Board of County Commissioners: July 2026
Miami-Dade County
IMPROVEMENTS TO SW 268 STREET FROM US-1 TO SW 139 STREET
Miami-Dade County Board of County Commissioners adopted Resolution R-638-26 (File Number 260766) on 7/21/2026, declaring the acquisition of Parcel 1 for the SW 268 Street Improvement Project from US-1 to SW 139 Avenue to be a public necessity. The project involves road widening, beautification, and right-of-way improvements, including reconstruction, widening, milling and resurfacing, new drainage, curb and gutter, sidewalks, signalization, pavement markings and signage, lighting, bicycle facilities, and Water and Sewer Department utility improvements. The resolution authorizes acquisition of Parcel 1 in fee simple by negotiation, donation, right-of-way designation, or purchase at the higher of appraised or tax assessed value, plus attorney's fees and costs, or by eminent domain. An incentive offer up to 15 percent over the greater of appraised or tax assessed value is authorized. The estimated project cost is $12,739,000, funded by Mobility Impact Fees. The project is located in District 9, represented by Vice Chairman Kionne McGhee. The Transportation Committee forwarded the item to the BCC with a favorable recommendation on 6/9/2026. The item was introduced on 4/27/2026 and adopted on 7/21/2026.
- Board:
- Board of County Commissioners
- Date:
- 2026-07-21
- Type:
- Resolution
- Decision:
- Adopted
- Address:
- SW 268 Street from US-1 to SW 139 Avenue
- Applicant:
- Miami-Dade County Department of Transportation and Public Works (DTPW)
IMPROVEMENTS TO SW 268 STREET FROM US-1 TO SW 139 STREET
Miami-Dade County Board of County Commissioners is considering a resolution to declare the acquisition of Parcel 1 a public necessity for road widening, beautification, and right-of-way improvements to SW 268 Street from US-1 to SW 139 Avenue. The project includes reconstruction, widening, sidewalks, drainage, lighting, bicycle facilities, and utility improvements. The Board is authorizing the County Mayor or designee and County Attorney to acquire the property through negotiation, donation, designation, purchase, or eminent domain, with an incentive offer up to 15% over appraised or tax assessed value. The estimated project cost is $12,739,000. The Transportation Committee forwarded the item to the Board with a favorable recommendation.
- Board:
- Board of County Commissioners
- Date:
- 2026-07-21
- Type:
- Resolution
- Decision:
- Forwarded to BCC with a favorable recommendation by Transportation Committee; pending BCC Assignment
- Address:
- SW 268 Street from US-1 to SW 139 Avenue
- Applicant:
- Miami-Dade County Transportation and Public Works
IMPROVEMENTS TO SW 268 STREET FROM US-1 TO SW 139 STREET
Miami-Dade County Board of County Commissioners adopted Resolution R-638-26 (File Number 260766) on 7/21/2026, declaring the acquisition of Parcel 1 for the SW 268 Street Improvement Project to be a public necessity. The project involves reconstructing and widening SW 268 Street from US-1 to SW 139 Avenue, including sidewalks, curbs and gutters, stormwater drainage, pavement markings and signage, signalization, lighting, bicycle facilities, and Water and Sewer Department utility improvements. The resolution authorizes the County Mayor or designee and County Attorney to acquire Parcel 1 in fee simple by negotiation, donation, right-of-way designation, or purchase at the higher of appraised or tax assessed value, plus reasonable attorney's fees and costs, or by eminent domain. An incentive offer up to 15 percent over the greater of appraised or tax assessed value is authorized. The estimated project funding is $12,739,000 from Mobility Impact Fees. The Transportation Cmte forwarded the item with a favorable recommendation on 6/9/2026. The project is in District 9, represented by Vice Chairman Kionne McGhee, who is the prime sponsor. The document does not state the exact street address or parcel/folio number of Parcel 1, the acreage or square footage, the current or proposed zoning, or any public comment or stakeholder sentiment.
- Board:
- Board of County Commissioners
- Date:
- 2026-07-21
- Type:
- Resolution
- Decision:
- Adopted
- Applicant:
- Miami-Dade County Department of Transportation and Public Works (DTPW); Prime Sponsor: Kionne L. McGhee
IMPROVEMENTS TO SW 268 STREET FROM US-1 TO SW 139 STREET
Miami-Dade County Board of County Commissioners is considering a resolution to declare the acquisition of Parcel 1 a public necessity for road widening, beautification, and right-of-way improvements to SW 268 Street, from US-1 to SW 139 Avenue. The project includes reconstruction, widening, sidewalks, drainage, lighting, bicycle facilities, and utility improvements. The Board is authorizing the County Mayor or designee and County Attorney to acquire the property through negotiation, donation, designation, purchase, or eminent domain, with an incentive offer up to 15% over appraised or tax assessed value. The estimated project cost is $12,739,000, funded by the FY25-26 Adopted Budget and Multi-Year Capital Plan for road widening and mobility impact fees. Annual maintenance costs are estimated at $5,764.99.
- Board:
- Board of County Commissioners
- Date:
- 2026-07-21
- Type:
- Resolution
- Decision:
- Resolution authorizing acquisition of property for public necessity
- Address:
- SW 268 Street from US-1 to SW 139 Avenue
- Applicant:
- Miami-Dade County Transportation and Public Works
IMPROVEMENTS TO SW 268 STREET FROM US-1 TO SW 139 STREET
Miami-Dade County Board of County Commissioners adopted Resolution R-638-26 (File Number 260766) on 7/21/2026, declaring the acquisition of Parcel 1 for the SW 268 Street Improvement Project to be a public necessity. The project involves road widening, beautification, and right-of-way improvements to SW 268 Street from US-1 to SW 139 Avenue. The resolution authorizes the County Mayor or designee and County Attorney to acquire Parcel 1 in fee simple by negotiation, donation, right-of-way designation, or purchase at the higher of appraised or tax assessed value, or by eminent domain, with an incentive offer not to exceed 15 percent over the greater of appraised or tax assessed value. The project scope includes reconstructing and widening SW 268 Street, sidewalks, curbs and gutters, stormwater drainage, pavement markings and signage, signalization, lighting, new bicycle facilities, and Water and Sewer Department utility improvements. The estimated funding for design, construction, CEI, and right-of-way acquisition is $12,739,000 from Mobility Impact Fees. The Transportation Cmte forwarded the item to the BCC with a favorable recommendation on 6/9/2026. The item was introduced on 4/27/2026. The sponsor is Kionne L. McGhee. The project is located within District 9. No public comment or stakeholder sentiment is stated in the document.
- Board:
- Board of County Commissioners
- Date:
- 2026-07-21
- Type:
- Resolution
- Decision:
- Adopted
- Address:
- SW 268 Street from US-1 to SW 139 Avenue
- Applicant:
- Miami-Dade County Department of Transportation and Public Works (DTPW)
IMPROVEMENTS TO SW 268 STREET FROM US-1 TO SW 139 STREET
Miami-Dade County is proceeding with improvements to SW 268 Street, specifically the section between US-1 and SW 139 Avenue. This project involves road widening, beautification, and right-of-way improvements, including reconstruction, milling and resurfacing, new drainage, sidewalks, curbs and gutters, signalization, lighting, bicycle facilities, and utility work. The County is declaring the acquisition of Parcel 1 for these improvements as a public necessity. The County Mayor or designee is authorized to acquire Parcel 1 through negotiation, donation, right-of-way designation, or purchase, with compensation based on the higher of appraised or tax assessed values, plus potential incentive offers up to 15% above these values. The estimated project cost for design, construction, and right-of-way acquisition is $12,739,000, funded by the FY25-26 Adopted Budget and Multi-Year Capital Plan for road widening and mobility impact fees. Annual maintenance costs are estimated at $5,764.99. The Transportation and Public Works Department is overseeing the project.
- Board:
- Board of County Commissioners
- Date:
- 2026-07-21
- Type:
- Resolution
- Decision:
- Approved (Resolution declaring acquisition a public necessity, authorizing acquisition actions)
- Address:
- SW 268 Street from US-1 to SW 139 Avenue
- Applicant:
- Miami-Dade County Transportation and Public Works
IMPROVEMENTS TO SW 268 STREET FROM US-1 TO SW 139 STREET
Miami-Dade County is proceeding with improvements to SW 268 Street, specifically from US-1 to SW 139 Avenue. This project involves road widening, beautification, and right-of-way improvements, including reconstruction, milling and resurfacing, new drainage, sidewalks, curbs and gutters, signalization, lighting, bicycle facilities, and utility work. The County is seeking to acquire Parcel 1 for these improvements. The estimated cost for design, construction, and right-of-way acquisition is $12,739,000. The Transportation and Public Works Department is overseeing the project. The Board of County Commissioners is considering a resolution to declare the acquisition of Parcel 1 a public necessity and to authorize the County Mayor or designee and County Attorney to acquire the property through negotiation, donation, right-of-way designation, purchase, or eminent domain. An incentive offer of up to 15 percent over the appraised or tax assessed value is also authorized. The Transportation Committee forwarded the item with a favorable recommendation.
