Development Review Committee Meeting: April 2026
City of Apopka
1. AN-26-3 - Kelly Park Road Commercial - Annexation (AN), 1st Submittal
A proposal is under review to annex a property located at 3603 West Kelly Park Road into the City of Apopka. The owner of the property is Effie Road Holdings LLC, and the applicant is 1882 Engineering, represented by Luke Classon. This item, AN-26-3, is a first submittal for annexation and a major development plan. The project is currently under review by the Development Review Committee. If approved, this annexation could lead to future commercial development. This process would likely involve initial site clearing and grading, followed by underground utility work, road construction, and building construction. Contractors, suppliers, and service providers in construction, engineering, and related fields should consider reaching out to the applicant or project manager, Jean Sanchez, to learn more about potential opportunities as the project moves forward in the review process.
- Board:
- Development Review Committee Meeting
- Date:
- 2026-04-29
- Type:
- Agenda_item
- Address:
- 3603 West Kelly Park Road
- Applicant:
- Effie Road Holdings LLC
1. AN-26-3 - Kelly Park Road Commercial - Annexation (AN), 1st Submittal
A proposal is under review to annex a property located at 3603 West Kelly Park Road into the City of Apopka. The owner is Effie Road Holdings LLC, and the applicant is 1882 Engineering, with Luke Classon as the contact. This item is currently in its first submittal phase with the Development Review Committee. If approved, the project would involve a major development plan for commercial use. This could lead to site clearing, grading, utility work, and the construction of commercial buildings. Contractors, suppliers, and service providers in construction, engineering, and related fields should consider reaching out to the applicant early. Engaging before final site plans, bids, and permits are established offers the best opportunity to compete for future work.
- Board:
- Development Review Committee Meeting
- Date:
- 2026-04-29
- Type:
- Agenda_item
- Address:
- 3603 West Kelly Park Road
- Applicant:
- Effie Road Holdings LLC
1. E-26-1 - Murph - Northwest Recreation Complex - 3710 Jason Dwelley Parkway - May 23rd 2026 7:00am - 10:00am
A workout and exercise event is planned for the Northwest Recreation Complex, located at 3710 Jason Dwelley Parkway. The Oak is the owner, and Andrew Reyes is the applicant. This event is currently under review by the Development Review Committee. The event is scheduled for May 23rd, 2026, from 7:00 am to 10:00 am. While this is a short-term event, it may involve site preparation, setup for temporary structures, and post-event cleanup. Local contractors, suppliers, and service providers, including those specializing in event setup, temporary facilities, site services, and potentially security or traffic management, could find opportunities. Engaging early, before final event plans and logistics are set, allows businesses to offer their services and potentially secure work.
- Board:
- Development Review Committee Meeting
- Date:
- 2026-04-29
- Type:
- Agenda_item
- Address:
- 3710 Jason Dwelley Parkway
- Applicant:
- The Oak
1. E-26-1 - Murph - Northwest Recreation Complex - 3710 Jason Dwelley Parkway - May 23rd 2026 7:00am - 10:00am
A workout and exercise event is planned for the Northwest Recreation Complex, located at 3710 Jason Dwelley Parkway. The Oak is the owner, and Andrew Reyes is the applicant. This event is currently under review by the Development Review Committee. The project involves setting up for and hosting a temporary fitness event. This could include site preparation for the event space, temporary structures, and event management services. Local contractors, suppliers, and service providers are encouraged to reach out early to learn more about potential opportunities related to this planned event, as details are still being finalized.
- Board:
- Development Review Committee Meeting
- Date:
- 2026-04-29
- Type:
- Agenda_item
- Address:
- 3710 Jason Dwelley Parkway
- Applicant:
- The Oak
1. MDP-24-4 - Floridian Town Center Hotel - Major Development Plan (MDP), 3rd Submittal
Florence Hotel Company LLC is proposing to develop a new hotel on Southfork Drive in Apopka. The project involves constructing a 4-story, approximately 77,081 square foot hotel with 137 rooms. This development will also include associated parking, landscaping, drainage, and utilities on a roughly 2.91-acre site. The Major Development Plan is currently under review, representing an early stage in the project's lifecycle. The work will likely involve site clearing and grading, underground utility installation, paving for parking lots and driveways, building construction including framing and finishes, and final landscaping. Local contractors, trades, suppliers, and service providers are encouraged to engage early to understand the project scope and potentially secure future work before final plans and bids are established.
- Board:
- Development Review Committee Meeting
- Date:
- 2026-04-29
- Type:
- Agenda_item
- Address:
- Southfork Drive
- Applicant:
- Florence Hotel Company LLC
1. MDP-24-4 - Floridian Town Center Hotel - Major Development Plan (MDP), 3rd Submittal
Florence Hotel Company LLC is proposing the development of a 137-room hotel, identified as MDP-24-4, at Southfork Drive. This Major Development Plan (MDP) is currently undergoing its third submittal for review. The project is in the planning and review stages, indicating early opportunity for interested parties. If approved, this development would likely involve site preparation, including clearing and grading, followed by underground utility work and foundation construction. Subsequent phases would include vertical construction of the hotel structure, installation of mechanical, electrical, and plumbing systems, interior finishing, and exterior site work such as paving and landscaping. Local contractors, trades, suppliers, and service providers are encouraged to engage early to understand the project's scope and potential needs before final plans and permits are issued.
- Board:
- Development Review Committee Meeting
- Date:
- 2026-04-29
- Type:
- Agenda_item
- Address:
- Southfork Drive
- Applicant:
- Florence Hotel Company LLC
2. Apopka / Altamonte Springs Veterans of Foreign Wars Post 10147 - Tribute to Billy Joel Dinner and Show - Apopka
The Apopka / Altamonte Springs Veterans of Foreign Wars Post 10147 is planning a fundraiser event called "Tribute to Billy Joel Dinner and Show." This event is proposed to take place at the Apopka Community Center / VFW Post 10147, located at 519 South Central Avenue. The event is scheduled for May 16th, 2026, from 5:00 PM to 10:00 PM. This item is currently under review by the Development Review Committee. The project involves event planning, setup, and tear-down, including potential needs for catering, entertainment services, and temporary site amenities. Local contractors, suppliers, and service providers could find opportunities by engaging early with the organizers before final plans and permits are secured.
- Board:
- Development Review Committee Meeting
- Date:
- 2026-04-29
- Type:
- Agenda_item
- Address:
- 519 South Central Avenue
- Applicant:
- Apopka / Altamonte Springs Veterans of Foreign Wars Post 10147
2. Apopka / Altamonte Springs Veterans of Foreign Wars Post 10147 - Tribute to Billy Joel Dinner and Show - Apopka
The Apopka / Altamonte Springs Veterans of Foreign Wars Post 10147 is planning a fundraiser event called "Tribute to Billy Joel Dinner and Show." This event is scheduled for May 16th, 2026, from 5:00 PM to 10:00 PM at the Apopka Community Center / VFW Post 10147, located at 519 South Central Avenue. The event is currently under review by the City of Apopka's Development Review Committee. While this is a single event, the planning and execution will involve coordination for setup and teardown, potentially including temporary structures, catering services, and entertainment logistics. Businesses specializing in event services, catering, and potentially temporary site setup could find opportunities. Engaging early with the applicant, Michael McFadden, or the project manager, Carolyn Ray, before final plans are set could provide a competitive advantage.
