Skip to main content

Be First, Build Lasting Relationships

Browse City of Apopka civic records

Every published record for City of Apopka, newest first. Filter by board, year, or industry to jump straight to the records you want, and page through to reach the full archive.

1,642 records

7. Building Safety Department — FY2027 Preliminary Budget Request Presentation

Budget Workshop Meeting listed this item on its agenda for 2026-05-13 in City of Apopka. The posted record gives the item title and nothing else, so there is no site, no size and no applicant on file for it yet. Local businesses that want to follow it can open the official agenda link above and watch for the fuller write-up the body posts as the meeting gets closer.

Board:
Budget Workshop Meeting
Date:
2026-05-13
Type:
Agenda_item

7. Building Safety Department — FY2027 Preliminary Budget Request Presentation

Budget Workshop Meeting listed this item on its agenda for 2026-05-13 in City of Apopka. The posted record gives the item title and nothing else, so there is no site, no size and no applicant on file for it yet. Local businesses that want to follow it can open the official agenda link above and watch for the fuller write-up the body posts as the meeting gets closer.

Board:
Budget Workshop Meeting
Date:
2026-05-13
Type:
Agenda_item

7. SURFACE WATER MANAGEMENT

This item concerns surface water management for a project in the City of Apopka. The plan is to manage surface water runoff using on-site retention and detention facilities. This is part of the approved paving and drainage plans for the area. Runoff from any disturbed ground will be sent to these facilities before it is released. This project is currently under review. The work will involve site preparation, grading, and the installation of stormwater management systems. Future phases may include paving and other site improvements. Contractors specializing in site prep, grading, concrete, and underground utilities could find opportunities here. Reaching out early could provide an advantage before final plans and permits are set.

Board:
Development Review Committee Meeting
Date:
2026-05-13
Type:
Agenda_item

8. EROSION AND SEDIMENT CONTROLS

Development Review Committee Meeting listed this item on its agenda for 2026-05-13 in City of Apopka. The posted record gives the item title and nothing else, so there is no site, no size and no applicant on file for it yet. Local businesses that want to follow it can open the official agenda link above and watch for the fuller write-up the body posts as the meeting gets closer.

Board:
Development Review Committee Meeting
Date:
2026-05-13
Type:
Agenda_item

8. Finance Department — FY2027 Preliminary Budget Request Presentation

Budget Workshop Meeting listed this item on its agenda for 2026-05-13 in City of Apopka. The posted record gives the item title and nothing else, so there is no site, no size and no applicant on file for it yet. Local businesses that want to follow it can open the official agenda link above and watch for the fuller write-up the body posts as the meeting gets closer.

Board:
Budget Workshop Meeting
Date:
2026-05-13
Type:
Agenda_item

8. Finance Department — FY2027 Preliminary Budget Request Presentation

Budget Workshop Meeting listed this item on its agenda for 2026-05-13 in City of Apopka. The posted record gives the item title and nothing else, so there is no site, no size and no applicant on file for it yet. Local businesses that want to follow it can open the official agenda link above and watch for the fuller write-up the body posts as the meeting gets closer.

Board:
Budget Workshop Meeting
Date:
2026-05-13
Type:
Agenda_item

9. Parks, Recreation, and Facilities Department - FY2027 Preliminary Budget Request Presentation

Budget Workshop Meeting listed this item on its agenda for 2026-05-13 in City of Apopka. The posted record gives the item title and nothing else, so there is no site, no size and no applicant on file for it yet. Local businesses that want to follow it can open the official agenda link above and watch for the fuller write-up the body posts as the meeting gets closer.

