Skip to main content

Be First, Build Lasting Relationships

Corridor Review Committee: May 2026

City of St. Augustine

1. Aluminum Storefront windows on front facade – see attached Kawneer brochure

Corridor Review Committee listed this item on its agenda for 2026-05-07 in City of St. Augustine. The posted record gives the item title and nothing else, so there is no site, no size and no applicant on file for it yet. Local businesses that want to follow it can open the official agenda link above and watch for the fuller write-up the body posts as the meeting gets closer.

Board:
Corridor Review Committee
Date:
2026-05-07
Type:
Agenda_item

1. Location Map (GIS)

Corridor Review Committee listed this item on its agenda for 2026-05-07 in City of St. Augustine. The posted record gives the item title and nothing else, so there is no site, no size and no applicant on file for it yet. Local businesses that want to follow it can open the official agenda link above and watch for the fuller write-up the body posts as the meeting gets closer.

Board:
Corridor Review Committee
Date:
2026-05-07
Type:
Agenda_item

1. Mechanical equipment shall not be permitted within any required building setback unless the utility company

Corridor Review Committee listed this item on its agenda for 2026-05-07 in City of St. Augustine. The posted record gives the item title and nothing else, so there is no site, no size and no applicant on file for it yet. Local businesses that want to follow it can open the official agenda link above and watch for the fuller write-up the body posts as the meeting gets closer.

Board:
Corridor Review Committee
Date:
2026-05-07
Type:
Agenda_item

1. NAME OF APPLICANT:

Corridor Review Committee listed this item on its agenda for 2026-05-07 in City of St. Augustine. The posted record gives the item title and nothing else, so there is no site, no size and no applicant on file for it yet. Local businesses that want to follow it can open the official agenda link above and watch for the fuller write-up the body posts as the meeting gets closer.

Board:
Corridor Review Committee
Date:
2026-05-07
Type:
Agenda_item

1. New 2,369sf 2nd story addition:

A new 2,369 square foot second story addition is planned. This project is currently under review by the Corridor Review Committee. The scope of work would likely involve site preparation, structural framing, and interior and exterior finishing trades. Early engagement with project stakeholders could provide opportunities for contractors, suppliers, and service providers to understand the project's needs before final plans and permits are issued.

Board:
Corridor Review Committee
Date:
2026-05-07
Type:
Agenda_item

1. This property is located on the northwest corner of W. King and N. Leonardi Street in the King Street Entry Corridor.

Corridor Review Committee listed this item on its agenda for 2026-05-07 in City of St. Augustine. The posted record gives the item title and nothing else, so there is no site, no size and no applicant on file for it yet. Local businesses that want to follow it can open the official agenda link above and watch for the fuller write-up the body posts as the meeting gets closer.

Board:
Corridor Review Committee
Date:
2026-05-07
Type:
Agenda_item

2. Existing building features to be altered:

Corridor Review Committee listed this item on its agenda for 2026-05-07 in City of St. Augustine. The posted record gives the item title and nothing else, so there is no site, no size and no applicant on file for it yet. Local businesses that want to follow it can open the official agenda link above and watch for the fuller write-up the body posts as the meeting gets closer.

Board:
Corridor Review Committee
Date:
2026-05-07
Type:
Agenda_item

2. Fiberglass-clad wood windows at side & rear elevation – Marvin Elevate series – see

Corridor Review Committee listed this item on its agenda for 2026-05-07 in City of St. Augustine. The posted record gives the item title and nothing else, so there is no site, no size and no applicant on file for it yet. Local businesses that want to follow it can open the official agenda link above and watch for the fuller write-up the body posts as the meeting gets closer.

Board:
Corridor Review Committee
Date:
2026-05-07
Type:
Agenda_item

2. Mechanical equipment shall not be located between the building and the street, unless technically

Corridor Review Committee listed this item on its agenda for 2026-05-07 in City of St. Augustine. The posted record gives the item title and nothing else, so there is no site, no size and no applicant on file for it yet. Local businesses that want to follow it can open the official agenda link above and watch for the fuller write-up the body posts as the meeting gets closer.

Board:
Corridor Review Committee
Date:
2026-05-07
Type:
Agenda_item

2. NAME OF PROPERTY OWNER:

Corridor Review Committee listed this item on its agenda for 2026-05-07 in City of St. Augustine. The posted record gives the item title and nothing else, so there is no site, no size and no applicant on file for it yet. Local businesses that want to follow it can open the official agenda link above and watch for the fuller write-up the body posts as the meeting gets closer.

