5-19-2026 Regular CC Final Agenda Packet
City Council Regular Meeting · 2026-05-19 · agenda_packet
[Airport Road Park; case RFSQ #25-22] The City Council approved awarding a Master Contract for Architectural Services to Wannemacher Jensen Architects, LLC for RFSQ #25-22 for the design services of the new REC West. The project is located at Airport Road Park and will include a gymnasium and indoor/outdoor activity spaces. The contract amount is not to exceed $1,121,880. The project is funded through a City bond program and is anticipated to be approximately 15,000 to 20,000 square feet on an approximately 10-acre site. The total project budget is approximately $12 million, including hard and soft costs. The contract term is three years or until project completion. [case RFSQ #25-22] This document outlines the architectural and engineering services for the City of Port Orange's REC West Recreation Center project. It details tasks from schematic design through construction administration, including civil engineering, environmental services, skate park design, landscape and irrigation, surveying, geotechnical engineering, site lighting, aquatics design for an interactive water feature, and cost estimating. The total estimated fee for these services is $1,121,880. The document also includes a presentation evaluation ranking summary where WJ Architects was recommended for award over Borrelli Architects for RFSQ #25-22, Architectural Services for New Recreational Center. [1000 City Center Circle, Port Orange, FL 32129 (City of Port Orange Purchasing Division); case RFSQ #25-22] Wannemacher Jensen Architects, LLC (WJArchitects) submitted qualifications for Architectural Services for the new Recreational Center, "REC West", for the City of Port Orange. The RFSQ number is 25-22. WJArchitects is a Florida-based firm with extensive experience in designing athletic and recreation centers, and they also offer in-house cost estimating and construction management services through their sister company, Create Building Co. The submission included various required forms and certifications. No public comment or stakeholder sentiment was stated in this document. [5919 Main Street, New Port Richey, FL 34652; case RFSQ #25-22] Renovation of a 35,000 sf multi-level facility to enhance community well-being. Key renovations include the relocation and expansion of the health fitness center and child care center, adding 1,512 sf with a new 20 ft high curtain wall. A new indoor playground of 336 sf and 19 ft tall was added within the child care center. Other updated spaces include the main entrance lobby, reception desk, administration suite, an activity room, and a multipurpose room. [11400 NW 82nd Street, Doral, FL 33178; case RFSQ #25-22] Development of an 18-acre recreational park and a two-story, 38,280 sf LEED Silver recreation building. The park includes a civic lawn, band shell, shelters, splash pad, playgrounds, sports fields (football/soccer, softball/baseball), basketball courts, beach volleyball courts, tennis courts, and supporting buildings. The recreation building features a double gymnasium, multi-purpose and activity rooms, and an indoor playground. A pedestrian bridge connects areas separated by a collector road. [One 4th St. N., St. Petersburg, FL 33701; case RFSQ #25-22] Construction of the Speer YMCA and Middle School Partnership, a 111,757 sf campus uniting recreation, education, and wellness. The facility includes a recreation center with a gymnasium for basketball, volleyball, and pickleball, and a second-level wellness center with fitness studios, a cycling room, an e-sports room, and an outdoor wellness terrace. [3620 Cleveland Heights Blvd, Lakeland, FL 33803; case RFSQ #25-22] Addition and renovation to an existing YMCA fitness and childcare center. Includes a 31,317 sf two-story field house with a new main entrance, reception, elevated running track, indoor soccer field, basketball courts, cardio deck, and weight room. Also includes renovation and expansion of the 19,866 sf childcare center with new classrooms, toilet rooms, an indoor play area, and a dining hall with a learning kitchen. Security features include a controlled vestibule and emergency lockdown system. [1000 City Center Circle, Port Orange, FL 32129; case RFSQ #25-22] The City of Port Orange is seeking Statements of Qualifications for architectural design and permitting services for Phase 1 of 2 of a new recreation building named 'REC West'. The project scope includes a double gym, indoor play area, meeting rooms, public spaces, an e-sports room, an outdoor skate park, and Recreation Department offices. The submission deadline for Statements of Qualifications is November 4, 2025, at 2:30 PM EST. The RFSQ number is 25-22. [1000 City Center Circle, Port Orange, Florida] This document is a Request for Qualifications (RFQ) for professional services for the City of Port Orange. It outlines the requirements for submitting statements of qualifications, including company history, qualifications, personnel experience, financial stability, and references. It details the evaluation process, insurance requirements, legal compliance, and contract terms. Specific project details such as address, size, or