Board:
Budget Workshop Meeting
Date:
2026-05-13
Type:
Agenda_item

9. Parks, Recreation, and Facilities Department - FY2027 Preliminary Budget Request Presentation

The City of Apopka is beginning its preliminary budget process for Fiscal Year 2027. The Parks, Recreation, and Facilities Department has presented its initial budget request. This early stage means that potential projects and needs for the upcoming fiscal year are being identified. While specific projects are not yet detailed, the department's request suggests future opportunities for site preparation, construction, and maintenance services related to parks and recreational facilities. Contractors, suppliers, and service providers are encouraged to engage with the city early in this budget cycle. Understanding the department's needs as they are formulated can provide a competitive advantage before formal plans, bids, and permits are established.

Board:
Budget Workshop Meeting
Date:
2026-05-13
Type:
Agenda_item

9. STORMWATER MANAGEMENT

This item concerns stormwater management for a project in the City of Apopka, Orange County. The plan is to manage stormwater using storm sewer systems, swales, and retention or detention areas. This project is currently under review by the Development Review Committee. The work would involve the installation of underground storm sewer pipes, grading for swales, and the construction of retention or detention ponds. This early stage means contractors, suppliers, and service providers can engage now. Reaching out before final site plans, bids, and permits are set allows businesses to understand the project's needs and potentially secure future work.