Board:
Corridor Review Committee
Date:
2026-05-07
Type:
Agenda_item

2. Staff photographs

Corridor Review Committee listed this item on its agenda for 2026-05-07 in City of St. Augustine. The posted record gives the item title and nothing else, so there is no site, no size and no applicant on file for it yet. Local businesses that want to follow it can open the official agenda link above and watch for the fuller write-up the body posts as the meeting gets closer.

Board:
Corridor Review Committee
Date:
2026-05-07
Type:
Agenda_item

2. The applicant is seeking approval for a 2,369sf second story addition, as detailed in the scope of work on page 4 of this staff

The Corridor Review Committee is considering a proposal for a 2,369 square foot second-story addition. This project involves a modification to the standards for second-story glazing. The proposal is currently under review by the committee. If approved, the project would likely involve work such as structural framing, window installation, and interior finishing trades. Contractors, suppliers, and service providers interested in this potential project are encouraged to reach out early. Understanding the project details before final site plans, bids, and permits are settled offers a competitive advantage.

Board:
Corridor Review Committee
Date:
2026-05-07
Type:
Agenda_item

3. Existing building features to remain:

Corridor Review Committee listed this item on its agenda for 2026-05-07 in City of St. Augustine. The posted record gives the item title and nothing else, so there is no site, no size and no applicant on file for it yet. Local businesses that want to follow it can open the official agenda link above and watch for the fuller write-up the body posts as the meeting gets closer.

Board:
Corridor Review Committee
Date:
2026-05-07
Type:
Agenda_item

3. Florida Master Site File

Corridor Review Committee listed this item on its agenda for 2026-05-07 in City of St. Augustine. The posted record gives the item title and nothing else, so there is no site, no size and no applicant on file for it yet. Local businesses that want to follow it can open the official agenda link above and watch for the fuller write-up the body posts as the meeting gets closer.

Board:
Corridor Review Committee
Date:
2026-05-07
Type:
Agenda_item

3. No new landscape or exterior lighting will be included; site photometrics to remain the

A review is planned for a project at 230 West King Street in St. Augustine. The proposal involves no new landscape or exterior lighting, with site photometrics intended to remain the same. This item is currently under review by the Corridor Review Committee. The project's current stage means that detailed site plans, bids, and permits are not yet finalized. This early stage presents an opportunity for local contractors, suppliers, and service providers to engage with the project. Businesses specializing in site preparation, grading, concrete, paving, framing, roofing, electrical, plumbing, HVAC, and final landscaping could find potential work as the project progresses. Reaching out now allows businesses to understand the project's scope and potentially secure future work before formal bidding processes begin.

Board:
Corridor Review Committee
Date:
2026-05-07
Type:
Agenda_item
Address:
230 West King Street

3. PROJECT LOCATION:

Corridor Review Committee listed this item on its agenda for 2026-05-07 in City of St. Augustine. The posted record gives the item title and nothing else, so there is no site, no size and no applicant on file for it yet. Local businesses that want to follow it can open the official agenda link above and watch for the fuller write-up the body posts as the meeting gets closer.

Board:
Corridor Review Committee
Date:
2026-05-07
Type:
Agenda_item

3. Screening (by wall, solid fence or vegetative matter) that exceeds the height of the equipment shall be

Corridor Review Committee listed this item on its agenda for 2026-05-07 in City of St. Augustine. The posted record gives the item title and nothing else, so there is no site, no size and no applicant on file for it yet. Local businesses that want to follow it can open the official agenda link above and watch for the fuller write-up the body posts as the meeting gets closer.

Board:
Corridor Review Committee
Date:
2026-05-07
Type:
Agenda_item

3. The existing one-story Mid-Century Modern commercial structure features a deep front roof overhang with exposed rafter

This item concerns a review of an existing one-story Mid-Century Modern commercial building located in St. Johns. The building has specific architectural features including a deep front roof overhang with exposed rafter tails, a tapered fascia, and a flat roof at the rear. The exterior is painted brick with horizontal cast stone veneer accents. This agenda item is currently under review by the Corridor Review Committee. The review process may lead to future work such as site clearing and grading, underground utility work, paving, vertical framing and structure, mechanical and finish trades, and landscaping. Local contractors, suppliers, and service providers are encouraged to reach out early to learn more about potential opportunities as this project progresses through the review stages.