- Board:
- Development Review Committee Meeting
- Date:
- 2026-04-29
- Type:
- Agenda_item
- Address:
- 519 South Central Avenue
- Applicant:
- Apopka / Altamonte Springs Veterans of Foreign Wars Post 10147
DRC Agenda 04/29/2026
The Apopka Development Review Committee agenda for April 29, 2026, includes several items relevant to contractors. Project 1 is a Special Event: E-26-1, a workout/exercise event at the Northwest Recreation Complex, 3710 Jason Dwelley Parkway, on May 23rd, 2026, proposed by Andrew Reyes. Project 2 is another Special Event: a Tribute to Billy Joel Dinner and Show at the Apopka Community Center / VFW Post 10147, 519 S Central Avenue, on May 16th, 2026, proposed by Michael McFadden. Under Annexation, AN-26-3, 'Kelly Park Road Commercial', involves the annexation of the property at 3603 West Kelly Park Road by Effie Road Holdings LLC, represented by 1882 Engineering. Under Site Plan, there is a Major Development Plan, MDP-24-4, 'Floridian Town Center Hotel', proposing a 137-room hotel at Southfork Drive, with Florence Hotel Company LLC as the owner and Jason Searl, Esq. as the applicant. The document does not state any public comment or stakeholder sentiment.
- Board:
- Development Review Committee Meeting
- Date:
- 2026-04-29
- Type:
- Agenda
- Address:
- 3710 Jason Dwelley Parkway; 519 S Central Avenue; 3603 West Kelly Park Road; Southfork Drive
- Applicant:
- Andrew Reyes; Michael McFadden; 1882 Engineering - Luke Classon; Jason Searl, Esq.
DRC Agenda Packet 04/29/2026
The Apopka Development Review Committee Agenda for April 29, 2026, lists several items. Item 1, E-26-1, concerns the 'Murph - Northwest Recreation Complex' event at 3710 Jason Dwelley Parkway on May 23rd, 2026, a workout/exercise event. Item 2, Apopka / Altamonte Springs Veterans of Foreign Wars Post 10147, details a 'Tribute to Billy Joel Dinner and Show' at the Community Center / VFW Post 10147, 529 South Central Avenue, on May 16th, 2026, a fundraiser. Under ANNEXATION, item 1, AN-26-3, is the 'Kelly Park Road Commercial - Annexation (AN), 1st Submittal' for property at 3603 West Kelly Park Road, proposed to be annexed into the City of Apopka. Under SITE PLAN, item 1, MDP-24-4, is the 'Floridian Town Center Hotel - Major Development Plan (MDP), 3rd Submittal' for property on Southfork Drive, proposing a 137-room hotel. The agenda also includes a DISCUSSION section. The document also contains detailed applications and supporting documents for these items, including a Special Event Permit Application for the 'Murph' event and a Special Event Permit Application for the VFW Tribute to Billy Joel Dinner and Show, along with associated insurance, licensing, and site plans for the Floridian Town Center Hotel.
- Board:
- Development Review Committee Meeting
- Date:
- 2026-04-29
- Type:
- Agenda_packet
- Address:
- 3710 Jason Dwelley Parkway; 529 South Central Avenue; 3603 West Kelly Park Road; Southfork Drive
- Applicant:
- The Oak; Apopka / Altamonte Springs Veterans of Foreign Wars Post 10147; 1882 Engineering - Luke Classon; Florence Hotel Company LLC
1. CSP-26-16 - Cold Link Construction Site Plan (CSP), 1st Submittal
A new 150,000 square foot building is proposed for the property at 2560 West Orange Blossom Trail. The owner is MG88 Central Florida, and Kimley-Horn, represented by Joshua Enot, is the applicant. This project is currently in its first submittal phase and is under review by the Development Review Committee. The scope of work would likely involve site preparation, grading, underground utilities, concrete work, building construction including framing, electrical, plumbing, and HVAC systems, and final finishes. Contractors, suppliers, and service providers in site prep, general construction, and all building trades should consider reaching out to the applicant early. Engaging before site plans, bids, and permits are finalized offers the best opportunity to compete for work on this planned development.
- Board:
- Development Review Committee Meeting
- Date:
- 2026-04-22
- Type:
- Agenda_item
- Address:
- 2560 West Orange Blossom Trail
- Applicant:
- MG88 Central Florida
1. CSP-26-16 - Cold Link Construction Site Plan (CSP), 1st Submittal
A new 150,000 square foot building is proposed for the property at 2560 West Orange Blossom Trail. The owner is MG88 Central Florida, and the applicant is Kimley-Horn, represented by Joshua Enot. This project is currently in its first submittal phase and is under review by the City of Apopka's Development Review Committee. The development is expected to involve significant site preparation, including clearing and grading, followed by underground utility work and construction of the building's foundation and structure. Subsequent phases will likely include mechanical, electrical, and plumbing installations, interior finishing, roofing, and exterior work, concluding with landscaping. Contractors, suppliers, and service providers in areas such as site work, concrete, framing, electrical, plumbing, HVAC, roofing, and landscaping may find opportunities. Engaging early, before final plans and permits are issued, allows businesses to understand the project's scope and prepare for potential bids.
- Board:
- Development Review Committee Meeting
- Date:
- 2026-04-22
- Type:
- Agenda_item
- Address:
- 2560 West Orange Blossom Trail
- Applicant:
- MG88 Central Florida
1. FLU-26-3 Kelly Park Road Commercial - Future Land Use (FLU), 1st Submittal
A proposal is under review to change the future land use for three properties located at 3595, 3603, and 6311 West Kelly Park Road. The current land use is Residential and FLU-IP9. The proposed change is to Mixed Use. This item is a first submittal and is currently planned for review. The project involves a plat, which typically includes site preparation, grading, and utility work. Following this, construction could involve building vertical structures, and then interior and exterior finishing trades. Local contractors, suppliers, and service providers should consider reaching out to the applicant or project manager early. Engaging before site plans, bids, and permits are finalized offers the best opportunity to compete for work on this developing project.
- Board:
- Development Review Committee Meeting
- Date:
- 2026-04-22
- Type:
- Agenda_item
- Address:
- 3595 West Kelly Park Road
- Applicant:
- Effie Road Holdings LLC
1. FLU-26-3 Kelly Park Road Commercial - Future Land Use (FLU), 1st Submittal
A proposal is under review to change the future land use for three properties located at 3595, 3603, and 6311 West Kelly Park Road. The current land use is Residential and FLU-IP9. The proposed change is to Mixed Use. This item is currently in the planning stages, having received its first submittal. If approved, this project would likely involve site preparation, grading, and utility work, followed by construction of mixed-use buildings. The project could then move into interior and exterior finishing trades, and finally landscaping. Local contractors, suppliers, and service providers are encouraged to learn more about this project early in the process. Understanding the project details before final site plans, bids, and permits are established can provide a competitive advantage for securing future work.