- Board:
- Board of County Commissioners
- Date:
- 2026-07-21
- Type:
- Resolution
- Decision:
- Forwarded to BCC with a favorable recommendation by Transportation Committee; resolution authorizing acquisition is before the Board
- Address:
- SW 268 Street from US-1 to SW 139 Avenue
- Applicant:
- Miami-Dade County Transportation and Public Works
IMPROVEMENTS TO SW 268 STREET FROM US-1 TO SW 139 STREET
Miami-Dade County Board of County Commissioners adopted Resolution R-638-26 (File Number 260766) on 7/21/2026, declaring the acquisition of Parcel 1 for the SW 268 Street Improvement Project to be a public necessity. The project involves reconstructing and widening SW 268 Street from US-1 to SW 139 Avenue, including sidewalks, curbs and gutters, stormwater drainage, pavement markings and signage, signalization, lighting, new bicycle facilities, and Water and Sewer Department utility improvements. The resolution authorizes the County Mayor or designee and County Attorney to acquire Parcel 1 in fee simple by negotiation, donation, right-of-way designation, or purchase at the higher of appraised or tax assessed value, plus reasonable attorney's fees and costs, or by eminent domain. An incentive offer to purchase Parcel 1 is authorized at up to 15 percent over the greater of appraised or tax assessed value. The estimated funding for design, construction, CEI, and right-of-way acquisition is $12,739,000 from Mobility Impact Fees. The project is located within District 9, represented by Vice Chairman Kionne McGhee, who is the Prime Sponsor. The Transportation Cmte forwarded the item to the BCC with a favorable recommendation on 6/9/2026. The document does not state the exact street address, parcel/folio number, acreage, or square footage of Parcel 1, nor does it state any public comment or stakeholder sentiment.
- Board:
- Board of County Commissioners
- Date:
- 2026-07-21
- Type:
- Resolution
- Decision:
- Adopted
- Address:
- SW 268 Street from US-1 to SW 139 Avenue
- Applicant:
- Miami-Dade County Department of Transportation and Public Works (DTPW)
IMPROVEMENTS TO SW 268 STREET FROM US-1 TO SW 139 STREET
Miami-Dade County Board of County Commissioners (BCC) is considering a resolution to declare the acquisition of Parcel 1 a public necessity for road widening, beautification, and right-of-way improvements to SW 268 Street from US-1 to SW 139 Avenue. The project involves reconstructing and widening SW 268 Street, including sidewalks, curbs and gutters, stormwater drainage, pavement markings, signage, signalization, lighting, bicycle facilities, and Water and Sewer Department utility improvements. The estimated cost for design, construction, CEI, and right-of-way acquisition is $12,739,000. The BCC authorized the County Mayor or designee and County Attorney to acquire the property through negotiation, donation, right-of-way designation, purchase, or eminent domain, with an option for an incentive offer up to 15% over the appraised or tax assessed value. The Transportation Committee forwarded the item to the BCC with a favorable recommendation.
- Board:
- Board of County Commissioners
- Date:
- 2026-07-21
- Type:
- Resolution
- Decision:
- Pending BCC Assignment (Resolution before the Board)
- Address:
- SW 268 Street from US-1 to SW 139 Avenue
- Applicant:
- Miami-Dade County Transportation and Public Works
IMPROVEMENTS TO SW 268 STREET FROM US-1 TO SW 139 STREET
The Miami-Dade Board of County Commissioners adopted Resolution R-638-26 (File Number 260766) on July 21, 2026, declaring the acquisition of Parcel 1 for the SW 268 Street Improvement Project to be a public necessity. The project involves road widening, beautification, and right-of-way improvements to SW 268 Street from US-1 to SW 139 Avenue. The resolution authorizes the County Mayor or designee and the County Attorney to acquire Parcel 1 in fee simple by negotiation, donation, right-of-way designation, or purchase at the higher of appraised or tax assessed value, or by eminent domain. An additional incentive offer to purchase Parcel 1 is authorized, not to exceed 15 percent over the greater of the appraised or tax assessed value. The estimated project cost is $12,739,000, funded by Mobility Impact Fees. The project is located within District 9, represented by Vice Chairman Kionne McGhee, who is the Prime Sponsor. The Transportation Committee forwarded the item to the Board with a favorable recommendation on June 9, 2026. The document does not state the exact street address, parcel number, acreage, or square footage of Parcel 1. No public comment or stakeholder sentiment is stated in the document.
- Board:
- Board of County Commissioners
- Date:
- 2026-07-21
- Type:
- Resolution
- Decision:
- Adopted
- Address:
- SW 268 Street from US-1 to SW 139 Avenue
- Applicant:
- Miami-Dade County, Department of Transportation and Public Works (DTPW); Prime Sponsor: Kionne L. McGhee
IMPROVEMENTS TO SW 268 STREET FROM US-1 TO SW 139 STREET
Miami-Dade County Board of County Commissioners is considering a resolution to declare the acquisition of Parcel 1 a public necessity for road widening, beautification, and right-of-way improvements to SW 268 Street, from US-1 to SW 139 Avenue. The project includes reconstruction, widening, sidewalks, drainage, lighting, and utility improvements. The Board is authorizing the County Mayor or designee and County Attorney to acquire the property through negotiation, donation, designation, purchase, or eminent domain, with an incentive offer up to 15% over appraised or tax assessed value. The estimated cost for design, construction, and right-of-way acquisition is $12,739,000. The Transportation Committee forwarded the item with a favorable recommendation.
- Board:
- Board of County Commissioners
- Date:
- 2026-07-21
- Type:
- Resolution
- Decision:
- Forwarded to BCC with a favorable recommendation (Transportation Committee); Resolution authorizing acquisition is before the Board.
- Address:
- SW 268 Street from US-1 to SW 139 Avenue
- Applicant:
- Transportation and Public Works
IMPROVEMENTS TO SW 268 STREET FROM US-1 TO SW 139 STREET
Miami-Dade County Board of County Commissioners is considering a resolution to declare the acquisition of Parcel 1 a public necessity for road widening, beautification, and right-of-way improvements to SW 268 Street, from US-1 to SW 139 Avenue. The project includes reconstruction, widening, sidewalks, drainage, lighting, bicycle facilities, and utility improvements. The Board is authorizing the County Mayor or designee and County Attorney to acquire the property through negotiation, donation, designation, purchase, or eminent domain, with an incentive offer up to 15% over appraised or tax assessed value. The estimated project cost is $12,739,000, funded by the FY25-26 Adopted Budget and Multi-Year Capital Plan for road widening and mobility impact fees. Annual maintenance costs are estimated at $5,764.99.
- Board:
- Board of County Commissioners
- Date:
- 2026-07-21
- Type:
- Resolution
- Decision:
- Resolution authorizing acquisition of Parcel 1 for public necessity, pending Board approval.
- Address:
- SW 268 Street from US-1 to SW 139 Avenue
- Applicant:
- Miami-Dade County Transportation and Public Works
IMPROVEMENTS TO SW 268 STREET FROM US-1 TO SW 139 STREET
Miami-Dade County Board of County Commissioners adopted Resolution R-638-26 (Legislative Item File Number 260766) on 7/21/2026, declaring the acquisition of Parcel 1 for the SW 268 Street Improvement Project to be a public necessity. The project involves road widening, beautification, and right-of-way improvements to SW 268 Street from US-1 to SW 139 Avenue. The resolution authorizes the County Mayor or designee and County Attorney to acquire Parcel 1 in fee simple by negotiation, donation, right-of-way designation, or purchase at the higher of appraised or tax assessed value, plus reasonable attorney's fees and costs, or by eminent domain. It also authorizes an incentive offer not to exceed 15 percent over the greater of appraised or tax assessed value. The project scope includes reconstructing and widening SW 268 Street, sidewalks, curbs and gutters, stormwater drainage, pavement markings and signage, signalization, lighting, new bicycle facilities, and Water and Sewer Department utility improvements. The estimated funding for design, construction, CEI, and right-of-way acquisition is $12,739,000 from Mobility Impact Fees. The project is located within District 9. The Transportation Committee forwarded the item to the Board with a favorable recommendation on 6/9/2026. The item was introduced on 4/27/2026. The sponsor is Kionne L. McGhee. The requester is Transportation and Public Works. The resolution references Exhibits A and B for the legal description and location map of Parcel 1, but the document does not provide the specific legal description or map contents.