zoning changes are not present as this is a general solicitation for services, not a specific project application. The document emphasizes compliance with Florida Statutes, public records laws, and various certifications. It also details the process for protests and dispute resolution. This document outlines the evaluation criteria and required forms for contractors submitting Statements of Qualifications (SOQ) to the City of Port Orange. It details how proposals will be scored based on responsiveness, capability, resources, character, licensure, past performance, references, and innovative approaches. The document also lists numerous required forms for submission, including acknowledgements of terms, certifications regarding public entity crimes, debarment, scrutinized companies, E-Verify compliance, and non-disclosure agreements. It specifies the process for oral presentations, final ranking, and award recommendations. The document does not contain information about specific projects, addresses, or development changes, but rather the procedural requirements for bidding on future work. [State rights-of-way within City limits, including portions of Nova Road (SR 5A), US 1/Ridgewood Ave. (SR 5), Dunlawton Ave. (SR 421), S. Peninsula Drive (SR 441), and SR A1A.; case AT752] The City of Port Orange is entering into a three-year Highway Maintenance Memorandum of Agreement (MOA) with the Florida Department of Transportation (FDOT), effective June 2026 through June 2029. Under this agreement, the City will receive $48,488.16 annually, paid quarterly, for routine landscape maintenance and roadside litter removal on state rights-of-way within city limits. The agreement covers specific state roads including Nova Road (SR 5A), US 1/Ridgewood Ave. (SR 5), Dunlawton Ave. (SR 421), S. Peninsula Drive (SR 441), and SR A1A. The total compensation over the three years will be $148,454.48. The City Council approved Resolution No. 26-23 authorizing the Mayor and City Clerk to execute this agreement. [case AT752] This document outlines a Highway Maintenance Memorandum of Agreement (MOA) between the Florida Department of Transportation (DEPARTMENT) and the City of Port Orange (LOCAL GOVERNMENT). The agreement covers routine maintenance activities on specific state roads within or adjacent to Port Orange for a term of three years, with a potential for one three-year renewal. The LOCAL GOVERNMENT is responsible for maintenance as defined in EXHIBIT C, including activities like sodding, seeding, mowing, ditch cleaning, sidewalk repair, tree trimming, and litter removal. The DEPARTMENT will compensate the LOCAL GOVERNMENT $12,372.00 per quarter ($49,488.00 annually). The agreement also details procedures for inspections, deficiencies, emergency response, and potential project-specific maintenance by the DEPARTMENT's contractors. It includes legal requirements, termination conditions, and points of contact. The document also references a separate City Council agenda item regarding a Local Agency Program (LAP) Supplemental Agreement for the Williamson Boulevard/Willow Run Boulevard Sidewalk Project. [Williamson Boulevard/Willow Run Boulevard (from south of Town Park Drive to Chardonnay Drive); case FDOT #448772; CD244; FPN 448772-2-58-01] City Council agenda item for Resolution No. 26-24, approving a Local Agency Program (LAP) Supplemental Agreement #1 for the Williamson Boulevard/Willow Run Boulevard Sidewalk Project (CD244). The project involves installing a 12-foot wide shared-use asphalt path along Williamson Boulevard and Willow Run Boulevard, totaling 0.5 miles, with pedestrian improvements. The original LAP Agreement was approved February 4, 2025, with construction awarded to Sparks Concrete, LLC, commencing March 30, 2026. Supplemental Agreement #1 addresses an additional $61,413.00 in funding authorized by the Volusia-Flagler Transportation Planning Organization (VFTPO) to cover the difference between the estimated construction cost and the lowest bid. FDOT will now reimburse up to 90% of eligible construction costs, not exceeding $498,864.00. [Williamson Boulevard / Willow Run Boulevard, from south of Town Park Drive to Chardonnay Drive, Port Orange, Florida; case 448772-2-58-01] The City of Port Orange City Council approved a supplemental agreement for the Williamson Boulevard / Willow Run Boulevard project. This project involves constructing a 12-foot wide shared use asphalt path along the north side of Willow Run Boulevard and the east side of Williamson Boulevard, including curb and gutter, milling and resurfacing, rapid flashing beacons, curb ramps, and drainage improvements. The total project length is approximately 2,806 feet (0.53 miles). The construction contract award amount is $554,294.00, with an increase in total construction funding by $61,413.00. [Riverwalk Trail adjacent to Tiki Docks Port Orange River Bar & Grill property, east of the trail, Port Orange, Florida; case CA8972] The City of Port Orange City Council is considering approving a License Agreement for Tiki Docks Port Orange River Bar & Grill to use a portion of the Riverwalk Trail for special events, specifically a weekly Sunday morning waterfront market. The agreement allows Tiki