- Board:
- Development Review Committee Meeting
- Date:
- 2026-04-22
- Type:
- Agenda_item
- Address:
- 3595 West Kelly Park Road
- Applicant:
- Effie Road Holdings LLC
1. MDP-26-1 - Paulucci Acres - Pod 1A/B & 4 - Major Development Plan (MDP), 2nd Submittal
A Major Development Plan for Paulucci Acres, Pod 1A/B & 4, is currently under review by the City of Apopka's Development Review Committee. This project, proposed by Paulucci Acres LLC and applied for by 1828 Engineering LLC, plans to create a residential subdivision with 502 individual single-family lots. The development is located at 2213 Vick Road, along Vick Road and West Ponkan Road. This early stage means that site clearing, grading, and underground utility work would likely be among the first phases of construction. Following this, road and driveway paving, vertical construction, and final landscaping would occur. Contractors, suppliers, and service providers in residential construction, site preparation, utilities, and related trades can explore opportunities by engaging early, before final site plans, bids, and permits are issued. Understanding the project scope now offers a chance to prepare for potential future work.
- Board:
- Development Review Committee Meeting
- Date:
- 2026-04-22
- Type:
- Agenda_item
- Address:
- 2213 Vick Road
- Applicant:
- Paulucci Acres LLC
1. MDP-26-1 - Paulucci Acres - Pod 1A/B & 4 - Major Development Plan (MDP), 2nd Submittal
A Major Development Plan (MDP) for Paulucci Acres, Pod 1A/B & 4, is under review by the City of Apopka's Development Review Committee. This project proposes a new residential subdivision with 502 individual single-family lots. The location is described as 2213 Vick Road, Vick Road, and West Ponkan Road. This second submittal indicates the project is planned for future construction phases. The work would likely involve initial site clearing and grading, followed by underground utility installation, road and driveway paving, and then the vertical construction of homes. Finally, landscaping and finishing trades would complete the development. Contractors, suppliers, and service providers in residential construction, site preparation, utilities, and related trades can explore opportunities by engaging early in the process before final plans and bids are set.
- Board:
- Development Review Committee Meeting
- Date:
- 2026-04-22
- Type:
- Agenda_item
- Address:
- 2213 Vick Road
- Applicant:
- Paulucci Acres LLC
1. SECTION SHOWN IS BASED ON AN ANTICIPATED CBR OF 1255 & 1277 PER THEPLYMOUTH SORRENTO RD IMPROVEMENTS PLANS PREPARED BY BOHLERENGINEERING FL, LLC.NOTE:
A project is planned to improve Plymouth Sorrento Road, located in Apopka, Florida. The work involves widening the road and resurfacing existing asphalt with new layers of asphalt and a compacted stone base. This project is currently under review by the Development Review Committee. The scope of work will include site clearing and grading, installation of underground utilities and stormwater systems, paving of new and existing road surfaces, and final landscaping. Contractors specializing in road construction, paving, grading, utility work, and material supply are encouraged to learn more about this project. Early engagement before final bid and permit stages could provide a competitive advantage.
- Board:
- Development Review Committee Meeting
- Date:
- 2026-04-22
- Type:
- Agenda_item
- Address:
- 1829 Plymouth Sorrento Rd, Apopka, FL 32712
2. CSP-25-46 - Apopka K-8 Charter School - Construction Site Plan (CSP), 3rd Submittal
A new K-8 charter school is planned for 1839 Plymouth Sorrento Road in Apopka. The project, proposed by Bohler Engineering FL LLC, involves the construction of a school facility. This item is currently under review by the Development Review Committee. The project will likely involve site clearing and grading, underground utility work, paving for access roads and parking, building construction including framing, mechanical, electrical, and plumbing, and final landscaping. Local contractors, trades, suppliers, and service providers should consider engaging with the applicant early to understand project needs before final plans and permits are issued. This early engagement can provide a competitive advantage for future work.
- Board:
- Development Review Committee Meeting
- Date:
- 2026-04-22
- Type:
- Agenda_item
- Address:
- 1839 Plymouth Sorrento Road
- Applicant:
- Scott Woodrey
2. CSP-25-46 - Apopka K-8 Charter School - Construction Site Plan (CSP), 3rd Submittal
A Construction Site Plan (CSP) for the Apopka K-8 Charter School is currently under review. The project is located at 1839 Plymouth Sorrento Road and is proposed as a K-8 charter school. This project is in the discussion phase with the Development Review Committee. The development would likely involve site clearing and grading, underground utility work, paving for access and parking, building construction including framing and finishes, and final landscaping. Contractors, suppliers, and service providers in construction, engineering, and related trades should consider reaching out early to learn more about potential opportunities as plans develop, before bids and permits are finalized.
- Board:
- Development Review Committee Meeting
- Date:
- 2026-04-22
- Type:
- Agenda_item
- Address:
- 1839 Plymouth Sorrento Road
- Applicant:
- Scott Woodrey
DRC Agenda 04/22/2026
[3595 West Kelly Park Road, 3603 West Kelly Park Road, 6311 West Kelly Park Road; case FLU-26-3] Future Land Use Amendment: Effie Road Holdings LLC, applicant 1828 Engineering Inc, proposes to change future land use from Residential (County)/FLU-IP9 (City) to Mixed Use (MU) at 3595, 3603, and 6311 West Kelly Park Road. Case number FLU-26-3. [2260, 2404 Plymouth Sorrento Road, 2244 Sorrento Avenue; case PL-25-10] Plat Application: TPG AG EHC III (LEN) Multi State 5 LLC, applicant G L Summitt Engineering Inc, seeks approval for Ridgebrook Plat to create 88 single family homes at 2260, 2404 Plymouth Sorrento Road, and 2244 Sorrento Avenue. Case number PL-25-10. [2213 Vick Road, Vick Road, West Ponkan Road; case MDP-26-1] Major Development Plan: Paulucci Acres LLC, applicant 1828 Engineering LLC, proposes a residential subdivision with 502 individual single family lots at 2213 Vick Road, Vick Road, and West Ponkan Road. Case number MDP-26-1. [2560 West Orange Blossom Trail; case CSP-26-16] Construction Site Plan: MG88 Central Florida, applicant Kimley-Horn, proposes to add an additional 150,000 SF building on the property at 2560 West Orange Blossom Trail. Case number CSP-26-16. [1839 Plymouth Sorrento Road; case CSP-25-46] Construction Site Plan: Scott Woodrey, applicant Bohler Engineering FL LLC, proposes a K-8 Charter School at 1839 Plymouth Sorrento Road. Case number CSP-25-46.