Board:
Corridor Review Committee
Date:
2026-05-07
Type:
Agenda_item

4. Air conditioning units and elevator shafts are permitted to go above the standard building height limit but

This item concerns proposed regulations for building height limits in St. Augustine. Specifically, air conditioning units and elevator shafts may exceed the standard 35-foot height limit. However, these elements must be visually screened from public view. This rule could affect the total number of stories a building can have. The item is currently under review by the Corridor Review Committee. This review process may lead to future construction projects requiring specialized work. Potential phases could include site preparation, structural work, and the installation of mechanical systems and screening elements. Local contractors, suppliers, and service providers should monitor this review. Engaging early could provide an advantage as project details and permit requirements are clarified.

Board:
Corridor Review Committee
Date:
2026-05-07
Type:
Agenda_item

4. Glazing Calculations

A proposal is under review for the property located at 230 W. King Street in St. Augustine. The project involves calculations related to glazing for the second floor of an existing structure. The current use is not specified, but the property is in an area with various businesses. The proposal is currently under review by the Corridor Review Committee. This review process would likely lead to work involving exterior modifications, potentially including window replacements or additions, and associated structural considerations. Contractors specializing in facade work, window installation, and potentially general contracting could find opportunities. Reaching out to the applicant or relevant city departments early in the review process may provide insight into potential future needs before formal plans and permits are finalized.

Board:
Corridor Review Committee
Date:
2026-05-07
Type:
Agenda_item
Address:
230 W. King Street

4. LEGAL DESCRIPTION:

A second story addition is planned for the existing one-story commercial building at 230 West King Street. The applicant, Sarah Ryan Architect, proposes to add new retail space, an owner's office, and storage on the second floor. This addition will include a freight elevator to connect the levels and an exterior stair. The project is currently under review by the Corridor Review Committee. The scope of work will likely involve site preparation, foundation work for the new elevator shaft, framing for the second story, installation of roofing, windows, doors, and exterior siding. Interior work will include finishing the retail space, office, and storage areas, along with installing the elevator and stair. Local contractors, suppliers, and tradespeople are encouraged to reach out early to learn more about this project as it moves through the design review process, before final plans and bids are established. This early engagement can provide an advantage in securing work for site preparation, vertical construction, and interior and exterior finishing trades.

Board:
Corridor Review Committee
Date:
2026-05-07
Type:
Agenda_item
Address:
201 Owens Ave
Applicant:
Sarah Ryan Architect

4. Modification and approval of Agenda

Corridor Review Committee listed this item on its agenda for 2026-05-07 in City of St. Augustine. The posted record gives the item title and nothing else, so there is no site, no size and no applicant on file for it yet. Local businesses that want to follow it can open the official agenda link above and watch for the fuller write-up the body posts as the meeting gets closer.

Board:
Corridor Review Committee
Date:
2026-05-07
Type:
Agenda_item

4. Modification and approval of Agenda

Corridor Review Committee listed this item on its agenda for 2026-05-07 in City of St. Augustine. The posted record gives the item title and nothing else, so there is no site, no size and no applicant on file for it yet. Local businesses that want to follow it can open the official agenda link above and watch for the fuller write-up the body posts as the meeting gets closer.

Board:
Corridor Review Committee
Date:
2026-05-07
Type:
Agenda_item

4. Modification and approval of Agenda

Corridor Review Committee listed this item on its agenda for 2026-05-07 in City of St. Augustine. The posted record gives the item title and nothing else, so there is no site, no size and no applicant on file for it yet. Local businesses that want to follow it can open the official agenda link above and watch for the fuller write-up the body posts as the meeting gets closer.

Board:
Corridor Review Committee
Date:
2026-05-07
Type:
Agenda_item

4. The proposed second-story addition rises from the prominent roof overhang while retaining the key visual features of the

A second-story addition is planned for a building located at an unspecified address within the City of St. Augustine. The proposal involves adding a new level that will extend from the existing roof overhang, preserving key roof features like exposed rafter tails and wide fascia. The addition will use vertically oriented Hardie siding, differing from the current brick, and will incorporate the existing stone veneer on an elevator shaft extension. This project is currently under review by the Corridor Review Committee. The work would likely involve structural framing, exterior siding installation, roofing, and potentially elevator shaft construction. Contractors specializing in vertical construction, siding, roofing, and concrete work may find opportunities as the project moves forward. Early engagement could be beneficial before final plans and permits are issued.