- Board:
- Board of County Commissioners
- Date:
- 2026-07-21
- Type:
- Resolution
- Decision:
- Adopted
- Address:
- SW 268 Street from US-1 to SW 139 Avenue
- Applicant:
- Miami-Dade County Transportation and Public Works
IMPROVEMENTS TO SW 268 STREET FROM US-1 TO SW 139 STREET
Miami-Dade County Board of County Commissioners adopted Resolution R-638-26 (File Number 260766) on 7/21/2026, declaring the acquisition of Parcel 1 for the SW 268 Street Improvement Project to be a public necessity. The project involves road widening, beautification, and right-of-way improvements to SW 268 Street from US-1 to SW 139 Avenue. The resolution authorizes the County Mayor or designee and County Attorney to acquire Parcel 1 in fee simple by negotiation, donation, right-of-way designation, or purchase at the higher of appraised or tax assessed value, or by eminent domain. An incentive offer up to 15 percent over the greater of appraised or tax assessed value is authorized. The project scope includes reconstructing and widening SW 268 Street, sidewalks, curbs and gutters, stormwater drainage, pavement markings and signage, signalization, lighting, bicycle facilities, and Water and Sewer Department utility improvements. The estimated funding for design, construction, CEI, and right-of-way acquisition is $12,739,000 from Mobility Impact Fees. The project is located within District 9. The Transportation Cmte forwarded it to the BCC with a favorable recommendation on 6/9/2026. The item was introduced on 4/27/2026. The final action was on 7/21/2026. The sponsor is Kionne L. McGhee. The requester is Transportation and Public Works. The document does not state the exact street address, parcel number, acreage, or square footage of Parcel 1. No public comment or stakeholder sentiment is stated in the document.
- Board:
- Board of County Commissioners
- Date:
- 2026-07-21
- Type:
- Resolution
- Decision:
- Adopted
- Address:
- SW 268 Street from US-1 to SW 139 Avenue
- Applicant:
- Miami-Dade County Transportation and Public Works
IMPROVEMENTS TO SW 268 STREET FROM US-1 TO SW 139 STREET
Miami-Dade County Board of County Commissioners adopted Resolution R-638-26 (Legislative Item File Number 260766) declaring the acquisition of Parcel 1 for the SW 268 Street Improvement Project to be a public necessity. The project consists of reconstructing and widening SW 268 Street from US-1 to SW 139 Avenue, including sidewalks, curbs and gutters, continuous stormwater drainage system, pavement markings and signage, signalization, lighting, new bicycle facilities, and Water and Sewer Department utility improvements. The resolution authorizes the County Mayor or designee and County Attorney to acquire Parcel 1 in fee simple by negotiation, donation, right-of-way designation, or purchase at values established by appraisals or tax assessed values, whichever is higher, plus reasonable attorney's fees and costs, or by eminent domain. An additional incentive offer to purchase Parcel 1 is authorized in a total amount not to exceed 15 percent over the greater of the appraised value or tax assessed value. The estimated funding for design, construction, Construction Engineering & Inspection, and right-of-way acquisition is $12,739,000 from Mobility Impact Fees. Annual maintenance and operational costs are estimated at $5,764.99. The project is located within District 9. The Transportation Cmte forwarded the item to the BCC with a favorable recommendation on 6/9/2026. The Board adopted the resolution on 7/21/2026. No public comment or stakeholder sentiment is stated in the document.
- Board:
- Board of County Commissioners
- Date:
- 2026-07-21
- Type:
- Resolution
- Decision:
- Adopted
- Address:
- SW 268 Street from US-1 to SW 139 Avenue
- Applicant:
- Miami-Dade County Transportation and Public Works
IMPROVEMENTS TO SW 268 STREET FROM US-1 TO SW 139 STREET
Miami-Dade County is proceeding with improvements to SW 268 Street, specifically from US-1 to SW 139 Avenue. This project involves road widening, beautification, and right-of-way acquisition for Parcel 1. The scope includes reconstruction, widening, milling and resurfacing, new drainage, curbs and gutters, sidewalks, signalization, pavement markings and signage, lighting, bicycle facilities, and Water and Sewer Department utility improvements. The estimated cost for design, construction, and right-of-way acquisition is $12,739,000, funded by the FY25-26 Adopted Budget and Multi-Year Capital Plan for Road Widening Countywide and Mobility Impact Fees. Annual maintenance and operational costs are estimated at $5,764.99. The Transportation and Public Works Department is overseeing the project. The Board of County Commissioners is authorizing the County Mayor or designee and County Attorney to acquire Parcel 1 through negotiation, donation, right-of-way designation, purchase (at appraised or tax assessed value, whichever is higher, plus up to 15% incentive), or eminent domain. The Transportation Committee forwarded this item with a favorable recommendation to the Board of County Commissioners.
- Board:
- Board of County Commissioners
- Date:
- 2026-07-21
- Type:
- Resolution
- Decision:
- Approved (Resolution authorizing acquisition)
- Address:
- SW 268 Street from US-1 to SW 139 Avenue
- Applicant:
- Miami-Dade County Transportation and Public Works
IMPROVEMENTS TO SW 268 STREET FROM US-1 TO SW 139 STREET
Miami-Dade County Board of County Commissioners is considering a resolution to declare the acquisition of Parcel 1 a public necessity for road widening, beautification, and right-of-way improvements to SW 268 Street from US-1 to SW 139 Avenue. The project involves reconstructing and widening SW 268 Street, including sidewalks, drainage, pavement markings, signalization, lighting, bicycle facilities, and utility improvements. The Transportation Committee forwarded this item to the Board with a favorable recommendation. The estimated cost for design, construction, and right-of-way acquisition is $12,739,000. Public comment is not stated in this document.
- Board:
- Board of County Commissioners
- Date:
- 2026-07-21
- Type:
- Resolution
- Decision:
- Pending BCC Assignment (Forwarded to BCC with a favorable recommendation by Transportation Committee)
- Address:
- SW 268 Street from US-1 to SW 139 Avenue
- Applicant:
- Miami-Dade County Transportation and Public Works
IMPROVEMENTS TO SW 268 STREET FROM US-1 TO SW 139 STREET
Miami-Dade County Board of County Commissioners adopted a resolution declaring the acquisition of Parcel 1 a public necessity for road widening, beautification, and right-of-way improvements to SW 268 Street from US-1 to SW 139 Avenue. The project includes reconstruction, widening, sidewalks, curbs and gutters, stormwater drainage, pavement markings, signage, signalization, lighting, bicycle facilities, and Water and Sewer Department utility improvements. The estimated cost for design, construction, and right-of-way acquisition is $12,739,000. The resolution authorizes the County Mayor or designee and County Attorney to acquire the property through negotiation, donation, right-of-way designation, purchase, or eminent domain, with an incentive offer up to 15 percent over the appraised or tax assessed value. Public comment is not stated in the document.
- Board:
- Board of County Commissioners
- Date:
- 2026-07-21
- Type:
- Resolution
- Decision:
- Adopted
- Address:
- SW 268 Street from US-1 to SW 139 Avenue
- Applicant:
- Miami-Dade County Transportation and Public Works
IMPROVEMENTS TO SW 268 STREET FROM US-1 TO SW 139 STREET
Miami-Dade County Board of County Commissioners is considering a resolution to declare the acquisition of Parcel 1 a public necessity for the SW 268 Street Improvement Project. This project involves reconstructing and widening SW 268 Street from US-1 to SW 139 Avenue, including sidewalks, drainage, pavement markings, signalization, lighting, bicycle facilities, and Water and Sewer Department utility improvements. The estimated cost for design, construction, CEI, and right-of-way acquisition is $12,739,000, funded by the FY25-26 Adopted Budget and Multi-Year Capital Plan, Volume 2, Page 158, and Mobility Impact Fees. The resolution authorizes the County Mayor or designee and County Attorney to acquire the property through negotiation, donation, right-of-way designation, purchase, or eminent domain, with an incentive offer up to 15 percent over the appraised or tax assessed value. The Transportation Committee forwarded this item to the Board with a favorable recommendation on 6/9/2026. The Board is scheduled to consider this on 7/21/2026.