- Board:
- Development Review Committee Meeting
- Date:
- 2026-04-22
- Type:
- Agenda
- Address:
- 3595 West Kelly Park Road, 3603 West Kelly Park Road, 6311 West Kelly Park Road
- Applicant:
- 1828 Engineering Inc - Luke Classon
DRC Agenda Packet 04/22/2026
[3595 West Kelly Park Road, 3603 West Kelly Park Road, 6311 West Kelly Park Road; case FLU-26-3] Future Land Use Amendment: Effie Road Holdings LLC, represented by 1828 Engineering Inc, seeks to change the future land use from Residential (County)/FLU-IP9 (City) to Mixed Use (MU) at 3595, 3603, and 6311 West Kelly Park Road. Case number FLU-26-3. This is the 1st submittal. [2260, 2404 Plymouth Sorrento Road, 2244 Sorrento Avenue; case PL-25-10] Plat Application: TPG AG EHC III (LEN) Multi State 5 LLC, represented by G L Summitt Engineering Inc, is applying for the Ridgebrook Plat, proposing 88 single-family homes. This is the 2nd submittal. The property is located at 2260 and 2404 Plymouth Sorrento Road, and 2244 Sorrento Avenue. The legal description covers approximately 40.71 acres (1,773,225 square feet) within Section 25, Township 20 South, Range 27 East and Section 30, Township 20 South, Range 28 East, City of Apopka, Orange County, Florida. [2213 Vick Road, Vick Road, West Ponkan Road; case MDP-26-1] Major Development Plan: Paulucci Acres LLC, represented by 1828 Engineering LLC, is seeking approval for Pod 1A/B & 4 of the Paulucci Acres development, proposing a residential subdivision with 502 individual single-family lots. This is the 2nd submittal. The location is 2213 Vick Road, Vick Road, and West Ponkan Road. [2560 West Orange Blossom Trail; case CSP-26-16] Construction Site Plan: MG88 Central Florida, represented by Kimley-Horn, is proposing to add an additional 150,000 SF building on the property at 2560 West Orange Blossom Trail. This is the 1st submittal. [1839 Plymouth Sorrento Road; case CSP-25-46] Construction Site Plan: Scott Woodrey, represented by Bohler Engineering FL LLC, is seeking approval for a K-8 Charter School at 1839 Plymouth Sorrento Road. This is the 3rd submittal.
- Board:
- Development Review Committee Meeting
- Date:
- 2026-04-22
- Type:
- Agenda_packet
- Address:
- 3595 West Kelly Park Road, 3603 West Kelly Park Road, 6311 West Kelly Park Road
- Applicant:
- 1828 Engineering Inc - Luke Classon
W. PONKAN ROAD
A new development is planned for an area near W. Ponkan Road, Jason Dwelley Parkway, Vick Road, Ponkan Summit Drive, Rogers Road, and Pittman Road. The specific details of this project, including its size, current use, or proposed use, are not provided in the posted record. The item is currently under review by the Development Review Committee. This review process will likely involve initial site assessments, planning, and design phases. Local contractors, suppliers, and service providers are encouraged to monitor this project's progress as it moves through the review process. Early engagement could provide opportunities to understand project needs as they develop.
- Board:
- Development Review Committee Meeting
- Date:
- 2026-04-22
- Type:
- Agenda_item
- Address:
- W. PONKAN ROAD
W. PONKAN ROAD
A new K-8 charter school is planned for development at the southeast corner of West Lester Road and Plymouth Sorrento Road in Apopka, Florida. The project includes a 55,653 square foot school building, associated parking, stormwater management systems, and utility infrastructure, with an additional 1.58 acres designated for future development. The site is currently vacant or agricultural land and will be rezoned to a Planned Development/Community Commercial designation. This project is currently under review by the City of Apopka and Orange County. The development will involve site clearing and grading, underground utility work, paving for access roads and parking lots, building construction, and final landscaping. Local contractors, trades, suppliers, and service providers are encouraged to engage early to understand the project scope and potential opportunities before final plans and bids are established.
- Board:
- Development Review Committee Meeting
- Date:
- 2026-04-22
- Type:
- Agenda_item
- Address:
- 1829 Plymouth Sorrento Rd, Apopka, FL 32712
- Applicant:
- Red Apple Development
1. ALL SITE WORK CONSTRUCTION TESTING SHALL BE PERFORMED BY A CERTIFIED / LICENSED2. ALL SITE WORK CONSTRUCTION TESTING SHALL BE CONDUCTED IN ACCORDANCE WITH THE PROJECT'S GEOTECHNICAL REPORT AND / OR THE TESTING PARAMETERS OF THE LOCAL MUNICIPALITY / AGENCY HAVING JURISDICTION OVER THE SITE WORK. THE MORE STRINGENT3. COPIES OF PASSING TEST RESULTS SHALL BE PROVIDED TO THE DEVELOPER, ENGINEER OF RECORD, CONTRACTOR AND LOCAL MUNICIPALITY / AGENCY FOR PURPOSES, SUCH AS BUT4. THE SERVICES OF A CONSTRUCTION TESTING GEOTECHNICAL FIRM SHALL BE RETAINED BY THE DEVELOPER, UNLESS OTHERWISE SPECIFIED IN THE BID DOCUMENTS.5. S.A.I. WILL NOT BE RESPONSIBLE FOR SCHEDULING, COORDINATION OR EVALUATION OF THE SOILS TESTING AND CERTIFICATIONS. IT SHALL BE THE SOLE RESPONSIBILITY OF THE CONTRACTOR TO MAKE THE NECESSARY ARRANGEMENTS DIRECTLY WITH THE SOILS TESTING LABORATORY / GEOTECHNICAL FIRM AND THE SITE CONTRACTOR.
The City of Apopka's Development Review Committee is reviewing requirements for site work construction testing and utility line installations. This review includes standards for soil testing, water system pressure testing, and chlorination sampling. It also details separation requirements for reclaimed water lines, potable water mains, and sanitary sewers, including specific rules for pipe crossings and parallel installations. The project is currently under review, indicating an early stage in the planning process. This review will set the stage for future construction activities, likely involving site clearing, grading, underground utility work for water and sewer systems, and potentially paving. Contractors specializing in geotechnical testing, utility installation, and site preparation could find opportunities. Engaging early allows businesses to understand the project's specific testing and installation requirements before bids and permits are finalized.
- Board:
- Development Review Committee Meeting
- Date:
- 2026-04-15
- Type:
- Agenda_item
1. CSP-26-15 - Logistics 429 at Apopka Ridge Buildings 400, 500 & 600 - Construction Site Plan (CSP), 1st Submittal
A Construction Site Plan (CSP) has been submitted for review for Buildings 400, 500, and 600 at 1315 Jack Junction Way. This project is part of Phase 2 of the Master Development Plan (MDP). The owner is Ridge 429 Owner LLC, and the applicant is Smiley & Associates Inc, with Mark Smiley as the contact. This item is currently under review as a first submittal. The project involves the construction of three new buildings. This work would likely include site clearing and grading, followed by underground utility installation, concrete work, framing, roofing, and the installation of mechanical, electrical, and plumbing systems. Final finishes and landscaping would complete the project. Local contractors, trades, suppliers, and service providers can explore opportunities by engaging with the applicant and project manager early in the review process, before final site plans, bids, and permits are established.
- Board:
- Development Review Committee Meeting
- Date:
- 2026-04-15
- Type:
- Agenda_item
- Address:
- 1315 Jack Junction Way
- Applicant:
- Ridge 429 Owner LLC
1. CSP-26-15 - Logistics 429 at Apopka Ridge Buildings 400, 500 & 600 - Construction Site Plan (CSP), 1st Submittal
Ridge 429 Owner LLC is proposing the construction of Buildings 400, 500, and 600 as part of the Phase 2 area of the MDP at 1315 Jack Junction Way. This project is currently under review as a Construction Site Plan (CSP) with its first submittal. The work will likely involve site clearing and grading, followed by underground utility installation, concrete and foundation work, structural framing, roofing, and the installation of mechanical, electrical, and plumbing systems. Interior and exterior finishes, along with final landscaping, will complete the project. Contractors, suppliers, and service providers in site preparation, concrete, framing, electrical, plumbing, HVAC, roofing, and landscaping could find opportunities. Reaching out to the applicant or project manager early, before final plans and permits are set, offers the best chance to compete for this upcoming work.
