Development Review Committee Meeting: April 2026
City of Apopka
2. A MINIMUM 10 FOOT HORIZONTAL SEPARATION SHALL BE MAINTAINED BETWEEN ANY TYPE OF SEWER (INCLUDING FORCE MAINS) AND
The City of Apopka's Development Review Committee is considering new standards for utility installation. These proposed rules focus on the required separation distances between water mains and sewer lines, including force mains. Specifically, they detail minimum horizontal and vertical clearances, as well as requirements for installing water mains in separate trenches or on undisturbed earth shelves when standard horizontal separation is not possible. The proposal also includes specifications for magnetic locator tape to be placed above PVC water mains, outlining its material, thickness, width, color, and imprinted warning text. This item is currently under review, meaning these standards are being considered for adoption. If approved, this would set new requirements for underground utility work, impacting site preparation, trenching, and the installation of water and sewer systems. Contractors specializing in underground utilities, site preparation, and concrete work, as well as suppliers of water and sewer pipes and locator tape, could benefit from understanding these proposed regulations. Engaging with the city early in this review process allows businesses to be aware of potential future project requirements and to provide input before final decisions are made.
- Board:
- Development Review Committee Meeting
- Date:
- 2026-04-15
- Type:
- Agenda_item
2. Apopka Florist - Grand Opening - 2121 East Semoran Boulevard - May 3rd, 2026 10:00am - 4:00pm
A grand opening event is planned for Apopka Florist, located at 2121 East Semoran Boulevard. The event is scheduled for May 3rd, 2026, from 10:00 am to 4:00 pm. This event is currently under review by the City of Apopka's Development Review Committee. The scope of work for this event would involve preparations for a business opening, potentially including interior setup, exterior signage, and promotional activities. Local businesses involved in event planning, retail setup, and marketing services could find opportunities. Engaging early with the applicant, Bruce Haase, before the event date could be advantageous.
- Board:
- Development Review Committee Meeting
- Date:
- 2026-04-15
- Type:
- Agenda_item
- Address:
- 2121 East Semoran Boulevard
- Applicant:
- Apopka Florist
2. Apopka Florist - Grand Opening - 2121 East Semoran Boulevard - May 3rd, 2026 10:00am - 4:00pm
Apopka Florist is planning a grand opening event at 2121 East Semoran Boulevard. The event is scheduled for May 3rd, 2026, from 10:00 AM to 4:00 PM. This event is currently planned and has not yet occurred. The scope of work for this event would involve setting up for a retail opening, including display arrangements, customer service setup, and potentially temporary signage or decorations. This event presents an opportunity for local businesses that provide event setup, floral supply, retail display services, and general event support. Reaching out to Apopka Florist before the event date could allow businesses to offer their services and secure work.
- Board:
- Development Review Committee Meeting
- Date:
- 2026-04-15
- Type:
- Agenda_item
- Address:
- 2121 East Semoran Boulevard
- Applicant:
- Apopka Florist
2. CONTRACTOR SHALL PREPARE AND FILE THE NECESSARY EPA - NPDES PERMIT(S) FOR THIS PROJECT. 1. CONTRACTOR SHALL BECOME FAMILIAR WITH THE SPECIFIC REQUIREMENTS OF ALL SITE DEVELOPMENT PERMITS.
A project is planned that requires contractors to prepare and file EPA - NPDES permits and become familiar with site development permit requirements. The contractor will be responsible for surveying, testing, and providing documents for engineering certifications, including as-built/record drawings. This work involves the water distribution system, which requires pressure testing and bacteriological testing. Additionally, as-built drawings are needed for the paving, grading, and stormwater management system. The review and approval process for engineering certifications can take one to two months and impacts the final certificate of occupancy. This project is in the planning stages, offering an early opportunity for businesses. The scope includes site clearing and grading, underground utility work for water distribution and stormwater management, and road and driveway paving. Contractors, suppliers, and service providers who can assist with permitting, surveying, testing, civil engineering, and site work are encouraged to engage early before final plans and bids are set.
- Board:
- Development Review Committee Meeting
- Date:
- 2026-04-15
- Type:
- Agenda_item
2. CSP-26-9 - Apopka Northwest Recreation Complex - Phase 4 Soccer Fields - Construction Site Plan (CSP), 2nd
The City of Apopka is reviewing plans for the Apopka Northwest Recreation Complex, Phase 4 Soccer Fields. This project, located at 3910 Jason Dwelley Parkway, proposes the construction of six soccer pads to be built in three phases. The project is currently under review by the Development Review Committee. This development will involve site clearing and grading, underground utility work, and paving for the soccer fields and related access areas. It will also require framing, roofing, electrical, plumbing, and HVAC for any associated structures, followed by final landscaping. Local contractors, trades, suppliers, and service providers are encouraged to engage early, before final bids and permits are issued, to explore potential opportunities in this planned development.
- Board:
- Development Review Committee Meeting
- Date:
- 2026-04-15
- Type:
- Agenda_item
- Address:
- 3910 Jason Dwelley Parkway
- Applicant:
- City of Apopka
2. CSP-26-9 - Apopka Northwest Recreation Complex - Phase 4 Soccer Fields - Construction Site Plan (CSP), 2nd
The City of Apopka is planning a new recreation complex, specifically Phase 4 which includes six soccer fields. This project is currently under review as a Construction Site Plan (CSP), with CPH Consulting LLC serving as the applicant. The proposed development involves creating six soccer pads, to be built in three distinct phases. This project will likely involve initial site clearing and grading, followed by underground utility work and stormwater management. Subsequent phases would include the installation of playing surfaces, field lighting, and final landscaping. Local contractors, trades, suppliers, and service providers should consider reaching out to the applicant or project manager early in the review process. Engaging before site plans, bids, and permits are finalized offers an advantage in securing potential work for site preparation, construction, and related services.