Board:
Development Review Committee Meeting
Date:
2026-05-13
Type:
Agenda_item

9. THE SOD STRIPS SHALL BE LAID IN A STAGGERED PATTERN WITH SNUG EVEN JOINTS. ALL JOINTS SHALL BE BUTTED TIGHT TO PREVENT VOIDS. IMMEDIATELY FOLLOWING SOD PLACEMENT, IT SHALL BE ROLLED OR TAMPED TO INSURE SOLID CONTACT OF ROOT MAT TO SOIL SURFACE. THE SOD SHALL BE SECURELY ANCHORED TO THE SOIL BY PINNING WITH STAPLES OR WOODEN PEGS WHEN PLACED ON SLOPES 3:1 OR STEEPER. COST OF STAPLES AND PEGS SHALL BE INCIDENTAL TO THE SOD UNIT PRICE. PIN OR PEG EACH SEPARATE PIECE OF SOD PLACED OR EVERY 3 FEET ALONG EACH CONTINUOUS STRIP OF SOD. SOIL EROSION PLAN 1. NO POLLUTION OR EROSION CAUSED BY THIS PROJECT WILL BE ALLOWED IN THE STORMWATER DRAINAGE SYSTEM. THE CONTRACTOR SHALL INSTALL ANY DEVICES NECESSARY TO PREVENT POLLUTION OR EROSION. THE COST OF POLLUTION AND EROSION CONTROL SHALL BE INCIDENTAL TO THE COST OF THE CONSTRUCTION. 2. PRIOR TO CONSTRUCTION, THE CONTRACTOR SHALL SUBMIT A SITE SPECIFIC SOIL EROSION CONTROL PLAN. IN GENERAL, THE SOIL EROSION CONTROL PLAN SHALL REQUIRE THAT ALL ON-SITE SOILS WILL REMAIN ON-SITE AND WILL NOT ERODE INTO THE ADJACENT ROADSIDE SWALES, ADJACENT PROPERTIES OR RETENTION DITCHES. ALL EXISTING SWALES SHALL REMAIN SODDED DURING CONSTRUCTION. THE CONTRACTOR SHALL SCARIFY ONLY AS NECESSARY TO CONSTRUCT THE PROJECT. THE CONTRACTOR SHALL SCARIFY AREAS TO PLACE VARIOUS PIPE WORK. AFTER PLACEMENT OF THE PIPE, THESE TRENCHES SHALL BE BACKFILLED AND COMPACTED TO 98% MODIFIED PROCTOR AASHTO T-180. PRIOR TO DISCHARGE FROM THE SITE, SILTATION BARRIERS AND HAY BALES SHALL BE UTILIZED AS PER FLORIDA EROSION AND SEDIMENT CONTROL MANUAL. THE DRAINAGE WHICH OUTFALLS TO THE RETENTION AREAS SHALL BE STABILIZED AND SODDED IMMEDIATELY UPON COMPLETION OF CONSTRUCTION. ANY DEWATERING OR PUMPING OF WATER INTO THE ROADSIDE SWALES OR RETENTION SWALES SHALL BE STAKED WITH BALED HAY AND SILTATION FENCES AS PER FLORIDA EROSION AND SEDIMENT CONTROL MANUAL TO AVOID FILLING THESE AREAS. UPON COMPLETION OF THE SITE WORK, ALL AREAS SHALL BE SODDED TO AVOID EROSION. CONTRACTOR IS REQUIRED TO COMPLY WITH ALL STATE WATER QUALITY CRITERIA. SPECIFICALLY, NO OFF-SITE DISCHARGES WILL BE ALLOWED WHICH EXCEED THE STATE TURBIDITY CRITERIA. WATER QUALITY NOTES 1. THE CONTRACTOR MUST MAINTAIN A COPY OF THE LATEST LOCAL WATER MANAGEMENT DISTRICT SURFACE WATER PERMIT, COMPLETE WITH ALL CONDITIONS, ATTACHMENTS, EXHIBITS AND PERMIT MODIFICATIONS IN GOOD CONDITION AT THE CONSTRUCTION SITE. THE COMPLETE PERMIT MUST BE AVAILABLE FOR REVIEW UPON REQUEST BY DISTRICT REPRESENTATIVES. THE CONTRACTOR SHALL REVIEW THE COMPLETE PERMIT PRIOR TO COMMENCEMENT OF THE ACTIVITY AUTHORIZED BY THE PERMIT. 2. ALL ACTIVITIES SHALL BE IMPLEMENTED AS SET FORTH IN THE PLANS, SPECIFICATIONS AND PERFORMANCE CRITERIA AS APPROVED BY LOCAL SURFACE WATER PERMIT. ANY DEVIATION FROM THE PERMITTED ACTIVITY AND THE CONDITIONS FOR UNDERTAKING THAT ACTIVITY SHALL BE CONSIDERED A VIOLATION OF THE PERMIT. PRIOR TO ANY WORK COVERED BY A PERMIT FROM SOUTH FLORIDA WATER MANAGEMENT DISTRICT (SFWMD), A NOTICE OF CONSTRUCTION COMMENCEMENT (FORM 0960) MUST BE SUBMITTED TO SFWMD BY THE PERMITTEE OR AUTHORIZED AGENT. 3. THE LOCAL WATER MANAGEMENT DISTRICT AUTHORIZED STAFF, UPON PROPER IDENTIFICATION, MUST BE GRANTED PERMISSION TO ENTER, INSPECT AND OBSERVE THE SYSTEM TO INSURE CONFORMITY WITH THE PLANS AND SPECIFICATIONS APPROVED BY THE PERMIT. 