Board:
Corridor Review Committee
Date:
2026-05-07
Type:
Agenda_item

5. (a). Annual reorganization: Selection

Corridor Review Committee listed this item on its agenda for 2026-05-07 in City of St. Augustine. The posted record gives the item title and nothing else, so there is no site, no size and no applicant on file for it yet. Local businesses that want to follow it can open the official agenda link above and watch for the fuller write-up the body posts as the meeting gets closer.

Board:
Corridor Review Committee
Date:
2026-05-07
Type:
Agenda_item

5. The CRC should determine whether the new addition meets the Standards requirements for additions and building design.

The Corridor Review Committee is reviewing a proposal for a new addition to an existing building. The committee will decide if the addition meets the design standards for additions and building design. These standards recommend keeping existing styles and features unless a redesign is needed for streetscape compatibility. Additions should not block key features of the existing building and should allow the original building to remain the main visual element. The review is currently planned, indicating an early stage in the process. This project could involve site preparation, construction of the addition, and finishing trades. Local contractors, suppliers, and service providers are encouraged to engage early to understand the project details as plans develop.

Board:
Corridor Review Committee
Date:
2026-05-07
Type:
Agenda_item

6. (a) May 7, 2026 - Regular Meeting (if

Corridor Review Committee listed this item on its agenda for 2026-05-07 in City of St. Augustine. The posted record gives the item title and nothing else, so there is no site, no size and no applicant on file for it yet. Local businesses that want to follow it can open the official agenda link above and watch for the fuller write-up the body posts as the meeting gets closer.

Board:
Corridor Review Committee
Date:
2026-05-07
Type:
Agenda_item

6. A painted metal stair and railing are proposed at the rear of the building. Prefabricated metal materials are generally

The Corridor Review Committee, City of St. Augustine, is reviewing a proposal for a painted metal stair and railing at the rear of a building. This feature is being considered because prefabricated metal materials are generally not allowed in the Entry Corridor unless they are approved by the committee as fitting the design intent. The committee will decide if the proposed stair and railing match the building's architectural style and meet the established standards. Changes to the design or materials might be suggested. This review is in its early stages, meaning contractors and suppliers can engage before final plans are set. The project involves the installation of metal stairs and railings, which could lead to work in site preparation, metal fabrication, and installation trades. Businesses specializing in metalwork, construction, and related supply services may find opportunities by connecting with the applicant or project team now to understand potential needs as the project moves forward.

Board:
Corridor Review Committee
Date:
2026-05-07
Type:
Agenda_item

6. Next Tentatively Scheduled Meeting

Corridor Review Committee listed this item on its agenda for 2026-05-07 in City of St. Augustine. The posted record gives the item title and nothing else, so there is no site, no size and no applicant on file for it yet. Local businesses that want to follow it can open the official agenda link above and watch for the fuller write-up the body posts as the meeting gets closer.

Board:
Corridor Review Committee
Date:
2026-05-07
Type:
Agenda_item

7. A Modification to the Standards for second-story window glazing has been requested by the applicant. Section 4.4.5 of the

A modification to window glazing standards is under review for a proposed second-story addition. The applicant has requested approval for 271.92 square feet of glazing, which exceeds the current standard of 153.6 square feet for second-story windows. The Corridor Review Committee can approve modifications up to 199.68 square feet. This item is currently under review by the committee. The project would involve construction of a second-story addition, potentially including site preparation, framing, window installation, and finishing trades. Contractors, suppliers, and service providers interested in this project should reach out to the applicant early, before final plans and permits are settled, to understand the project's needs and potential scope.

Board:
Corridor Review Committee
Date:
2026-05-07
Type:
Agenda_item

8. Alterations to the existing structure include relocation of a n existing double door on the east elevation, facing N. Leonardi

This notice is about proposed alterations to an existing structure located at N. Leonardi Street in St. Augustine. The project plans include moving a double door on the east side of the building and adding a new concrete landing and stairs with painted metal handrails. Additionally, two new windows are planned for the west elevation. One of these windows will connect to a window on the north elevation, creating a "catio" feature. This item is currently under review by the Corridor Review Committee. The work would involve concrete and masonry for the landing and stairs, metal fabrication for the handrails, and window installation. Contractors specializing in general construction, concrete work, metal fabrication, and window installation may find opportunities. Early engagement could be beneficial as plans are still being developed.

