Skip to main content

Be First, Build Lasting Relationships

2. 26-51 CC Regular Meeting Calendar Update

City Commission Meeting · 2026-04-21 · agenda_item

The City of Ormond Beach is planning a significant reconstruction of the interchange at SR 9 (I-95) and SR 5 (N US-1). This project aims to modernize an interchange originally built in the 1960s, addressing outdated design standards for median openings, driveway connections, loop ramps, and bridge clearances. The reconstruction is intended to improve traffic flow, reduce congestion, and enhance safety for all users, including vehicles, freight trucks, motorcyclists, and bicyclists. This initiative is currently under review, with the city preparing to execute a Subordination of City Utility Interests to allow the Florida Department of Transportation (FDOT) to proceed with design and construction. The project scope will likely involve extensive site clearing, grading, underground utility work, and substantial paving. Contractors specializing in heavy civil construction, roadwork, and utility services, along with suppliers of construction materials and equipment, may find opportunities. Early engagement is advised as FDOT coordinates design and construction, which is fully funded by the FDOT.

Industries that could win this work

  • Site Prep, Grading & Hardscape
  • Concrete & Masonry
  • Electrical
  • HVAC & Climate Control
  • Plumbing
  • General Contractor
  • Utilities (Sub)
  • Building & Industrial Supply
  • Engineering & Architecture
  • Real Estate Development
  • Government Authority

Follow this across meetings

See the actual businesses behind these numbers

Get the real filings, with addresses and officers, backed by a 14-day money-back guarantee.

Create your account