4. PRIOR TO AND DURING CONSTRUCTION, THE CONTRACTOR SHALL IMPLEMENT AND MAINTAIN ALL EROSION AND SEDIMENT CONTROL MEASURES (BEST MANAGEMENT PRACTICES) REQUIRED TO RETAIN SEDIMENT ON-SITE AND TO PREVENT VIOLATIONS OF STATE WATER QUALITY STANDARDS. ALL PRACTICES MUST BE IN ACCORDANCE WITH THE GUIDELINES AND SPECIFICATIONS IN CHAPTER 6 OF THE FLORIDA LAND DEVELOPMENT MANUAL: A GUIDE TO SOUND LAND AND WATER MANAGEMENT (FLORIDA DEPARTMENT OF ENVIRONMENTAL REGULATIONS 1988), WHICH ARE HEREBY INCORPORATED BY REFERENCE, UNLESS A PROJECT'S SPECIFIC EROSION AND SEDIMENT CONTROL PLAN IS APPROVED AS PART OF THE SFWMD PERMIT, IN WHICH CASE THE PRACTICES MUST BE IN ACCORDANCE WITH THE PLAN. IF SITE'S SPECIFIC CONDITIONS REQUIRE ADDITIONAL MEASURES DURING ANY PHASE OF CONSTRUCTION OR OPERATION TO PREVENT EROSION OR CONTROL SEDIMENT, BEYOND THOSE SPECIFIED IN THE EROSION AND SEDIMENT CONTROL PLAN, THE CONTRACTOR SHALL IMPLEMENT ADDITIONAL BEST MANAGEMENT PRACTICES AS NECESSARY, IN ACCORDANCE WITH THE SPECIFICATIONS IN CHAPTER 6 OF THE FLORIDA LAND DEVELOPMENT MANUAL: A GUIDE TO SOUND LAND AND WATER MANAGEMENT (FLORIDA DEPARTMENT OF ENVIRONMENTAL REGULATION 1988). THE CONTRACTOR SHALL CORRECT ANY EROSION OR SHOALING THAT CAUSES ADVERSE IMPACTS TO THE WATER RESOURCES AT NO ADDITIONAL COST TO OWNER. 5. WITHIN 30 DAYS AFTER COMPLETION OF THE STORMWATER SYSTEM, THE CONTRACTOR MUST ASSIST IN SUBMITTING TO THE SOUTH FLORIDA WATER MANAGEMENT DISTRICT THE FOLLOWING: DISTRICT FORM EN-45 (AS-BUILT CERTIFICATION BY A REGISTERED PROFESSIONAL), SIGNED AND SEALED BY AN APPROPRIATE PROFESSIONAL REGISTERED IN THE STATE OF FLORIDA AND TWO SETS OF AS-BUILT DRAWINGS WHEN, A) REQUIRED BY A SPECIAL CONDITION OF THIS PERMIT; B) THE PROFESSIONAL USES AS-BUILT DRAWINGS TO SUPPORT THE AS-BUILT CERTIFICATION; OR C) WHEN THE COMPLETED SYSTEM SUBSTANTIALLY DIFFERS FROM PERMITTED PLANS. THIS SUBMITTAL WILL SERVE TO NOTIFY THE DISTRICT STAFF THAT THE SYSTEM IS READY FOR INSPECTION AND APPROVAL. 6. STABILIZATION MEASURES SHALL BE INITIATED FOR EROSION AND SEDIMENT CONTROL ON DISTURBED AREAS AS SOON AS PRACTICABLE IN PORTIONS OF THE SITE WHERE CONSTRUCTION ACTIVITIES HAVE TEMPORARY OR PERMANENTLY CEASED, BUT IN NO CASE MORE THAN SEVEN (7) DAYS AFTER THE CONSTRUCTION ACTIVITY IN THAT PORTION OF THE SITE HAS TEMPORARILY OR PERMANENTLY CEASED. 7. THE STORMWATER MANAGEMENT SYSTEM MUST BE COMPLETE IN ACCORDANCE WITH THE PERMITTED PLANS AND PERMIT CONDITIONS PRIOR TO THE INITIATION OF THE PERMITTED USE OF SITE INFRASTRUCTURE. THE SYSTEM MUST BE COMPLETED IN ACCORDANCE WITH THE PERMITTED PLANS AND PERMIT CONDITIONS PRIOR TO TRANSFERRING RESPONSIBILITY FOR OPERATION AND MAINTENANCE OF THE STORMWATER MANAGEMENT SYSTEM TO A RESPONSIBLE ENTITY. 8. IF DEWATERING IS TO OCCUR DURING ANY PHASE OF CONSTRUCTION OR THEREAFTER AND THE SURFACE WATER PUMP(S), WELL(S) OR FACILITIES ARE CAPABLE OF WITHDRAWING ONE MILLION GALLONS OF WATER PER DAY OR MORE OR AN AVERAGE OF 1800,000 GALLONS PER DAY OR MORE OVER A YEAR AND ANY DISCHARGE IS TO BE OFF-SITE, THE CONTRACTOR MUST APPLY FOR AND OBTAIN A CONSUMPTIVE USE PERMIT (40C-2) FROM THE SFWMD. CONTRACTOR SHALL NOTIFY ENGINEER IF ADDITIONAL INFORMATION OR APPLICATION MATERIALS ARE NEEDED. 