Development Review Committee Meeting: May 2026
City of Apopka
1. ALL FRAMING CONSTRUCTION, WORKMANSHIP AND MATERIALS (INCLUDING TRUSSES)
This item concerns construction standards for framing, workmanship, and materials, including trusses. All work must follow specifications from the American Institute of Timber Construction, the National Design Specification for Wood Construction, and U.S. Product Standard PS 1 or APA PRP-108 Performance Standards. This is a review of planned construction standards, indicating an early stage in the project lifecycle. The work will involve detailed requirements for structural framing, potentially including site preparation, foundation work, and the erection of wood structures. This early stage presents an opportunity for contractors, suppliers, and service providers to engage with the project before final plans and bids are set. Understanding these foundational requirements now can help businesses prepare to compete for future work related to this project.
- Board:
- Development Review Committee Meeting
- Date:
- 2026-05-06
- Type:
- Agenda_item
1. ALL MATERIALS AND CONSTRUCTION SHALL BE IN COMPLIANCE WITH THE CITY OF APOPKA MANUAL OF STANDARD SPECIFICATIONS FORWASTEWATER CONSTRUCTION.2. ALL SANITARY SEWER CONSTRUCTION AND MATERIALS WITHIN R/W OR EASEMENT TO BE OWNED AND MAINTAINED BY THE CITY OF APOPKAUTILITIES.3. ALL MANHOLES SHALL BE 4 FT. INSIDE DIAMETER.4. PIPE LENGTHS SHOWN REPRESENT SCALED DISTANCES BETWEEN MANHOLE CENTERLINE.5. ALL SANITARY SERVICE LATERALS SHALL BE 6 INCH DIAMETER, UNLESS SPECIFIED OTHERWISE ON PLANS.6. INVERTS OF SANITARY SERVICE LATERALS AT THEIR CONNECTION TO SANITARY MANHOLES SHALL BE NO MORE THAN ONE (1) FOOT ABOVE THEMANHOLE INVERT.7. MINIMUM AS BUILT 8" PVC SEWER LINE SLOPE WILL BE 0.4% MINIMUM SLOPE OR WILL BE RELAID BY CONTRACTOR TO MEET THE MINIMUM SLOPEREQUIREMENT AT NO ADDITIONAL COST.8. MARK LATERALS WITH 4" X 4" X 8' PT POST PAINTED GREEN ON END.9. PIPE MATERIAL IS ASTM D3034, SDR-26 UNLESS OTHERWISE NOTED.10. A MINIMUM 1.04% SLOPE SHALL BE MAINTAINED ON THE SANITARY SEWER SERVICE LATERALS. AT NO TIME SHALL A SANITARY SEWER LATERAL HAVEA SLOPE OF 15% OR GREATER.11. SANITARY SEWER GRAVITY MAINS ARE TO BE UPGRADED IN MATERIAL TO WATER MAIN STANDARDS AND HYDROSTATICALLY PRESSURE TESTED WITHWATER TO ENSURE JOINT TIGHTNESS IF EITHER OF THE HORIZONTAL OR VERTICAL MINIMUM REQUIRED CLEARANCE FROM A WATER MAIN CANNOTBE MAINTAINED OR IF THE SEWER MAIN IS ABOVE THE WATER MAIN. UPGRADE TO MATERIAL CANNOT BE MADE WITHOUT PRIOR APPROVAL FROMFDEP.12.LEAKAGE TEST ARE SPECIFIED REQUIRING THAT A) THE LEAKAGE EXFILTRATION OR INFILTRATION DOES NOT EXCEED 200 GALLONS PER INCH OF PIPE DIAMETER PER MILE PER DAY FOR ANY SECTION OF THE SYSTEM. B) EXFILTRATION OR INFILTRATION TESTS BE PERFORMED WITH A MINIMUM POSITIVE HEAD OF 2 FEET. C) AIR TESTS, AS MINIMUM, CONFORM TO THE TEST PROCEDURE DESCRIBED IN ASTM C-924 FOR CONCRETE PIPE, ASTM F-1417 FOR PLASTIC PIPE AND FOR OTHER MATERIALS APPROPRIATE TEST PROCEDURES, AIR TESTING, IF SPECIFIED FOR CONCRETE SEWER MANHOLES, CONFORMS TO THE TEST PROCEDURES DESCRIBED IN ASTM C-1244.13. DEFLECTION TESTS SHALL BE PERFORMED IN ACCORDANCE WITH THE RECOMMENDED STANDARDS FOR WASTEWATER FACILITIES, CHAPTER 33.85,FOR ALL GRAVITY SANITARY SEWER LINES. TESTING IS REQUIRED AFTER THE FINAL BACKFILL HAS BEEN IN PLACE AT LEAST 30 DAYS TO PERMITSTABILIZATION OF THE SOIL-PIPE SYSTEM.TESTING REQUIREMENTS SPECIFY: 1) NO PIPE SHALL EXCEED A DEFLECTION OF 5%. 2) USING A RIGID BALL OR MANDREL FOR THE PIPE DEFLECTION TESTS WITH A DIAMETER NOT LESS THAN 95% OF THE BASE INSIDE DIAMETER OR AVERAGE INSIDE DIAMETER OF THE PIPE, DEPENDING ON WHICH IS SPECIFIED IN THE ASTM SPECIFICATION, INCLUDING THE APPENDIX, TO WHICH THE PIPE IS MANUFACTURED. 