- Board:
- Board of County Commissioners
- Date:
- 2026-07-21
- Type:
- Resolution
- Decision:
- Forwarded to BCC with a favorable recommendation by Transportation Committee; Pending BCC Assignment
- Address:
- SW 268 Street from US-1 to SW 139 Avenue
- Applicant:
- Miami-Dade County Transportation and Public Works
IMPROVEMENTS TO SW 268 STREET FROM US-1 TO SW 139 STREET
Miami-Dade County Board of County Commissioners adopted Resolution R-638-26 (File Number 260766) on 7/21/2026, declaring the acquisition of Parcel 1 for the SW 268 Street Improvement Project to be a public necessity. The project involves road widening, beautification, and right-of-way improvements to SW 268 Street from US-1 to SW 139 Avenue. The resolution authorizes the County Mayor or designee and County Attorney to acquire Parcel 1 in fee simple by negotiation, donation, right-of-way designation, or purchase at the higher of appraised or tax assessed value, or by eminent domain, with an incentive offer not to exceed 15 percent over the greater of appraised or tax assessed value. The project includes reconstructing and widening SW 268 Street, sidewalks, curbs and gutters, stormwater drainage, pavement markings and signage, signalization, lighting, new bicycle facilities, and Water and Sewer Department utility improvements. The estimated funding for design, construction, CEI, and right-of-way acquisition is $12,739,000 from Mobility Impact Fees. The Transportation Cmte forwarded the item to the BCC with a favorable recommendation on 6/9/2026. The item was introduced on 4/27/2026. The project is located within District 9, represented by Vice Chairman Kionne McGhee, who is the Prime Sponsor. No public comment or stakeholder sentiment is stated in the document.
- Board:
- Board of County Commissioners
- Date:
- 2026-07-21
- Type:
- Resolution
- Decision:
- Adopted
- Address:
- SW 268 Street from US-1 to SW 139 Avenue
- Applicant:
- Miami-Dade County Department of Transportation and Public Works (DTPW)
IMPROVEMENTS TO SW 268 STREET FROM US-1 TO SW 139 STREET
Miami-Dade County Board of County Commissioners is considering a resolution to declare the acquisition of Parcel 1 a public necessity for road widening, beautification, and right-of-way improvements to SW 268 Street, from US-1 to SW 139 Avenue. The project includes reconstruction, widening, sidewalks, drainage, lighting, bicycle facilities, and utility improvements. The Board will authorize the County Mayor or designee and County Attorney to acquire the property through negotiation, donation, designation, purchase, or eminent domain, with an option for an incentive offer up to 15% over appraised or tax-assessed value. The estimated project cost is $12,739,000. The Transportation Committee forwarded the item with a favorable recommendation.
- Board:
- Board of County Commissioners
- Date:
- 2026-07-21
- Type:
- Resolution
- Decision:
- Forwarded to BCC with a favorable recommendation (Transportation Committee); Pending Board of County Commissioners approval
- Address:
- SW 268 Street from US-1 to SW 139 Avenue
- Applicant:
- Miami-Dade County Transportation and Public Works
IMPROVEMENTS TO SW 268 STREET FROM US-1 TO SW 139 STREET
Miami-Dade County is proceeding with improvements to SW 268 Street, spanning from US-1 to SW 139 Avenue. This project involves road widening, beautification, and right-of-way acquisition for Parcel 1. The scope includes reconstruction, widening, milling and resurfacing, new drainage, sidewalks, curbs and gutters, signalization, lighting, bicycle facilities, and Water and Sewer Department utility improvements. The estimated cost for design, construction, and acquisition is $12,739,000, funded by the FY25-26 Adopted Budget and Multi-Year Capital Plan for road widening and mobility impact fees. The Transportation and Public Works Department is overseeing the project. The Board of County Commissioners is set to consider declaring the acquisition of Parcel 1 a public necessity on July 21, 2026. The Transportation Committee previously forwarded this item with a favorable recommendation. Public comment is not stated in this document.
- Board:
- Board of County Commissioners
- Date:
- 2026-07-21
- Type:
- Resolution
- Decision:
- Recommended for approval by Transportation Committee; pending Board of County Commissioners decision
- Address:
- SW 268 Street from US-1 to SW 139 Avenue
- Applicant:
- Miami-Dade County Transportation and Public Works
IMPROVEMENTS TO SW 268 STREET FROM US-1 TO SW 139 STREET
Miami-Dade County is proceeding with improvements to SW 268 Street, specifically the section between US-1 and SW 139 Avenue. This project involves road widening, beautification, and right-of-way improvements, including reconstruction, milling and resurfacing, new drainage, sidewalks, curbs, gutters, signalization, lighting, bicycle facilities, and utility work. The Board of County Commissioners is authorizing the acquisition of Parcel 1 for these improvements. The estimated cost for design, construction, and right-of-way acquisition is $12,739,000. The Transportation and Public Works Department is overseeing the project. The Transportation Committee forwarded this item to the Board with a favorable recommendation.
- Board:
- Board of County Commissioners
- Date:
- 2026-07-21
- Type:
- Resolution
- Decision:
- Approved (recommended by Transportation Committee, pending Board of County Commissioners)
- Address:
- SW 268 Street from US-1 to SW 139 Avenue
- Applicant:
- Miami-Dade County Transportation and Public Works
IMPROVEMENTS TO SW 268 STREET FROM US-1 TO SW 139 STREET
Miami-Dade County is proceeding with improvements to SW 268 Street, specifically the section between US-1 and SW 139 Avenue. This project involves road widening, beautification, and right-of-way improvements, including reconstruction, milling and resurfacing, new drainage, sidewalks, curbs and gutters, signalization, lighting, bicycle facilities, and utility work. The County is declaring the acquisition of Parcel 1 for these improvements as a public necessity. The County Mayor or designee is authorized to acquire Parcel 1 through negotiation, donation, right-of-way designation, purchase (at appraised or tax-assessed value, whichever is higher), or eminent domain. An incentive offer of up to 15 percent over the higher of appraised or tax-assessed value is also authorized to expedite acquisition. The estimated cost for design, construction, and right-of-way acquisition is $12,739,000, funded by the FY25-26 Adopted Budget and Multi-Year Capital Plan for Road Widening Countywide and Mobility Impact Fees. Annual maintenance costs are estimated at $5,764.99.
- Board:
- Board of County Commissioners
- Date:
- 2026-07-21
- Type:
- Resolution
- Decision:
- Approved (Resolution declaring acquisition a public necessity, authorizing acquisition actions)
- Address:
- SW 268 Street from US-1 to SW 139 Avenue
- Applicant:
- Miami-Dade County Transportation and Public Works
IMPROVEMENTS TO SW 268 STREET FROM US-1 TO SW 139 STREET
Miami-Dade County is proceeding with improvements to SW 268 Street, spanning from US-1 to SW 139 Avenue. This project involves road widening, beautification, and right-of-way acquisition for Parcel 1. The scope includes reconstruction, widening, milling and resurfacing, new drainage, sidewalks, curbs and gutters, signalization, lighting, bicycle facilities, and Water and Sewer Department utility improvements. The estimated cost for design, construction, and acquisition is $12,739,000, funded by the Countywide Road Widening program and Mobility Impact Fees. The Transportation and Public Works Department is overseeing the project. The Board of County Commissioners is set to consider declaring the acquisition of Parcel 1 a public necessity on July 21, 2026. A favorable recommendation was made by the Transportation Committee on June 9, 2026.
- Board:
- Board of County Commissioners
- Date:
- 2026-07-21
- Type:
- Resolution
- Decision:
- Forwarded to BCC with a favorable recommendation (Transportation Cmte); Pending BCC Assignment (Legislative Item)
- Address:
- SW 268 Street from US-1 to SW 139 Avenue
- Applicant:
- Miami-Dade County Transportation and Public Works
IMPROVEMENTS TO SW 268 STREET FROM US-1 TO SW 139 STREET
The Board of County Commissioners adopted Resolution R-638-26, File Number 260766, declaring the acquisition of Parcel 1 for the SW 268 Street Improvement Project to be a public necessity. The project involves road widening, beautification, and right-of-way improvements to SW 268 Street from US-1 to SW 139 Avenue. The resolution authorizes the County Mayor or designee and County Attorney to acquire the property in fee simple by negotiation, donation, right-of-way designation, or purchase, with an incentive offer not to exceed 15 percent over the appraised or tax assessed value. The project includes reconstructing and widening SW 268 Street, sidewalks, curbs and gutters, stormwater drainage, pavement markings and signage, signalization, lighting, new bicycle facilities, and Water and Sewer Department utility improvements. The estimated funding for design, construction, CEI, and right-of-way acquisition is $12,739,000, funded by Mobility Impact Fees. The final action was adoption on 7/21/2026. The Transportation Cmte forwarded it to the BCC with a favorable recommendation on 6/9/2026. The item was introduced on 4/27/2026. The sponsor is Kionne L. McGhee. The project is located within District 9. The document does not state the exact street address of Parcel 1, the acreage, the number of units or lots, the square footage, or a zoning change. No public comment or stakeholder sentiment is stated in the document.
