSED IMPROVEMENTS AT LEAST 10 DAYSPRIOR TO CONSTRUCTION TO CONFIRM CONFLICT RESOLUTION SHOWN ON THE PLANS.SOD 1. THE SOD SHALL BE CERTIFIED TO MEET FLORIDA STATE PLANT BOARD SPECIFICATIONS, ABSOLUTELY TRUE TO VARIETAL TYPE AND FREE FROM WEEDS, FUNGUS, INSECTS AND DISEASE OF ANY KIND. ALL SODDED AREAS SHALL BE GRASSED AS SPECIFIED ON PLANS AND SURVIVAL GUARANTEED FOR NINETY DAYS FROM DATE OF REPLACEMENT. SURVIVAL OF ALL RELOCATED TREES SHALL BE GUARANTEED FOR 1 YEAR AFTER TRANSPLANTING. 2. SODDING SHALL CONSIST OF SITE PREPARATION, FURNISHING AND PLACING SOD, STAPLES AND FERTILIZER AND IRRIGATING AT THE RATES AND MANNER DESCRIBED IN THIS SPECIFICATION FOR THE DESIGNATED AREAS. 3. UNLESS NOTED OTHERWISE ON LANDSCAPE PLANS, SOD SHALL BE ARGENTINE BAHIA GRASS AND SHALL BE 12-INCH BY 12-INCH SQUARES OR OTHER COMMERCIALLY AVAILABLE RECTANGLES. THE SOD SHALL BE SUFFICIENTLY THICK (MINIMUM THICKNESS OF 2 INCHES) TO PROVIDE A DENSE STAND OF LIVE GRASS. THE SOD SHALL HAVE BEEN GROWN ON MINERAL SOIL. SOD SHALL BE LIVE, FRESH, AND UNINJURED AT THE TIME OF PLANTING AND SHALL BE PROTECTED FROM DRYING OUT BY SHADING AND WATERING FROM THE TIME IT IS DUG UNTIL PLANTING. 4. FERTILIZER SHALL BE EITHER IN THE LIQUID OR DRY FORM. FERTILIZER SHALL BE UNIFORM IN COMPOSITION, FREE-FLOWING AND SUITABLE FOR APPLICATION WITH STANDARD EQUIPMENT. THE FERTILIZER SHALL CONFORM TO THE CITY OR COUNTY FERTILIZER ORDINANCES IN EFFECT ON THE DATE OF IT BEING PLACED AND SHALL BE DELIVERED IN BAGS, BOTTLES, DRUMS, OR OTHER CONVENIENT CONTAINERS, EACH FULLY LABELED AND BEARING THE NAME, TRADEMARK, ANALYSIS, AND WARRANTY OF THE PRODUCT. 5. LIME SHALL BE DOLOMITIC LIMESTONE, AND SHALL BE IN ACCORDANCE WITH RULES AND REGULATIONS OF FLORIDA FERTILIZER LAW IN EFFECT ON THE DATE OF IT BEING PLACED. LIME SHALL BE APPLIED AT THE RATE OF ONE TON PER ACRE OR 45 POUNDS PER 1,000 SQ. FT. 6. STAPLES FOR SOD PLACED ON SIDE SLOPES 3:1 & STEEPER SHALL BE BLACK IRON WIRE NOT SMALLER THAN 14 GAUGE, AND BENT FROM A LENGTH OF WIRE AT LEAST 25 INCHES LONG INTO A 'U' WITH A 1 INCH WIDTH AT THE CROWN. COST OF STAPLES SHALL BE INCIDENTAL TO THE SOD UNIT PRICE. 7. WATER USED FOR IRRIGATION MAY BE OBTAINED FROM ANY APPROVED SOURCE. IT SHALL BE FREE OF EXCESS AND HARMFUL CHEMICALS, ACIDS, ALKALIES, OR ANY SUBSTANCE, WHICH IS HARMFUL TO PLANT GROWTH. 8. WHERE SODDING WILL BE DONE, ALL LOOSE ROCK, WOODY MATERIAL, AND OTHER OBSTRUCTIONS THAT WILL INTERFERE WITH SODDING SHALL BE REMOVED AND THE AREA SHALL BE REASONABLY SMOOTH AND UNIFORM. LIME AND FERTILIZER WILL BE APPLIED IN THE SAME QUANTITY AND MANNER AS SPECIFIED BY THE MANUFACTURER.
