Development Review Committee Meeting: May 2026
City of Apopka
8. CALCIUM CHLORIDE SHALL NOT BE USED IN ANY FORM.
Development Review Committee Meeting listed this item on its agenda for 2026-05-06 in City of Apopka. The posted record gives the item title and nothing else, so there is no site, no size and no applicant on file for it yet. Local businesses that want to follow it can open the official agenda link above and watch for the fuller write-up the body posts as the meeting gets closer.
- Board:
- Development Review Committee Meeting
- Date:
- 2026-05-06
- Type:
- Agenda_item
8. THE CONTRACTOR IS RESPONSIBLE TO ENSURE THAT ALL MASONRY STRUCTURAL ELEMENTS
This item concerns a requirement for contractors working on future projects in the City of Apopka. It specifies that all masonry structural elements must be properly braced to withstand forces like wind, backfilling, and soil compaction during construction. This bracing must stay in place until the structure is finished. This requirement is currently under review by the Development Review Committee. The work would involve ensuring proper bracing techniques are applied during the construction of masonry structures. This could include site preparation, foundation work, and the erection of masonry walls and elements. Contractors, suppliers, and service providers involved in masonry construction, structural engineering, and site safety could benefit from understanding this requirement early. Engaging with the city or project developers before final plans and permits are issued may provide an advantage.
- Board:
- Development Review Committee Meeting
- Date:
- 2026-05-06
- Type:
- Agenda_item
9. MASONRY GROUT SHALL BE PROPORTIONED AND PRODUCED TO HAVE A SLUMP BETWEEN 8
Development Review Committee Meeting listed this item on its agenda for 2026-05-06 in City of Apopka. The posted record gives the item title and nothing else, so there is no site, no size and no applicant on file for it yet. Local businesses that want to follow it can open the official agenda link above and watch for the fuller write-up the body posts as the meeting gets closer.
- Board:
- Development Review Committee Meeting
- Date:
- 2026-05-06
- Type:
- Agenda_item
9. THE GENERAL CONTRACTOR SHALL COORDINATE ALL CONSTRUCTION
This item concerns a project where a general contractor will be responsible for coordinating all construction work shown on the project drawings. Any questions or issues must be reported to the engineer before work begins. The project is currently planned and under review. This project will involve site clearing and grading, underground utility work, road and driveway paving, vertical framing and structure, mechanical and finish trades, and final landscaping. Local contractors, suppliers, and service providers can get involved by reaching out early, before site plans, bids, and permits are finalized, to understand the scope and potential opportunities.
- Board:
- Development Review Committee Meeting
- Date:
- 2026-05-06
- Type:
- Agenda_item
9. U.N.O PERMITTED OR SPECIFIED, CONCRETE SHALL BE PROPORTIONED AND
Development Review Committee Meeting listed this item on its agenda for 2026-05-06 in City of Apopka. The posted record gives the item title and nothing else, so there is no site, no size and no applicant on file for it yet. Local businesses that want to follow it can open the official agenda link above and watch for the fuller write-up the body posts as the meeting gets closer.
- Board:
- Development Review Committee Meeting
- Date:
- 2026-05-06
- Type:
- Agenda_item
9. WHERE DRAWING INDICATES APPLIED EXTERIOR FINISH OVER APPROVED WATER BARRIER
This civic agenda item concerns a requirement for applied exterior finishes over approved water barriers on wood framing. The owner must install sealant and flashing to ensure the structure remains waterproof and prevent moisture damage. This includes ongoing maintenance of the exterior finish. The item is currently under review by the Development Review Committee. This project would involve work related to ensuring proper exterior waterproofing and maintenance. This could include site preparation, installation of exterior finishes, and ongoing maintenance services. Local contractors, trades, suppliers, and service providers should reach out early to understand the specific requirements and potential opportunities as plans develop.