Docks to use approximately 10 feet of the City's 23-foot-wide Riverwalk Trail adjacent to their property to accommodate vendors, tents, and sales areas, while ensuring a minimum of 10 feet of the trail remains open to the public. The license is for Sundays only and will continue until December 31, 2028, with annual renewal options. The agreement includes provisions for coordination with Parks and Recreation, cleanup, maintenance, and liability insurance. [717 Dove Avenue, Port Orange, Florida] The City of Port Orange City Council is considering approving a Contract for Sale and Purchase of real property located at 717 Dove Avenue to Carroll and Mary Brunk for $55,000. The City acquired this ±8,800 square-foot vacant lot in September 2025 through foreclosure after it was a chronic nuisance site. The Brunks intend to install a manufactured home and make it their permanent residence. The City anticipates net proceeds of approximately $21,900 after costs. [535 Locust Street, Port Orange, Florida; case CA8926] The City of Port Orange City Council is considering approving Amendment No. 1 to the Contract to Purchase Real Property at 535 Locust Street for the Wastewater Treatment Plant Upgrades Project. This amendment clarifies that the seller's Title Agent, Glenn D. Storch, P.A., will also serve as the Escrow Agent for the closing. The original contract was approved on May 5, 2026. [East of Spruce Creek Road, south of Dunlawton Ave. and west of Locust Street, Port Orange, Florida; case CA8925] The City of Port Orange City Council is considering approving Amendment No. 1 to the Contract to Purchase Real Property identified by Parcel Numbers 630407001400, 630407001061, 630407000990, and 630407001060, generally located east of Spruce Creek Road, south of Dunlawton Ave. and west of Locust Street, for the Wastewater Treatment Plant Upgrades Project. This amendment clarifies that the seller's Title Agent, Glenn D. Storch, P.A., will also serve as the Escrow Agent for the closing. The original contract was approved on May 5, 2026. [West side of Airport Road, north of Charles Street; case CPAM-26-0001] This record details two separate agenda items for the City Council meeting on May 19, 2026. The first item (F19) concerns appointments to the Golf Advisory Board, with four individuals seeking reappointment or to fill vacancies. The second item (G20) is the second reading of Ordinance No. 2026-2, a large-scale Comprehensive Plan Future Land Use Amendment (Case No. CPAM-26-0001) proposed by Paylin Acres, LLC. This amendment seeks to change the Future Land Use designation of a 56.53-acre property located west of Airport Road, north of Charles Street, from Volusia County Agriculture Resource and Urban Low Intensity to City of Port Orange Rural Transition (0-2 units/acre), with an added policy to limit density to 1 unit/acre. The applicant proposes a 50-lot single-family subdivision on this property, which was previously annexed in June 2025 and had a prior development proposal (113-unit subdivision) denied in October 2025. The Planning Commission recommended approval for the amendment (3-2). No objections were received from state review agencies or adjacent local governments. [West side of Airport Road, north of Charles Street; case REZONING-26-0001] Rezoning of approximately 56.53 acres from Volusia County A-1 (Prime Agriculture) and A-2 (Rural Agriculture) to City of Port Orange R-20SF Single Family Residential. The applicant, Paylin Acres, LLC, on behalf of property owners Andrea Baumann and Beth Anne Burnett, Joyce E Tumblin Trust, and Stetson University Inc., intends to develop a 50-lot single-family residential subdivision. The property is located on the west side of Airport Road, north of Charles Street. The Planning Commission recommended approval (3-2). A previous application for a 113-unit development was denied in October 2025. Public notice signs were posted on February 4, 2026. Five individuals contacted staff with concerns about vehicular access onto Charles Street or Russell Road and potential drainage impacts. [West side of Airport Road, north of Charles Street; case REZONING-26-0001] The City of Port Orange is considering a rezoning request for approximately 56.53 acres. The property is located on the west side of Airport Road, north of Charles Street. The proposed change is from Volusia County A-1 (Prime Agriculture) and A-2 (Rural Agriculture) to City of Port Orange R-20SF. If approved, the developer, Paytas Homes, plans to develop a 50-lot single-family residential subdivision. The Volusia County School District has reviewed the proposal and determined there is adequate capacity for the estimated 13 students. An environmental analysis by Young Bear Environmental (YBE) Consulting in July 2024 found no wetlands on the property, only man-made agricultural drainage features and a cattle pond. One potentially occupied gopher tortoise burrow was observed, requiring a survey and potential permitting prior to development. Public notice signs were posted on February 4, 2026. Five individuals contacted staff with concerns about vehicular access onto Charles Street or Russell Road, and potential drainage impacts. Staff recommends approval of the rezoning.