- Board:
- Development Review Committee Meeting
- Date:
- 2026-04-15
- Type:
- Agenda_item
- Address:
- 3910 Jason Dwelley Parkway
- Applicant:
- City of Apopka
2. MDP-25-14 - Wyld Oaks C- Store - Major Development Plan (MDP), 2nd Submittal
A Major Development Plan (MDP) for Wyld Oaks C-Store is currently under review. This project proposes a 1.24-acre commercial development located on West Kelly Park Road, between Effie Drive and Highway 429. The plan includes a 6,300 square foot multi-tenant building and 16 fuel pumps. The development is in its second submittal phase, indicating it is still in the planning stages. This project will likely involve site clearing and grading, followed by underground utility work, concrete for foundations and fueling areas, and construction of the multi-tenant building. Mechanical, electrical, and plumbing trades will be needed, along with interior and exterior finishes. Final landscaping and paving will complete the project. Local contractors, suppliers, and service providers can gain an advantage by engaging early, before final site plans, bids, and permits are issued, to understand the project's scope and potential needs.
- Board:
- Development Review Committee Meeting
- Date:
- 2026-04-15
- Type:
- Agenda_item
- Address:
- West Kelly Park Road between Effie Drive and Highway 429
- Applicant:
- Kelly Park VB Development LLC
2. MDP-25-14 - Wyld Oaks C- Store - Major Development Plan (MDP), 2nd Submittal
A commercial development called Wyld Oaks C-Store is planned for West Kelly Park Road, between Effie Drive and Highway 429. The proposal includes a 1.24-acre site with a 6,300 square foot multi-tenant building and 16 fuel pumps. This Major Development Plan (MDP) is currently under review by the City of Apopka's Development Review Committee. The project is expected to involve site preparation, grading, underground utility work, building construction, and final landscaping. Local contractors, trades, suppliers, and service providers should consider reaching out to the applicant or project manager early in the process. Engaging before site plans, bids, and permits are finalized can offer an advantage for securing future work on this development.
- Board:
- Development Review Committee Meeting
- Date:
- 2026-04-15
- Type:
- Agenda_item
- Address:
- West Kelly Park Road between Effie Drive and Highway 429
- Applicant:
- Kelly Park VB Development LLC
2. Refer to Index 520-001 for drop curb details and Index 522-001 for joints between driveway, sidewalks, and curb.
Development Review Committee Meeting listed this item on its agenda for 2026-04-15 in City of Apopka. The posted record gives the item title and nothing else, so there is no site, no size and no applicant on file for it yet. Local businesses that want to follow it can open the official agenda link above and watch for the fuller write-up the body posts as the meeting gets closer.
- Board:
- Development Review Committee Meeting
- Date:
- 2026-04-15
- Type:
- Agenda_item
3. ALL DIP PIPE SHALL BE CLASS 50 OR HIGHER. REFER TO NOTE #8 BELOW FOR ADDITIONAL DIP SPECIFICATIONS. ADEQUATETHE WATER MAIN SHALL BE LOCATED AS FAR APART AS POSSIBLE FROM JOINTS ON THE SEWER OR FORCE MAIN (ie. STAGGERED
Development Review Committee Meeting listed this item on its agenda for 2026-04-15 in City of Apopka. The posted record gives the item title and nothing else, so there is no site, no size and no applicant on file for it yet. Local businesses that want to follow it can open the official agenda link above and watch for the fuller write-up the body posts as the meeting gets closer.
- Board:
- Development Review Committee Meeting
- Date:
- 2026-04-15
- Type:
- Agenda_item
3. ALL ROCK FINISHING SHALL BE BOARDED TO THE ACCEPTANCE OF THE ENGINEER PRIOR TO TACK.
Development Review Committee Meeting listed this item on its agenda for 2026-04-15 in City of Apopka. The posted record gives the item title and nothing else, so there is no site, no size and no applicant on file for it yet. Local businesses that want to follow it can open the official agenda link above and watch for the fuller write-up the body posts as the meeting gets closer.
- Board:
- Development Review Committee Meeting
- Date:
- 2026-04-15
- Type:
- Agenda_item
3. Apopka Police Department - Apopka PD Personal Safety Day in the Park - Kit Land Nelson Park - 10 North Forest
The Apopka Police Department is planning a Personal Safety Day event at Kit Land Nelson Park, located at 10 North Forest Avenue. This event is proposed as a Self Defense Safety Day. The event is currently planned and scheduled for May 9th, 2026, from 9:00 AM to 11:00 AM. While this is an event and not a construction project, it will involve setting up an area for public safety demonstrations and activities. This could include needs for temporary structures, event equipment rental, and potentially site preparation for the event space. Local businesses involved in event services, temporary structure rental, and site preparation could find opportunities related to this planned event. Early engagement with the organizers may be beneficial as plans are finalized.