3) PERFORMING THE TEST WITHOUT MECHANICAL PULLING DEVICES.14.TESTING OF THE SEWAGE COLLECTION SYSTEM IS AS FOLLOWS:A. ALL GRAVITY SEWER MAINS REQUIRE LOW PRESSURE AIR TESTING IN ACCORDANCE WITH THE LATEST UNI-BELL STANDARD FOR LOW PRESSURE AIR TESTS. AIR TEST, AS A MINIMUM, SHALL CONFORM TO THE TEST PROCEDURES DESCRIBED IN ASTM SPECIFICATIONS, ASTM F1417 FOR PLASTIC PIPE.B. ALL SEWER MAINS SHALL BE LAMPED BY IN THE PRESENCE OF A CITY OF APOPKA REPRESENTATIVE.C. ALL MANHOLES SHALL BE INSPECTED FOR INFILTRATION, ALIGNMENT, FLOW CHANNEL CONSTRUCTION AND COAL TAR EPOXY PAINT THROUGHOUT.D. HYDRO-STATIC TESTS CONSISTING OF A HYDROSTATIC PRESSURE TEST AND HYDROSTATIC LEAKAGE TEST SHALL BE CONDUCTED ON ALL NEWLY INSTALLED SEWER FORCE MAIN SYSTEM PRESSURE PIPES AND APPURTENANCES IN ACCORDANCE WITH AWWA C600 OR M23 AS APPLICABLE. THE PRESSURE SHALL BE 150 PSI FOR TWO (2) HOURS.E. DEFLECTION TEST ARE REQUIRED FOR ALL FLEXIBLE PIPE EXCLUDING FORCE MAINS. TESTS SHALL BE PERFORMED WITHOUT MECHANICAL PULLING DEVICES.D MEASURED FROM THE INTERFACE TO THE CONCRETE CURB AND PAVEMENT SURFACE UNLESS OTHERWISE NOTED.SANITARY SEWER SERVICES SHALL BE INSTALLED 18 FEET FROM BACK OF CURB OF BUILDING .15.THE CONTRACTOR SHALL SUBMIT THREE (3) SETS OF COMPLETE DETAILED SHOP DRAWINGS FOR ALL SANITARY MANHOLES, WET WELLS, OTHERCASTINGS, AND PUMPS. THE SUBMITTALS SHALL BEAR THE APPROVAL OF THE UNDERGROUND UTILITY CONTRACTOR ON EACH SHEET. A COMPLETESET OF THE LIFT STATION ELECTRICAL SHOP DRAWINGS IS ALSO REQUIRED IF APPLICABLE. ALL UTILITY SHOP DRAWINGS SHALL BE APPROVED BYTHE ENGINEER OF RECORD AND CITY OF APOPKA PRIOR TO CONSTRUCTION.
A new commercial development is planned at 1250 Ocoee Apopka Road in Apopka, Florida. The project involves constructing two buildings totaling 11,060 square feet for showroom, warehouse, and office flex space, along with a 144 square foot lift station. This development is currently under review by the City of Apopka's Development Review Committee. The project will require extensive site preparation, including clearing, grading, and stormwater management. It will also involve significant underground utility work for sanitary sewer and reuse water systems, as well as paving for roads, driveways, and parking areas. Vertical construction will include framing, roofing, and the installation of mechanical, electrical, and plumbing systems, followed by interior and exterior finishes and final landscaping. Local contractors, trades, suppliers, and service providers are encouraged to engage early to understand the project's scope and potential needs before final plans and bids are established, offering an advantage in securing work.
- Board:
- Development Review Committee Meeting
- Date:
- 2026-05-06
- Type:
- Agenda_item
- Address:
- 1250 Ocoee Apopka Road, Apopka, FL 32703
- Applicant:
- Ivan Frank Correa
1. CSP-26-5 - Everly-Ondich Road Subdivision - Construction Site Plan (CSP), 2nd Submittal
A proposed development is under review for 3100 Ondich Road. The project plans to create 67 detached single-family lots, each fifty-five feet wide. This construction site plan is a second submittal for the Everly-Ondich Road Subdivision. The project is currently under review by the Development Review Committee. This development would likely involve site clearing and grading, underground utility work, road and driveway construction, and the subsequent building of homes. Contractors, suppliers, and service providers in site preparation, heavy civil, residential construction, and related trades should consider reaching out to the applicant, 1828 Engineering LLC, to learn more about potential opportunities as the project moves forward in the review process.
- Board:
- Development Review Committee Meeting
- Date:
- 2026-05-06
- Type:
- Agenda_item
- Address:
- 3100 Ondich Road
- Applicant:
- Larry M. Everly Sr Family Trust
1. CSP-26-5 - Everly-Ondich Road Subdivision - Construction Site Plan (CSP), 2nd Submittal
A construction site plan for a new subdivision is under review. The project, located at 3100 Ondich Road, proposes to develop 67 detached single-family lots, each fifty-five feet wide. The applicant is 1828 Engineering LLC, with Larry M. Everly Sr Family Trust and Corrinne F. Everly Family Trust listed as owners. This project is currently in the second submittal phase for its Construction Site Plan (CSP) and is being reviewed by the Development Review Committee. The development would likely involve site clearing and grading, underground utility work, road and driveway construction, and final landscaping. Contractors, suppliers, and service providers interested in this residential development opportunity should consider reaching out to the applicant or project manager early in the review process, before final site plans, bids, and permits are established.