Agenda items
- 1. Coordinate and attend a kick-off meeting to discuss and reach an understanding of the Client’s
- 1. Coordinate structural, mechanical and electrical sy stems with engineering design consultants as
- 1. Meet and coordinate systems with engineering design consultants.
- Engineering & Architecture
- General Contractor
- Site Prep, Grading & Hardscape
- Electrical
- Plumbing
- HVAC & Climate Control
- Building & Industrial Supply
- 1. Provide Signed and Sealed document sets for the building permit.
- 1. Provision of Services
- General Contractor
- Engineering & Architecture
- Site Prep, Grading & Hardscape
- Concrete & Masonry
- Electrical
- HVAC & Climate Control
- Plumbing
- Roofing
- Painting & Flooring
- Drywall & Insulation
- Building & Industrial Supply
- Real Estate Development
- Legal Services
- Landscaping & Lawn Service
- 1. Review and certify Contractor's pay applications ba sed on the Architect’s best knowledge of the
- 1. Silent Invocation
- 1. Silent Invocation
- 1. Wannemacher Jensen Architects LLC
- 10. Approval of a License Agreement for use of the Riverwalk Trail for Special Events
- Event Planning & Rentals
- Landscaping & Lawn Service
- Site Prep, Grading & Hardscape
- Building & Industrial Supply
- Legal Services
- Business Consulting
- 10. Approval of a License Agreement for use of the Riverwalk Trail for Special Events
- Event Planning & Rentals
- Waste Management
- Site Prep, Grading & Hardscape
- 10. Fair Housing Month
- 10. Submit Final Construction Documents to Client.
- 10. Termination for Non-Appropriation of Funds
- 11. Approval of Contract for Sale and Purchase of real property located at 717 Dove
- Real Estate Development
- Residential Brokerage
- Commercial Brokerage
- Legal Services
- Engineering & Architecture
- Building & Industrial Supply
- General Contractor
- Site Prep, Grading & Hardscape
- Concrete & Masonry
- Carpentry & Cabinetry
- Electrical
- Plumbing
- HVAC & Climate Control
- Roofing
- Painting & Flooring
- 11. Approval of Contract for Sale and Purchase of real property located at 717 Dove
- Real Estate Development
- Residential Brokerage
- Commercial Brokerage
- Title & Settlement Services
- General Contractor
- Legal Services
- Engineering & Architecture
- 11. Insurance. Architect shall maintain insurance, as required herein, during the life of this Contract. Architect
- Engineering & Architecture
- Legal Services
- Commercial & Business Insurance
- General Contractor
- Carpentry & Cabinetry
- Concrete & Masonry
- Drywall & Insulation
- Electrical
- HVAC & Climate Control
- Painting & Flooring
- Plumbing
- Roofing
- Site Prep, Grading & Hardscape
- Building & Industrial Supply
- Real Estate Development
- 11. Professional Municipal Clerks Week
- 12. A Contract for the purchase of supplies shall be governed by the City of Port Orange Code of Ordinances,
- 12. Approval of Amendment No. 1 to the Contract to Purchase Real Property located at
- Utilities (Sub)
- General Contractor
- Site Prep, Grading & Hardscape
- Concrete & Masonry
- Electrical
- HVAC & Climate Control
- Plumbing
- Restoration & Waterproofing
- Building & Industrial Supply
- Engineering & Architecture
- Waste Management
- 12. Approval of Amendment No. 1 to the Contract to Purchase Real Property located at
- Utilities (Sub)
- General Contractor
- Site Prep, Grading & Hardscape
- Concrete & Masonry
- Plumbing
- Electrical
- HVAC & Climate Control
- Building & Industrial Supply
- Engineering & Architecture
- 12. Port Orange University Graduation Certificates
- 13. Approval of Amendment No. 1 to the Contract to Purchase Real Property identified as
- General Contractor
- Site Prep, Grading & Hardscape
- Concrete & Masonry
- Electrical
- HVAC & Climate Control
- Plumbing
- Utilities (Sub)
- Building & Industrial Supply
- Engineering & Architecture
- Real Estate Development
- Government Authority
- 13. Approval of Amendment No. 1 to the Contract to Purchase Real Property identified as
- General Contractor
- Site Prep, Grading & Hardscape
- Concrete & Masonry
- Plumbing
- Electrical
- HVAC & Climate Control
- Utilities (Sub)
- Engineering & Architecture
- Building & Industrial Supply
- Real Estate Development