Board:
Corridor Review Committee
Date:
2026-05-07
Type:
Agenda_item
Address:
N. Leonardi Street

9. Paint colors are not regulated along W. King Street.

A design review is underway for a property located at 230 W. King Street. The property is currently zoned CM-2 and is a commercial building constructed around 1969. The review concerns proposed design changes, specifically paint colors, which are not typically regulated along W. King Street. The Corridor Review Committee is considering the application, with a staff recommendation to approve the design if it meets specific review criteria related to design standards and potential precedent. This review is in the preliminary design stage. If approved, the project would involve exterior modifications, likely including painting and potentially other cosmetic upgrades to align with the proposed design. Contractors specializing in painting, exterior finishes, and general building maintenance could find opportunities. Engaging early in this review process allows businesses to understand the project's direction before final plans and permits are issued.

Board:
Corridor Review Committee
Date:
2026-05-07
Type:
Agenda_item
Address:
230 W. King Street

CRCagenda050726

The Corridor Review Committee is reviewing a design for a second-story addition to an existing one-story commercial building. The applicant is Sarah Ryan Architect, and the owners are Thomas C. and Donna L. Cope. The project is located at 230 W. King Street and falls within the King Street Entry Corridor. The agenda does not state the decision or key dates for this item, nor does it mention any public comment or stakeholder sentiment.

Board:
Corridor Review Committee
Date:
2026-05-07
Type:
Agenda
Address:
230 W. King Street
Applicant:
Sarah Ryan Architect

CRCpacket050726

The Corridor Review Committee (CRC) reviewed a design review application for a second-story addition to an existing commercial building. The applicant, Sarah Ryan Architect, representing owners Thomas C. and Donna L. Cope, proposed a 2,369 sq ft addition at 230 W. King Street. The project involves constructing a second story on the existing one-story Mid-Century Modern commercial building. Key aspects of the proposal include a modification request for second-story window glazing, exceeding the standard allowance. The staff report detailed the proposed materials, including Hardie siding and Kawneer storefront systems, and alterations to existing features like relocating doors and adding windows. The CRC's decision is not explicitly stated in the provided text, but the document outlines the review criteria and potential motions for approval, continuation, or denial. Public comment was not recorded for this specific agenda item.

Board:
Corridor Review Committee
Date:
2026-05-07
Type:
Agenda_packet
Address:
230 W. King Street
Applicant:
Sarah Ryan Architect

N. LEONARDI ST.

A second story addition is planned for the existing building at 230 West King Avenue. The addition will include a showroom, office, and storage space, served by a new elevator and exterior stairs. The project proposes to add 2,186 square feet to the current 2,016 square foot structure, bringing the total to 4,385 square feet. This project is currently under review by the Corridor Review Committee. Work is expected to involve site preparation, structural framing for the second story, installation of new mechanical and electrical systems, plumbing, and finishing trades. Local contractors, suppliers, and service providers are encouraged to engage early, as plans and bids are not yet finalized, to understand the scope and potential opportunities for this expansion project.

Board:
Corridor Review Committee
Date:
2026-05-07
Type:
Agenda_item
Address:
230 West King Ave.
Applicant:
A Coastal Home Furniture

S. LEONARDI ST.EXISTING STRUCTURE

A proposal is under review for an addition to an existing structure located at S. Leonardi St. The project involves adding two new sections to the current building. The existing structure measures 48 feet by 12 feet 2 inches. The proposed additions are 13 feet 11 inches and 45 feet 4 inches. This item is currently under review by the Corridor Review Committee. The project would involve site preparation, foundation work, framing, and the installation of new building systems and finishes. Contractors specializing in general construction, concrete, framing, electrical, plumbing, and HVAC may find opportunities. Suppliers of building materials and equipment could also be involved. Engaging early before final plans and permits are set could provide a competitive advantage.

Board:
Corridor Review Committee
Date:
2026-05-07
Type:
Agenda_item
Address:
S. Leonardi St.

