Skip to main content

Be First, Build Lasting Relationships

Browse City of St. Augustine civic records

Every published record for City of St. Augustine, newest first. Filter by board, year, or industry to jump straight to the records you want, and page through to reach the full archive.

1,111 records

2. Existing building features to be altered:

Corridor Review Committee listed this item on its agenda for 2026-05-07 in City of St. Augustine. The posted record gives the item title and nothing else, so there is no site, no size and no applicant on file for it yet. Local businesses that want to follow it can open the official agenda link above and watch for the fuller write-up the body posts as the meeting gets closer.

Board:
Corridor Review Committee
Date:
2026-05-07
Type:
Agenda_item

2. Fiberglass-clad wood windows at side & rear elevation – Marvin Elevate series – see

Corridor Review Committee listed this item on its agenda for 2026-05-07 in City of St. Augustine. The posted record gives the item title and nothing else, so there is no site, no size and no applicant on file for it yet. Local businesses that want to follow it can open the official agenda link above and watch for the fuller write-up the body posts as the meeting gets closer.

Board:
Corridor Review Committee
Date:
2026-05-07
Type:
Agenda_item

2. Mechanical equipment shall not be located between the building and the street, unless technically

Corridor Review Committee listed this item on its agenda for 2026-05-07 in City of St. Augustine. The posted record gives the item title and nothing else, so there is no site, no size and no applicant on file for it yet. Local businesses that want to follow it can open the official agenda link above and watch for the fuller write-up the body posts as the meeting gets closer.

Board:
Corridor Review Committee
Date:
2026-05-07
Type:
Agenda_item

2. NAME OF PROPERTY OWNER:

Corridor Review Committee listed this item on its agenda for 2026-05-07 in City of St. Augustine. The posted record gives the item title and nothing else, so there is no site, no size and no applicant on file for it yet. Local businesses that want to follow it can open the official agenda link above and watch for the fuller write-up the body posts as the meeting gets closer.

Board:
Corridor Review Committee
Date:
2026-05-07
Type:
Agenda_item

2. Staff photographs

Corridor Review Committee listed this item on its agenda for 2026-05-07 in City of St. Augustine. The posted record gives the item title and nothing else, so there is no site, no size and no applicant on file for it yet. Local businesses that want to follow it can open the official agenda link above and watch for the fuller write-up the body posts as the meeting gets closer.

Board:
Corridor Review Committee
Date:
2026-05-07
Type:
Agenda_item

2. The applicant is seeking approval for a 2,369sf second story addition, as detailed in the scope of work on page 4 of this staff

The Corridor Review Committee is considering a proposal for a 2,369 square foot second-story addition. This project involves a modification to the standards for second-story glazing. The proposal is currently under review by the committee. If approved, the project would likely involve work such as structural framing, window installation, and interior finishing trades. Contractors, suppliers, and service providers interested in this potential project are encouraged to reach out early. Understanding the project details before final site plans, bids, and permits are settled offers a competitive advantage.

Board:
Corridor Review Committee
Date:
2026-05-07
Type:
Agenda_item

3. Existing building features to remain:

Corridor Review Committee listed this item on its agenda for 2026-05-07 in City of St. Augustine. The posted record gives the item title and nothing else, so there is no site, no size and no applicant on file for it yet. Local businesses that want to follow it can open the official agenda link above and watch for the fuller write-up the body posts as the meeting gets closer.

Board:
Corridor Review Committee
Date:
2026-05-07
Type:
Agenda_item

3. Florida Master Site File

Corridor Review Committee listed this item on its agenda for 2026-05-07 in City of St. Augustine. The posted record gives the item title and nothing else, so there is no site, no size and no applicant on file for it yet. Local businesses that want to follow it can open the official agenda link above and watch for the fuller write-up the body posts as the meeting gets closer.

Board:
Corridor Review Committee
Date:
2026-05-07
Type:
Agenda_item

3. No new landscape or exterior lighting will be included; site photometrics to remain the

A review is planned for a project at 230 West King Street in St. Augustine. The proposal involves no new landscape or exterior lighting, with site photometrics intended to remain the same. This item is currently under review by the Corridor Review Committee. The project's current stage means that detailed site plans, bids, and permits are not yet finalized. This early stage presents an opportunity for local contractors, suppliers, and service providers to engage with the project. Businesses specializing in site preparation, grading, concrete, paving, framing, roofing, electrical, plumbing, HVAC, and final landscaping could find potential work as the project progresses. Reaching out now allows businesses to understand the project's scope and potentially secure future work before formal bidding processes begin.

Board:
Corridor Review Committee
Date:
2026-05-07
Type:
Agenda_item
Address:
230 West King Street

3. PROJECT LOCATION:

Corridor Review Committee listed this item on its agenda for 2026-05-07 in City of St. Augustine. The posted record gives the item title and nothing else, so there is no site, no size and no applicant on file for it yet. Local businesses that want to follow it can open the official agenda link above and watch for the fuller write-up the body posts as the meeting gets closer.

Board:
Corridor Review Committee
Date:
2026-05-07
Type:
Agenda_item

3. Screening (by wall, solid fence or vegetative matter) that exceeds the height of the equipment shall be

Corridor Review Committee listed this item on its agenda for 2026-05-07 in City of St. Augustine. The posted record gives the item title and nothing else, so there is no site, no size and no applicant on file for it yet. Local businesses that want to follow it can open the official agenda link above and watch for the fuller write-up the body posts as the meeting gets closer.