- Appraisal & Inspection
- Commercial Brokerage
- Government Authority
- 13. Assignability of Contract. Neither this contract, nor any part hereof, may be assigned by the Architect to any
- 13. Council Members
- Utilities (Sub)
- Site Prep, Grading & Hardscape
- General Contractor
- Plumbing
- Building & Industrial Supply
- Engineering & Architecture
- Real Estate Development
- 14. City Attorney
- 14. Memorial Day 2026 Proclamation
- 14. Memorial Day 2026 Proclamation
- 14. Modifications or Changes to this Contract
- 15. Sovereign Immunity. The City expressly retains all rights, benefits and immunities of sovereign immunity in
- Engineering & Architecture
- General Contractor
- Site Prep, Grading & Hardscape
- Building & Industrial Supply
- Real Estate Development
- Legal Services
- 16. Environmental Advisory Board Report
- Engineering & Architecture
- Landscaping & Lawn Service
- Site Prep, Grading & Hardscape
- Utilities (Sub)
- 16. Liability for Loss or Damage. Architect shall be liable for any loss of, or damage to, City property caused by
- 17. Non-discrimination. During the performance of this Contract, Architect agrees as follows:
- 17. Parks and Recreation Advisory Board Report
- 18. Authorize the Renaming of the Lakeside Community Center to the Allen Green
- Government Authority
- Signage & Printing
- 18. Citizen Advisory Committee for TPO
- 18. Citizen Advisory Committee for TPO
- 19. Golf Advisory Board Appointments (4)
- 19. Golf Advisory Board Appointments (4)
- 2. Attend up to twenty (20) in-person site visits/meetings at the project site to evaluate the progress
- 2. City Obligations. In return for the services identified above, the City agrees to compensate the Architect in
- 2. Coordinate and attend up to four (4) in-person progress meetings.
- 2. Prepare developed plans, sections, elevations, typi cal construction details, and diagrammatical
- 2. RFSQ #25-22 Final Evaluation
- 2. Respond to questions, provide clarifications, and m odify documents as required in response to
- 2. Review the program and other information provided b y the Client, review laws, codes, and
- 20. Second Reading - Ordinance No. 2026-2 - Large-Scale Comprehensive Plan Future
- Engineering & Architecture
- Real Estate Development
- General Contractor
- 20. Second Reading - Ordinance No. 2026-2 - Large-Scale Comprehensive Plan Future
- Legal Services
- Engineering & Architecture
- Site Prep, Grading & Hardscape
- General Contractor
- Concrete & Masonry
- Electrical
- HVAC & Climate Control
- Painting & Flooring
- Plumbing
- Roofing
- Drywall & Insulation
- Building & Industrial Supply
- Real Estate Development
- 21. Second Reading - Ordinance No. 2026-3 - Conventional Rezoning/Case No.
- Site Prep, Grading & Hardscape
- General Contractor
- Engineering & Architecture
- Real Estate Development
- 21. Second Reading - Ordinance No. 2026-3 - Conventional Rezoning/Case No.
- General Contractor
- Site Prep, Grading & Hardscape
- Engineering & Architecture
- Real Estate Development
- Building & Industrial Supply
- 23. E-Verify. Architect shall utilize the U.S. Department of Homeland Security’s E -Verify system to verify the
- Legal Services
- Engineering & Architecture
- 24. Disputes. The City Manager, who shall reduce his decision to writing and mail or otherwise furnish a copy
- 26. Controlling Law. THIS AGREEMENT CONTAINS IMPORTANT MATTERS AFFECTING LEGAL RIGHTS
- 27. Additional Provisions. This Contract includes all additional provisions a s may have been outlined in written
- 28. Integration. This Contract and the documents incorporated herein by reference shall constitute the whole
- 3. Assist the Client/Contractor with preparation and distribution of bid documents.
- 3. Attend up to twenty (20) virtual meetings during Construction.
- 3. Contract Administration . The Parks and Recreation Director, Susan Lovallo (“Contract Manager”), shall
- 3. Coordinate and attend up to four (4) virtual progress meetings.
- 3. Coordinate and attend up to three (3) in-person progress meetings.
- 3. Evaluate the Client provided program, schedule, bud get for the Cost of Work, Project site, and
- 3. RFSQ 25-22 ARCH. SERV. NEW REC
- 30. Truth-in-Negotiations.
