Board of County Commissioners: July 2026

Miami-Dade County

CHANGE ORDER #1 WITH RIC-MAN INTERNATIONAL S-945

Miami-Dade County Board of County Commissioners is set to ratify Change Order No. 1 to Contract No. S-945 with Ric-Man International, Inc. for the construction of a 60-inch Force Main (NL-1A) (West Segment). This change order increases the total contract amount by $1,662,315.17 and grants a 426-calendar day time extension. The project involved approximately 10,000 linear feet of 60-inch Prestressed Concrete Cylinder Pipe (PCCP) Force Main along NW 162nd Street from NW 6th Avenue to NE 8th Avenue. The increase in cost is attributed to various construction challenges including utility conflicts, roadway repairs, tree mitigation, failures of existing asbestos cement pipe water mains, and unforeseen site conditions. The project is part of Miami-Dade Water and Sewer Department's Capital Improvement Program. The change order was introduced on 6/30/2026 and is scheduled for an agenda date of 7/21/2026. The project has since been completed. No public comment is stated in the document.

Board:
Board of County Commissioners
Date:
2026-07-21
Type:
Resolution
Decision:
Pending BCC Assignment (for ratification of Change Order No. 1)
Address:
NW 162 Street from NW 6 Avenue to NE 8 Avenue
Applicant:
Ric-Man International, Inc.

CHANGE ORDER #1 WITH RIC-MAN INTERNATIONAL S-945

Resolution ratifying Change Order No. 1 to Contract No. S-945 between Miami-Dade County and Ric-Man International, Inc. for construction of a 60-inch Force Main (NL-1A) (West Segment) along NW 162 Street from NW 6 Avenue to NE 8 Avenue. The change order increases the contract amount by $1,662,315.17 and grants a 426-calendar day compensable time extension, extending the Substantial Completion Date from June 6, 2023 to August 5, 2024 and the Final Completion Date from August 5, 2023 to October 4, 2024. The project has been successfully completed and this change order serves as final contract closeout. The project is approximately 10,000 linear feet of 60-inch Prestressed Concrete Cylinder Pipe (PCCP) Force Main. The change order addresses utility conflicts, required roadway repairs, tree mitigation, pipe interconnection, failures of asbestos cement pipe water mains, and utility conflicts with Florida Power & Light. The total contract value increases from $19,314,785.95 to $20,977,101.12. The resolution was adopted by the Board of County Commissioners on July 21, 2026. No public comment or stakeholder sentiment is stated in the document.

Board:
Board of County Commissioners
Date:
2026-07-21
Type:
Resolution
Decision:
Adopted
Address:
NW 162 Street from NW 6 Avenue to NE 8 Avenue
Applicant:
Miami-Dade Water and Sewer Department; Contractor: Ric-Man International, Inc.

CHANGE ORDER #1 WITH RIC-MAN INTERNATIONAL S-945

Resolution R-643-26, File Number 261211, adopted by the Miami-Dade Board of County Commissioners on 7/21/2026, ratifies Change Order No. 1 to Contract No. S-945 with Ric-Man International, Inc. for construction of a 60-inch Force Main (NL-1A) (West Segment) along NW 162 Street from NW 6 Avenue to NE 8 Avenue. The change order increases the contract amount by $1,662,315.17, from $19,314,785.95 to $20,977,101.12, and grants a 426-calendar day compensable time extension, extending the Substantial Completion Date from June 6, 2023 to August 5, 2024 and the Final Completion Date from August 5, 2023 to October 4, 2024. The project is approximately 10,000 linear feet of 60-inch Prestressed Concrete Cylinder Pipe (PCCP) Force Main. The project has been successfully completed and this change order serves as final contract closeout. The change order addresses utility conflicts, required roadway repairs, tree mitigation, pipe interconnection, failures of asbestos cement pipe water mains, and other conditions. The project is in Commission District 4, represented by Commissioner Micky Steinberg. The contract was awarded on January 7, 2021, and ratified by the Board on April 20, 2021, via Resolution No. R-343-21. The additional fiscal impact is funded through WASD Revenue Bonds Sold and Future WASD Revenue Bonds. The project is in WASD's Fiscal Year 2025-26 Adopted Budget and Multi-Year Capital Plan under North District Force Main Network- Infrastructure Improvements, Program #9652101, Volume #3, Page #107. The interconnection between the 60-inch force main and the existing 72-inch pipeline has not been completed and will be performed under a separate competitively solicited contract. The change order includes a total amount of $2,439,364.31 in additional costs, offset by a $56,150.00 Value Engineering credit and reallocation of $720,899.14 in unused Contract funds. The compensable delay rate is $1,893.61 per day. The change order includes costs for pipe interconnection ($687,529.39), tree mitigation ($394,260.99), failures of asbestos cement pipe water mains ($345,757.80), utility conflicts ($198,596.92), and road repairs ($6,541.35). The contract was awarded with a 4.73 percent Small Business Enterprise (SBE) Construction goal, a 0.56 percent SBE Goods goal, and a 0.45 percent SBE Services goal. Upon approval, SBE-Con firms will have been paid $1,212,276; SBE-Goods firms will have been paid $441,097; and SBE-Services firms will have paid $172,034.