- Board:
- Development Review Committee Meeting
- Date:
- 2026-05-06
- Type:
- Agenda_item
- Address:
- 3100 Ondich Road
- Applicant:
- Larry M. Everly Sr Family Trust
1. CSP-26-6 - 1250 Ocoee Apopka Rd - Construction Site Plan (CSP), 2nd Submittal
A proposal is under review for the construction of three single-story commercial retail buildings at 1250 Ocoee Apopka Road. The project is currently in its second submittal for a Construction Site Plan (CSP) and is being reviewed by the City of Apopka's Development Review Committee. This project is in the early stages of the review process. If approved, the development would likely involve site clearing and grading, followed by underground utility work, concrete and paving for access and parking areas, and then the vertical construction of the retail buildings. The final phases would include interior and exterior finishes, mechanical systems, and landscaping. Local contractors, suppliers, and service providers should consider engaging with the applicant early to understand project needs as plans develop, before bids and permits are finalized. This early engagement can provide a competitive advantage for potential work related to site preparation, building construction, and related trades.
- Board:
- Development Review Committee Meeting
- Date:
- 2026-05-06
- Type:
- Agenda_item
- Address:
- 1250 Ocoee Apopka Rd
- Applicant:
- Resende Correa Holdings LLC
1. CSP-26-6 - 1250 Ocoee Apopka Rd - Construction Site Plan (CSP), 2nd Submittal
A new commercial development is planned at 1250 Ocoee Apopka Road. The project, proposed by Mint Homes USA LLC, involves the construction of three single-story retail buildings. This project is currently under review as a Construction Site Plan (CSP), with this being the second submittal. The development will likely involve site clearing and grading, followed by underground utility work, foundation and structural framing for the commercial buildings, and then mechanical, electrical, and plumbing systems. Final finishes, paving, and landscaping will complete the project. Local contractors, suppliers, and service providers should consider reaching out to the applicant or project manager early. Engaging before site plans, bids, and permits are finalized offers an advantage in securing potential work for this upcoming commercial construction.
- Board:
- Development Review Committee Meeting
- Date:
- 2026-05-06
- Type:
- Agenda_item
- Address:
- 1250 Ocoee Apopka Rd
- Applicant:
- Resende Correa Holdings LLC
1. FINAL TREE STAKING DETAILS ANDPLACEMENT TO BE APPROVED BY THE L.A.2. CONTRACTOR SHALL ASSURE PERCOLATIONOF ALL PLANTING PITS PRIOR TO INSTALLATION
A new residential development is planned for the area. The project involves the construction of multiple single-family homes on lots of varying sizes, including typical 55-foot and 34-foot wide lots, as well as corner lots. The development will include internal streets, landscape buffers, and amenities such as a pond and trails. The project is currently under review by the Development Review Committee. Work will likely involve site clearing, grading, utility installation, road construction, and the vertical construction of homes. Contractors, suppliers, and service providers are encouraged to engage early to understand the project's scope and potential needs before final plans and permits are issued.
- Board:
- Development Review Committee Meeting
- Date:
- 2026-05-06
- Type:
- Agenda_item
- Address:
- 1250 Ocoee Apopka Rd, Apopka, FL 32703
- Applicant:
- INB, LLC.
1. PL-26-1 - Chandler Row Plat - Plat (PL), 1st Submittal
A residential development is planned for 240 lots at 4648 Chandler Road. The owner is MRP HNHB LLC, and the applicant is Kimley-Horn, represented by Brian Ashby. This project is currently in the platting stage, with a first submittal to the Development Review Committee. The work would involve site clearing and grading, followed by underground utility installation and stormwater management. Road construction and paving would then occur, leading to the vertical construction of homes. Finally, finishing trades and landscaping would complete the development. Contractors, suppliers, and service providers in site preparation, heavy civil, utility work, concrete, paving, framing, electrical, plumbing, HVAC, roofing, painting, flooring, and landscaping could find opportunities. Reaching out to the applicant or project manager early, before bids and permits are finalized, offers the best chance to compete for this work.
- Board:
- Development Review Committee Meeting
- Date:
- 2026-05-06
- Type:
- Agenda_item
- Address:
- 4648 Chandler Road
- Applicant:
- MRP HNHB LLC
1. PL-26-1 - Chandler Row Plat - Plat (PL), 1st Submittal
A residential development is planned for 240 lots at 4648 Chandler Road. The owner is MRP HNHB LLC, and the applicant is Kimley-Horn, represented by Brian Ashby. This project is currently in the platting stage, with a first submittal to the Development Review Committee. The proposed work would involve site clearing and grading, followed by underground utility installation and stormwater management. Road and driveway construction, including paving, would then take place. Vertical construction for homes would follow, involving framing, roofing, electrical, plumbing, and HVAC systems. Finally, finishing trades and landscaping would complete the development. Contractors, suppliers, and service providers in site preparation, heavy civil, utility, concrete, framing, roofing, electrical, plumbing, HVAC, and landscaping trades can find opportunities. Reaching out to the applicant and project manager now, before final plans and permits are set, offers the best chance to compete for this work.
- Board:
- Development Review Committee Meeting
- Date:
- 2026-05-06
- Type:
- Agenda_item
- Address:
- 4648 Chandler Road
- Applicant:
- MRP HNHB LLC
1. THESE DRAWINGS WERE PREPARED WITH THE ASSUMPTION THE
Development Review Committee Meeting listed this item on its agenda for 2026-05-06 in City of Apopka. The posted record gives the item title and nothing else, so there is no site, no size and no applicant on file for it yet. Local businesses that want to follow it can open the official agenda link above and watch for the fuller write-up the body posts as the meeting gets closer.