- Board:
- Development Review Committee Meeting
- Date:
- 2026-04-15
- Type:
- Agenda_item
- Address:
- 10 North Forest Avenue
- Applicant:
- Apopka Police Department
3. Apopka Police Department - Apopka PD Personal Safety Day in the Park - Kit Land Nelson Park - 10 North Forest
The Apopka Police Department is planning a Personal Safety Day event at Kit Land Nelson Park, located at 10 North Forest Avenue. This event is proposed to be a Self Defense Safety Day. The event is currently planned and scheduled for May 9th, 2026, from 9:00 AM to 11:00 AM. While this is an event and not a construction project, it will involve site setup and management for public attendance. Services such as event staffing, security, and potentially portable facilities or equipment rental may be needed. Local contractors and service providers are encouraged to reach out to the Apopka Police Department or the project manager early, before final arrangements are made, to explore potential opportunities to support this community event.
- Board:
- Development Review Committee Meeting
- Date:
- 2026-04-15
- Type:
- Agenda_item
- Address:
- 10 North Forest Avenue
- Applicant:
- Apopka Police Department
3. Existing Curb and Gutter:
Development Review Committee Meeting listed this item on its agenda for 2026-04-15 in City of Apopka. The posted record gives the item title and nothing else, so there is no site, no size and no applicant on file for it yet. Local businesses that want to follow it can open the official agenda link above and watch for the fuller write-up the body posts as the meeting gets closer.
- Board:
- Development Review Committee Meeting
- Date:
- 2026-04-15
- Type:
- Agenda_item
4. ALL WATER MAIN PIPE FITTINGS AND APPURTENANCES SHALL BE INSTALLED TO COMPLY WITH CITY OF APOPKA WATER DEPARTMENT
Development Review Committee Meeting listed this item on its agenda for 2026-04-15 in City of Apopka. The posted record gives the item title and nothing else, so there is no site, no size and no applicant on file for it yet. Local businesses that want to follow it can open the official agenda link above and watch for the fuller write-up the body posts as the meeting gets closer.
- Board:
- Development Review Committee Meeting
- Date:
- 2026-04-15
- Type:
- Agenda_item
4. Apopka Police Department - APD Shred Event - Edwards Field - E 1st Street - June 6th, 2026 9:00am - 12:00pm
The Apopka Police Department is planning a shred event at Edwards Field on E 1st Street. This event is scheduled for June 6th, 2026, from 9:00 am to 12:00 pm. The proposed use is a community shred event. This item is currently planned and under review by the Development Review Committee. The event will involve setting up a temporary area for document shredding services. This could include site preparation for traffic flow, temporary fencing, and waste management for shredded materials. Local contractors, suppliers, and service providers for event setup, waste disposal, and security could find opportunities. Reaching out early before final plans are set may offer an advantage.
- Board:
- Development Review Committee Meeting
- Date:
- 2026-04-15
- Type:
- Agenda_item
- Address:
- Edwards Field - E 1st Street
- Applicant:
- Apopka Police Department
4. Apopka Police Department - APD Shred Event - Edwards Field - E 1st Street - June 6th, 2026 9:00am - 12:00pm
The Apopka Police Department is planning a shred event at Edwards Field on E 1st Street. This event is currently under review by the Development Review Committee. The proposed use is a shred event, scheduled for June 6th, 2026, from 9:00 am to 12:00 pm. While this is not a construction project, it will require site setup and management for the event. This includes temporary event infrastructure, traffic control, and waste management for collected documents. Local businesses specializing in event services, temporary staffing, waste hauling, and signage could find opportunities. Engaging early allows businesses to understand the event's specific needs before final plans are set.
- Board:
- Development Review Committee Meeting
- Date:
- 2026-04-15
- Type:
- Agenda_item
- Address:
- Edwards Field - E 1st Street
- Applicant:
- Apopka Police Department
4. CONTRACTOR SHALL INSPECT AND MAINTAIN ON A DAILY BASIS ALL EROSION/SEDIMENTATION STABILIZE THE AFFECTED AREA USING SPRINKLING, IRRIGATION OR OTHER ACCEPTABLE3. IF WIND EROSION BECOMES SIGNIFICANT DURING CONSTRUCTION, THE CONTRACTOR SHALL
This agenda item concerns planned construction activities that require strict erosion and sedimentation control measures. The project involves managing earthwork, including the removal and backfilling of unsuitable subsurface materials like muck and peat. Contractors will be responsible for installing erosion control barriers such as hay bales or siltation curtains to protect adjacent properties and waterways. Daily inspection and maintenance of these controls, along with stabilization of affected areas through sprinkling or irrigation, will be required. If wind erosion becomes a problem, additional measures will be needed to prevent excessive earth transport off-site. This project is currently under review, indicating an early stage in the development process. The scope of work will likely involve site clearing, grading, extensive earthmoving, utility installation for reclaimed water and sanitary sewers, and final site stabilization. Local contractors, suppliers, and service providers in site preparation, grading, concrete, plumbing, and general construction trades should consider reaching out early to understand the project's needs before final plans and bids are established.
- Board:
- Development Review Committee Meeting
- Date:
- 2026-04-15
- Type:
- Agenda_item
4. Grades and cross slopes shown are maximums.
Development Review Committee Meeting listed this item on its agenda for 2026-04-15 in City of Apopka. The posted record gives the item title and nothing else, so there is no site, no size and no applicant on file for it yet. Local businesses that want to follow it can open the official agenda link above and watch for the fuller write-up the body posts as the meeting gets closer.
- Board:
- Development Review Committee Meeting
- Date:
- 2026-04-15
- Type:
- Agenda_item
4. TESTING AND COORDINATING PAPERWORK/REPORTS/FEES, ETC. FOR SEWER CERTIFICATION SHALL BE CONTRACTORS RESPONSIBILITY.5. RECORD DRAWINGS SHALL BE SUBMITTED BY FL. REG. SURVEYOR TO THE ACCEPTANCE OF GOVERNING AGENCIES.