- Legal Services
- Engineering & Architecture
- 31. Contract Construction
- Engineering & Architecture
- General Contractor
- 32. Authority to Sign. Each person signing this Agreement warrants that he or she is duly authorized to do so
- General Contractor
- Site Prep, Grading & Hardscape
- Concrete & Masonry
- Electrical
- HVAC & Climate Control
- Plumbing
- Painting & Flooring
- Drywall & Insulation
- Roofing
- Building & Industrial Supply
- Real Estate Development
- Engineering & Architecture
- Landscaping & Lawn Service
- 4. Coordinate and attend up to one (1) public meeting/community engagement event.
- 4. Coordinate and attend up to three (3) virtual progress meetings.
- 4. Coordinate and attend up to two (2) in-person progress meetings.
- 4. FINAL WJA Port Orange New
- General Contractor
- Site Prep, Grading & Hardscape
- Concrete & Masonry
- Electrical
- HVAC & Climate Control
- Plumbing
- Painting & Flooring
- Drywall & Insulation
- Roofing
- Building & Industrial Supply
- Real Estate Development
- Engineering & Architecture
- Landscaping & Lawn Service
- 4. Florida Inland Navigation District Presentation - Buddy Davenport
- 4. Florida Inland Navigation District Presentation - Buddy Davenport
- 4. Liens. Architect acknowledges that Architect shall not be entitled to lien the City or other public property.
- 4. Respond to questions and provide clarifications and interpretations of the Construction
- General Contractor
- Engineering & Architecture
- Building & Industrial Supply
- 4. Review and respond to the contractor’s submittals and shop drawings.
- 5. Coordinate and attend up to two (2) virtual progress meetings.
- 5. Incorporate the design requirements of governmental authorities having jurisdiction over the
- 5. Outline specifications that identify the major materials and systems.
- 5. Review and respond to the contractor’s requests for information (RFIs).
- 5. Termination for Convenience of the City
- Legal Services
- Engineering & Architecture
- General Contractor
- Building & Industrial Supply
- Site Prep, Grading & Hardscape
- Concrete & Masonry
- Carpentry & Cabinetry
- Drywall & Insulation
- Electrical
- HVAC & Climate Control
- Painting & Flooring
- Plumbing
- Roofing
- Windows, Doors & Glass
- Landscaping & Lawn Service
- 5. WJ Architects ALL 08.20.26 WJ Architects ALL 08.20.26.pdf
- Engineering & Architecture
- Site Prep, Grading & Hardscape
- General Contractor
- Concrete & Masonry
- Electrical
- HVAC & Climate Control
- Painting & Flooring
- Plumbing
- Roofing
- Building & Industrial Supply
- Real Estate Development
- 6. Awarded Completed Forms Awarded Completed Forms.pdf
- 6. Bid Awards and Contract Items
- 6. Prepare one Schematic concept consisting of a site plan, preliminary building plan, sections and
- Engineering & Architecture
- General Contractor
- Real Estate Development
- 6. Provide interior finish selections (color/material) and specifications for room finishes including
- Painting & Flooring
- Electrical
- Lighting & Low-Voltage Systems
- General Contractor
- Building & Industrial Supply
- 6. Provide telephone and email correspondence as necessary.
- 6. Submit Design Development Documents for Client’s approval.
- 6. Termination for Convenience for Subcontractors. In accordance with the termination for the convenience of
- 7. Attend one Substantial Completion walk-through.
- 7. Bid Awards and Contract Items
- 7. Bid Awards and Contract Items
- 7. Preliminary selections of major building systems and construction materials shall be noted on the
- 7. Provide finish selection and specification for millwork including elevations.
- 7. RFSQ 25-22 Architectural Services for
- General Contractor
- Engineering & Architecture
- Building & Industrial Supply
- Site Prep, Grading & Hardscape
- Concrete & Masonry
- Carpentry & Cabinetry
- Electrical
- HVAC & Climate Control
- Plumbing
- Roofing
- Painting & Flooring
- Drywall & Insulation
- Windows, Doors & Glass
- Landscaping & Lawn Service
- Real Estate Development
- 7. Resolution No. 26-21 - Approval of Amendment No. 1 to the Agreement with the
- Utilities (Sub)
- General Contractor
- Concrete & Masonry
- Site Prep, Grading & Hardscape
- Construction (Other)
- Building & Industrial Supply
- Engineering & Architecture
- Business Consulting
- Government Authority
- 7. Termination for Default. Either party may terminate this Contract, without further obligation, for the default of
- 8. Attend one Final Completion Walk-Through to verify punch list items.
- 8. Examination of Records
- 8. Interiors Construction Documentation: Prepare finish plans, required life safety signage, reflected
- 8. Provide up to two (2) conceptual exterior renderings.