- Board:
- Development Review Committee Meeting
- Date:
- 2026-04-15
- Type:
- Agenda_item
- Address:
- 1315 Jack Junction Way
- Applicant:
- Ridge 429 Owner LLC
1. EXCAVATE APPROXIMATELY 4" TO 6" BELOW THE TOP OF THE INLET STRUCTURE.2. PLACE THE FRAME ONTO THE INLET STRUCTURE, ENSURING PROPER SEATINGOF FRAME TO STRUCTURE.3. SLIDE THE COVER OVER THE FRAME.4. FILL THE COVER POCKETS WITH SOIL, #57 GRAVEL OR EQUIVALENT. THE COVERPOCKETS SHOULD BE COMPLETELY FILLED TO ENSURE A GOOD SEAL BETWEENTHE GROUND AND INLET STRUCTURE.5. BACK FILL AROUND THE FRAME AND COVER ASSEMBLY IS NOT REQUIRED TOCOMPLETE INSTALLATION; HOWEVER, BACKFILLING MAY BE NECESSARY TOCOMPLETE EXCAVATION REQUIREMENTS FOR THE SITE.
This civic agenda item concerns planned inlet protection measures for the City of Apopka. The proposed work involves excavating around existing inlet structures, placing frames and covers, and filling cover pockets with soil or gravel to create a seal. Sediment barriers, including curb-type barriers and sandbags filled with gravel, will be placed on sloped streets to manage runoff and separate sediment. These measures are intended for areas with expected heavy concentrated flows, avoiding locations where ponding could cause damage. The project is currently under review by the Development Review Committee. This work would likely involve site preparation, including excavation and grading, followed by the installation of sediment control devices and potentially some utility work related to the inlet structures. Contractors specializing in site preparation, grading, concrete, and erosion control could find opportunities. Reaching out early could provide an advantage before specific bid packages and permits are finalized.
- Board:
- Development Review Committee Meeting
- Date:
- 2026-04-15
- Type:
- Agenda_item
1. GFWC Apopka Woman's Club - Apopka Art and Foliage Festival - Kit Land Nelson Park - 10 North Forest Avenue
The GFWC Apopka Woman's Club is planning the Apopka Art and Foliage Festival. This event is scheduled to take place at Kit Land Nelson Park, located at 10 North Forest Avenue. The festival is planned for April 25th and 26th, 2026, running from 9:00 am to 5:00 pm daily. This item is currently under review by the Development Review Committee. The event will involve setting up temporary structures, vendor booths, and activity areas within the park. It will also require site preparation for event flow and potential utility hookups for vendors. Local contractors, suppliers, and service providers can find opportunities in providing event services, temporary structures, site services, and potentially cleanup and maintenance. Engaging early, before final event plans and permits are set, allows businesses to align their services with the festival's needs.
- Board:
- Development Review Committee Meeting
- Date:
- 2026-04-15
- Type:
- Agenda_item
- Address:
- Kit Land Nelson Park - 10 North Forest Avenue
- Applicant:
- GFWC Apopka Woman's Club
1. GFWC Apopka Woman's Club - Apopka Art and Foliage Festival - Kit Land Nelson Park - 10 North Forest Avenue
The GFWC Apopka Woman's Club is planning an Art and Foliage Festival at Kit Land Nelson Park, located at 10 North Forest Avenue. This event is scheduled for April 25th and 26th, 2026, running from 9:00 am to 5:00 pm daily. The applicant, Joann Castillo, and project manager, Carolyn Ray, are coordinating this celebration. The festival is currently under review by the Development Review Committee. This event will involve site preparation for vendor booths, temporary power and lighting setup, and potentially basic landscaping or site beautification for the park grounds. Following the event, site cleanup and restoration will be necessary. Local contractors, suppliers, and service providers can get involved by reaching out early to understand the specific needs for temporary structures, event services, and site management before final plans are set. This early engagement offers an advantage in securing potential work related to the festival's execution and wrap-up.
- Board:
- Development Review Committee Meeting
- Date:
- 2026-04-15
- Type:
- Agenda_item
- Address:
- Kit Land Nelson Park - 10 North Forest Avenue
- Applicant:
- GFWC Apopka Woman's Club
1. MDP-26-2 - The Ridge PD Parcel 3 - Major Development Plan (MDP), 1st Submittal
The City of Apopka's Development Review Committee is reviewing a Major Development Plan (MDP) for a new project called The Ridge PD Parcel 3. This plan, submitted by Apopka Centerline Development LLC and represented by applicant Vanasse Hangen Brustlin Inc, proposes a multi-family development with 363 dwelling units. The project is located on Boyscout Road. This item is currently under review, representing an early stage in the public process. The development would likely involve site clearing and grading, followed by underground utility work, paving, and the construction of the multi-family structures. Subsequent phases would include interior and exterior finishing trades, and final landscaping. Local contractors, trades, suppliers, and service providers can gain an advantage by engaging with the project early, before site plans, bids, and permits are finalized, to explore potential opportunities.
- Board:
- Development Review Committee Meeting
- Date:
- 2026-04-15
- Type:
- Agenda_item
- Address:
- Boyscout Road
- Applicant:
- Apopka Centerline Development LLC
1. MDP-26-2 - The Ridge PD Parcel 3 - Major Development Plan (MDP), 1st Submittal
A Major Development Plan (MDP) for The Ridge PD Parcel 3 is currently under review by the City of Apopka's Development Review Committee. This plan proposes a new multi-family development with 363 dwelling units on a parcel identified by PID:17-21-28-7345-03-000, located on Boyscout Road. The project is in its initial submittal phase, indicating an early stage in the public process. If approved, this development would likely involve site clearing and grading, followed by underground utility work, foundation and framing, and then mechanical, electrical, and plumbing installations, leading to interior and exterior finishes and landscaping. Contractors, suppliers, and service providers in construction, engineering, and related fields are encouraged to engage early to understand the project's scope and potential needs before final plans and bids are established.
- Board:
- Development Review Committee Meeting
- Date:
- 2026-04-15
- Type:
- Agenda_item
- Address:
- Boyscout Road
- Applicant:
- Apopka Centerline Development LLC
1. PLACE CONCRETE BLOCKS IN A SINGLE ROWAROUND PERIMETER OF INLET ON THEIR SIDES,WITH ENDS OF ADJACENT BLOCKS ABUTTING.2. HEIGHT OF BARRIER VARIES. USE STACKS OF4-INCH, 8-INCH, OR 12" BLOCKS. MIN.3.HEIGHT OF BARRIER 12" AND MAX. HEIGHT OF24" PLACE FILTER FABRIC OVER VERTICAL FACEOF CONCRETE BLOCKS.4. THE SEDIMENT FILTER SHALL BE ANYNON-ERODIBLE MATERIAL SUCH AS LOOSEROCK, BROKEN CONCRETE THAT WILL SLOWTHE FLOW OF THE WATER AND ALLOW IT TOFILTER THROUGH AND OVER THE MATERIALBEFORE ENTERING THE INLET.