Development Review Committee Meeting listed this item on its agenda for 2026-04-15 in City of Apopka. The posted record gives the item title and nothing else, so there is no site, no size and no applicant on file for it yet. Local businesses that want to follow it can open the official agenda link above and watch for the fuller write-up the body posts as the meeting gets closer.
- Board:
- Development Review Committee Meeting
- Date:
- 2026-04-15
- Type:
- Agenda_item
4. TESTING AND COORDINATING PAPERWORK/REPORTS/FEES, ETC. FOR WATER CERTIFICATION SHALL BE CONTRACTORS RESPONSIBILITY.5. RECORD DRAWINGS SHALL BE SUBMITTED BY FL. REG. SURVEYOR TO THE ACCEPTANCE OF GOVERNING AGENCIES.
Development Review Committee Meeting listed this item on its agenda for 2026-04-15 in City of Apopka. The posted record gives the item title and nothing else, so there is no site, no size and no applicant on file for it yet. Local businesses that want to follow it can open the official agenda link above and watch for the fuller write-up the body posts as the meeting gets closer.
- Board:
- Development Review Committee Meeting
- Date:
- 2026-04-15
- Type:
- Agenda_item
4. THE CONTRACTOR IS RESPONSIBLE FOR REPAIRING ANY DAMAGE TO EXISTING
Development Review Committee Meeting listed this item on its agenda for 2026-04-15 in City of Apopka. The posted record gives the item title and nothing else, so there is no site, no size and no applicant on file for it yet. Local businesses that want to follow it can open the official agenda link above and watch for the fuller write-up the body posts as the meeting gets closer.
- Board:
- Development Review Committee Meeting
- Date:
- 2026-04-15
- Type:
- Agenda_item
5. ALL WATER MAINS SHALL BE INSTALLED WITH A MINIMUM OF 36 INCHES OF COVER.
This civic agenda item concerns proposed water main installations and upgrades. The project requires all water mains to be installed with a minimum of 36 inches of cover and all installation, testing, and field inspections must conform to AWWA standards. Off-site contractors must verify requirements before constructing the fire protection system. Piping specifications include Class 150 PSI, with PVC water main piping less than 4 inches in diameter needing to be Schedule 40 per ASTM SDR 21. Larger PVC water main piping, from 4 to 12 inches in diameter, must conform to AWWA C900 (DR 18) standard specifications. This item is currently under review. The work will involve underground utility installation, including trenching, pipe laying, and connection to existing systems, followed by testing and inspection. Contractors specializing in underground utilities, civil engineering, and material supply could find opportunities. Engaging early, before final plans and permits are set, allows businesses to understand project needs and prepare for potential work.
- Board:
- Development Review Committee Meeting
- Date:
- 2026-04-15
- Type:
- Agenda_item
5. Longitudinal Joints:
Development Review Committee Meeting listed this item on its agenda for 2026-04-15 in City of Apopka. The posted record gives the item title and nothing else, so there is no site, no size and no applicant on file for it yet. Local businesses that want to follow it can open the official agenda link above and watch for the fuller write-up the body posts as the meeting gets closer.
- Board:
- Development Review Committee Meeting
- Date:
- 2026-04-15
- Type:
- Agenda_item
5. Sundown Presents LLC - Tailgate N' Tunes - Apopka Amphitheater - 3710 Jason Dwelley Parkway - June 6th 2026
Sundown Presents LLC is planning a festival and celebration event called Tailgate N' Tunes. This event is proposed to take place at the Apopka Amphitheater, located at 3710 Jason Dwelley Parkway. The event is scheduled for June 6th, 2026, from 5:30 PM to 10:00 PM. This item is currently under review by the Development Review Committee. The project involves event planning and management, including setup and breakdown of temporary structures, sound systems, and vendor areas. Potential phases include site preparation for the event, managing the event itself, and post-event cleanup. Local contractors, suppliers, and service providers in areas such as event management, temporary structure rental, sound and lighting, security, and catering could find opportunities. Reaching out to the applicant early, before final plans and permits are set, could provide a competitive advantage for securing work on this planned event.
- Board:
- Development Review Committee Meeting
- Date:
- 2026-04-15
- Type:
- Agenda_item
- Address:
- 3710 Jason Dwelley Parkway
- Applicant:
- Sundown Presents LLC
5. Sundown Presents LLC - Tailgate N' Tunes - Apopka Amphitheater - 3710 Jason Dwelley Parkway - June 6th 2026
Sundown Presents LLC is planning a festival and celebration event called Tailgate N' Tunes. This event is proposed to take place at the Apopka Amphitheater, located at 3710 Jason Dwelley Parkway. The event is scheduled for June 6th, 2026, from 5:30 PM to 10:00 PM. This item is currently under review by the Development Review Committee. The project involves site preparation for the event, including setup and teardown of temporary structures, sound systems, and vendor booths. It will also require event management services, security, and potentially waste management. Local contractors, suppliers, and service providers can explore opportunities by reaching out early, as this event is in the planning stages before final permits and detailed plans are set.