- Board:
- Development Review Committee Meeting
- Date:
- 2026-05-06
- Type:
- Agenda_item
DRC Agenda Packet 05/06/2026
[case PL-26-1] Chandler Row Plat is a proposed residential development for 240 lots. MRP HNHB LLC is the owner, and Kimley-Horn - Brian Ashby is the applicant. The project is identified as PL-26-1. [107 North Central Avenue; case SPX-26-5] A Special Exception application (SPX-26-5) proposes to convert a pre-existing detached garage into an Accessory Dwelling Unit (ADU) at 107 North Central Avenue. The owners are Johnny Navarro and Maria Serna, and Johnny Navarro is the applicant. [1250 Ocoee Apopka Rd; case CSP-26-6] A Construction Site Plan (CSP) application, CSP-26-6, for 1250 Ocoee Apopka Road proposes the construction of three single-story commercial retail buildings. Resende Correa Holdings LLC is the owner, and Mint Homes USA LLC - Jeffrey Sanon is the applicant. [Rock Springs Road; case CSP-25-25] A Construction Site Plan (CSP) application, CSP-25-25, for Go Ministry, located on Rock Springs Road, proposes the development of an approximate 11,000 square foot church. Sala Evangelica De La Sana Doctrina Orlando Inc is the owner, and Burkett Engineering is the applicant. [3100 Ondich Road; case CSP-26-5] A Construction Site Plan (CSP) application, CSP-26-5, for Everly-Ondich Road Subdivision proposes a development comprised of 67 fifty-five foot wide detached single-family lots. The owners are Larry M. Everly Sr Family Trust and Corrinne F. Everly Family Trust, and 1828 Engineering LLC - Luke Classon is the applicant. The location is 3100 Ondich Road. [1250 Ocoee Apopka Road, Apopka, FL 32703] Project involves the construction of two showroom/warehouse/office flex buildings totaling 11,060 sq ft on a 1.019-acre parcel. Includes a 144 sq ft lift station. The development is zoned for commercial land use. Utilities include central water, sewer, and irrigation provided by the City of Apopka. The owner is Ivan Frank Correa. [3100 ONDICH RD, APOPKA, FL, 32712] This document details the civil engineering plans for a residential development. The project involves rezoning from T (City) and A-1 (County) to KPI-MU (City) and MU (County), with a proposed Future Land Use of MU. The development includes 67 lots, with minimum lot sizes of 4,080 SF for rear-loaded and 6,600 SF for front-loaded configurations. Setbacks, lot dimensions, and building heights are specified. The project incorporates green building standards, including passive solar orientation and tree preservation. Utility providers include the City of Apopka for water/sewer, Charter Communications for cable, Century Link for telephone/fiber, Lake Apopka Natural Gas District for gas, and Duke Energy for power. The document outlines detailed plans for paving, grading, drainage, utilities, street geometry, and site amenities like a pond trail, multipurpose trail, and pool area. It also includes standard details for various civil engineering components such as manholes, service laterals, and pump station grounding.
- Board:
- Development Review Committee Meeting
- Date:
- 2026-05-06
- Type:
- Agenda_packet
- Address:
- 107 North Central Avenue
- Applicant:
- Kimley-Horn - Brian Ashby
M. BEDROOM
This project proposes the renovation of a master bedroom and bathroom area at 107 North Central Avenue in Apopka, Florida. The work involves modifying an existing garage space to create a new master bedroom and bathroom, including the demolition of existing garage doors and windows, and the installation of new windows and a door. The project also includes interior framing, drywall, and potential electrical and plumbing work to support the new bathroom. This item is currently under review by the Development Review Committee. The scope of work will likely involve site preparation, framing, concrete work for any necessary slab modifications, installation of new windows and doors, interior finishing trades such as drywall, painting, and potentially electrical and plumbing system updates, followed by final landscaping. Local contractors, trades, suppliers, and service providers are encouraged to engage early to understand the project details as plans and permits are finalized, offering an advantage in securing future work.
- Board:
- Development Review Committee Meeting
- Date:
- 2026-05-06
- Type:
- Agenda_item
- Address:
- 107 NORTH CENTRAL AVENUE APOPKA, FL
- Applicant:
- JOHNNY NAVARRO JR
M. BEDROOM
A proposed garage renovation is under review at 107 North Central Avenue in Apopka, Florida. The project involves converting an existing garage into living space, including a bedroom, bathroom, and living/kitchen area. This renovation will tie into the existing city sewage system. The project is currently under review by the Development Review Committee. Work is expected to involve demolition, framing, plumbing, electrical, and finishing trades. Local contractors, suppliers, and service providers are encouraged to reach out early to learn more about this renovation opportunity before plans and permits are finalized.
- Board:
- Development Review Committee Meeting
- Date:
- 2026-05-06
- Type:
- Agenda_item
- Address:
- 107 North Central Avenue Apopka, FL
- Applicant:
- Santos Construction & Design
See the actual businesses behind these numbers
Get the real filings, with addresses and officers, backed by a 14-day money-back guarantee.
Create your account