This civic agenda item involves a planned construction project to install a sediment filter around an inlet. The work includes placing concrete blocks in a single row along the perimeter of the inlet, with block heights varying from 12 to 24 inches. Filter fabric will be placed over the vertical faces of the concrete blocks. The sediment filter itself will be made of non-erodible material like loose rock or broken concrete to slow water flow before it enters the inlet. This project is currently under review. The scope of work will likely involve site preparation, concrete block placement, and installation of filter fabric and sediment materials. Local contractors, concrete suppliers, and landscape material providers could find opportunities by engaging early in the process before final plans and bids are set.
- Board:
- Development Review Committee Meeting
- Date:
- 2026-04-15
- Type:
- Agenda_item
1. REMOVE TRAPPED SEDIMENT WHEN BRIGHTLY COLORED EXPANSION RESTRAINTCAN NO LONGER BE SEEN.2. GEOTEXTILE SHALL BE A WOVEN POLYPROPYLENE FABRIC THAT MEETS OREXCEEDS REQUIREMENTS IN THE SPECIFICATIONS TABLE.3. PLACE AN OIL ADSORBENT PAD OR PILLOW OVER INLET GRATE WHEN OIL SPILLSARE A CONCERN.4. INSPECT PER REGULATORY EQUIREMENTS.5. THE WIDTH, "W", OF THE FILTER SACK SHALL MATCH THE INSIDE WIDTH OF THEGRATED INLET BOX.6. THE DEPTH, "D", OF THE FILTER SACK SHALL BE BETWEEN 18 INCHES AND 36INCHES.7. THE LENGTH, "L", OF THE FILTER SACK SHALL MATCH THE INSIDE LENGTH OF THEGRATED INLET BOX.8. EXTRA CARE SHALL BE TAKEN TO ENSURE REGULAR MAINTENANCE OF FILTERSACKS USED IN RIGHT OF WAY TO ENSURE ADEQUATE DRAINAGE CAPACITY.DOMED INLET PROTECTION (PREFABRICATED)
A project is planned to expand the Apopka Northwest Recreation Center soccer fields. The proposed improvements cover approximately 29 acres. This project involves site clearing and grubbing, grading, and the installation of new soccer fields, parking areas, and related infrastructure. The work will also include stormwater management features, utility connections for water, and potentially other site improvements. This project is currently under review, indicating an early stage in the development process. Contractors, suppliers, and service providers are encouraged to engage early to understand the project's scope, which includes site preparation, earthwork, paving, utility installation, and final landscaping. Early involvement can provide an advantage before formal bidding and permitting.
- Board:
- Development Review Committee Meeting
- Date:
- 2026-04-15
- Type:
- Agenda_item
- Address:
- 3910 JASON DWELLEY PKWY, APOPKA, ORANGE COUNTY, FL
1. SANITARY SEWERS, FORCE MAINS, AND STORM SEWERS SHOULD ALWAYS CROSS UNDERNEATHWATER MAINS. INSTALLATIONS OF SANITARY SEWERS, FORCE MAINS AND STORM SEWERS, ATCROSSINGS OF WATER MAINS, SHALL BE PERFORMED SO AS TO PROVIDE A MINIMUM VERTICALDISTANCE OF 18 INCHES BETWEEN THE INVERT OF THE UPPER PIPE AND THE CROWN OF THELOWER PIPE, WHENEVER POSSIBLE. THE CROSSING SHALL BE ARRANGED SO THAT THE SEWERJOINTS AND WATER JOINTS SHALL BE EQUIDISTANT FROM THE POINT OF CROSSING WITH NO
This notice concerns new standards for installing sanitary sewers, force mains, and storm sewers where they cross water mains. The City of Apopka's Development Review Committee is reviewing these proposed standards. The new rules require a minimum vertical distance of 18 inches between sewer and water pipes when possible, with sewer lines typically placed below water lines. Specific requirements apply when less vertical distance is possible, including using ductile iron pipe (DIP) for both lines or placing the sewer in a sleeve. These standards will guide future utility construction projects. Contractors specializing in underground utilities, site preparation, and concrete work may find opportunities as these standards are implemented. Early engagement with the city or project developers could provide insight into upcoming projects.
- Board:
- Development Review Committee Meeting
- Date:
- 2026-04-15
- Type:
- Agenda_item
1. SEE PLAN FOR JOINT SPACING.NOTE:
The City of Apopka is reviewing plans for the expansion of soccer fields at the Apopka Northwest Recreation Center. This project involves significant site work, including the installation of new pavement sections, potentially including asphalt and concrete, along with sub-base and sub-grade preparation. Details show requirements for compacting sub-grade to specific densities, laying limerock base, and installing asphalt concrete layers. Concrete joint details, including dowel placement and sealant application, are also specified. The project also includes ADA striping and ramp construction. This item is currently under review by the Development Review Committee. The scope of work will likely involve site clearing and grading, extensive underground utility work for water service connections and irrigation, road and driveway paving, and final landscaping. Local contractors, suppliers, and service providers in site preparation, concrete, paving, and utility work are encouraged to engage early to understand the project's needs before bids and permits are finalized.
- Board:
- Development Review Committee Meeting
- Date:
- 2026-04-15
- Type:
- Agenda_item
- Address:
- 500 West Fulton StreetSanford, FL 32771
1. SPX-26-4 - Telecom Tower (FL23193-S Wyld Oaks) - Special Exception Use (SPX), 1st Submittal
A special exception use application has been submitted for a proposed 120-foot stealth wireless telecommunications tower. The application, identified as SPX-26-4, is a first submittal for the project named FL23193-S Wyld Oaks. The owner is Kelly Park VB Development LLC, and the applicant is Kimley-Horn, represented by Shahzad Mahmood. The project is currently under review by the City of Apopka's Development Review Committee. This project would involve site preparation, including clearing and grading, followed by the installation of the tower structure and associated underground utilities. Final landscaping and site restoration would complete the work. Local contractors, suppliers, and service providers in construction, utilities, and professional services could find opportunities. Early engagement before final site plans, bids, and permits are issued may offer a competitive advantage.
- Board:
- Development Review Committee Meeting
- Date:
- 2026-04-15
- Type:
- Agenda_item
- Address:
- 13-20-27-4300-01-000
- Applicant:
- Kelly Park VB Development LLC
1. SPX-26-4 - Telecom Tower (FL23193-S Wyld Oaks) - Special Exception Use (SPX), 1st Submittal
A special exception use application has been submitted for a proposed 120-foot stealth wireless telecommunications tower. The project is located at parcel number 13-20-27-4300-01-000. This is the first submittal for the project, which is currently under review by the City of Apopka Development Review Committee. The project involves the construction of a telecommunications tower. This early stage means that site plans, bids, and permits are not yet finalized. Local contractors, suppliers, and service providers are encouraged to engage now to understand the project's scope and potential needs. Early involvement can provide an advantage as the project moves through the review process.