- Board:
- Development Review Committee Meeting
- Date:
- 2026-04-15
- Type:
- Agenda_item
- Address:
- 3710 Jason Dwelley Parkway
- Applicant:
- Sundown Presents LLC
6. ALL GRAVITY SEWERS MUST BE SDR 35 PVC OR DIP CLASS 54 PIPE, EXCEPT FOR PIPE DEEPER5. ALL SANITARY SEWER MAINS, LATERALS AND FORCE MAINS SHALL HAVE A MINIMUM OF 36 INCHES OF COVER, UNLESS OTHERWISE NOTED ON PLANS. THAN 10 FEET, IN WHICH CASE SDR 26 PIPE SHALL BE USED. ELASTOMERIC GASKET JOINTS7. ALL ON-SITE PVC FORCE MAINS (IF REQUIRED) SHALL BE CLASS 200, DR 14 FOR 4"
This item concerns proposed standards for gravity sewers, sanitary sewer mains, laterals, and force mains. It specifies materials like SDR 35 PVC, DIP Class 54, and SDR 26 pipe, along with requirements for elastomeric gasket joints and minimum cover depths. Ductile iron pipe and fittings must meet AWWA C151 and ANSI A21.51 standards, with specific interior linings and exterior coatings. Manholes for sanitary sewers should be placed no more than 400 feet apart. The item is currently under review by the Development Review Committee. This review will set the stage for future underground utility work, including the installation of sewer mains, laterals, and force mains, requiring site preparation, trenching, pipe laying, and backfilling. Contractors specializing in underground utilities, pipe suppliers, and site preparation services could find opportunities as these standards are finalized and projects move forward.
- Board:
- Development Review Committee Meeting
- Date:
- 2026-04-15
- Type:
- Agenda_item
6. CONTRACTOR SHALL BE RESPONSIBLE FOR ALL TESTING/PAPERWORK/REPORTS, FEES, ETC. FOR TELE/DATA/POWERAS REQUIRED BY UTILITY COMPANIES.
Development Review Committee Meeting listed this item on its agenda for 2026-04-15 in City of Apopka. The posted record gives the item title and nothing else, so there is no site, no size and no applicant on file for it yet. Local businesses that want to follow it can open the official agenda link above and watch for the fuller write-up the body posts as the meeting gets closer.
- Board:
- Development Review Committee Meeting
- Date:
- 2026-04-15
- Type:
- Agenda_item
6. THE CONTRACTOR SHALL SUBMIT SHOP DRAWINGS, ON ALL PRECAST AND REQUIREMENTS.
This item concerns a planned civic project involving precast construction and associated electric facilities. The project is currently under review by the Development Review Committee for the City of Apopka. Work will likely involve site preparation, including locating buried utilities, and the installation of precast pads and electrical infrastructure. Contractors specializing in site work, concrete, electrical, and potentially utility services may find opportunities. Engaging early in the review process allows businesses to understand the project scope before bids and permits are finalized.
- Board:
- Development Review Committee Meeting
- Date:
- 2026-04-15
- Type:
- Agenda_item
6. THE PROPOSED EROSION CONTROL BARRIERS MUST BE REMOVED FOLLOWING SOIL STABILIZATION.
This agenda item concerns notes for a planned construction project, focusing on site preparation and utility work. The project requires specific attention to erosion control, including the installation and eventual removal of barriers after soil stabilization. Paving and grading notes indicate that new pavement must match existing surfaces, with potential adjustments to elevations to protect tree root systems. The contractor will be responsible for site preparation according to the soils report, including placing and compacting fill and embankment materials. Dewatering methods will be necessary to keep trenches dry during pipe and appurtenance installation, and the contractor must obtain permits for removing any deleterious material. Work will involve site clearing, grading, underground utility installation, and paving. Local contractors, suppliers, and service providers should consider this project as it moves through the review process. Early engagement could provide an advantage as detailed plans and permits are developed.
- Board:
- Development Review Committee Meeting
- Date:
- 2026-04-15
- Type:
- Agenda_item
6. The Gina Reynolds Foundation - The 2026 Team Gina 5K - Apopka Amphitheater - 3170 Jason Dwelley Parkway
The Gina Reynolds Foundation is planning the 2026 Team Gina 5K event. This organized run/walk is proposed to take place at the Apopka Amphitheater, located at 3710 Jason Dwelley Parkway. The event is scheduled for October 31st, 2026, from 5:00 AM to 10:00 AM. This item is currently under review by the Development Review Committee. The project involves event planning and execution, including site setup and management for a large gathering. Local contractors, suppliers, and service providers in areas such as event management, temporary structures, sanitation, and security could find opportunities. Engaging early in the review process allows businesses to understand the event's needs before final plans and permits are established.
- Board:
- Development Review Committee Meeting
- Date:
- 2026-04-15
- Type:
- Agenda_item
- Address:
- 3710 Jason Dwelley Parkway
- Applicant:
- The Gina Reynolds Foundation
6. The Gina Reynolds Foundation - The 2026 Team Gina 5K - Apopka Amphitheater - 3170 Jason Dwelley Parkway
The Gina Reynolds Foundation is planning the 2026 Team Gina 5K event. This organized run/walk is proposed to take place at the Apopka Amphitheater, located at 3710 Jason Dwelley Parkway. The event is scheduled for October 31st, 2026, from 5:00 AM to 10:00 AM. This item is currently under review by the Development Review Committee. The project involves event planning and coordination, including setup and breakdown of event infrastructure, traffic management, and public safety measures. Potential work could include temporary structures, sound systems, portable restrooms, and waste management. Local contractors, suppliers, and service providers in event management, site services, and logistics could find opportunities by engaging early before final plans and permits are established.