- Board:
- Board of County Commissioners
- Date:
- 2026-07-21
- Type:
- Resolution
- Decision:
- Adopted
- Address:
- SW 268 Street from US-1 to SW 139 Avenue
- Applicant:
- Miami-Dade County, Department of Transportation and Public Works (DTPW)
IMPROVEMENTS TO SW 268 STREET FROM US-1 TO SW 139 STREET
The Board of County Commissioners adopted Resolution R-638-26, File Number 260766, declaring the acquisition of Parcel 1 for the SW 268 Street Improvement Project to be a public necessity. The project involves road widening, beautification, and right-of-way improvements to SW 268 Street from US-1 to SW 139 Avenue. The resolution authorizes the County Mayor or designee and County Attorney to acquire the property in fee simple by negotiation, donation, right-of-way designation, or purchase, with an incentive offer not to exceed 15 percent over the appraised or tax assessed value. The project includes reconstructing and widening SW 268 Street, sidewalks, curbs and gutters, stormwater drainage, pavement markings and signage, signalization, lighting, new bicycle facilities, and Water and Sewer Department utility improvements. The estimated funding for design, construction, CEI, and right-of-way acquisition is $12,739,000, funded by Mobility Impact Fees. The final action was adoption on 7/21/2026. The Transportation Committee forwarded it with a favorable recommendation on 6/9/2026. The item was introduced on 4/27/2026. The project is located within District 9, represented by Vice Chairman Kionne McGhee, who is the prime sponsor. The document does not state a specific street address, parcel number, acreage, or number of units.
- Board:
- Board of County Commissioners
- Date:
- 2026-07-21
- Type:
- Resolution
- Decision:
- Adopted
- Address:
- SW 268 Street from US-1 to SW 139 Avenue
- Applicant:
- Miami-Dade County, Department of Transportation and Public Works (DTPW)
IMPROVEMENTS TO SW 268 STREET FROM US-1 TO SW 139 STREET
Miami-Dade County Board of County Commissioners adopted Resolution R-638-26 (File Number 260766) on 7/21/2026, declaring the acquisition of Parcel 1 for the SW 268 Street Improvement Project to be a public necessity. The project involves road widening, beautification, and right-of-way improvements to SW 268 Street from US-1 to SW 139 Avenue. The resolution authorizes the County Mayor or designee and County Attorney to acquire Parcel 1 in fee simple by negotiation, donation, right-of-way designation, or purchase at the higher of appraised or tax assessed value, plus reasonable attorney's fees and costs, or by eminent domain. An incentive offer to purchase Parcel 1 is authorized at up to 15 percent over the greater of appraised or tax assessed value. The project includes reconstruction, widening, milling and resurfacing, new drainage, curb and gutter, sidewalks, signalization, pavement markings, signage, lighting, bicycle facilities, and Water and Sewer Department utility improvements. The estimated funding for design, construction, CEI, and right-of-way acquisition is $12,739,000 from Mobility Impact Fees. The project is located within District 9, represented by Vice Chairman Kionne McGhee, who is the prime sponsor. The Transportation Committee forwarded the item to the Board with a favorable recommendation on 6/9/2026. The document does not state a specific street address, parcel number, acreage, or square footage for Parcel 1; the legal description is referenced as Exhibit A and the location map as Exhibit B, which are not included in the text. No public comment or stakeholder sentiment is stated in the document.
- Board:
- Board of County Commissioners
- Date:
- 2026-07-21
- Type:
- Resolution
- Decision:
- Adopted
- Address:
- SW 268 Street from US-1 to SW 139 Avenue
- Applicant:
- Miami-Dade County Department of Transportation and Public Works (DTPW); Prime Sponsor: Kionne L. McGhee
IMPROVEMENTS TO SW 268 STREET FROM US-1 TO SW 139 STREET
Miami-Dade County Board of County Commissioners is considering a resolution to declare the acquisition of Parcel 1 a public necessity for road widening, beautification, and right-of-way improvements to SW 268 Street from US-1 to SW 139 Avenue. The project involves reconstructing and widening SW 268 Street, including sidewalks, drainage, pavement markings, signage, signalization, lighting, bicycle facilities, and Water and Sewer Department utility improvements. The estimated cost for design, construction, CEI, and right-of-way acquisition is $12,739,000. The Transportation Committee forwarded the item to the Board with a favorable recommendation. No public comment is stated in the document.
- Board:
- Board of County Commissioners
- Date:
- 2026-07-21
- Type:
- Resolution
- Decision:
- Pending BCC Assignment (Forwarded to BCC with a favorable recommendation by Transportation Committee)
- Address:
- SW 268 Street from US-1 to SW 139 Avenue
- Applicant:
- Miami-Dade County Transportation and Public Works
IMPROVEMENTS TO SW 268 STREET FROM US-1 TO SW 139 STREET
Miami-Dade County is undertaking improvements to SW 268 Street from US-1 to SW 139 Avenue, involving road widening, beautification, and right-of-way acquisition for Parcel 1. The project includes reconstruction, widening, milling and resurfacing, new drainage, sidewalks, curbs and gutters, signalization, lighting, bicycle facilities, and utility improvements. The estimated cost for design, construction, and acquisition is $12,739,000, funded by the Countywide Road Widening program and Mobility Impact Fees. The Transportation and Public Works Department is overseeing the project. The Board of County Commissioners is set to consider declaring the acquisition of Parcel 1 a public necessity on July 21, 2026. The Transportation Committee has already forwarded this item with a favorable recommendation. Public comment is not stated in this document.
- Board:
- Board of County Commissioners
- Date:
- 2026-07-21
- Type:
- Resolution
- Decision:
- Forwarded to BCC with a favorable recommendation by Transportation Committee; pending Board of County Commissioners approval
- Address:
- SW 268 Street from US-1 to SW 139 Avenue
- Applicant:
- Miami-Dade County Transportation and Public Works
IMPROVEMENTS TO SW 268 STREET FROM US-1 TO SW 139 STREET
Miami-Dade County Board of County Commissioners adopted Resolution R-638-26 (File Number 260766) on 7/21/2026, declaring the acquisition of Parcel 1 for the SW 268 Street Improvement Project to be a public necessity. The project involves road widening, beautification, and right-of-way improvements to SW 268 Street from US-1 to SW 139 Avenue. The resolution authorizes the County Mayor or designee and County Attorney to acquire Parcel 1 in fee simple by negotiation, donation, right-of-way designation, or purchase at the higher of appraised or tax assessed value, or by eminent domain. An incentive offer up to 15 percent over the appraised or tax assessed value is authorized. The project scope includes reconstructing and widening SW 268 Street, sidewalks, curbs and gutters, stormwater drainage, pavement markings and signage, signalization, lighting, new bicycle facilities, and Water and Sewer Department utility improvements. The estimated funding for design, construction, CEI, and right-of-way acquisition is $12,739,000 from Mobility Impact Fees. The project is located within District 9, represented by Vice Chairman Kionne McGhee, who is the Prime Sponsor. The Transportation Cmte forwarded the item to the BCC with a favorable recommendation on 6/9/2026. The item was introduced on 4/27/2026. No public comment or stakeholder sentiment is stated in the document.
- Board:
- Board of County Commissioners
- Date:
- 2026-07-21
- Type:
- Resolution
- Decision:
- Adopted
- Address:
- SW 268 Street from US-1 to SW 139 Avenue
- Applicant:
- Miami-Dade County Department of Transportation and Public Works (DTPW)
IMPROVEMENTS TO SW 268 STREET FROM US-1 TO SW 139 STREET
Miami-Dade County Board of County Commissioners adopted Resolution R-638-26 (File Number 260766) on 7/21/2026, declaring the acquisition of Parcel 1 for the SW 268 Street Improvement Project to be a public necessity. The project involves road widening, beautification, and right-of-way improvements to SW 268 Street from US-1 to SW 139 Avenue. The resolution authorizes the County Mayor or designee and County Attorney to acquire Parcel 1 in fee simple by negotiation, donation, right-of-way designation, or purchase at values established by appraisals or tax assessed values, whichever is higher, plus reasonable attorney's fees and costs, or by eminent domain. An additional incentive offer to purchase Parcel 1 is authorized, not to exceed 15 percent over the greater of appraised or tax assessed value. The project scope includes reconstructing and widening SW 268 Street, sidewalks, curbs and gutters, continuous stormwater drainage system, pavement markings and signage, signalization, lighting, new bicycle facilities, and Water and Sewer Department utility improvements. The estimated funding for design, construction, CEI, and right-of-way acquisition is $12,739,000, funded by Mobility Impact Fees. The project is located within District 9, represented by Vice Chairman Kionne McGhee. The Transportation Cmte forwarded the item to the BCC with a favorable recommendation on 6/9/2026. The item was introduced on 4/27/2026. The final action was on 7/21/2026. No public comment or stakeholder sentiment is stated in the document.