Board:
Board of County Commissioners
Date:
2026-07-21
Type:
Resolution
Decision:
Adopted
Address:
NW 162 Street from NW 6 Avenue to NE 8 Avenue
Applicant:
Miami-Dade County Water and Sewer Department (WASD); Contractor: Ric-Man International, Inc.

CHANGE ORDER #1 WITH RIC-MAN INTERNATIONAL S-945

Resolution R-643-26, File Number 261211, adopted by the Miami-Dade Board of County Commissioners on 7/21/2026, ratifies Change Order No. 1 to Contract No. S-945 with Ric-Man International, Inc. for construction of a 60-inch Force Main (NL-1A) (West Segment) along NW 162 Street from NW 6 Avenue to NE 8 Avenue. The change order increases the contract amount by $1,662,315.17 (from $19,314,785.95 to $20,977,101.12) and grants a 426-calendar day compensable time extension, extending the Substantial Completion Date from June 6, 2023 to August 5, 2024 and the Final Completion Date from August 5, 2023 to October 4, 2024. The project is approximately 10,000 linear feet of 60-inch Prestressed Concrete Cylinder Pipe (PCCP) Force Main. The project has been successfully completed and this change order serves as final contract closeout. The change order addresses utility conflicts, roadway repairs, tree mitigation, pipe interconnection, asbestos cement pipe failures, and other conditions. The project is in Commission District 4, represented by Commissioner Micky Steinberg. The contract was awarded on January 7, 2021 and ratified by the Board on April 20, 2021 via Resolution No. R-343-21. The change order is funded through WASD Revenue Bonds Sold and Future WASD Revenue Bonds, with no impact to the General Fund. The project is in WASD's Fiscal Year 2025-26 Adopted Budget and Multi-Year Capital Plan under North District Force Main Network- Infrastructure Improvements, Program #9652101, Volume #3, Page #107. The change order includes $2,439,364.31 in additional costs, partially offset by a $56,150.00 Value Engineering credit and reallocation of $720,899.14 in unused Contract funds. The compensable time extension is $806,677.86 at a rate of $1,893.61 per day. The pipe interconnection cost is $687,529.39, tree mitigation is $394,260.99, asbestos cement pipe failures are $345,757.80, utility conflicts are $198,596.92, and road repairs are $6,541.35. The SBE participation upon approval: SBE-Con firms paid $1,212,276; SBE-Goods firms paid $441,097; SBE-Services firms paid $172,034. The Strategic Procurement Department reviewed the Contract for compliance with Resolution No. R-1001-15 on March 18, 2026.

Board:
Board of County Commissioners
Date:
2026-07-21
Type:
Resolution
Decision:
Adopted
Address:
NW 162 Street from NW 6 Avenue to NE 8 Avenue
Applicant:
Miami-Dade Water and Sewer Department (WASD); Contractor: Ric-Man International, Inc.

CHANGE ORDER #1 WITH RIC-MAN INTERNATIONAL S-945

Miami-Dade County Board of County Commissioners is set to ratify Change Order No. 1 to Contract No. S-945 with Ric-Man International, Inc. for the construction of a 60-inch Force Main (NL-1A) (West Segment). This change order increases the total contract amount by $1,662,315.17 and grants a 426-calendar day time extension. The project involved approximately 10,000 linear feet of 60-inch Prestressed Concrete Cylinder Pipe (PCCP) Force Main along NW 162nd Street from NW 6th Avenue to NE 8th Avenue. The increase in cost is attributed to various construction challenges including utility conflicts, roadway repairs, tree mitigation, failures of existing asbestos cement pipe water mains, and unforeseen site conditions. The project has been successfully completed, and this change order serves as the final contract closeout. The original contract was awarded on January 7, 2021, and ratified by the Board on April 20, 2021. The total contract value will increase from $19,314,785.95 to $20,977,101.12. The change order includes a value engineering credit of $56,150.00 and reallocation of $720,899.14 in unused contract funds to offset additional costs. Small Business Enterprise (SBE) goals for the contract are expected to be met upon approval of this change order.