9. WATER QUALITY MONITORING SHALL BE PERFORMED DAILY. SAMPLING SHALL BE PERFORMED IN THE MIDDLE OF ADJACENT CHANNELS MEASURING FOR TURBIDITY, 100 FEET UPSTREAM AND 100 FEET DOWNSTREAM OF DISCHARGES. WHEN TURBIDITY EXCEEDS 29 NTU'S ABOVE BACKGROUND LEVELS AT A SAMPLE POINT 100 FEET UPSTREAM OF DISCHARGES AND / OR 0 NTU'S ABOVE BACKGROUND LEVELS AT A SAMPLE POINT 100 FEET DOWNSTREAM OF DISCHARGES, WORK MUST CEASE AND REMEDIAL MEASURES MUST BE PERFORMED TO RETURN CONDITIONS TO ACCEPTABLE TURBIDITY LEVELS. CONTRACTOR MUST RECEIVE ENGINEER'S APPROVAL PRIOR TO RESTARTING WORK. SAMPLE POINT LOCATIONS ARE IDENTIFIED IN THE SFWMD PERMITS.10. THE CONTRACTOR SHALL PLACE TURBIDITY BARRIERS AT ALL OUTFALLS PRIOR TO CONSTRUCTION. ALL CUT / FILL WILL BE RELOCATED WITHIN THE EXISTING SITE AND THEREFORE HAULING OF MATERIAL WILL NOT BE REQUIRED, UNLESS APPROVED BY THE OWNER. CONTRACTOR SHALL INSTALL TURBIDITY CONTROL MEASURES PRIOR TO COMMENCEMENT OF CONSTRUCTION, MAINTAIN SAID CONTROLS IN WORKING ORDER THROUGHOUT THE CONSTRUCTION PERIOD, ASSURE THAT TURBID DISCHARGES FROM THE PROJECT TO PROTECTED WATERS AND WETLANDS DO NOT EXCEED LIMITS STATED IN NOTE 9 AND REMOVE SAID CONTROLS AFTER COMPLETION OF CONSTRUCTION. EARTHWORK AND RELATED OPERATIONS 1. THE CONTRACTOR SHALL PROVIDE A QUALITY CONTROL PLAN FOR MONITORING OF ALL EARTHWORK AND RELATED OPERATIONS. THE QUALITY CONTROL PLAN SHALL INCLUDE AS A MINIMUM, ALL TESTS THAT WILL BE PERFORMED INCLUDING THE PROPOSED TEST FREQUENCIES, ALL MATERIAL SOURCES, THE NAME AND BACKGROUND OF THE PERSON THAT THE CONTRACTOR WILL DESIGNATE AS THE CONTRACTOR'S QUALITY CONTROL MANAGER. THE NAME AND QUALIFICATIONS OF THE TESTING LABORATORY THAT WILL BE PERFORMING QUALITY CONTROL TESTING AND THE NAMES AND QUALIFICATIONS OF THE TESTING LABORATORY PERSONNEL THAT WILL BE PERFORMING THE QUALITY CONTROL TESTING. 2. THE TESTING LABORATORY THAT IS RETAINED TO PERFORM THE CONTRACTOR'S QUALITY CONTROL TESTING MUST BE CERTIFIED BY A RECOGNIZED QUALIFYING AGENCY SUCH AS F.D.O.T., CMEC OR AASHTO FOR THE TYPE OF WORK TO BE PERFORMED. 3. THE QUALITY CONTROL PLAN SHALL BE SUBMITTED TO THE ENGINEER FOR REVIEW AND APPROVAL PRIOR TO THE START OF ANY EARTHWORK OR RELATED OPERATION. 4. UTILIZATION OF MATERIALS WITHIN ANY ROADWAY CROSS-SECTION SHALL BE IN ACCORDANCE WITH F.D.O.T. ROADWAY AND TRAFFIC DESIGN STANDARDS (LATEST EDITION) UNLESS OTHERWISE SHOWN ON THE PLANS. 5. IF THE EXISTING FILL IS CLASSIFIED AS A-2-4 BASED ON AASHTO M-145 CRITERIA, THE MAXIMUM PERMISSIBLE MOISTURE CONTENT SHALL BE 2 PERCENT ABOVE THE OPTIMUM MOISTURE CONTENT. COMPACTION 1. WHERE THERE ARE EXISTING STRUCTURES ADJACENT TO THE SITE THAT MAY BE AFFECTED BY THE SELF-PROPELLED STEEL DRUM VIBRATORY EQUIPMENT, DENSIFICATION MUST BE PERFORMED USING EQUIPMENT THAT WILL SATISFY THE REQUIRED DENSIFICATION WITHOUT THE RISK OF DAMAGE TO THE EXISTING STRUCTURE(S). 2. LOADERS AND HEAVY PLATE COMPACTORS ARE TWO TYPES OF EQUIPMENT THAT HAVE BEEN USED SUCCESSFULLY. 3. DENSIFICATION PROCEDURES MUST COMPLY WITH THE CAPABILITY OF THE EQUIPMENT EMPLOYED. 4. WHEN SELF-PROPELLED STEEL DRUM VIBRATORY EQUIPMENT CANNOT BE USED AS SPECIFIED, VIBRATORY PLATE COMPACTORS MAY BE USED. WHEN THIS CONDITION OCCURS, THE OVERALL DENSIFICATION PROCEDURE MUST BE REVISED TO COMPLY WITH THE CAPABILITY OF THE EQUIPMENT EMPLOYED. IN GENERAL, SMALL PLATE COMPACTORS WILL BE EFFECTIVE TO A MAXIMUM DEPTH OF 6 TO 8 INCHES.

