4. CONTRACTOR SHALL INSPECT AND MAINTAIN ON A DAILY BASIS ALL EROSION/SEDIMENTATION STABILIZE THE AFFECTED AREA USING SPRINKLING, IRRIGATION OR OTHER ACCEPTABLE3. IF WIND EROSION BECOMES SIGNIFICANT DURING CONSTRUCTION, THE CONTRACTOR SHALL
Development Review Committee Meeting · 2026-04-15 · agenda_item
This agenda item concerns planned construction activities that require strict erosion and sedimentation control measures. The project involves managing earthwork, including the removal and backfilling of unsuitable subsurface materials like muck and peat. Contractors will be responsible for installing erosion control barriers such as hay bales or siltation curtains to protect adjacent properties and waterways. Daily inspection and maintenance of these controls, along with stabilization of affected areas through sprinkling or irrigation, will be required. If wind erosion becomes a problem, additional measures will be needed to prevent excessive earth transport off-site. This project is currently under review, indicating an early stage in the development process. The scope of work will likely involve site clearing, grading, extensive earthmoving, utility installation for reclaimed water and sanitary sewers, and final site stabilization. Local contractors, suppliers, and service providers in site preparation, grading, concrete, plumbing, and general construction trades should consider reaching out early to understand the project's needs before final plans and bids are established.
Industries that could win this work
- Site Prep, Grading & Hardscape
- Concrete & Masonry
- Plumbing
- General Contractor
- Utilities (Sub)
- Building & Industrial Supply
Follow this across meetings
See the actual businesses behind these numbers
Get the real filings, with addresses and officers, backed by a 14-day money-back guarantee.
Create your account