- Board:
- Development Review Committee Meeting
- Date:
- 2026-05-06
- Type:
- Agenda_item
1. TWO LAYERS OF AN APPROVED WATER-RESISTANT BARRIER:
Development Review Committee Meeting listed this item on its agenda for 2026-05-06 in City of Apopka. The posted record gives the item title and nothing else, so there is no site, no size and no applicant on file for it yet. Local businesses that want to follow it can open the official agenda link above and watch for the fuller write-up the body posts as the meeting gets closer.
- Board:
- Development Review Committee Meeting
- Date:
- 2026-05-06
- Type:
- Agenda_item
10. THE STRUCTURE HAS BEEN DESIGNED TO MEET THE REQUIREMENTS OF
Development Review Committee Meeting listed this item on its agenda for 2026-05-06 in City of Apopka. The posted record gives the item title and nothing else, so there is no site, no size and no applicant on file for it yet. Local businesses that want to follow it can open the official agenda link above and watch for the fuller write-up the body posts as the meeting gets closer.
- Board:
- Development Review Committee Meeting
- Date:
- 2026-05-06
- Type:
- Agenda_item
10. WATER-RESISTIVE BARRIER
This item concerns new requirements for water-resistive barriers on exterior walls of frame construction that will receive veneer. The proposed standard specifies a minimum of one layer of No. 15 asphalt felt, complying with ASTM D 226 for Type 1 felt. This material must be attached to the sheathing with flashing to create a continuous barrier behind the exterior wall veneer. For cement plaster or stucco applications over frame construction, a bond break is required between the water-resistive barrier and the cement plaster to prevent bonding. This agenda item is currently under review by the City of Apopka Development Review Committee. The work would involve installing these specified water-resistive barriers and bond breaks during the construction of new buildings. Contractors specializing in exterior wall systems, waterproofing, and stucco application, as well as suppliers of asphalt felt and related materials, could find opportunities. Engaging early before final plans and permits are issued may offer a competitive advantage.
- Board:
- Development Review Committee Meeting
- Date:
- 2026-05-06
- Type:
- Agenda_item
10. WHEN GROUT POURS EXCEED 5 FEET IN HEIGHT, PROVIDE A CLEAN-OUT HOLE AT THE
Development Review Committee Meeting listed this item on its agenda for 2026-05-06 in City of Apopka. The posted record gives the item title and nothing else, so there is no site, no size and no applicant on file for it yet. Local businesses that want to follow it can open the official agenda link above and watch for the fuller write-up the body posts as the meeting gets closer.
- Board:
- Development Review Committee Meeting
- Date:
- 2026-05-06
- Type:
- Agenda_item
11. FOUNDATION AND SLAB ARE TO BE FORMED UPON SOIL WITH A MINIMUM
Development Review Committee Meeting listed this item on its agenda for 2026-05-06 in City of Apopka. The posted record gives the item title and nothing else, so there is no site, no size and no applicant on file for it yet. Local businesses that want to follow it can open the official agenda link above and watch for the fuller write-up the body posts as the meeting gets closer.
- Board:
- Development Review Committee Meeting
- Date:
- 2026-05-06
- Type:
- Agenda_item
12. IT IS THE RESPONSIBILITY OF THE GENERAL CONTRACTOR TO UNIFORMLY
Development Review Committee Meeting listed this item on its agenda for 2026-05-06 in City of Apopka. The posted record gives the item title and nothing else, so there is no site, no size and no applicant on file for it yet. Local businesses that want to follow it can open the official agenda link above and watch for the fuller write-up the body posts as the meeting gets closer.
- Board:
- Development Review Committee Meeting
- Date:
- 2026-05-06
- Type:
- Agenda_item
13. THE CONTRACTORS SHALL HIRE A GEOTECHNICAL ENGINEER TO
A proposal is under review for the construction of two commercial flex buildings totaling approximately 11,060 square feet at 1250 Ocoee Apopka Road in Apopka. The current zoning is Commercial Vacant Land, and the proposed use is for showroom, office, and accessory warehouse/storage. This project is in the planning stages and has not yet been approved. The work would involve site preparation, including potential soil improvements recommended by a geotechnical engineer. Construction will include concrete slab and footer work, structural framing, roofing, and interior and exterior finishes. Utility work, including water, sewer, and electrical systems, will also be part of the project. Local contractors, trades, suppliers, and service providers are encouraged to engage early to understand the project scope and potential needs before final plans and permits are issued.
- Board:
- Development Review Committee Meeting
- Date:
- 2026-05-06
- Type:
- Agenda_item
- Address:
- 4707 Wild Turkey Rd
- Applicant:
- JOHNNY NAVARRO JR
2. ALL CONCRETE SHALL BE TYPE I OR II PORTLAND CEMENT COMPLYING WITH
Development Review Committee Meeting listed this item on its agenda for 2026-05-06 in City of Apopka. The posted record gives the item title and nothing else, so there is no site, no size and no applicant on file for it yet. Local businesses that want to follow it can open the official agenda link above and watch for the fuller write-up the body posts as the meeting gets closer.