This civic agenda item concerns planned construction activities that will require extensive site preparation and erosion control measures. The project involves scarifying areas for pipe work, backfilling and compacting trenches to specific density standards, and stabilizing drainage outfalls with sod. All disturbed areas must be restored to pre-construction conditions or better, with a focus on preventing soil erosion and maintaining water quality. The work will include site clearing, grading, underground utility installation, and final landscaping or sodding. Contractors specializing in earthwork, utility installation, and erosion control are encouraged to engage early, as detailed plans and permits are still under review. Understanding the specific requirements for soil compaction, dewatering, and water quality monitoring will be crucial for any business seeking to participate in this project.

Board:
Development Review Committee Meeting
Date:
2026-05-13
Type:
Agenda_item
Address:
HAAS ROAD

Budget Workshop Meeting 05/13/26

This document is an agenda for the Apopka City Commission meeting on May 13, 2026. The agenda primarily consists of presentations for the FY2027 Preliminary Budget Requests from various city departments, including Finance, City Clerk, Human Resources, Information Technology, Economic Development, Planning, Building Safety, Parks and Recreation, Police, Fire, Sanitation and Fleet, Utilities Operations, and Public Works. There is also a Public Comment Period scheduled. No specific development projects or business opportunities are detailed.

Board:
Budget Workshop Meeting
Date:
2026-05-13
Type:
Agenda
Address:
Apopka City Hall Commission Chambers