- 8. RFSQ 25-22 Architectural Services for
- Engineering & Architecture
- 8. Resolution No. 26-22 - Calling for Primary and Regular Elections for the Purpose
- 8. Resolution No. 26-23 - Approving the State Highway Memorandum of Agreement
- 8. Resolution No. 26-23 - Approving the State Highway Memorandum of Agreement
- 9. Prepare a set of Construction Documents including detailed design plans, detailed building system
- General Contractor
- Engineering & Architecture
- Building & Industrial Supply
- Site Prep, Grading & Hardscape
- Electrical
- Plumbing
- HVAC & Climate Control
- Concrete & Masonry
- Painting & Flooring
- Roofing
- Drywall & Insulation
- Carpentry & Cabinetry
- Landscaping & Lawn Service
- 9. Public Records Compliance . Architect shall comply with public records laws as set forth in Chapter 119,
- Legal Services
- Engineering & Architecture
- Office & Business Support Services
- 9. Resolution No. 26-24 - Approval of Local Agency Program (LAP) Supplemental
- Site Prep, Grading & Hardscape
- Concrete & Masonry
- Construction (Other)
- Building & Industrial Supply
- Engineering & Architecture
- 9. Resolution No. 26-24 - Approval of Local Agency Program (LAP) Supplemental
- Site Prep, Grading & Hardscape
- Concrete & Masonry
- General Contractor
- Engineering & Architecture
- Building & Industrial Supply
- 9. Review and respond to the Contractor's prepared as-built drawings.
- Engineering & Architecture
- General Contractor
- Site Prep, Grading & Hardscape
- Concrete & Masonry
- Electrical
- Plumbing
- HVAC & Climate Control
- Roofing
- Painting & Flooring
- Drywall & Insulation
- Building & Industrial Supply
- Real Estate Development
- 9. Submit Schematic Design Documents for Client’s review and approval.
- Engineering & Architecture
- General Contractor
- Site Prep, Grading & Hardscape
- Concrete & Masonry
- Electrical
- HVAC & Climate Control
- Plumbing
- Carpentry & Cabinetry
- Drywall & Insulation
- Painting & Flooring
- Roofing
- Windows, Doors & Glass
- Building & Industrial Supply
- Real Estate Development
- 9. Sunbiz Sunbiz.pdf
- Engineering & Architecture
- General Contractor
- Building & Industrial Supply
- Business Consulting
- 9. Water Safety Month
- E. COMMENTS AND ADDITIONAL ITEMS
- E. COMMENTS AND ADDITIONAL ITEMS
- F. BOARD APPOINTMENTS, INTERVIEWS, AND REPORTS
- F. BOARD APPOINTMENTS, INTERVIEWS, AND REPORTS
- a. Approval of Addendum No. 1 to the Rental Quotes (#Q12146 & #Q12147)
- Utilities (Sub)
- Electrical
- Construction (Other)
- Building & Industrial Supply
- Security Services
- a. Approval to Award a Master Contract for Architectural Services to Wannemacher
- Engineering & Architecture
- Site Prep, Grading & Hardscape
- General Contractor
- Concrete & Masonry
- Electrical
- HVAC & Climate Control
- Painting & Flooring
- Plumbing
- Roofing
- Building & Industrial Supply
- Real Estate Development
- a. Approval to Award a Master Contract for Architectural Services to Wannemacher
- Engineering & Architecture
- General Contractor
- Site Prep, Grading & Hardscape
- Concrete & Masonry
- Carpentry & Cabinetry
- Electrical
- HVAC & Climate Control
- Plumbing
- Roofing
- Painting & Flooring
- Drywall & Insulation
- Building & Industrial Supply
- Real Estate Development
- Landscaping & Lawn Service
- Business Consulting
- a. First Step Shelter - Councilman Shawn Goepfert
- a. First Step Shelter - Councilman Shawn Goepfert
- a. It is anticipated that all site visits and meetings will be completed concurrently.
- a. Preparation of one punch list is included.