- Board:
- Board of County Commissioners
- Date:
- 2026-07-21
- Type:
- Resolution
- Decision:
- Adopted
- Address:
- SW 268 Street from US-1 to SW 139 Avenue
- Applicant:
- Miami-Dade County Department of Transportation and Public Works (DTPW)
IMPROVEMENTS TO SW 268 STREET FROM US-1 TO SW 139 STREET
Miami-Dade County Board of County Commissioners adopted Resolution R-638-26 (File Number 260766) on 7/21/2026, declaring the acquisition of Parcel 1 for the SW 268 Street Improvement Project to be a public necessity. The project involves road widening, beautification, and right-of-way improvements to SW 268 Street from US-1 to SW 139 Avenue. The resolution authorizes the County Mayor or designee and County Attorney to acquire Parcel 1 in fee simple by negotiation, donation, right-of-way designation, or purchase at the higher of appraised or tax assessed value, or by eminent domain, with an incentive offer not to exceed 15 percent over the greater of appraised or tax assessed value. The project scope includes reconstructing and widening SW 268 Street, sidewalks, curbs and gutters, stormwater drainage, pavement markings and signage, signalization, lighting, new bicycle facilities, and Water and Sewer Department utility improvements. The estimated funding for design, construction, CEI, and right-of-way acquisition is $12,739,000 from Mobility Impact Fees. The Transportation Cmte forwarded the item to the BCC with a favorable recommendation on 6/9/2026. The item was introduced on 4/27/2026. The sponsor is Kionne L. McGhee. The project is located within District 9. No public comment or stakeholder sentiment is stated in the document.
- Board:
- Board of County Commissioners
- Date:
- 2026-07-21
- Type:
- Resolution
- Decision:
- Adopted
- Address:
- SW 268 Street from US-1 to SW 139 Avenue
- Applicant:
- Miami-Dade County Department of Transportation and Public Works (DTPW)
IMPROVEMENTS TO SW 268 STREET FROM US-1 TO SW 139 STREET
Miami-Dade County is undertaking improvements to SW 268 Street from US-1 to SW 139 Avenue, involving road widening, beautification, and right-of-way acquisition for Parcel 1. The project includes reconstruction, widening, milling and resurfacing, new drainage, sidewalks, curbs and gutters, signalization, lighting, bicycle facilities, and Water and Sewer Department utility improvements. The estimated cost for design, construction, CEI, and right-of-way acquisition is $12,739,000, funded by the FY25-26 Adopted Budget and Multi-Year Capital Plan, Volume 2, Page 158, and Mobility Impact Fees. The Transportation Committee forwarded the item to the Board of County Commissioners (BCC) with a favorable recommendation on 6/9/2026. The BCC is scheduled to consider the resolution on 7/21/2026. The resolution authorizes the County Mayor or designee and County Attorney to acquire Parcel 1 through negotiation, donation, right-of-way designation, purchase, or eminent domain, with an incentive offer up to 15 percent over the appraised or tax assessed value. Public comment is not stated in the document.
- Board:
- Board of County Commissioners
- Date:
- 2026-07-21
- Type:
- Resolution
- Decision:
- Forwarded to BCC with a favorable recommendation (Transportation Committee); Pending BCC Assignment (Board)
- Address:
- SW 268 Street from US-1 to SW 139 Avenue
- Applicant:
- Miami-Dade County Transportation and Public Works
IMPROVEMENTS TO SW 268 STREET FROM US-1 TO SW 139 STREET
Miami-Dade County Board of County Commissioners is considering a resolution (File Number: 260766) to declare the acquisition of Parcel 1 a public necessity for road widening, beautification, and right-of-way improvements to SW 268 Street, extending from US-1 to SW 139 Avenue. The project involves reconstructing and widening SW 268 Street, including sidewalks, drainage, lighting, bicycle facilities, and utility improvements. The estimated cost for design, construction, and right-of-way acquisition is $12,739,000. The Board is authorizing the County Mayor or designee and County Attorney to acquire the property through negotiation, donation, designation, purchase, or eminent domain, with an option for an incentive offer up to 15% over the appraised or tax assessed value. The Transportation Committee forwarded the item with a favorable recommendation.
- Board:
- Board of County Commissioners
- Date:
- 2026-07-21
- Type:
- Resolution
- Decision:
- Forwarded to BCC with a favorable recommendation (Transportation Committee); Resolution pending Board approval
- Address:
- SW 268 Street from US-1 to SW 139 Avenue
- Applicant:
- Transportation and Public Works
IMPROVEMENTS TO SW 268 STREET FROM US-1 TO SW 139 STREET
Miami-Dade County Board of County Commissioners adopted Resolution R-638-26 (Legislative Item File Number 260766) on 7/21/2026, declaring the acquisition of Parcel 1 for the SW 268 Street Improvement Project to be a public necessity. The project involves reconstructing and widening SW 268 Street from US-1 to SW 139 Avenue, including sidewalks, curbs and gutters, stormwater drainage, pavement markings and signage, signalization, lighting, bicycle facilities, and Water and Sewer Department utility improvements. The resolution authorizes the County Mayor or designee and County Attorney to acquire Parcel 1 in fee simple by negotiation, donation, right-of-way designation, or purchase at the higher of appraised or tax assessed value, or by eminent domain, and to make an incentive offer not to exceed 15 percent over the greater of appraised or tax assessed value. The estimated funding for design, construction, CEI, and right-of-way acquisition is $12,739,000 from Mobility Impact Fees. The project is located within District 9, represented by Vice Chairman Kionne McGhee, who is the Prime Sponsor. The Transportation Committee forwarded the item to the Board with a favorable recommendation on 6/9/2026. The document does not state the exact street address, parcel or folio number, legal description, acreage, or square footage of Parcel 1, nor does it state any public comment or stakeholder sentiment.
- Board:
- Board of County Commissioners
- Date:
- 2026-07-21
- Type:
- Resolution
- Decision:
- Adopted
- Applicant:
- Miami-Dade County Department of Transportation and Public Works (DTPW); Prime Sponsor: Kionne L. McGhee
IMPROVEMENTS TO SW 268 STREET FROM US-1 TO SW 139 STREET
Miami-Dade County Board of County Commissioners adopted Resolution R-638-26, File Number 260766, declaring the acquisition of Parcel 1 for the SW 268 Street Improvement Project to be a public necessity. The project involves road widening, beautification, and right-of-way improvements to SW 268 Street from US-1 to SW 139 Avenue. The resolution authorizes the County Mayor or designee and County Attorney to acquire the property in fee simple by negotiation, donation, right-of-way designation, or purchase, with an incentive offer not to exceed 15 percent over appraised or tax assessed value. The project includes reconstructing and widening SW 268 Street, sidewalks, curbs and gutters, stormwater drainage, pavement markings and signage, signalization, lighting, bicycle facilities, and Water and Sewer Department utility improvements. The estimated funding for design, construction, CEI, and right-of-way acquisition is $12,739,000 from Mobility Impact Fees. The item was introduced on 4/27/2026, forwarded to the Board with a favorable recommendation by the Transportation Committee on 6/9/2026, and adopted on 7/21/2026. The project is located within District 9, represented by Vice Chairman Kionne McGhee, who is the prime sponsor. Public comment sentiment is not stated.
- Board:
- Board of County Commissioners
- Date:
- 2026-07-21
- Type:
- Resolution
- Decision:
- Adopted
- Address:
- SW 268 Street from US-1 to SW 139 Avenue
- Applicant:
- Miami-Dade County Department of Transportation and Public Works (DTPW)
IMPROVEMENTS TO SW 268 STREET FROM US-1 TO SW 139 STREET
Miami-Dade County Board of County Commissioners adopted Resolution R-638-26, File Number 260766, declaring the acquisition of Parcel 1 for the SW 268 Street Improvement Project to be a public necessity. The project involves road widening, beautification, and right-of-way improvements to SW 268 Street from US-1 to SW 139 Avenue. The resolution authorizes the County Mayor or designee and County Attorney to acquire Parcel 1 in fee simple by negotiation, donation, right-of-way designation, or purchase at the higher of appraised or tax assessed value, plus attorney's fees and costs, or by eminent domain. An incentive offer up to 15 percent over the greater of appraised or tax assessed value is authorized. The project includes reconstructing and widening SW 268 Street, sidewalks, curbs and gutters, stormwater drainage, pavement markings and signage, signalization, lighting, new bicycle facilities, and Water and Sewer Department utility improvements. The estimated funding for design, construction, CEI, and right-of-way acquisition is $12,739,000 from Mobility Impact Fees. The project is located in District 9, represented by Vice Chairman Kionne McGhee, who is the Prime Sponsor. The Transportation Cmte forwarded it with a favorable recommendation on 6/9/2026, and the Board adopted it on 7/21/2026. No public comment or stakeholder sentiment is stated in the document.