Budget Workshop Meeting 05/13/26

This document is the Apopka City Commission Agenda for May 13, 2026, detailing various departmental budget presentations and a timeline for the FY2027 budget development process. It does not contain specific project proposals for contractors or trades, but outlines departmental needs and initiatives that may lead to future work. Key departments presenting include Finance, Parks & Recreation, Planning, Building Safety, Information Technology, Human Resources, Economic Development, and the Community Redevelopment Agency (CRA). The document highlights planned capital expenditures, new initiatives, and long-term goals across these departments, which could signal future opportunities. For example, the Parks & Recreation department lists numerous capital projects including new softball fields, amphitheater upgrades, and park improvements. The IT department mentions upgrades to wireless networks, cybersecurity, and fiber installation. The CRA outlines plans for downtown redevelopment and infrastructure improvements. The Planning department discusses the need for a GIS/Addressing Administrator and a Transportation Planner. The Building Safety department anticipates needing more inspectors and permit technicians. The Finance department is implementing a new ERP system and requests new positions. Public comment is not detailed in this agenda.

Board:
Budget Workshop Meeting
Date:
2026-05-13
Type:
Agenda_packet

DRC Agenda 05/13/2026

[3710 Jason Dwelley Parkway; 951 South Highland Avenue; 4490 Rock Springs Road; case E-26-2; CSP-26-17; CSP-26-19] Apopka Development Review Committee agenda for May 13, 2026, includes a special event permit for a concert and two construction site plans for asphalt maintenance and a church expansion. The concert is proposed by All In Management & More LLC at the Apopka Amphitheater. One construction site plan is for Pave A Lot Asphalt Maintenance Inc. at 951 South Highland Avenue for site storage. The second construction site plan is for a 9,600 SF building addition at 4490 Rock Springs Road for Gospel Church Expansion.

Board:
Development Review Committee Meeting
Date:
2026-05-13
Type:
Agenda
Address:
3710 Jason Dwelley Parkway; 951 South Highland Avenue; 4490 Rock Springs Road
Applicant:
All In Management & More LLC (for special event); Sunstate Plans LLC - Juan Rivera (for CSP-26-17); Marci Chandler (for CSP-26-19)

DRC Agenda Packet 05/13/2026

[3710 Jason Dwelley Parkway; case E-26-2] A Fathers Day special event is proposed at the Apopka Amphitheater, 3710 Jason Dwelley Parkway, on June 21, 2026. The event is planned as a concert/performance. All In Management & More LLC is the owner and All In Management & More LLC is the applicant. The case number is E-26-2. [951 South Highland Avenue; case CSP-26-17] Pave A Lot Asphalt Maintenance Inc is seeking approval for a Construction Site Plan (CSP) at 951 South Highland Avenue. The project involves site storage, including grading, drainage, and ground cover. The owner is Pave A Lot Asphalt Maintenance Inc, and Sunstate Plans LLC (Juan Rivera) is the applicant. The site is 0.57 acres, with a proposed development area of 24,829.20 sqft. The current zoning is APK-MU-D, and the land use is 0001 - Vacant Residential. The parcel ID is 15-21-28-0000-00-106. The case number is CSP-26-17. [4490 Rock Springs Road; case CSP-26-19] Go Ministry Corporation Inc is proposing an expansion to a Gospel Church at 4490 Rock Springs Road. The project involves the addition of a 9,600 SF building. The owner is Go Ministry Corporation Inc, and Marci Chandler is the applicant. The site is 3.164 acres. The zoning is RCE-Residential Country Estate. The parcel ID is 16-20-28-0000-00-022A. The case number is CSP-26-19. [4490 ROCK SPRINGS RD, APOPKA, FL 32712] Project involves the development of approximately 1.20 acres for a tennis and pool complex, with a total site area of 3.16 acres and 2.04 acres to be disturbed. The intended use is a worship assembly, with proposed construction of a 9,600 sq ft worship center, 400 sq ft office, and 2,000 sq ft community center facility. Existing buildings include a community center (1,722 sq ft) and another community center facility (1,165 sq ft). The project requires 58 parking spaces and proposes 58, including 3 handicap spaces. The future land use is Low Density Residential (LDR) and the zoning is Residential Country Estate (RCE). Construction is anticipated to be completed by July 2025. The project requires extensive erosion and sediment control measures, including silt fencing, gravel at entrances, sweeping of paved roads, sodding of disturbed areas, and filter fabric for inlets. Utilities include potable water, reuse water, sanitary sewer, and gas. The project is located in a FEMA flood zone X.