- a. Regular City Council Meeting - April 21, 2026
- a. Regular City Council Meeting - May 5, 2026
- a. Regular City Council Meeting - May 5, 2026
- a. Riverwalk Update
- a. Riverwalk Update
- a. Riverwalk Update
- a. Volusia Flagler TPO - Vice Mayor Tracy Grubbs
- Engineering & Architecture
- General Contractor
- Site Prep, Grading & Hardscape
- Concrete & Masonry
- Carpentry & Cabinetry
- Electrical
- HVAC & Climate Control
- Plumbing
- Roofing
- Painting & Flooring
- Drywall & Insulation
- Building & Industrial Supply
- Real Estate Development
- b. Approval to Award Continuing Services Contract with Barfield Group and
- Engineering & Architecture
- Business Consulting
- b. Port Orange South Daytona Chamber of Commerce - Councilman Shawn
- b. Port Orange South Daytona Chamber of Commerce - Councilman Shawn
- b. Stormwater Projects Update
- General Contractor
- Site Prep, Grading & Hardscape
- Utilities (Sub)
- c. Approval of Task Authorization No. 10 to Paul Culver Construction, Inc. for
- General Contractor
- Site Prep, Grading & Hardscape
- Concrete & Masonry
- Carpentry & Cabinetry
- Roofing
- Painting & Flooring
- Building & Industrial Supply
- Real Estate Development
- Engineering & Architecture
- c. ArtHaus - Vice Mayor Tracy Grubbs
- c. ArtHaus - Vice Mayor Tracy Grubbs
- c. Parks and Recreation Bond Projects Update
- Site Prep, Grading & Hardscape
- Utilities (Sub)
- General Contractor
- Concrete & Masonry
- Electrical
- HVAC & Climate Control
- Painting & Flooring
- Plumbing
- Roofing
- Drywall & Insulation
- Building & Industrial Supply
- Real Estate Development
- Engineering & Architecture
- Landscaping & Lawn Service
- c. Parks and Recreation Bond Projects Update
- Site Prep, Grading & Hardscape
- General Contractor
- Concrete & Masonry
- Electrical
- HVAC & Climate Control
- Painting & Flooring
- Plumbing
- Roofing
- Building & Industrial Supply
- Real Estate Development
- Engineering & Architecture
- Landscaping & Lawn Service
- c. Parks and Recreation Bond Projects Update
- d. Approval of a Contract to Purchase Real Property located at 535 Locust
- General Contractor
- Utilities (Sub)
- Building & Industrial Supply
- Engineering & Architecture
- Real Estate Development
- Site Prep, Grading & Hardscape
- e. Approval of a Contract to Purchase Real Property identified as Parcel
- General Contractor
- Site Prep, Grading & Hardscape
- Concrete & Masonry
- Plumbing
- Electrical
- HVAC & Climate Control
- Utilities (Sub)
- Building & Industrial Supply
- Real Estate Development
- Engineering & Architecture
- Government Authority
Follow this across meetings
Applicants and firms
- Wannemacher Jensen Architects, LLC
- City of Port Orange
- Wannemacher Jensen Architects, LLC dba WJArchitects
- WJArchitects (for RFSQ #25-22)
- City of Port Orange and Florida Department of Transportation
- Tiki Docks Port Orange, LLC (Licensee)
- Carroll and Mary Brunk
- City of Port Orange (Purchaser), Nordman Ave, LLC (Seller)
- City of Port Orange (Purchaser), Pinepoint Properties, LLC (Seller)
- Paylin Acres, LLC (on behalf of property owners Andrea Baumann and Beth Anne Burnett; Joyce E Tumblin Trust; Stetson University Inc.)
- Paylin Acres, LLC
- Paytas Homes
Locations
- Airport Road Park
- 1000 City Center Circle, Port Orange, FL 32129 (City of Port Orange Purchasing Division)
- 5919 Main Street, New Port Richey, FL 34652
- 11400 NW 82nd Street, Doral, FL 33178
- One 4th St. N., St. Petersburg, FL 33701
- 3620 Cleveland Heights Blvd, Lakeland, FL 33803
- 1000 City Center Circle, Port Orange, FL 32129
- 1000 City Center Circle, Port Orange, Florida
- State rights-of-way within City limits, including portions of Nova Road (SR 5A), US 1/Ridgewood Ave. (SR 5), Dunlawton Ave. (SR 421), S. Peninsula Drive (SR 441), and SR A1A.
- Williamson Boulevard/Willow Run Boulevard (from south of Town Park Drive to Chardonnay Drive)
- Williamson Boulevard / Willow Run Boulevard, from south of Town Park Drive to Chardonnay Drive, Port Orange, Florida
- Riverwalk Trail adjacent to Tiki Docks Port Orange River Bar & Grill property, east of the trail, Port Orange, Florida
- 717 Dove Avenue, Port Orange, Florida
- 535 Locust Street, Port Orange, Florida
- East of Spruce Creek Road, south of Dunlawton Ave. and west of Locust Street, Port Orange, Florida
- West side of Airport Road, north of Charles Street
See the actual businesses behind these numbers
Get the real filings, with addresses and officers, backed by a 14-day money-back guarantee.
Create your account