- Board:
- Development Review Committee Meeting
- Date:
- 2026-04-15
- Type:
- Agenda_item
- Address:
- 13-20-27-4300-01-000
- Applicant:
- Kelly Park VB Development LLC
1. Work this Index with Specification 522.
The Ridge PD - Parcel 3 project in Apopka, Florida, is currently under review as a Major Development Plan. This project involves the development of Parcel 3, identified by parcel IDs 17-21-28-7345-03-000. The plans include details for grading, drainage, utilities, typical sections, and landscape designs. The scope of work will likely involve site clearing and grading, underground utility installation, concrete work for driveways and sidewalks, and final landscaping. As this is a preliminary development plan, not yet approved for construction, contractors, suppliers, and service providers have an early opportunity to engage with the project team. Reaching out now, before final bids and permits are issued, allows businesses to understand the project's needs and potentially secure future work.
- Board:
- Development Review Committee Meeting
- Date:
- 2026-04-15
- Type:
- Agenda_item
- Address:
- 1500 Cordova RoadSuite 203Fort Lauderdale, Florida 33316
- Applicant:
- Apopka Centerline Development LLC
10. ALL ON-SITE FIRE HYDRANTS SHALL BE PAINTED WITH HIGH GRADE ENAMEL FEDERAL SAFETY YELLOW (OSHA APPROVED), AND MUSTBE LOCATED A MINIMUM OF 6 FEET FROM THE EDGE OF PAVEMENT OR BACK OF CURB, OTHERWISE BOLLARDS WILL BE REQUIRED FORTO ASSURE ADEQUATE FLUSHING AND DISINFECTION/CHLORINATION.PROTECTION ALL FIRE HYDRANTS SHALL COMPLY WITH AWWA STANDARDS C502-80 THEREOF.
This civic agenda item concerns planned updates to fire hydrant specifications for the City of Apopka. All on-site fire hydrants must be painted federal safety yellow and meet specific placement requirements relative to pavement or curbs. Additional requirements include compliance with AWWA standards for structural integrity, protection, and corrosion resistance, along with adherence to City of Apopka Utility Department specifications for water mains and related materials. The item is currently under review by the Development Review Committee. This project will involve site preparation, including potential grading and paving adjustments, installation or modification of underground utilities, and the painting and protection of fire hydrants. Contractors specializing in site preparation, concrete, utility work, painting, and general construction services may find opportunities. Early engagement before final plans and permits are issued could provide a competitive advantage.
- Board:
- Development Review Committee Meeting
- Date:
- 2026-04-15
- Type:
- Agenda_item
10. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO OBTAIN AN "ON-SITE THAT THE OWNER OR ENGINEER WILL INSPECT AND/OR ENFORCE SAFETY REGULATIONS. BEEN PROVIDED FOR THE CONTRACTOR'S INFORMATION ONLY AND DOES NOT IMPLY IT SHALL BE THE SOLE RESPONSIBILITY OF THE CONTRACTOR TO COMPLY AND
This item concerns a planned development project located in the City of Apopka, Orange County. While specific details about the project's nature, size, or proposed use are not provided in the agenda text, it indicates that a contractor will be responsible for obtaining an "on-site" permit. The agenda also mentions that the owner or engineer will inspect and enforce safety regulations. This information is for the contractor's use only and does not relieve them of their compliance responsibilities. The project is currently in the planning stages, suggesting early opportunities for businesses. This early phase could involve site preparation, utility work, and general construction services. Local contractors, suppliers, and service providers are encouraged to engage early to understand the project's requirements before final plans, bids, and permits are established, which could offer a competitive advantage.
- Board:
- Development Review Committee Meeting
- Date:
- 2026-04-15
- Type:
- Agenda_item
11. CONTRACTOR TO INSTALL TEMPORARY BLOWOFFS, AT THE END(S) OF PROPOSED WATER MAINS AND SERVICE LATERALS TO BUILDING(S),
This item concerns planned work for temporary blowoffs on proposed water mains and service laterals to buildings. The work is currently under review by the City of Apopka's Development Review Committee. This project will involve installing temporary blowoff valves at the ends of new water mains and service lines. This early stage means contractors, suppliers, and service providers can engage before final plans are set. Early outreach can provide an advantage for businesses specializing in utility work, plumbing, and site preparation.
- Board:
- Development Review Committee Meeting
- Date:
- 2026-04-15
- Type:
- Agenda_item
12. ALL SANITARY SEWER WORK SHALL CONFORM WITH APPLICABLE CITY OF APOPKA13. PRIOR TO COMMENCING WORK WHICH REQUIRES CONNECTING PROPOSED FACILITIES TO EXISTING LINES OR APPURTENANCES, THE CONTRACTOR SHALL VERIFY THE LOCATION AND ELEVATION(S) OF EXISTING CONNECTION POINT(S) AND NOTIFY THE OWNER'S ENGINEER OF ANY CONFLICTS
This item concerns planned sanitary sewer work for the City of Apopka. All work must follow the city's standards and specifications. Before connecting to existing lines, contractors must confirm the location and elevation of connection points and report any issues to the owner's engineer. This project is currently planned and under review. The scope of work will involve underground utility installation, including excavation, pipe laying, and connections to existing infrastructure. This early stage presents an opportunity for general contractors, utility contractors, and suppliers of sewer pipes and related materials to engage with the project owner and their engineer. Reaching out now, before bids and permits are finalized, allows businesses to understand the project's needs and potentially secure future work.
- Board:
- Development Review Committee Meeting
- Date:
- 2026-04-15
- Type:
- Agenda_item
12. CONTRACTOR SHALL COORDINATE AND VERIFY ALL ADA ACCESS WAY SLOPES PRIOR TO CONSTRUCTION. NOTIFY ENGINEER OF ANY LOCATIONS WHERESLOPES DO NOT MEET ADA REQUIREMENTS.13. CONTRACTOR SHALL INCLUDE IN BID FINAL ADJUSTMENTS TO ALL MANHOLES ANDCATCH BASIN RIMS TO FINAL FIELD GRADE.
This civic agenda item concerns a planned demolition and construction project. The project involves demolition of existing materials and subsequent construction, requiring careful attention to ADA access way slopes and final grade adjustments for manholes and catch basins. The demolition plan is noted as approximate, meaning the extent of material removal will be dictated by the needs of the construction. The contractor must notify the FDEP and provide proof of NPDES compliance. This item is currently under review, indicating an early stage in the public process. The scope of work will likely involve site clearing and grading, underground utility work for stormwater management, and potentially concrete and masonry for infrastructure adjustments. Contractors, suppliers, and service providers are encouraged to reach out early to understand the project's full scope before bids and permits are finalized, offering a competitive advantage.
- Board:
- Development Review Committee Meeting
- Date:
- 2026-04-15
- Type:
- Agenda_item
13. ALL WATER MAINS SHALL BE STERILIZED IN ACCORDANCE WITH THE APPLICABLE SECTION OF THE LATEST AWWA SPECIFICATION C65112. ALL WATER MAINS SHALL BE PRESSURE TESTED IN ACCORDANCE WITH AWWA STANDARD C605 FOR PVC AND C600 FOR DUCTILE IRON
Development Review Committee Meeting listed this item on its agenda for 2026-04-15 in City of Apopka. The posted record gives the item title and nothing else, so there is no site, no size and no applicant on file for it yet. Local businesses that want to follow it can open the official agenda link above and watch for the fuller write-up the body posts as the meeting gets closer.