W. KING AVE.

Corridor Review Committee listed this item on its agenda for 2026-05-07 in City of St. Augustine. The posted record gives the item title and nothing else, so there is no site, no size and no applicant on file for it yet. Local businesses that want to follow it can open the official agenda link above and watch for the fuller write-up the body posts as the meeting gets closer.

Board:
Corridor Review Committee
Date:
2026-05-07
Type:
Agenda_item

W. KING AVE.

A project is under review to renovate and expand a commercial building located at 230 West King Avenue. The proposed work includes interior modifications to create a new showroom, office, storage, and restroom spaces, as well as exterior improvements such as a new storefront window system and a new roof. The project also involves adding a new concrete stair and landing, and potentially a new elevator shaft. This item is currently under review by the Corridor Review Committee. The scope of work will likely involve site preparation, concrete work for the new stair and landing, framing for interior and exterior walls, installation of new roofing and storefront systems, and finishing trades for the interior spaces. Local contractors, suppliers, and service providers are encouraged to reach out early to learn more about this opportunity before final plans and bids are established.

Board:
Corridor Review Committee
Date:
2026-05-07
Type:
Agenda_item
Address:
230 West King Ave.
Applicant:
A Coastal Home Furniture

W. KING ST.

A proposal is under review to add a second story to an existing single-story building located at 230 W. King Street. The project involves adding new construction above the current structure. This item is currently under review by the Corridor Review Committee. The work would likely involve structural additions, new roofing, and potentially interior build-out for the new floor. This early stage presents an opportunity for contractors, suppliers, and service providers to engage before final plans and permits are issued. Early involvement can allow businesses to prepare bids and understand project needs as they develop.

Board:
Corridor Review Committee
Date:
2026-05-07
Type:
Agenda_item
Address:
230 W. King Street

W. KING ST.

Corridor Review Committee listed this item on its agenda for 2026-05-07 in City of St. Augustine. The posted record gives the item title and nothing else, so there is no site, no size and no applicant on file for it yet. Local businesses that want to follow it can open the official agenda link above and watch for the fuller write-up the body posts as the meeting gets closer.

Board:
Corridor Review Committee
Date:
2026-05-07
Type:
Agenda_item

a) HP2026-0025 Sarah Ryan Architect - Applicant

A design review is planned for a second-story addition to an existing one-story commercial building at 230 W. King Street. The applicant, Sarah Ryan Architect, is proposing this addition within the King Street Entry Corridor. This project is currently under review by the Corridor Review Committee. The work would involve structural modifications to the existing building, including framing, roofing, and potentially HVAC and electrical upgrades to support the new second story. Finishing trades for interior and exterior work would also be needed. Local contractors, suppliers, and service providers are encouraged to reach out early to learn more about this project as it moves through the review process, before final plans and permits are issued.

Board:
Corridor Review Committee
Date:
2026-05-07
Type:
Agenda_item
Address:
230 W. King Street
Applicant:
Sarah Ryan Architect

a) HP2026-0025 Sarah Ryan Architect - Applicant

A design review is planned for a second-story addition to an existing one-story commercial building at 230 W. King Street. The applicant, Sarah Ryan Architect, is seeking approval for this project on behalf of owners Thomas C. and Donna L. Cope. This project is currently under review by the Corridor Review Committee. If approved, the work would involve structural modifications to the existing building, including framing, roofing, and potentially HVAC and electrical upgrades to support the new second story. Final finishes and exterior work would also be part of the project. Contractors, suppliers, and service providers interested in this project should reach out to the applicant or owner early in the process, before final site plans, bids, and permits are established, to understand the scope and potentially secure future work.

Board:
Corridor Review Committee
Date:
2026-05-07
Type:
Agenda_item
Address:
230 W. King Street
Applicant:
Sarah Ryan Architect

a) May is Preservation Month! Celebrate St. Augustine's rich and unique history with these activities:

This item concerns planned events and activities celebrating St. Augustine's history during Preservation Month in May 2026. The events include a History Festival from May 6-10, 2026, a City Commission meeting on May 11, 2026, to read a special proclamation, and the Preserve Florida 2026 Conference from May 14-15, 2026, in St. Petersburg. Additional special events are planned for St. Augustine's America 250th celebration. These activities are currently in the planning stages for May 2026. The scope of work involves event planning, coordination, marketing, and potentially providing services for lectures, tours, and conference support. Local businesses involved in event services, marketing, printing, and hospitality could find opportunities. Early engagement before final plans are set may offer a competitive advantage.