Board:
Board of County Commissioners
Date:
2026-07-21
Type:
Resolution
Decision:
Recommended for ratification
Address:
NW 162 Street from NW 6 Avenue to NE 8 Avenue
Applicant:
Ric-Man International, Inc.

CHANGE ORDER #1 WITH RIC-MAN INTERNATIONAL S-945

Miami-Dade County Board of County Commissioners is ratifying Change Order No. 1 to Contract No. S-945 with Ric-Man International, Inc. for the construction of a 60-inch Force Main (NL-1A) (West Segment). This change order increases the total contract amount by $1,662,315.17 and grants a 426-calendar day time extension. The project involved approximately 10,000 linear feet of 60-inch Prestressed Concrete Cylinder Pipe (PCCP) Force Main along NW 162 Street from NW 6 Avenue to NE 8 Avenue. The increase in contract amount is attributed to various construction challenges including utility conflicts, required roadway repairs, tree mitigation, failures of existing asbestos cement pipe water mains, and unforeseen site conditions. The project has since been successfully completed and this change order serves as the final contract closeout. The project is part of Miami-Dade Water and Sewer Department's Capital Improvement Program.

Board:
Board of County Commissioners
Date:
2026-07-21
Type:
Resolution
Decision:
Resolution ratifying action by the County Mayor or County Mayor’s designee, specifically approval of Change Order No. 1
Address:
NW 162 Street from NW 6 Avenue to NE 8 Avenue
Applicant:
Ric-Man International, Inc.

CHANGE ORDER #1 WITH RIC-MAN INTERNATIONAL S-945

Resolution ratifying Change Order No. 1 to Contract No. S-945 between Miami-Dade County and Ric-Man International, Inc. for construction of a 60-inch Force Main (NL-1A) (West Segment) along NW 162 Street from NW 6 Avenue to NE 8 Avenue. The change order increases the contract amount by $1,662,315.17 and grants a 426-calendar day compensable time extension. The project is approximately 10,000 linear feet of 60-inch Prestressed Concrete Cylinder Pipe (PCCP) Force Main. The change order addresses utility conflicts, required roadway repairs, tree mitigation, pipe interconnection, failures of asbestos cement pipe water mains, and utility conflicts with Florida Power & Light. The project has been successfully completed and this change order serves as final contract closeout. Adopted by the Board of County Commissioners on 7/21/2026.

Board:
Board of County Commissioners
Date:
2026-07-21
Type:
Resolution
Decision:
Adopted
Address:
NW 162 Street from NW 6 Avenue to NE 8 Avenue
Applicant:
Miami-Dade Water and Sewer Department; Contractor: Ric-Man International, Inc.

CHANGE ORDER #1 WITH RIC-MAN INTERNATIONAL S-945

Resolution ratifying Change Order No. 1 to Contract No. S-945 between Miami-Dade County and Ric-Man International, Inc. for construction of a 60-inch Force Main (NL-1A) (West Segment) along NW 162 Street from NW 6 Avenue to NE 8 Avenue. The change order increases the contract amount by $1,662,315.17 and grants a 426-calendar day compensable time extension, extending the Substantial Completion Date from June 6, 2023 to August 5, 2024 and the Final Completion Date from August 5, 2023 to October 4, 2024. The project has been successfully completed and this change order serves as final contract closeout. The project is approximately 10,000 linear feet of 60-inch Prestressed Concrete Cylinder Pipe (PCCP) Force Main. The change order addresses utility conflicts, required roadway repairs, tree mitigation, pipe interconnection, failures of asbestos cement pipe water mains, and utility conflicts with Florida Power & Light. The total contract value increases from $19,314,785.95 to $20,977,101.12. The contract was awarded on January 7, 2021, and ratified by the Board on April 20, 2021, via Resolution No. R-343-21. The resolution was adopted on July 21, 2026. The project is in Commission District 4, represented by Commissioner Micky Steinberg. The project is part of WASD's $8.6 billion Capital Improvement Program.