- Board:
- Board of County Commissioners
- Date:
- 2026-07-21
- Type:
- Resolution
- Decision:
- Adopted
- Address:
- SW 268 Street from US-1 to SW 139 Avenue
- Applicant:
- Miami-Dade County Department of Transportation and Public Works (DTPW)
IMPROVEMENTS TO SW 268 STREET FROM US-1 TO SW 139 STREET
The Board of County Commissioners adopted Resolution R-638-26, File Number 260766, declaring the acquisition of Parcel 1 for the SW 268 Street Improvement Project to be a public necessity. The project involves road widening, beautification, and right-of-way improvements to SW 268 Street from US-1 to SW 139 Avenue. The resolution authorizes the County Mayor or designee and the County Attorney to acquire the property in fee simple by negotiation, donation, right-of-way designation, or purchase, with an incentive offer not to exceed 15 percent over the appraised or tax assessed value. The project includes reconstruction, widening, sidewalks, curbs, gutters, drainage, pavement markings, signage, signalization, lighting, bicycle facilities, and utility improvements. The estimated funding for design, construction, CEI, and right-of-way acquisition is $12,739,000, funded by Mobility Impact Fees. The item was introduced on 4/27/2026, forwarded with a favorable recommendation from the Transportation Committee on 6/9/2026, and adopted on 7/21/2026. The project is located within District 9, represented by Vice Chairman Kionne McGhee, who is the prime sponsor.
- Board:
- Board of County Commissioners
- Date:
- 2026-07-21
- Type:
- Resolution
- Decision:
- Adopted
- Address:
- SW 268 Street from US-1 to SW 139 Avenue
- Applicant:
- Miami-Dade County, Department of Transportation and Public Works
IMPROVEMENTS TO SW 268 STREET FROM US-1 TO SW 139 STREET
Miami-Dade County is proceeding with improvements to SW 268 Street, specifically from US-1 to SW 139 Avenue. This project involves road widening, beautification, and right-of-way improvements, including reconstruction, milling and resurfacing, new drainage, sidewalks, curbs and gutters, signalization, lighting, bicycle facilities, and Water and Sewer Department utility upgrades. The County is authorizing the acquisition of Parcel 1, designated as a public necessity for these improvements. The acquisition process includes negotiation, donation, right-of-way designation, purchase based on higher of appraisal or tax assessed value, and potentially eminent domain. An incentive offer up to 15 percent over the appraised or tax assessed value is also authorized. The estimated cost for design, construction, CEI, and right-of-way acquisition is $12,739,000, funded by the FY25-26 Adopted Budget and Multi-Year Capital Plan for road widening. Annual maintenance and operational costs are estimated at $5,764.99. The Transportation and Public Works Department is overseeing the project.
- Board:
- Board of County Commissioners
- Date:
- 2026-07-21
- Type:
- Resolution
- Decision:
- Resolution authorizing acquisition of Parcel 1 for public necessity, with a favorable recommendation from the Transportation Committee.
- Address:
- SW 268 Street from US-1 to SW 139 Avenue
- Applicant:
- Miami-Dade County Transportation and Public Works
IMPROVEMENTS TO SW 268 STREET FROM US-1 TO SW 139 STREET
The Board of County Commissioners adopted Resolution R-638-26, File Number 260766, declaring the acquisition of Parcel 1 for the SW 268 Street Improvement Project to be a public necessity. The project involves road widening, beautification, and right-of-way improvements to SW 268 Street from US-1 to SW 139 Avenue. The resolution authorizes the County Mayor or designee and County Attorney to acquire Parcel 1 in fee simple by negotiation, donation, right-of-way designation, or purchase at the higher of appraised or tax assessed value, plus reasonable attorney's fees and costs, or by eminent domain. An incentive offer up to 15 percent over the greater of appraised or tax assessed value is authorized. The estimated funding for design, construction, CEI, and right-of-way acquisition is $12,739,000 from Mobility Impact Fees. The project includes road reconstruction, widening, milling and resurfacing, new drainage, curb and gutter, sidewalks, signalization, pavement markings, signage, lighting, bicycle facilities, and WASD utility improvements. The item was introduced on 4/27/2026, forwarded with a favorable recommendation by the Transportation Committee on 6/9/2026, and adopted by the Board on 7/21/2026. The project is located within District 9, represented by Vice Chairman Kionne McGhee, who is the Prime Sponsor. The document does not state any public comment or stakeholder sentiment.
- Board:
- Board of County Commissioners
- Date:
- 2026-07-21
- Type:
- Resolution
- Decision:
- Adopted
- Address:
- SW 268 Street from US-1 to SW 139 Avenue
- Applicant:
- Miami-Dade County Department of Transportation and Public Works (DTPW)
IMPROVEMENTS TO SW 268 STREET FROM US-1 TO SW 139 STREET
Miami-Dade County Board of County Commissioners adopted Resolution R-638-26 (Legislative Item File Number 260766) on 7/21/2026, declaring the acquisition of Parcel 1 for the SW 268 Street Improvement Project to be a public necessity. The project involves road widening, beautification, and right-of-way improvements to SW 268 Street from US-1 to SW 139 Avenue. The resolution authorizes the County Mayor or designee and County Attorney to acquire Parcel 1 in fee simple by negotiation, donation, right-of-way designation, or purchase at the higher of appraised or tax assessed value, plus attorney's fees and costs, or by eminent domain. An incentive offer to purchase Parcel 1 is authorized up to 15 percent over the greater of appraised or tax assessed value. The project includes reconstructing and widening SW 268 Street, sidewalks, curbs and gutters, stormwater drainage, pavement markings and signage, signalization, lighting, bicycle facilities, and Water and Sewer Department utility improvements. The estimated funding for design, construction, CEI, and right-of-way acquisition is $12,739,000 from Mobility Impact Fees. The project is located within District 9, represented by Vice Chairman Kionne McGhee, who is the Prime Sponsor. The Transportation Committee forwarded the item to the Board with a favorable recommendation on 6/9/2026. The item was introduced on 4/27/2026. The resolution references Exhibits A and B for the legal description and location map of Parcel 1, but the document does not state the specific contents of those exhibits. The document does not state a specific street address, parcel number, acreage, or square footage for Parcel 1. The document does not state any public comment or stakeholder sentiment.
- Board:
- Board of County Commissioners
- Date:
- 2026-07-21
- Type:
- Resolution
- Decision:
- Adopted
- Applicant:
- Miami-Dade County Transportation and Public Works (requester); Kionne L. McGhee, Prime Sponsor
IMPROVEMENTS TO SW 268 STREET FROM US-1 TO SW 139 STREET
Miami-Dade County Board of County Commissioners adopted Resolution R-638-26 (File Number 260766) on 7/21/2026, declaring the acquisition of Parcel 1 for the SW 268 Street Improvement Project to be a public necessity. The project involves road widening, beautification, and right-of-way improvements to SW 268 Street from US-1 to SW 139 Avenue. The resolution authorizes the County Mayor or designee and County Attorney to acquire the parcel in fee simple by negotiation, donation, right-of-way designation, or purchase at the higher of appraised or tax assessed value, plus reasonable attorney's fees and costs, or by eminent domain. An additional incentive offer up to 15 percent over the greater of appraised or tax assessed value is authorized. The project includes reconstruction, widening, milling and resurfacing, new drainage, curb and gutter, sidewalks, signalization, pavement markings, signage, lighting, bicycle facilities, and Water and Sewer Department utility improvements. The estimated funding for design, construction, CEI, and right-of-way acquisition is $12,739,000 from Mobility Impact Fees. The project is located within District 9. The Transportation Cmte forwarded the item to the BCC with a favorable recommendation on 6/9/2026. The item was introduced on 4/27/2026. No public comment or stakeholder sentiment is stated in the document.
- Board:
- Board of County Commissioners
- Date:
- 2026-07-21
- Type:
- Resolution
- Decision:
- Adopted
- Address:
- SW 268 Street from US-1 to SW 139 Avenue
- Applicant:
- Miami-Dade County Department of Transportation and Public Works (DTPW)
IMPROVEMENTS TO SW 268 STREET FROM US-1 TO SW 139 STREET
Miami-Dade County Board of County Commissioners is considering a resolution to declare the acquisition of Parcel 1 a public necessity for road widening, beautification, and right-of-way improvements to SW 268 Street from US-1 to SW 139 Avenue. The project involves reconstructing and widening SW 268 Street, including sidewalks, drainage, pavement markings, signalization, lighting, bicycle facilities, and utility improvements. The Transportation Committee forwarded the item with a favorable recommendation to the Board. The estimated cost for design, construction, and right-of-way acquisition is $12,739,000. Public comment is not stated in this document.