Board:
Corridor Review Committee
Date:
2026-05-07
Type:
Agenda_item

3. The existing one-story Mid-Century Modern commercial structure features a deep front roof overhang with exposed rafter

This item concerns a review of an existing one-story Mid-Century Modern commercial building located in St. Johns. The building has specific architectural features including a deep front roof overhang with exposed rafter tails, a tapered fascia, and a flat roof at the rear. The exterior is painted brick with horizontal cast stone veneer accents. This agenda item is currently under review by the Corridor Review Committee. The review process may lead to future work such as site clearing and grading, underground utility work, paving, vertical framing and structure, mechanical and finish trades, and landscaping. Local contractors, suppliers, and service providers are encouraged to reach out early to learn more about potential opportunities as this project progresses through the review stages.

Board:
Corridor Review Committee
Date:
2026-05-07
Type:
Agenda_item

4. Air conditioning units and elevator shafts are permitted to go above the standard building height limit but

This item concerns proposed regulations for building height limits in St. Augustine. Specifically, air conditioning units and elevator shafts may exceed the standard 35-foot height limit. However, these elements must be visually screened from public view. This rule could affect the total number of stories a building can have. The item is currently under review by the Corridor Review Committee. This review process may lead to future construction projects requiring specialized work. Potential phases could include site preparation, structural work, and the installation of mechanical systems and screening elements. Local contractors, suppliers, and service providers should monitor this review. Engaging early could provide an advantage as project details and permit requirements are clarified.

Board:
Corridor Review Committee
Date:
2026-05-07
Type:
Agenda_item

4. Glazing Calculations

A proposal is under review for the property located at 230 W. King Street in St. Augustine. The project involves calculations related to glazing for the second floor of an existing structure. The current use is not specified, but the property is in an area with various businesses. The proposal is currently under review by the Corridor Review Committee. This review process would likely lead to work involving exterior modifications, potentially including window replacements or additions, and associated structural considerations. Contractors specializing in facade work, window installation, and potentially general contracting could find opportunities. Reaching out to the applicant or relevant city departments early in the review process may provide insight into potential future needs before formal plans and permits are finalized.

Board:
Corridor Review Committee
Date:
2026-05-07
Type:
Agenda_item
Address:
230 W. King Street

4. LEGAL DESCRIPTION:

A second story addition is planned for the existing one-story commercial building at 230 West King Street. The applicant, Sarah Ryan Architect, proposes to add new retail space, an owner's office, and storage on the second floor. This addition will include a freight elevator to connect the levels and an exterior stair. The project is currently under review by the Corridor Review Committee. The scope of work will likely involve site preparation, foundation work for the new elevator shaft, framing for the second story, installation of roofing, windows, doors, and exterior siding. Interior work will include finishing the retail space, office, and storage areas, along with installing the elevator and stair. Local contractors, suppliers, and tradespeople are encouraged to reach out early to learn more about this project as it moves through the design review process, before final plans and bids are established. This early engagement can provide an advantage in securing work for site preparation, vertical construction, and interior and exterior finishing trades.

Board:
Corridor Review Committee
Date:
2026-05-07
Type:
Agenda_item
Address:
201 Owens Ave
Applicant:
Sarah Ryan Architect

4. Modification and approval of Agenda

Corridor Review Committee listed this item on its agenda for 2026-05-07 in City of St. Augustine. The posted record gives the item title and nothing else, so there is no site, no size and no applicant on file for it yet. Local businesses that want to follow it can open the official agenda link above and watch for the fuller write-up the body posts as the meeting gets closer.

Board:
Corridor Review Committee
Date:
2026-05-07
Type:
Agenda_item

4. Modification and approval of Agenda

Corridor Review Committee listed this item on its agenda for 2026-05-07 in City of St. Augustine. The posted record gives the item title and nothing else, so there is no site, no size and no applicant on file for it yet. Local businesses that want to follow it can open the official agenda link above and watch for the fuller write-up the body posts as the meeting gets closer.

Board:
Corridor Review Committee
Date:
2026-05-07
Type:
Agenda_item

4. Modification and approval of Agenda

Corridor Review Committee listed this item on its agenda for 2026-05-07 in City of St. Augustine. The posted record gives the item title and nothing else, so there is no site, no size and no applicant on file for it yet. Local businesses that want to follow it can open the official agenda link above and watch for the fuller write-up the body posts as the meeting gets closer.

Board:
Corridor Review Committee
Date:
2026-05-07
Type:
Agenda_item

4. The proposed second-story addition rises from the prominent roof overhang while retaining the key visual features of the

A second-story addition is planned for a building located at an unspecified address within the City of St. Augustine. The proposal involves adding a new level that will extend from the existing roof overhang, preserving key roof features like exposed rafter tails and wide fascia. The addition will use vertically oriented Hardie siding, differing from the current brick, and will incorporate the existing stone veneer on an elevator shaft extension. This project is currently under review by the Corridor Review Committee. The work would likely involve structural framing, exterior siding installation, roofing, and potentially elevator shaft construction. Contractors specializing in vertical construction, siding, roofing, and concrete work may find opportunities as the project moves forward. Early engagement could be beneficial before final plans and permits are issued.

Board:
Corridor Review Committee
Date:
2026-05-07
Type:
Agenda_item

5. (a). Annual reorganization: Selection

Corridor Review Committee listed this item on its agenda for 2026-05-07 in City of St. Augustine. The posted record gives the item title and nothing else, so there is no site, no size and no applicant on file for it yet. Local businesses that want to follow it can open the official agenda link above and watch for the fuller write-up the body posts as the meeting gets closer.

Board:
Corridor Review Committee
Date:
2026-05-07
Type:
Agenda_item

See the actual businesses behind these numbers

Get the real filings, with addresses and officers, backed by a 14-day money-back guarantee.

Create your account