- Board:
- Development Review Committee Meeting
- Date:
- 2026-04-15
- Type:
- Agenda_item
14. SANITARY SEWER MAINS SHALL HAVE SUITABLE MAGNETIC LOCATOR TAPE(S) BURIED AT15. FORCE MAINS SHALL HAVE SUITABLE MAGNETIC LOCATOR TAPE(S) BURIED AT LEAST 18
A civic agenda item regarding sanitary sewer mains and drainage systems is under review by the Development Review Committee for the City of Apopka. This review involves detailed testing and inspection requirements for both gravity and force main sewer systems, including hydrostatic pressure tests, infiltration/exfiltration tests, and visual inspections. The project also specifies requirements for storm drainage piping, structures, and the construction of the stormwater management system. The contractor will be responsible for scheduling and coordinating all inspections and tests with the engineer of record and regulatory agencies. This early stage of review means that contractors, suppliers, and service providers can engage now to understand the project's scope and requirements. The work will likely involve site clearing and grading, underground utility installation for sewer and drainage, concrete work for structures, paving, and final landscaping and stabilization of disturbed areas. Businesses specializing in civil engineering, utility contracting, concrete, paving, and landscaping services are encouraged to reach out to learn more about potential involvement as plans develop.
- Board:
- Development Review Committee Meeting
- Date:
- 2026-04-15
- Type:
- Agenda_item
15. CONSTRUCTION MUST COMPLY WITH THE CITY OF APOPKA ENGINEERING STANDARDS MANUAL, LAND DEVELOPMENT CODE, AND CITY DETAILS. SHOULD NOTES BETWEEN THIS PLAN AND CITY STANDARDS/DETAILS SHOW DIFFERENT INFORMATION, THE MOST STRINGENT STANDARD BETWEEN THE (AS DETERMINED BY THE ENGINEER OF RECORD OR THE CITY) SHOULD BE FOLLOWED.
This item concerns requirements for as-built and record drawings for future construction projects in Apopka. All construction must follow the City of Apopka's Engineering Standards Manual and Land Development Code. If there are differences between project plans and city standards, the stricter rule will apply. Upon project completion, contractors must provide the owner's engineer with certified as-built drawings. These drawings need to show utility locations, invert elevations, and grade break locations and elevations. The drawings must be submitted in paper, PDF, and CAD formats using state plane coordinates. No engineer's certification for a certificate of occupancy will be issued until these as-built records are approved. This process will involve site clearing, grading, underground utility work, paving, and final construction, followed by the detailed record-keeping phase. Contractors, surveyors, engineers, and suppliers involved in site development and construction trades can benefit from understanding these requirements early. Engaging now allows businesses to prepare for potential future projects and ensure compliance with Apopka's stringent standards before bids and permits are finalized.
- Board:
- Development Review Committee Meeting
- Date:
- 2026-04-15
- Type:
- Agenda_item
16. CONTRACTOR SHALL REFERENCE THE APPROVED MASTER DEVELOPMENT PLAN FOR ADDITIONAL INFORMATION RELATIVE TO PARCEL 5. APPROVED PLANS BY VHB DATED AUGUST 26, 2021 AND APPROVED BY THE CITY OCTOBER 20, 2021.17. RETAINING WALL SYSTEMS SHALL BE MAINTAINED BY THE OWNER OF PARCEL 5.
A master development plan for Parcel 5 has been approved, with plans dated August 26, 2021, and approved by the City of Apopka on October 20, 2021. This project involves the installation of DIP and PVC water mains, which will require hydrostatic testing witnessed by a City of Apopka inspector. Retaining wall systems will be maintained by the owner of Parcel 5. The project is currently under review, following the approval of the master development plan. This work will likely involve site preparation, underground utility installation, and specialized testing for water mains. Contractors specializing in underground utilities, concrete, and water systems, along with suppliers of water main materials and testing equipment, may find opportunities. Early engagement before final bid and permit stages could be advantageous.
- Board:
- Development Review Committee Meeting
- Date:
- 2026-04-15
- Type:
- Agenda_item
- Decision:
- City of Apopka
- Address:
- PARCEL 5
16. FIRE LINES SHALL BE INSTALLED BY A CONTRACTOR, DULY LICENSED BY THE STATE OF FLORIDA FIRE MARSHALL'S OFFICE.
This item concerns the planned installation of fire lines. The work will be performed by a contractor who must be licensed by the State of Florida Fire Marshall's Office. This project is currently under review. The scope of work will involve the installation of underground fire suppression systems. This early stage means contractors, suppliers, and service providers can engage now to understand the project's needs. Reaching out before final plans and permits are set can offer a competitive advantage.
- Board:
- Development Review Committee Meeting
- Date:
- 2026-04-15
- Type:
- Agenda_item
17. FIRE PROTECTION SHALL MEET ALL THE REQUIREMENTS OF THE APPLICABLE MUNICIPALITY OR COUNTY.
Development Review Committee Meeting listed this item on its agenda for 2026-04-15 in City of Apopka. The posted record gives the item title and nothing else, so there is no site, no size and no applicant on file for it yet. Local businesses that want to follow it can open the official agenda link above and watch for the fuller write-up the body posts as the meeting gets closer.
- Board:
- Development Review Committee Meeting
- Date:
- 2026-04-15
- Type:
- Agenda_item
18. WATERMAINS DESIGNATED AS FIRE LINE BY FIRE MARSHAL MAY REQUIRE ADDITIONAL RESTRAINTS. CONTRACTOR SHALL VERIFY WITH FIRE MARSHAL PRIOR TO CONSTRUCTION. ADDITIONAL MEASURES SHALL BE INCLUDED IN BASE BID.19. CONTRACTOR SHALL PLAN ON 2 LIFTS FOR ASPHALT UNLESS OTHERWISE NOTIFIED BY OWNER.20. PIPE LENGTHS ARE APPROXIMATE. FIELD CONDITIONS MAY REQUIRE ADJUSTMENTS AND BE PART OF BASE BID.21. PRIOR TO INITIATING SITE WORK, CONTRACTOR SHALL VERIFY BUILDING UTILITY POINTS OF CONNECTION WITH FINAL BUILDING PERMIT PLANS. NOTIFY A/E OF ANY DISCREPANCIES.
The City of Apopka is planning an expansion of the Apopka Northwest Recreation Center Soccer Fields. This project involves the construction of new soccer fields and associated infrastructure. The work will include site clearing and grading, installation of underground utilities such as water mains and sewer lines, paving for access roads and parking areas, and final landscaping. Additionally, stormwater management systems and erosion control measures will be implemented. This project is currently under review, offering an early opportunity for contractors, suppliers, and service providers to engage. The scope includes significant earthwork, utility installation, concrete and asphalt paving, and potentially specialized trades for drainage and site preparation. Early involvement before final bid packages are prepared can provide a competitive advantage.
- Board:
- Development Review Committee Meeting
- Date:
- 2026-04-15
- Type:
- Agenda_item
- Decision:
- FLORIDA DEPARTMENT OF ENVIRONMENTAL PROTECTION
- Address:
- 3910 JASON DWELLEY PKWY, APOPKA, ORANGE COUNTY, FL