- Board:
- Board of County Commissioners
- Date:
- 2026-07-21
- Type:
- Resolution
- Decision:
- Forwarded to BCC with a favorable recommendation by Transportation Committee; pending Board of County Commissioners approval
- Address:
- SW 268 Street from US-1 to SW 139 Avenue
- Applicant:
- Miami-Dade County Transportation and Public Works
IMPROVEMENTS TO SW 268 STREET FROM US-1 TO SW 139 STREET
Miami-Dade County Board of County Commissioners adopted Resolution R-638-26 (File Number 260766) on 7/21/2026, declaring the acquisition of Parcel 1 for the SW 268 Street Improvement Project to be a public necessity. The project involves road widening, beautification, and right-of-way improvements to SW 268 Street from US-1 to SW 139 Avenue, including reconstruction, widening, sidewalks, curbs and gutters, stormwater drainage, pavement markings and signage, signalization, lighting, new bicycle facilities, and Water and Sewer Department utility improvements. The resolution authorizes the County Mayor or designee and County Attorney to acquire Parcel 1 in fee simple by negotiation, donation, right-of-way designation, or purchase at the higher of appraised or tax assessed value, plus reasonable attorney's fees and costs, or by eminent domain. An additional incentive offer to purchase Parcel 1 is authorized, not to exceed 15 percent over the greater of appraised or tax assessed value. The estimated funding for design, construction, CEI, and right-of-way acquisition is $12,739,000 from Mobility Impact Fees. The project is located within District 9, represented by Vice Chairman Kionne McGhee, who is the Prime Sponsor. The Transportation Cmte forwarded the item to the BCC with a favorable recommendation on 6/9/2026. The item was introduced on 4/27/2026 and adopted on 7/21/2026.
- Board:
- Board of County Commissioners
- Date:
- 2026-07-21
- Type:
- Resolution
- Decision:
- Adopted
- Address:
- SW 268 Street from US-1 to SW 139 Avenue
- Applicant:
- Miami-Dade County, Transportation and Public Works
IMPROVEMENTS TO SW 268 STREET FROM US-1 TO SW 139 STREET
Miami-Dade County Board of County Commissioners is considering a resolution to declare the acquisition of Parcel 1 a public necessity for road widening, beautification, and right-of-way improvements to SW 268 Street from US-1 to SW 139 Avenue. The project includes reconstruction, widening, sidewalks, drainage, lighting, bicycle facilities, and utility improvements. The Board will authorize the County Mayor or designee and County Attorney to acquire the property through negotiation, donation, or eminent domain, with an incentive offer up to 15% over appraised or tax assessed value. The estimated project cost is $12,739,000.
- Board:
- Board of County Commissioners
- Date:
- 2026-07-21
- Type:
- Resolution
- Decision:
- Pending BCC Assignment (Resolution before the Board)
- Address:
- SW 268 Street from US-1 to SW 139 Avenue
- Applicant:
- Miami-Dade County Transportation and Public Works
IMPROVEMENTS TO SW 268 STREET FROM US-1 TO SW 139 STREET
Miami-Dade County Board of County Commissioners is considering a resolution to declare the acquisition of Parcel 1 a public necessity for road widening, beautification, and right-of-way improvements to SW 268 Street from US-1 to SW 139 Avenue. The project involves reconstructing and widening SW 268 Street, including sidewalks, curbs and gutters, stormwater drainage, pavement markings, signage, signalization, lighting, bicycle facilities, and Water and Sewer Department utility improvements. The estimated cost for design, construction, CEI, and right-of-way acquisition is $12,739,000. The Transportation Committee forwarded the item to the Board with a favorable recommendation. No public comment is stated in the document.
- Board:
- Board of County Commissioners
- Date:
- 2026-07-21
- Type:
- Resolution
- Decision:
- Pending BCC Assignment (Resolution before the Board)
- Address:
- SW 268 Street from US-1 to SW 139 Avenue
- Applicant:
- Miami-Dade County Transportation and Public Works
IMPROVEMENTS TO SW 268 STREET FROM US-1 TO SW 139 STREET
Miami-Dade County Board of County Commissioners adopted Resolution R-638-26 (File Number 260766) on 7/21/2026, declaring the acquisition of Parcel 1 for the SW 268 Street Improvement Project to be a public necessity. The project involves reconstructing and widening SW 268 Street from US-1 to SW 139 Avenue, including sidewalks, curbs and gutters, stormwater drainage, pavement markings and signage, signalization, lighting, new bicycle facilities, and Water and Sewer Department utility improvements. The resolution authorizes the County Mayor or designee and County Attorney to acquire Parcel 1 in fee simple by negotiation, donation, right-of-way designation, or purchase at the higher of appraised or tax assessed value, plus reasonable attorney's fees and costs, or by eminent domain. An additional incentive offer to purchase Parcel 1 is authorized, not to exceed 15 percent over the greater of appraised or tax assessed value. The estimated funding for design, construction, CEI, and right-of-way acquisition is $12,739,000, funded by Mobility Impact Fees. The project is located within District 9, represented by Vice Chairman Kionne McGhee, who is the Prime Sponsor. The Transportation Cmte forwarded the item to the BCC with a favorable recommendation on 6/9/2026. The document does not state any public comment or stakeholder sentiment.
- Board:
- Board of County Commissioners
- Date:
- 2026-07-21
- Type:
- Resolution
- Decision:
- Adopted
- Address:
- SW 268 Street from US-1 to SW 139 Avenue
- Applicant:
- Miami-Dade County Transportation and Public Works
IMPROVEMENTS TO SW 268 STREET FROM US-1 TO SW 139 STREET
Miami-Dade County Board of County Commissioners adopted Resolution R-638-26 (Legislative Item File Number 260766) on 7/21/2026, declaring the acquisition of Parcel 1 for the SW 268 Street Improvement Project to be a public necessity. The project involves road widening, beautification, and right-of-way improvements to SW 268 Street from US-1 to SW 139 Avenue. The resolution authorizes the County Mayor or designee and County Attorney to acquire Parcel 1 in fee simple by negotiation, donation, right-of-way designation, or purchase at the higher of appraised or tax assessed value, or by eminent domain. An incentive offer to purchase Parcel 1 is authorized at up to 15 percent over the greater of appraised or tax assessed value. The project scope includes reconstructing and widening SW 268 Street, sidewalks, curbs and gutters, stormwater drainage, pavement markings and signage, signalization, lighting, bicycle facilities, and Water and Sewer Department utility improvements. The estimated funding for design, construction, CEI, and right-of-way acquisition is $12,739,000 from Mobility Impact Fees. The project is located within District 9, represented by Vice Chairman Kionne McGhee, who is the Prime Sponsor. The Transportation Cmte forwarded the item to the BCC with a favorable recommendation on 6/9/2026. The resolution was introduced on 4/27/2026. The legal description of Parcel 1 is in Exhibit A and the location map is in Exhibit B, both attached to the resolution but not included in the provided text. No public comment or stakeholder sentiment is stated in the document.
- Board:
- Board of County Commissioners
- Date:
- 2026-07-21
- Type:
- Resolution
- Decision:
- Adopted
- Address:
- SW 268 Street from US-1 to SW 139 Avenue
- Applicant:
- Miami-Dade County Department of Transportation and Public Works (DTPW); Prime Sponsor Kionne L. McGhee
IMPROVEMENTS TO SW 268 STREET FROM US-1 TO SW 139 STREET
The Miami-Dade Board of County Commissioners adopted Resolution R-638-26 (File Number 260766) on 7/21/2026, declaring the acquisition of Parcel 1 for the SW 268 Street Improvement Project to be a public necessity. The project involves road widening, beautification, and right-of-way improvements to SW 268 Street from US-1 to SW 139 Avenue. The resolution authorizes the County Mayor or designee and County Attorney to acquire Parcel 1 in fee simple by negotiation, donation, right-of-way designation, or purchase, and authorizes an incentive offer not to exceed 15 percent over the appraised or tax assessed value. The estimated funding for design, construction, CEI, and right-of-way acquisition is $12,739,000. The Transportation Cmte forwarded the item to the BCC with a favorable recommendation on 6/9/2026. The item was introduced on 4/27/2026. The sponsor is Kionne L. McGhee. The project is located within District 9. The scope of work includes road reconstruction, widening, milling and resurfacing, new drainage, new curb and gutter, new sidewalks, signalization improvements, new pavement markings and signage, new lighting, new bicycle facilities, and WASD utility improvements. No public comment or stakeholder sentiment is stated in the document.
- Board:
- Board of County Commissioners
- Date:
- 2026-07-21
- Type:
- Resolution
- Decision:
- Adopted
- Address:
- SW 268 Street from US-1 to SW 139 Avenue
- Applicant:
- Miami-Dade County (Transportation and Public Works)