This notice concerns planned stormwater system construction and related site work. The project involves installing and cleaning drainage systems, including pipes and inlets, with specific requirements for concrete strength and dewatering permits. All excavated material must be used on-site, and the contractor must protect existing drainage systems from siltation during construction. The work includes site preparation, grading, sodding disturbed areas, and ensuring the stormwater management system minimizes environmental impacts. Final acceptance requires cleaning all debris from drainage systems and providing certification from a Florida professional engineer. This project is currently under review and presents an early opportunity for contractors specializing in site preparation, grading, concrete work, plumbing, electrical, and landscaping. Reaching out now allows businesses to engage before final bid packages and permits are issued, offering a chance to compete for work involving underground utilities, pipe installation, concrete structures, and extensive site restoration.
- Board:
- Development Review Committee Meeting
- Date:
- 2026-05-13
- Type:
- Agenda_item
5. Economic Development and CRA Department - FY2027 Preliminary Budget Request Presentation
Budget Workshop Meeting listed this item on its agenda for 2026-05-13 in City of Apopka. The posted record gives the item title and nothing else, so there is no site, no size and no applicant on file for it yet. Local businesses that want to follow it can open the official agenda link above and watch for the fuller write-up the body posts as the meeting gets closer.
- Board:
- Budget Workshop Meeting
- Date:
- 2026-05-13
- Type:
- Agenda_item
5. Economic Development and CRA Department - FY2027 Preliminary Budget Request Presentation
Budget Workshop Meeting listed this item on its agenda for 2026-05-13 in City of Apopka. The posted record gives the item title and nothing else, so there is no site, no size and no applicant on file for it yet. Local businesses that want to follow it can open the official agenda link above and watch for the fuller write-up the body posts as the meeting gets closer.
- Board:
- Budget Workshop Meeting
- Date:
- 2026-05-13
- Type:
- Agenda_item
6. AREAS TO BE STABILIZED
Development Review Committee Meeting listed this item on its agenda for 2026-05-13 in City of Apopka. The posted record gives the item title and nothing else, so there is no site, no size and no applicant on file for it yet. Local businesses that want to follow it can open the official agenda link above and watch for the fuller write-up the body posts as the meeting gets closer.
- Board:
- Development Review Committee Meeting
- Date:
- 2026-05-13
- Type:
- Agenda_item
6. Planning Department — FY2027 Preliminary Budget Request Presentation
Budget Workshop Meeting listed this item on its agenda for 2026-05-13 in City of Apopka. The posted record gives the item title and nothing else, so there is no site, no size and no applicant on file for it yet. Local businesses that want to follow it can open the official agenda link above and watch for the fuller write-up the body posts as the meeting gets closer.
- Board:
- Budget Workshop Meeting
- Date:
- 2026-05-13
- Type:
- Agenda_item
6. Planning Department — FY2027 Preliminary Budget Request Presentation
Budget Workshop Meeting listed this item on its agenda for 2026-05-13 in City of Apopka. The posted record gives the item title and nothing else, so there is no site, no size and no applicant on file for it yet. Local businesses that want to follow it can open the official agenda link above and watch for the fuller write-up the body posts as the meeting gets closer.
- Board:
- Budget Workshop Meeting
- Date:
- 2026-05-13
- Type:
- Agenda_item
See the actual businesses behind these numbers
Get the real filings, with addresses and officers, backed by a 14-day money-back guarantee.
Create your account