- Board:
- Development Review Committee Meeting
- Date:
- 2026-04-15
- Type:
- Agenda_item
- Address:
- 3710 Jason Dwelley Parkway
- Applicant:
- The Gina Reynolds Foundation
6. Transverse Joints:
Development Review Committee Meeting listed this item on its agenda for 2026-04-15 in City of Apopka. The posted record gives the item title and nothing else, so there is no site, no size and no applicant on file for it yet. Local businesses that want to follow it can open the official agenda link above and watch for the fuller write-up the body posts as the meeting gets closer.
- Board:
- Development Review Committee Meeting
- Date:
- 2026-04-15
- Type:
- Agenda_item
7. Construct driveways (6" thick concrete) to a uniform width (W) to the R/W line or the extent shown in the Plans.
The City of Apopka's Development Review Committee is considering a project that involves the construction of driveways. These driveways are planned to be 6 inches thick concrete and will extend to the right-of-way line or as shown in the project plans. The plans also specify expansion joints with preformed filler every fifth joint, and 1-inch open joints at 10-foot centers. This item is currently under review by the committee. The work would involve site preparation, concrete pouring, and potentially utility connections. Contractors specializing in concrete work, site preparation, and general contracting could find opportunities. Reaching out to the city or project planners early could provide an advantage before final bid processes begin.
- Board:
- Development Review Committee Meeting
- Date:
- 2026-04-15
- Type:
- Agenda_item
7. MECHANICAL RESTAINED PIPE AND FITTING JOINTS ARE REQUIRED FOR UNDERGROUND MAIN PIPING,6. ALL WATER SERVICE LINES, VALVES AND METERS SHALL BE INSTALLED TO COMPLY WITH CITY OF APOPKA WATER DEPARTMENT
This item concerns requirements for underground main piping and water service lines within the City of Apopka. Specifically, mechanical restrained pipe and fitting joints are mandated for all underground main piping. Additionally, all water service lines, valves, and meters must be installed according to the City of Apopka Water Department's standards. This item is currently under review by the Development Review Committee. The project will involve underground utility work, including the installation of piping, valves, and meters. Contractors specializing in underground utilities and plumbing could find opportunities. Early engagement before final plans and permits are issued may provide a competitive advantage.
- Board:
- Development Review Committee Meeting
- Date:
- 2026-04-15
- Type:
- Agenda_item
8. Width of Sidewalk Thru Driveway is 4'-0" minimum. Match sidewalk width when shown in Plans or when utility strip
Development Review Committee Meeting listed this item on its agenda for 2026-04-15 in City of Apopka. The posted record gives the item title and nothing else, so there is no site, no size and no applicant on file for it yet. Local businesses that want to follow it can open the official agenda link above and watch for the fuller write-up the body posts as the meeting gets closer.
- Board:
- Development Review Committee Meeting
- Date:
- 2026-04-15
- Type:
- Agenda_item
9. ALL WATER SYSTEM CONSTRUCTION, UP TO AND INCLUDING POINT OF METERING AND BACK FLOW PREVENTION (IF REQUIRED), SHALL BE FURNISHED IN 18 OR 20 FOOT SECTIONS, PIPE THICKNESS SHALL BE CLASS 50, UNLESS OTHERWISE SPECIFIED..8. ALL DUCTILE IRON PIPE SHALL BE MANUFACTURED IN ACCORDANCE WITH THE LATEST EDITION OF AWWA C151/A21.51. PIPE SHALL
Development Review Committee Meeting listed this item on its agenda for 2026-04-15 in City of Apopka. The posted record gives the item title and nothing else, so there is no site, no size and no applicant on file for it yet. Local businesses that want to follow it can open the official agenda link above and watch for the fuller write-up the body posts as the meeting gets closer.
- Board:
- Development Review Committee Meeting
- Date:
- 2026-04-15
- Type:
- Agenda_item
9. Alpha-Numeric Identification:
Development Review Committee Meeting listed this item on its agenda for 2026-04-15 in City of Apopka. The posted record gives the item title and nothing else, so there is no site, no size and no applicant on file for it yet. Local businesses that want to follow it can open the official agenda link above and watch for the fuller write-up the body posts as the meeting gets closer.
- Board:
- Development Review Committee Meeting
- Date:
- 2026-04-15
- Type:
- Agenda_item
A. DURING THE CONSTRUCTION AND/OR MAINTENANCE OF THIS PROJECT, ALL
This notice concerns a project planned for the City of Apopka, Orange County, which is currently under review by the Development Review Committee. The project involves site clearing and grubbing, with specific instructions for managing excavated material, including stockpiling for landscaping or on-site reuse if suitable. It also requires careful handling of existing utilities, such as gas, water, electric, and communications, with a mandatory 48-hour call to 811 before any digging. The scope of work will include site preparation, installation of underground utilities, and coordination with other contractors. The project is in its early stages, offering an opportunity for contractors, suppliers, and service providers to engage before final plans and permits are issued. Early involvement can provide an advantage in securing work related to site clearing, grading, utility installation, and potentially other construction phases.
- Board:
- Development Review Committee Meeting
- Date:
- 2026-04-15
- Type:
- Agenda_item
C. THE MINIMUM STANDARDS AS SET FORTH IN THE CURRENT EDITION OF "THE B. LABOR SAFETY REGULATIONS SHALL CONFORM TO THE PROVISIONS SET FORTH
This item concerns proposed minimum standards and labor safety regulations for future construction projects. It outlines requirements for contractors, including obtaining necessary permits and conforming to labor safety rules. The agenda also mentions inspection requirements by governmental agencies and that other features will be shown according to the best information available. This item is currently under review by the Development Review Committee. The work would involve site preparation, utility installation, and construction adhering to established safety and engineering standards. Contractors, suppliers, and service providers in construction, engineering, and related fields should monitor this review process. Early engagement before final plans and permits are issued could provide an advantage.