Board:
Corridor Review Committee
Date:
2026-05-07
Type:
Agenda_item
Address:
St. Petersburg, FL
Applicant:
National Trust for Historic Preservation

a) May is Preservation Month! Celebrate St. Augustine's rich and unique history with these activities:

This item concerns a series of planned events and activities in May 2026 celebrating St. Augustine's history and the 250th anniversary of the Declaration of Independence. The events include the St. Augustine History Festival from May 6-10, 2026, a special proclamation reading at the City Commission Meeting on May 11, 2026, and the Preserve Florida 2026 conference in St. Petersburg from May 14-15, 2026. These events are currently planned and are part of a larger civic agenda. The scope of work involves event planning, promotion, and execution, including lectures, tours, and special presentations. Local businesses in event services, marketing, printing, and potentially hospitality could find opportunities. Engaging early before specific vendor selections are made could provide a competitive advantage.

Board:
Corridor Review Committee
Date:
2026-05-07
Type:
Agenda_item
Applicant:
National Trust for Historic Preservation

a. A modification of the standard is being requested for the upper-level storefront

A modification to building standards is under review for a project at an unspecified location within the City of St. Augustine. The request involves a proposed change to the percentage of glazing allowed on upper-level storefront systems. The applicant seeks to have 68.7% glazing, which is higher than the standard 40% suggested. This request is intended to align with the design of the ground-floor storefront glazing system, which currently uses 80% glazing against a suggested 65%. This item is currently under review by the Corridor Review Committee. If approved, the project would involve work related to the installation of storefront systems and glazing. Contractors specializing in architectural systems, glazing, and related trades may find opportunities. Early engagement could be beneficial as the project moves through the review process.

Board:
Corridor Review Committee
Date:
2026-05-07
Type:
Agenda_item

a. Buildings that already feature a particular style or present some of the characteristics of a style are

This item concerns redevelopment and restoration projects on King Street in St. Augustine. The Corridor Review Committee (CRC) recommends that existing buildings be restored to preserve their architectural style and character features. If restoration is not possible, buildings should be redesigned to better fit the context of King Street. This review process is currently under consideration by the CRC. Projects could involve demolition, structural repair, facade improvements, and general construction to meet the committee's guidelines. Contractors specializing in historic restoration, general contracting, and building material supply may find opportunities as these projects move forward. Engaging with the review process early can provide insight into specific project needs and timelines.

Board:
Corridor Review Committee
Date:
2026-05-07
Type:
Agenda_item
Address:
King Street

a. Buildings with flat roofs shall have a cornice treatment or a parapet. The cornice shall be at least eighteen (18)

Corridor Review Committee listed this item on its agenda for 2026-05-07 in City of St. Augustine. The posted record gives the item title and nothing else, so there is no site, no size and no applicant on file for it yet. Local businesses that want to follow it can open the official agenda link above and watch for the fuller write-up the body posts as the meeting gets closer.

Board:
Corridor Review Committee
Date:
2026-05-07
Type:
Agenda_item

a. Modifications of more than ten (10) percent but no more than thirty (30) percent of a dimensional requirement,

Corridor Review Committee listed this item on its agenda for 2026-05-07 in City of St. Augustine. The posted record gives the item title and nothing else, so there is no site, no size and no applicant on file for it yet. Local businesses that want to follow it can open the official agenda link above and watch for the fuller write-up the body posts as the meeting gets closer.

Board:
Corridor Review Committee
Date:
2026-05-07
Type:
Agenda_item

a. Promote the unique characteristics of the King Street overlay area that distinguish it from the other built

This item is under review by the Corridor Review Committee for the City of St. Augustine. The committee is considering ways to highlight the special features of the King Street overlay area. This review is in its early stages, meaning plans are not yet finalized. The project aims to promote the unique characteristics of this area, distinguishing it from other parts of the city. Businesses that provide design, marketing, or signage services may find opportunities as this review progresses. Early engagement could be beneficial as concepts are developed.

Board:
Corridor Review Committee
Date:
2026-05-07
Type:
Agenda_item

See the actual businesses behind these numbers

Get the real filings, with addresses and officers, backed by a 14-day money-back guarantee.

Create your account