- Board:
- Development Review Committee Meeting
- Date:
- 2026-05-06
- Type:
- Agenda_item
2. ALL TRUSS BEAM AND COLUMN MEMBERS SHALL BE SPECIES AND GRADES OF LUMBER
Development Review Committee Meeting listed this item on its agenda for 2026-05-06 in City of Apopka. The posted record gives the item title and nothing else, so there is no site, no size and no applicant on file for it yet. Local businesses that want to follow it can open the official agenda link above and watch for the fuller write-up the body posts as the meeting gets closer.
- Board:
- Development Review Committee Meeting
- Date:
- 2026-05-06
- Type:
- Agenda_item
2. COURSE GROUT (SIZE 8) SHALL BE USED IN CONFORMANCE TO THE REQUIREMENTS OF
Development Review Committee Meeting listed this item on its agenda for 2026-05-06 in City of Apopka. The posted record gives the item title and nothing else, so there is no site, no size and no applicant on file for it yet. Local businesses that want to follow it can open the official agenda link above and watch for the fuller write-up the body posts as the meeting gets closer.
- Board:
- Development Review Committee Meeting
- Date:
- 2026-05-06
- Type:
- Agenda_item
2. CSP-25-25 - Go Ministry - Construction Site Plan (CSP), 3rd Submittal
A church development is planned for Rock Springs Road, identified by Parcel ID 34-20-28-7440-02-000. The owner is Sala Evangelica De La Sana Doctrina Orlando Inc, and Burkett Engineering is the applicant. The proposal includes developing an approximately 11,000 square foot church. This Construction Site Plan (CSP) is currently under review, representing an early stage in the project process. The project will likely involve site clearing and grading, followed by underground utility work, concrete and foundation preparation, vertical construction including framing and roofing, and then interior and exterior finishing trades. Local contractors, suppliers, and service providers can gain an advantage by engaging early, before final site plans, bids, and permits are issued, to understand the project's needs and potential scope of work.
- Board:
- Development Review Committee Meeting
- Date:
- 2026-05-06
- Type:
- Agenda_item
- Address:
- Rock Springs Road - PID:34-20-28-7440-02-000
- Applicant:
- Sala Evangelica De La Sana Doctrina Orlando Inc
2. CSP-25-25 - Go Ministry - Construction Site Plan (CSP), 3rd Submittal
A new church is proposed for development at Rock Springs Road. The owner is Sala Evangelica De La Sana Doctrina Orlando Inc, and Burkett Engineering is the applicant. The project plans for an approximately 11,000 square foot church building. This item is currently a 3rd submittal for a Construction Site Plan (CSP) and is under review by the Development Review Committee. The project would involve site preparation, foundation work, building construction including framing, roofing, electrical, plumbing, and HVAC systems, as well as interior and exterior finishes and landscaping. Contractors, suppliers, and service providers in construction, engineering, and related trades can find opportunities by engaging early in the process before final plans and bids are set.
- Board:
- Development Review Committee Meeting
- Date:
- 2026-05-06
- Type:
- Agenda_item
- Address:
- Rock Springs Road - PID:34-20-28-7440-02-000
- Applicant:
- Sala Evangelica De La Sana Doctrina Orlando Inc
2. ONE LAYER OF AN APPROVED WATER-RESISTANT BARRIER OVER AN APPROVED
Development Review Committee Meeting listed this item on its agenda for 2026-05-06 in City of Apopka. The posted record gives the item title and nothing else, so there is no site, no size and no applicant on file for it yet. Local businesses that want to follow it can open the official agenda link above and watch for the fuller write-up the body posts as the meeting gets closer.
- Board:
- Development Review Committee Meeting
- Date:
- 2026-05-06
- Type:
- Agenda_item
2. SERIES 3 (Q-FRAME) CIRCUIT BREAKERS.LAYOUT NEMA TYPE 3R S.S. ENCLOSED WITH STIANLESS STEEL. TYPICAL, ACTUAL LAYOUT MAYCONTINUOUS HINGE ALL HARDWARE TYPE 304 1. OUTER DOOR REMOVED TO SHOW DEADFRONT
Development Review Committee Meeting listed this item on its agenda for 2026-05-06 in City of Apopka. The posted record gives the item title and nothing else, so there is no site, no size and no applicant on file for it yet. Local businesses that want to follow it can open the official agenda link above and watch for the fuller write-up the body posts as the meeting gets closer.
- Board:
- Development Review Committee Meeting
- Date:
- 2026-05-06
- Type:
- Agenda_item
2. THE CONTRACTOR/OWNER-BUILDER SHALL REVIEW DRAWINGS FOR
Development Review Committee Meeting listed this item on its agenda for 2026-05-06 in City of Apopka. The posted record gives the item title and nothing else, so there is no site, no size and no applicant on file for it yet. Local businesses that want to follow it can open the official agenda link above and watch for the fuller write-up the body posts as the meeting gets closer.
