Skip to main content

Be First, Build Lasting Relationships

Browse City of Cocoa Beach civic records

Every published record for City of Cocoa Beach, newest first. Filter by board, year, or industry to jump straight to the records you want, and page through to reach the full archive.

841 records

6. Area view of where the accessory structure would be constructed.

Board of Adjustment Meeting listed this item on its agenda for 2026-06-17 in City of Cocoa Beach. The posted record gives the item title and nothing else, so there is no site, no size and no applicant on file for it yet. Local businesses that want to follow it can open the official agenda link above and watch for the fuller write-up the body posts as the meeting gets closer.

Board:
Board of Adjustment Meeting
Date:
2026-06-17
Type:
Agenda_item

6. Harmony with the Purpose and Intent of the Code

Board of Adjustment Meeting listed this item on its agenda for 2026-06-17 in City of Cocoa Beach. The posted record gives the item title and nothing else, so there is no site, no size and no applicant on file for it yet. Local businesses that want to follow it can open the official agenda link above and watch for the fuller write-up the body posts as the meeting gets closer.

Board:
Board of Adjustment Meeting
Date:
2026-06-17
Type:
Agenda_item

6. The granting of the variance will be in harmony with the general purpose and intent of

A project is planned to construct two new accessory structures at 1 Azalea Drive in Cocoa Beach. One structure will be 459 square feet, and the second will be 560 square feet. The project is currently under review by the Board of Adjustment. This project will involve site preparation, concrete work for foundations and slabs, block wall construction, framing, roofing, electrical installations, plumbing hookups, HVAC systems, and interior and exterior finishes. Local contractors, trades, suppliers, and service providers are encouraged to reach out early to learn more about this opportunity before bids and permits are finalized.

Board:
Board of Adjustment Meeting
Date:
2026-06-17
Type:
Agenda_item
Address:
1 Azalea Drive, Cocoa Beach, FL 32931
Applicant:
Eric Griffith

6. The granting of the variance will be in harmony with the general purpose and intent of the LDC

The City of Cocoa Beach Board of Adjustment is reviewing a variance application. This item concerns a property where an accessory structure is proposed to be architecturally compatible with the primary residence and largely screened from public view. The application is currently under review by the Board of Adjustment. If approved, this variance could lead to site preparation, construction of the accessory structure, and related finishing work. Local contractors, trades, suppliers, and service providers are encouraged to reach out early to understand the project details as the review process progresses, before final site plans, bids, and permits are established. This early engagement offers an advantage in competing for potential work.

Board:
Board of Adjustment Meeting
Date:
2026-06-17
Type:
Agenda_item

7. Current Survey

Board of Adjustment Meeting listed this item on its agenda for 2026-06-17 in City of Cocoa Beach. The posted record gives the item title and nothing else, so there is no site, no size and no applicant on file for it yet. Local businesses that want to follow it can open the official agenda link above and watch for the fuller write-up the body posts as the meeting gets closer.

Board:
Board of Adjustment Meeting
Date:
2026-06-17
Type:
Agenda_item

7. Current Survey

Board of Adjustment Meeting listed this item on its agenda for 2026-06-17 in City of Cocoa Beach. The posted record gives the item title and nothing else, so there is no site, no size and no applicant on file for it yet. Local businesses that want to follow it can open the official agenda link above and watch for the fuller write-up the body posts as the meeting gets closer.

Board:
Board of Adjustment Meeting
Date:
2026-06-17
Type:
Agenda_item

7. Public Welfare

This item concerns a proposed variance for an accessory structure at an unstated location within the City of Cocoa Beach. The variance requests a reduction in the required side setback to six feet and an increase in the accessory structure's height to 15 feet and 4 inches. The staff recommends approval of this variance, subject to compliance with all other development regulations and building codes. This project is currently under review, with a staff recommendation for approval. If approved, the project would involve the construction of a new accessory structure, likely requiring site preparation, foundation work, framing, roofing, and the installation of utilities and finishes. Local contractors, suppliers, and service providers should consider reaching out to the applicant or project team early in the process, before final site plans, bids, and permits are established, to explore potential opportunities.

Board:
Board of Adjustment Meeting
Date:
2026-06-17
Type:
Agenda_item

a. The homeowner discussed the project and explained his neighbor had no

Board of Adjustment Meeting listed this item on its agenda for 2026-06-17 in City of Cocoa Beach. The posted record gives the item title and nothing else, so there is no site, no size and no applicant on file for it yet. Local businesses that want to follow it can open the official agenda link above and watch for the fuller write-up the body posts as the meeting gets closer.