- Board:
- Development Review Committee Meeting
- Date:
- 2026-04-15
- Type:
- Agenda_item
D. ALL TRAFFIC CONTROL MARKINGS AND DEVICES SHALL CONFORM TO THE
This civic agenda item concerns proposed utility work related to a construction project. The work involves installing new utilities, including water, sanitary sewer, and storm sewers, on or near the site. It also requires coordinating with electric utility suppliers for electric facilities and transformer installation. The project is currently under review. The scope of work will likely include site preparation, underground utility installation, and coordination with various service providers. Contractors specializing in utility installation, electrical work, and site preparation may find opportunities. Engaging early in the review process could provide an advantage before final plans and permits are issued.
- Board:
- Development Review Committee Meeting
- Date:
- 2026-04-15
- Type:
- Agenda_item
DRC Agenda 04/15/2026
[10 North Forest Avenue] Special Event: GFWC Apopka Woman's Club is holding the Apopka Art and Foliage Festival at Kit Land Nelson Park, 10 North Forest Avenue, on April 25th-26th, 2026. Applicant is Joann Castillo. [2121 East Semoran Boulevard] Special Event: Apopka Florist is holding a Grand Opening at 2121 East Semoran Boulevard on May 3rd, 2026. Applicant is Bruce Haase. [10 North Forest Avenue] Special Event: Apopka Police Department is hosting Apopka PD Personal Safety Day in the Park at Kit Land Nelson Park, 10 North Forest Avenue, on May 9th, 2026. Applicant is Sgt. Mark Creaser. [E 1st Street] Special Event: Apopka Police Department is holding an APD Shred Event at Edwards Field, E 1st Street, on June 6th, 2026. Applicant is Sgt. Mark Creaser. [3710 Jason Dwelley Parkway] Special Event: Sundown Presents LLC is hosting Tailgate N' Tunes at Apopka Amphitheater, 3710 Jason Dwelley Parkway, on June 6th, 2026. Applicant is Francisco Muniz. [3710 Jason Dwelley Parkway] Special Event: The Gina Reynolds Foundation is holding The 2026 Team Gina 5K at Apopka Amphitheater, 3710 Jason Dwelley Parkway, on October 31st, 2026. Applicant is Tara Barrett. [13-20-27-4300-01-000; case SPX-26-4] Special Exception Use: A 120-Foot Stealth Wireless Telecommunications Tower is proposed at parcel/folio 13-20-27-4300-01-000. Applicant is Kimley-Horn, represented by Shahzad Mahmood. This is the 1st submittal for Special Exception Use (SPX-26-4). [Boyscout Road; case MDP-26-2] Major Development Plan: The Ridge PD Parcel 3 proposes a Multi-Family Development with 363 Multi-Family Dwelling Units. Location is Boyscout Road, PID:17-21-28-7345-03-000. Applicant is Vanasse Hangen Brustlin Inc, represented by George Georgy PE. This is the 1st submittal for Major Development Plan (MDP-26-2). [West Kelly Park Road between Effie Drive and Highway 429; case MDP-25-14] Major Development Plan: Wyld Oaks C-Store proposes a 1.24-Acre Commercial Development with a 6,300 SF Multi-Tenant Building & 16 Fuel Pumps. Location is West Kelly Park Road between Effie Drive and Highway 429. Applicant is Kimley-Horn and Associates LLC, represented by Mackenzie Cerjan. This is the 2nd submittal for Major Development Plan (MDP-25-14). [1315 Jack Junction Way; case CSP-26-15] Construction Site Plan: Logistics 429 at Apopka Ridge Buildings 400, 500 & 600 proposes construction of Buildings 400, 500 & 600 in Phase 2 area of the MDP. Location is 1315 Jack Junction Way. Applicant is Smiley & Associates Inc, represented by Mark Smiley. This is the 1st submittal for Construction Site Plan (CSP-26-15). [3910 Jason Dwelley Parkway; case CSP-26-9] Construction Site Plan: Apopka Northwest Recreation Complex - Phase 4 Soccer Fields proposes six soccer pads in three phases. Location is 3910 Jason Dwelley Parkway. Applicant is CPH Consulting LLC, represented by Joshua Hughes. This is the 2nd submittal for Construction Site Plan (CSP-26-9).