- Board:
- Development Review Committee Meeting
- Date:
- 2026-05-06
- Type:
- Agenda_item
23. The Contractor shall not excavate, remove or otherwise disturb any material, structure or partof a structure which is located outside the lines, grades or grading section, established for thisproject, except where such excavations or removal is provided or in the ContractConstruction Plans or Technical Specifications.24. All work and all materials furnished shall be in conformity with the lines, grades, gradingsections, cross sections, dimensions, material requirements, and testing requirements that arespecified in the Contract Construction Plans or Technical Specifications.25. All work shall be accomplished in strict accordance with all applicable federal, state and localcodes, ordinances and regulations.26. Apparent errors, discrepancies or omissions in the Construction Plans shall be brought to theEngineer's attention before bidding.27. After completion of construction, the Contractor shall provide to the City a completedas-built plan one week prior to the final inspection. Before the final acceptance it shall be theContractor's responsibility to perform a site cleanup for the removal of trash, debris, excessmaterials, and equipment to present the project site clean and in good order.28. No extra payments shall be allowed for any work required due to misunderstanding of job orsite conditions affecting the work as described in the Technical Specifications or shown onthe Construction Plans. The Contractor shall not take advantage of any apparent error oromission in the Construction Plans or Technical Specifications and the Engineer shall bepermitted to make corrections and interpretation as may be deemed necessary for thefulfillment of the intent of the Contract Documents. By entering the bidding process thebidders acknowledge acceptance of these conditions.29. The Contractor shall submit four (4) sets of detailed shop drawings of all major itemsproposed for this project to the Engineer prior to ordering any of the equipment or material.Two (2) copies of the shop drawings will be returned to the Contractor. Upon theContractor's receipt of approved shop drawings from the Engineer, the Contractor mayproceed with the work.30. The Contractor shall comply with the legal load restrictions in hauling of materials in publicroads beyond the limits of construction work. A special permit will not relieve theContractor of liability for damage which may result from the moving of material andequipment.31. During construction, no direct discharge of water to downstream receiving waters will beallowed. The Contractor is responsible for maintaining water quality and route dischargewater in such a manner as to adequately remove silt prior to runoff from the site.32. Connection to existing lines to which utility pipe of the Contract must connect, the followingwork shall be performed:A. Expose buried lines to confirm or determine end connection, pipe material and diameter.B. Furnishing and installing piping and making proper connections.
The City of Apopka's Design Engineering Division is reviewing plans for a project that involves electrical work for pump stations. This project requires contractors to adhere strictly to contract construction plans and technical specifications, including all applicable codes and regulations. Work will involve excavating and disturbing materials within project lines, installing piping, making connections to existing utility lines, and managing water quality to prevent discharge into downstream waters. Contractors must submit shop drawings for approval before ordering materials and will be responsible for site cleanup after construction. This project is currently under review, offering an early opportunity for businesses. The scope includes site preparation, underground utility work, electrical system installation, and final landscaping. Local contractors, suppliers, and service providers in electrical, plumbing, site prep, and general contracting can find opportunities by engaging early before bids and permits are finalized.
- Board:
- Development Review Committee Meeting
- Date:
- 2026-05-06
- Type:
- Agenda_item
3. ALL REINFORCING STEEL SHALL BE DEFORMED BARS CONFORMING TO ASTM A
Development Review Committee Meeting listed this item on its agenda for 2026-05-06 in City of Apopka. The posted record gives the item title and nothing else, so there is no site, no size and no applicant on file for it yet. Local businesses that want to follow it can open the official agenda link above and watch for the fuller write-up the body posts as the meeting gets closer.
- Board:
- Development Review Committee Meeting
- Date:
- 2026-05-06
- Type:
- Agenda_item
3. CONCRETE MASONRY SHALL BE NORMAL WEIGHT, GRADE N, TYPE I OR TYPE II CONFORMING
Development Review Committee Meeting listed this item on its agenda for 2026-05-06 in City of Apopka. The posted record gives the item title and nothing else, so there is no site, no size and no applicant on file for it yet. Local businesses that want to follow it can open the official agenda link above and watch for the fuller write-up the body posts as the meeting gets closer.
- Board:
- Development Review Committee Meeting
- Date:
- 2026-05-06
- Type:
- Agenda_item
3. GALVANIZED METAL HANGERS AND FRAMING ANCHORS SHOWN ON THE PLANS SHALL BE
Development Review Committee Meeting listed this item on its agenda for 2026-05-06 in City of Apopka. The posted record gives the item title and nothing else, so there is no site, no size and no applicant on file for it yet. Local businesses that want to follow it can open the official agenda link above and watch for the fuller write-up the body posts as the meeting gets closer.
- Board:
- Development Review Committee Meeting
- Date:
- 2026-05-06
- Type:
- Agenda_item
3. GENERATOR OUTLET FOR 230V - PYLE NATIONALMODEL JRE 4100. FOR 460V OR > 100 AMPSERVICE USE CROUSE HINDS MODEL AR 2042.VARY WITH HORSEPOWER.
This item concerns electrical components for a pump control system, specifically generator outlets and related equipment. The City of Apopka's Design Engineering Division created a diagram for this system in January 2014. The system includes components like pump run indicators, high and low-level alarms, emergency circuit breakers, and various relays and switches. The project involves the installation and integration of these electrical parts. This is an early stage review item. The work would likely involve electrical contractors and suppliers for components such as generator outlets, circuit breakers, and control panels. Reaching out now allows businesses to understand the project's needs before formal bidding processes begin.
- Board:
- Development Review Committee Meeting
- Date:
- 2026-05-06
- Type:
- Agenda_item
- Applicant:
- City of Apopka
3. OTHER APPROVED METHODS OR MATERIALS APPLIED IN ACCORDANCE WITH
Development Review Committee Meeting listed this item on its agenda for 2026-05-06 in City of Apopka. The posted record gives the item title and nothing else, so there is no site, no size and no applicant on file for it yet. Local businesses that want to follow it can open the official agenda link above and watch for the fuller write-up the body posts as the meeting gets closer.