Board:
Development Review Committee Meeting
Date:
2026-05-13
Type:
Agenda_packet
Address:
3710 Jason Dwelley Parkway
Applicant:
All In Management & More LLC

a. General

This item concerns erosion and sediment control measures for a project in the City of Apopka, Orange County. The contractor will be responsible for installing, inspecting, maintaining, and documenting these controls. This work must follow guidelines from the Florida Department of Environmental Protection, Orange County, and the Florida Stormwater, Erosion, and Sedimentation Control Inspector’s Manual. Inspections of disturbed areas are required at least weekly and within 24 hours after a rainfall of 0.5 inches or more. This is an early stage of the public process, indicating planned work. The project will involve site clearing and grading, stormwater management, and ongoing maintenance. Local contractors, suppliers, and service providers in site preparation, grading, and environmental compliance could find opportunities. Reaching out now, before detailed site plans and permits are finalized, offers an advantage to understand project needs.

Board:
Development Review Committee Meeting
Date:
2026-05-13
Type:
Agenda_item

b. Structural Controls

This item concerns structural controls for a development project in the City of Apopka. The project requires stabilized construction entrances to be put in place before any land is disturbed. Type III silt fence will be installed around the site's edges and as detailed in the project plans. Protection for storm drain inlets that receive runoff from disturbed areas is also required. Turbidity barriers will be installed where needed to protect nearby water bodies. This item is currently under review by the Development Review Committee. The work will involve site preparation and erosion control measures, likely in phases starting with entrance and perimeter fencing, followed by inlet and turbidity barrier installation. Contractors specializing in site prep, grading, erosion control, and related trades could find opportunities. Early engagement is advised before final plans and permits are issued.

Board:
Development Review Committee Meeting
Date:
2026-05-13
Type:
Agenda_item

c. Temporary Stabilization

Development Review Committee Meeting listed this item on its agenda for 2026-05-13 in City of Apopka. The posted record gives the item title and nothing else, so there is no site, no size and no applicant on file for it yet. Local businesses that want to follow it can open the official agenda link above and watch for the fuller write-up the body posts as the meeting gets closer.

Board:
Development Review Committee Meeting
Date:
2026-05-13
Type:
Agenda_item

d. Permanent Stabilization

Development Review Committee Meeting listed this item on its agenda for 2026-05-13 in City of Apopka. The posted record gives the item title and nothing else, so there is no site, no size and no applicant on file for it yet. Local businesses that want to follow it can open the official agenda link above and watch for the fuller write-up the body posts as the meeting gets closer.

Board:
Development Review Committee Meeting
Date:
2026-05-13
Type:
Agenda_item

1. ALL CONCRETE CONSTRUCTION WORKMANSHIP AND MATERIAL SHALL

Development Review Committee Meeting listed this item on its agenda for 2026-05-06 in City of Apopka. The posted record gives the item title and nothing else, so there is no site, no size and no applicant on file for it yet. Local businesses that want to follow it can open the official agenda link above and watch for the fuller write-up the body posts as the meeting gets closer.

Board:
Development Review Committee Meeting
Date:
2026-05-06
Type:
Agenda_item

1. ALL CONSTRUCTION WORKMANSHIP AND MATERIALS SHALL CONFORM TO

Development Review Committee Meeting listed this item on its agenda for 2026-05-06 in City of Apopka. The posted record gives the item title and nothing else, so there is no site, no size and no applicant on file for it yet. Local businesses that want to follow it can open the official agenda link above and watch for the fuller write-up the body posts as the meeting gets closer.

Board:
Development Review Committee Meeting
Date:
2026-05-06
Type:
Agenda_item

See the actual businesses behind these numbers

Get the real filings, with addresses and officers, backed by a 14-day money-back guarantee.

Create your account