Board:
Board of Adjustment Meeting
Date:
2026-06-17
Type:
Agenda_item

b. Neighbor, Rolland D. Smith, Jr., was in attendance and said he was okay with

Board of Adjustment Meeting listed this item on its agenda for 2026-06-17 in City of Cocoa Beach. The posted record gives the item title and nothing else, so there is no site, no size and no applicant on file for it yet. Local businesses that want to follow it can open the official agenda link above and watch for the fuller write-up the body posts as the meeting gets closer.

Board:
Board of Adjustment Meeting
Date:
2026-06-17
Type:
Agenda_item

i. Rick Anderson motioned to approve with applicable conditions; John Kaboord

Board of Adjustment Meeting listed this item on its agenda for 2026-06-17 in City of Cocoa Beach. The posted record gives the item title and nothing else, so there is no site, no size and no applicant on file for it yet. Local businesses that want to follow it can open the official agenda link above and watch for the fuller write-up the body posts as the meeting gets closer.

Board:
Board of Adjustment Meeting
Date:
2026-06-17
Type:
Agenda_item

1) CLARIFIER 1 AND 2 REHABILIATION 6,000,000

The City of Cocoa Beach is planning a rehabilitation project for two existing clarifiers. These clarifiers, each 80 feet in diameter, are used to separate activated sludge from the plant flow through sedimentation. While the drive units were replaced in 2012, the mechanisms were last updated in 1999. The existing collection and clarifier drive equipment have reached the end of their useful life and require replacement. This project is currently planned and under review. The work will involve removing and replacing old drive units and mechanisms, likely including site preparation, demolition of existing equipment, installation of new mechanical components, and potentially electrical and control system upgrades. Contractors specializing in heavy equipment repair, mechanical systems, and wastewater treatment facility upgrades could find opportunities. Engaging early, before final plans and bids are set, allows businesses to understand the project scope and prepare for potential work.

Board:
City Commission - Budget Workshop
Date:
2026-06-16
Type:
Agenda_item

1) GRIT REMOVAL SYSTEM REPLACEMENT 300,000

The City of Cocoa Beach is planning a replacement of the grit removal system at its treatment plant. The current system uses two headcells installed in 2013, which are in good condition. However, specific equipment within the system requires replacement, including a grit snail, slurry cup, one grit pump, all associated piping, and the control panel. This project is currently under review as part of the city's budget workshop. The work will likely involve demolition of existing components, installation of new grit removal equipment, and associated piping and electrical controls. This early stage presents an opportunity for contractors specializing in utility infrastructure, mechanical systems, and electrical work to engage with the city before final plans and bids are established. Suppliers of specialized equipment and materials may also find opportunities by connecting with the project team now.

Board:
City Commission - Budget Workshop
Date:
2026-06-16
Type:
Agenda_item

1) GRIT REMOVAL SYSTEM REPLACEMENT 300,000

The City of Cocoa Beach is planning a replacement project for the grit removal system at its wastewater treatment plant. The current system, installed in 2013, uses two headcells. Equipment needing replacement includes grit snails, slurry cups, one grit pump, and all associated piping and control panels. This project is currently under review as part of the Capital Improvement Program for fiscal years 2027-2031, with an estimated total cost of $300,000. The work will likely involve site preparation for equipment installation, removal of old components, installation of new grit removal equipment, and connection of new piping and control systems. This project presents an opportunity for contractors specializing in utility system upgrades, mechanical equipment installation, and plumbing. Reaching out early could provide an advantage as plans and specifications are developed.

Board:
City Commission - Budget Workshop
Date:
2026-06-16
Type:
Agenda_item

1. Discuss FY2027 proposed 5-Year Capital Improvement Program budget

The City of Cocoa Beach is holding a budget workshop to discuss proposed capital improvement program requests for Fiscal Year 2027. This discussion covers a 5-year plan, indicating potential future projects. While specific projects are not yet detailed, this early stage means that planning and design services may be needed in the coming years. Businesses involved in construction, engineering, and related trades should monitor future announcements as these capital improvement plans are developed. Engaging with city staff early could provide insight into upcoming needs for site preparation, utility work, and construction services.

Board:
City Commission - Budget Workshop
Date:
2026-06-16
Type:
Agenda_item

1. Discuss FY2027 proposed 5-Year Capital Improvement Program budget

The City of Cocoa Beach is discussing its proposed 5-Year Capital Improvement Program budget for Fiscal Year 2027. This program outlines planned future projects and investments for the city. The discussion is currently in the budget workshop phase, indicating it is an early stage of review. While specific projects are not detailed, a Capital Improvement Program typically involves infrastructure upgrades and new construction. This could include work such as site preparation, utility installation, road construction, building construction, and landscaping. Local contractors, trades, suppliers, and service providers should monitor this process. Engaging with city staff early, before final budget approval and project specifics are set, can provide valuable insight into upcoming opportunities and allow businesses to prepare bids and proposals.