- Board:
- Development Review Committee Meeting
- Date:
- 2026-05-06
- Type:
- Agenda_item
3. THE FOUNDATION PLAN SHALL BE VERIFIED BY THE CONTRACTOR/OWNER
Development Review Committee Meeting listed this item on its agenda for 2026-05-06 in City of Apopka. The posted record gives the item title and nothing else, so there is no site, no size and no applicant on file for it yet. Local businesses that want to follow it can open the official agenda link above and watch for the fuller write-up the body posts as the meeting gets closer.
- Board:
- Development Review Committee Meeting
- Date:
- 2026-05-06
- Type:
- Agenda_item
4. ALL CONCRETE REINFORCEMENT SHALL BE DETAILED, FABRICATED, LABELED,
Development Review Committee Meeting listed this item on its agenda for 2026-05-06 in City of Apopka. The posted record gives the item title and nothing else, so there is no site, no size and no applicant on file for it yet. Local businesses that want to follow it can open the official agenda link above and watch for the fuller write-up the body posts as the meeting gets closer.
- Board:
- Development Review Committee Meeting
- Date:
- 2026-05-06
- Type:
- Agenda_item
4. ANCHORING AND NAILING NOT IDENTIFIED SHALL COMPLY WITH THE NAILING SCHEDULE
Development Review Committee Meeting listed this item on its agenda for 2026-05-06 in City of Apopka. The posted record gives the item title and nothing else, so there is no site, no size and no applicant on file for it yet. Local businesses that want to follow it can open the official agenda link above and watch for the fuller write-up the body posts as the meeting gets closer.
- Board:
- Development Review Committee Meeting
- Date:
- 2026-05-06
- Type:
- Agenda_item
4. DIMENSIONS SHALL TAKE PRECEDENCE OVER SCALE- DO NOT SCALE
Development Review Committee Meeting listed this item on its agenda for 2026-05-06 in City of Apopka. The posted record gives the item title and nothing else, so there is no site, no size and no applicant on file for it yet. Local businesses that want to follow it can open the official agenda link above and watch for the fuller write-up the body posts as the meeting gets closer.
- Board:
- Development Review Committee Meeting
- Date:
- 2026-05-06
- Type:
- Agenda_item
4. THE NET AREA COMPRESSIVE STRENGTH OF MASONRY UNITS (f'm) SHALL BE 1900 PSI
Development Review Committee Meeting listed this item on its agenda for 2026-05-06 in City of Apopka. The posted record gives the item title and nothing else, so there is no site, no size and no applicant on file for it yet. Local businesses that want to follow it can open the official agenda link above and watch for the fuller write-up the body posts as the meeting gets closer.
- Board:
- Development Review Committee Meeting
- Date:
- 2026-05-06
- Type:
- Agenda_item
5. A MINIMUM OF TWO STUDS SHALL BE INSTALLED ADJACENT TO ALL OPENINGS IN
Development Review Committee Meeting listed this item on its agenda for 2026-05-06 in City of Apopka. The posted record gives the item title and nothing else, so there is no site, no size and no applicant on file for it yet. Local businesses that want to follow it can open the official agenda link above and watch for the fuller write-up the body posts as the meeting gets closer.
- Board:
- Development Review Committee Meeting
- Date:
- 2026-05-06
- Type:
- Agenda_item
5. ALL BAR SPLICES, DOWELS AND CONCRETE COVERAGE SHALL MEET THE
Development Review Committee Meeting listed this item on its agenda for 2026-05-06 in City of Apopka. The posted record gives the item title and nothing else, so there is no site, no size and no applicant on file for it yet. Local businesses that want to follow it can open the official agenda link above and watch for the fuller write-up the body posts as the meeting gets closer.
- Board:
- Development Review Committee Meeting
- Date:
- 2026-05-06
- Type:
- Agenda_item
5. FLASHING SHALL BE PROVIDED PER FIELD CONDITIONS.
Development Review Committee Meeting listed this item on its agenda for 2026-05-06 in City of Apopka. The posted record gives the item title and nothing else, so there is no site, no size and no applicant on file for it yet. Local businesses that want to follow it can open the official agenda link above and watch for the fuller write-up the body posts as the meeting gets closer.
- Board:
- Development Review Committee Meeting
- Date:
- 2026-05-06
- Type:
- Agenda_item
5. THICKNESS OF MORTAR BED SHALL NOT EXCEED 5/8''.
Development Review Committee Meeting listed this item on its agenda for 2026-05-06 in City of Apopka. The posted record gives the item title and nothing else, so there is no site, no size and no applicant on file for it yet. Local businesses that want to follow it can open the official agenda link above and watch for the fuller write-up the body posts as the meeting gets closer.
- Board:
- Development Review Committee Meeting
- Date:
- 2026-05-06
- Type:
- Agenda_item
6. ALL SERVICE UNDER EXISTING OR PROPOSED PAVEMENT SHALL BE INSTALLED IN A MINIMUM 2" PVC SLEEVE.
The City of Apopka's Design Engineering Division is reviewing plans for utility upgrades, including the installation of new pipes, tapping sleeves, and valves. This project involves work within public right-of-way and requires adherence to Florida Department of Transportation and City of Apopka standards. The scope includes site clearing, grading, underground utility installation, and pavement work. Specific tasks involve installing all service under existing or proposed pavement in a minimum 2-inch PVC sleeve, performing pneumatic testing on tapping sleeves and valves, and relocating mailboxes. The project is currently under review, indicating an early stage in the development process. Contractors, suppliers, and service providers are encouraged to engage early to understand the project's requirements and potential scope before final bid documents and permits are issued. This proactive approach can provide a competitive advantage for securing work related to site preparation, utility installation, concrete, paving, and final landscaping.