- Board:
- Development Review Committee Meeting
- Date:
- 2026-04-15
- Type:
- Agenda
- Address:
- 10 North Forest Avenue
- Applicant:
- Joann Castillo
DRC Agenda Packet 04/15/2026
[Multiple locations including 10 North Forest Avenue, 2121 East Semoran Boulevard, Edwards Field, 3710 Jason Dwelley Parkway, Boyscout Road, West Kelly Park Road, 1315 Jack Junction Way, 3910 Jason Dwelley Parkway.; case SPX-26-4, MDP-26-2, MDP-25-14, CSP-26-15, CSP-26-9] Apopka Art and Foliage Festival at Kit Land Nelson Park, 10 North Forest Avenue, on April 25th-26th, 2026. Apopka Florist Grand Opening at 2121 East Semoran Boulevard on May 3rd, 2026. Apopka PD Personal Safety Day in the Park at Kit Land Nelson Park, 10 North Forest Avenue, on May 9th, 2026. Apopka PD Shred Event at Edwards Field, E 1st Street, on June 6th, 2026. Sundown Presents LLC Tailgate N' Tunes at Apopka Amphitheater, 3710 Jason Dwelley Parkway, on June 6th, 2026. The Gina Reynolds Foundation 5K at Apopka Amphitheater, 3710 Jason Dwelley Parkway, on October 31st, 2026. A Special Exception Use (SPX) for a 120-foot stealth wireless telecommunications tower at parcel 13-20-27-4300-01-000. A Major Development Plan (MDP) for The Ridge PD Parcel 3, located on Boyscout Road, proposing 363 multi-family dwelling units. A Major Development Plan (MDP) for Wyld Oaks C-Store at West Kelly Park Road between Effie Drive and Highway 429, proposing a 1.24-acre commercial development with a 6,300 SF multi-tenant building and 16 fuel pumps. A Construction Site Plan (CSP) for Logistics 429 at Apopka Ridge Buildings 400, 500 & 600 at 1315 Jack Junction Way, for construction of buildings in Phase 2. A Construction Site Plan (CSP) for Apopka Northwest Recreation Complex - Phase 4 Soccer Fields at 3910 Jason Dwelley Parkway, proposing six soccer pads in three phases. [W Kelly Park Road between Effie Drive and HWY 429] Preliminary Development Plan for Wyld Oaks C-Store, a convenience store project. The project involves construction of infrastructure for the convenience store. The site is located on W Kelly Park Road between Effie Drive and Highway 429 in Apopka, FL. The applicant is M & R United, Inc. The project area is 1.24 acres, with 1.24 acres to be disturbed. The plan includes paving, grading, drainage, utilities, and erosion control measures. Groundwater is anticipated, and contractors must include consideration for this in their bids. The plans are preliminary and not for construction, permit, or bidding purposes. [KELLY PARK ROAD; case C-451] This document details utility plans and specifications for the Wyld Oaks C-Store project, including paving, grading, and drainage. It specifies materials and installation requirements for water, sanitary sewer, and storm sewer systems, as well as electrical and communication lines. The project involves extensive coordination with existing utilities and adherence to City of Apopka standards. A key note for contractors is the anticipation of groundwater presence, which must be factored into bids. The document also includes details on truck movement plans for delivery and fire trucks, and general construction notes covering safety, testing, erosion control, and site work. This document outlines construction requirements, permit obligations, and utility coordination for contractors. It details specifications for excavation, dewatering, paving, erosion and sediment control, stormwater pollution prevention, and the installation of water and reclaimed water distribution systems. Key requirements include obtaining all necessary permits, adhering to strict erosion and sediment control measures, preparing and implementing a Stormwater Pollution Prevention Plan (SWPPP), and complying with utility separation requirements. Specific details are provided for pipe materials, joint types, casing pipe dimensions for jacking and boring, and record drawing submittal procedures. The project involves a total site area of 29 acres, with the entire area impacted by construction. The receiving waters are the Saint Johns River, and the MS4 operator name is not stated. The project location is at latitude 28°48'25.19"N. and longitude 81°16'25.78"W. [3910 Jason Dwelley Pkwy, Apopka, Orange County, FL] This document contains detailed specifications for water, sewer, fire protection, storm sewer, paving, sidewalks, and curbing construction, as well as traffic control and stormwater pollution prevention plans. It outlines material requirements, installation procedures, testing protocols, and maintenance standards for various underground utilities and surface infrastructure. Specific details include pipe types (PVC, ductile iron, RCP), valve specifications, backfill requirements, concrete strengths, and testing pressures. The document also addresses traffic control measures, erosion and sediment control best management practices (BMPs), dust control, and waste management. The project is located in Apopka, Orange County, Florida, and involves the expansion of the Apopka Northwest Recreation Center soccer fields. [Apopka, Orange County, FL; case 2501352] Project involves the expansion of the Apopka Northwest Recreation Center Soccer Fields. The project includes site preparation, grading, utility work, and the construction of soccer fields, emergency lanes, parking areas, and fencing. Specific construction details include the installation of PVC sleeves, rolled sod, sprigged fields, and concrete/asphalt ADA parking stalls. The project is divided into three phases: Phase 1 includes emergency lanes and fencing; Phase 2 includes soccer fields and sprigged areas; Phase 3 includes additional soccer fields, sprigged areas, and expanded parking.
- Board:
- Development Review Committee Meeting
- Date:
- 2026-04-15
- Type:
- Agenda_packet
- Address:
- Multiple locations including 10 North Forest Avenue, 2121 East Semoran Boulevard, Edwards Field, 3710 Jason Dwelley Parkway, Boyscout Road, West Kelly Park Road, 1315 Jack Junction Way, 3910 Jason Dwelley Parkway.
- Applicant:
- GFWC Apopka Woman's Club, Apopka Florist, Apopka Police Department, Sundown Presents LLC, The Gina Reynolds Foundation, Kimley-Horn, Vanasse Hangen Brustlin Inc, Ridge 429 Owner LLC, CPH Consulting LLC.
E. ALL SUBSURFACE CONSTRUCTION SHALL COMPLY WITH THE "TRENCH SAFETY
Development Review Committee Meeting listed this item on its agenda for 2026-04-15 in City of Apopka. The posted record gives the item title and nothing else, so there is no site, no size and no applicant on file for it yet. Local businesses that want to follow it can open the official agenda link above and watch for the fuller write-up the body posts as the meeting gets closer.
- Board:
- Development Review Committee Meeting
- Date:
- 2026-04-15
- Type:
- Agenda_item
See the actual businesses behind these numbers
Get the real filings, with addresses and officers, backed by a 14-day money-back guarantee.
Create your account