Board:
City Commission - Budget Workshop
Date:
2026-06-16
Type:
Agenda_item

2) FACILTIY GENERATOR REPLACMENT 750,000

The City of Cocoa Beach is planning to replace two existing generators for the Wastewater Treatment Operations facility. One generator was installed in 1995, and the other, a used trailer-mounted unit purchased in 2017, was intended as a temporary solution. Both are nearing the end of their useful life and are proposed for replacement. The city intends to sell the existing generators to help offset replacement costs. This project is currently under review as part of the Capital Improvement Program for fiscal years 2027-2031. The work will likely involve the removal of old equipment, installation of new generators, and related electrical and utility connections. Contractors specializing in electrical work, heavy equipment installation, and potentially demolition and disposal services could find opportunities. Engaging early in the review process may provide an advantage before final plans and bids are established.

Board:
City Commission - Budget Workshop
Date:
2026-06-16
Type:
Agenda_item

2) FACILTIY GENERATOR REPLACMENT 750,000

The City of Cocoa Beach is planning a generator replacement project for a city facility. The facility currently has two generators, one permanently installed in 1995 and a temporary outdoor trailer unit purchased used in 2017. Both units are nearing the end of their useful life and are proposed for replacement. The city intends to sell the existing generators to help offset project costs. This project is currently in the planning stages, as it is being discussed in a budget workshop. The scope of work will likely involve the removal of the old generators and the installation of new ones. This could include site preparation, electrical work, and potentially structural modifications to accommodate the new equipment. Local contractors, suppliers, and service providers should consider reaching out to the city early to learn more about this upcoming project. Engaging before final plans, bids, and permits are established could provide an advantage in securing future work.

Board:
City Commission - Budget Workshop
Date:
2026-06-16
Type:
Agenda_item

2) REUSE GROUND STORAGE TANK INSPECTION AND REPAIR 150,000

The City of Cocoa Beach is planning upgrades and repairs for its wastewater treatment facilities. This includes inspection and repair of reuse ground storage tanks, estimated at $150,000, and replacement of a 24" chlorine contact chamber flow meter for $25,000. Additionally, engineering and design services are planned for a larger treatment plant upgrade project, with an estimated 15% design cost on a $4+ million project. This major upgrade will involve grit removal improvements, generator replacement, injection well cleaning, reuse transfer pump replacement, fine screen drum replacement, and various flow control and disc filter replacements. The city is also looking into SCADA system virtualization for $135,000 to improve data reliability and backup, and a $50,000 project for replacing eight tank screens. A separate $100,000 project is planned for a mural on the reuse storage tank. These projects are currently in the planning and design review stages, part of the Fiscal Years 2027-2031 Capital Improvement Program. The scope of work will likely involve site preparation, utility work, equipment installation, and specialized trade work. Contractors, suppliers, and service providers in construction, engineering, and related fields are encouraged to engage early to understand the project details before bids and permits are finalized.

Board:
City Commission - Budget Workshop
Date:
2026-06-16
Type:
Agenda_item
Address:
CHLORINE CONTACT CHAMBER (WRCCC)

3) INJECTION WELL & MONITORING WELLS CLEANING 50,000

The City of Cocoa Beach is planning to clean and inspect existing injection and monitoring wells that were installed in 2013. This project includes rehabilitating the aging wells, adding new valving for flow control, and upgrading above-ground piping to stainless steel. This item is currently under review as part of a budget workshop. The work will likely involve site access for well cleaning and rehabilitation, installation of new valving, and replacement of existing piping with stainless steel. Contractors specializing in well services, plumbing, and metal fabrication could find opportunities. Early engagement may be beneficial as plans and specifications are developed.

Board:
City Commission - Budget Workshop
Date:
2026-06-16
Type:
Agenda_item

3) INJECTION WELL & MONITORING WELLS CLEANING 50,000

The City of Cocoa Beach is planning to clean and inspect existing injection and monitoring wells that were installed in 2013. This project includes rehabilitation and cleaning of the aging wells. Additionally, the plan calls for installing new valving for flow control and upgrading above-ground piping to stainless steel. This item is currently under review as part of a budget workshop. The work will likely involve site access, well cleaning and rehabilitation, installation of new valving, and replacement of existing piping with stainless steel. Contractors specializing in well services, plumbing, and potentially metal fabrication or supply could find opportunities. Early engagement may be beneficial as plans are still being developed.

Board:
City Commission - Budget Workshop
Date:
2026-06-16
Type:
Agenda_item

See the actual businesses behind these numbers

Get the real filings, with addresses and officers, backed by a 14-day money-back guarantee.

Create your account