- Board:
- Development Review Committee Meeting
- Date:
- 2026-05-06
- Type:
- Agenda_item
6. BEAMS OVER MASONRY OPENINGS SHALL HAVE CONTINUOUS TOP AND
Development Review Committee Meeting listed this item on its agenda for 2026-05-06 in City of Apopka. The posted record gives the item title and nothing else, so there is no site, no size and no applicant on file for it yet. Local businesses that want to follow it can open the official agenda link above and watch for the fuller write-up the body posts as the meeting gets closer.
- Board:
- Development Review Committee Meeting
- Date:
- 2026-05-06
- Type:
- Agenda_item
6. EXTERIOR WOOD FRAME WALL SHALL BE SHEATHED WITH 15/32'' APA SPAN RATED,
Development Review Committee Meeting listed this item on its agenda for 2026-05-06 in City of Apopka. The posted record gives the item title and nothing else, so there is no site, no size and no applicant on file for it yet. Local businesses that want to follow it can open the official agenda link above and watch for the fuller write-up the body posts as the meeting gets closer.
- Board:
- Development Review Committee Meeting
- Date:
- 2026-05-06
- Type:
- Agenda_item
6. HORIZONTAL REINFORCING SHALL CONFORM WITH ASTM A82-02.
Development Review Committee Meeting listed this item on its agenda for 2026-05-06 in City of Apopka. The posted record gives the item title and nothing else, so there is no site, no size and no applicant on file for it yet. Local businesses that want to follow it can open the official agenda link above and watch for the fuller write-up the body posts as the meeting gets closer.
- Board:
- Development Review Committee Meeting
- Date:
- 2026-05-06
- Type:
- Agenda_item
6. MOISTURE PROTECTION SHALL BE PROVIDED BETWEEN ALL MASONRY AND
Development Review Committee Meeting listed this item on its agenda for 2026-05-06 in City of Apopka. The posted record gives the item title and nothing else, so there is no site, no size and no applicant on file for it yet. Local businesses that want to follow it can open the official agenda link above and watch for the fuller write-up the body posts as the meeting gets closer.
- Board:
- Development Review Committee Meeting
- Date:
- 2026-05-06
- Type:
- Agenda_item
7. A 1/2'' DIAMETER x 10'' LONG MINIMUM WEDGE ANCHOR MAY BE USED IN
Development Review Committee Meeting listed this item on its agenda for 2026-05-06 in City of Apopka. The posted record gives the item title and nothing else, so there is no site, no size and no applicant on file for it yet. Local businesses that want to follow it can open the official agenda link above and watch for the fuller write-up the body posts as the meeting gets closer.
- Board:
- Development Review Committee Meeting
- Date:
- 2026-05-06
- Type:
- Agenda_item
7. EXTERIOR AND INTERIOR LOAD BEARING WALLS SHALL BE FRAMED WITH 2x4 MEMBERS AT
Development Review Committee Meeting listed this item on its agenda for 2026-05-06 in City of Apopka. The posted record gives the item title and nothing else, so there is no site, no size and no applicant on file for it yet. Local businesses that want to follow it can open the official agenda link above and watch for the fuller write-up the body posts as the meeting gets closer.
- Board:
- Development Review Committee Meeting
- Date:
- 2026-05-06
- Type:
- Agenda_item
7. MASONRY REINFORCING STEEL BARS SHALL BE CONTINUOUS WITH LAP SPLICES OF 30
Development Review Committee Meeting listed this item on its agenda for 2026-05-06 in City of Apopka. The posted record gives the item title and nothing else, so there is no site, no size and no applicant on file for it yet. Local businesses that want to follow it can open the official agenda link above and watch for the fuller write-up the body posts as the meeting gets closer.
- Board:
- Development Review Committee Meeting
- Date:
- 2026-05-06
- Type:
- Agenda_item
8. ALL MATERIALS AND WORKMANSHIP SHALL CONFORM TO THE DRAWINGS
Development Review Committee Meeting listed this item on its agenda for 2026-05-06 in City of Apopka. The posted record gives the item title and nothing else, so there is no site, no size and no applicant on file for it yet. Local businesses that want to follow it can open the official agenda link above and watch for the fuller write-up the body posts as the meeting gets closer.
- Board:
- Development Review Committee Meeting
- Date:
- 2026-05-06
- Type:
- Agenda_item
8. ALL PRESSURE TREATED LUMBER SHALL BE SOUTHER YELLOW PINE #2 19% MAX. M/C/ IN
Development Review Committee Meeting listed this item on its agenda for 2026-05-06 in City of Apopka. The posted record gives the item title and nothing else, so there is no site, no size and no applicant on file for it yet. Local businesses that want to follow it can open the official agenda link above and watch for the fuller write-up the body posts as the meeting gets closer.
- Board:
- Development Review Committee Meeting
- Date:
- 2026-05-06
- Type:
- Agenda_item
See the actual businesses behind these numbers
Get the real filings, with addresses and officers, backed by a 14-day money-back guarantee.
Create your account