Board:
Board of County Commissioners
Date:
2026-07-21
Type:
Resolution
Decision:
Adopted
Address:
NW 162 Street from NW 6 Avenue to NE 8 Avenue
Applicant:
Miami-Dade Water and Sewer Department; Ric-Man International, Inc. (Contractor)

CHANGE ORDER #1 WITH RIC-MAN INTERNATIONAL S-945

Resolution ratifying Change Order No. 1 to Contract No. S-945 between Miami-Dade County and Ric-Man International, Inc. for construction of a 60-inch Force Main (NL-1A) (West Segment) along NW 162 Street from NW 6 Avenue to NE 8 Avenue. The change order increases the total contract amount by $1,662,315.17 and grants a 426-calendar day compensable time extension, extending the Substantial Completion Date from June 6, 2023 to August 5, 2024 and the Final Completion Date from August 5, 2023 to October 4, 2024. The project has been successfully completed and this change order serves as final contract closeout. The project is approximately 10,000 linear feet of 60-inch Prestressed Concrete Cylinder Pipe (PCCP) Force Main. The change order addresses utility conflicts, required roadway repairs, and tree mitigation. The total contract value increases from $19,314,785.95 to $20,977,101.12. The project is located in Commission District 4. The agenda date is 7/21/2026, agenda item number 8O3. The file number is 261211. The status is 'Before the Board'. The resolution ratifies action by the County Mayor or designee pursuant to Section 2-8.2.12 of the Code of Miami-Dade County, Florida. The contract was awarded on January 7, 2021 and ratified by the Board on April 20, 2021 via Resolution No. R-343-21. The original contract duration was 548 calendar days with a Contingency Time Allowance of 55 days. The change order includes $2,439,364.31 in additional costs, offset by a $56,150.00 Value Engineering credit and reallocation of $720,899.14 in unused Contract funds. Compensable time is $806,677.86 at a rate of $1,893.61 per day. Pipe interconnection costs are $687,529.39. Tree mitigation coordination and permitting costs are $394,260.99. Failures of asbestos cement pipe water mains cost $345,757.80. Utility conflicts cost $198,596.92. Road repairs cost $6,541.35. The project is funded through WASD Revenue Bonds Sold and Future WASD Revenue Bonds. The project is in WASD's Fiscal Year 2025-26 Adopted Budget and Multi-Year Capital Plan under North District Force Main Network- Infrastructure Improvements, Program #9652101, Volume #3, Page #107. The project is part of WASD's $8.6 billion Capital Improvement Program. The staff recommendation is to ratify the change order. The document does not state any public comment or stakeholder sentiment.

Board:
Board of County Commissioners
Date:
2026-07-21
Type:
Resolution
Decision:
Before the Board; staff recommendation is to ratify Change Order No. 1
Address:
NW 162 Street from NW 6 Avenue to NE 8 Avenue
Applicant:
Miami-Dade County Water & Sewer Department; Contractor: Ric-Man International, Inc.

CHANGE ORDER #1 WITH RIC-MAN INTERNATIONAL S-945

Miami-Dade County Board of County Commissioners is ratifying Change Order No. 1 to Contract No. S-945 with Ric-Man International, Inc. for the construction of a 60-inch Force Main (NL-1A) (West Segment). This change order increases the total contract amount by $1,662,315.17 and grants a 426-calendar day time extension. The project involved approximately 10,000 linear feet of 60-inch Prestressed Concrete Cylinder Pipe (PCCP) Force Main along NW 162nd Street from NW 6th Avenue to NE 8th Avenue. The increase in cost is attributed to utility conflicts, required roadway repairs, tree mitigation, pipe interconnection complexities due to unforeseen site conditions, failures of existing asbestos cement pipe water mains, and delays from late design revisions and permitting issues. The project has been successfully completed, and this change order serves as the final contract closeout. The original contract was awarded on January 7, 2021, and ratified by the Board on April 20, 2021. The change order extends the substantial completion date from June 6, 2023, to August 5, 2024, and the final completion date from August 5, 2023, to October 4, 2024. The total contract value increases from $19,314,785.95 to $20,977,101.12. The project is part of Miami-Dade Water and Sewer Department's Capital Improvement Program.

Board:
Board of County Commissioners
Date:
2026-07-21
Type:
Resolution
Decision:
Ratified (Change Order No. 1 approved)
Address:
NW 162 Street from NW 6 Avenue to NE 8 Avenue
Applicant:
Ric-Man International, Inc.

CHANGE ORDER #1 WITH RIC-MAN INTERNATIONAL S-945

Resolution ratifying Change Order No. 1 to Contract No. S-945 between Miami-Dade County and Ric-Man International, Inc. for construction of a 60-inch Force Main (NL-1A) (West Segment) along NW 162 Street from NW 6 Avenue to NE 8 Avenue. The change order increases the contract amount by $1,662,315.17 and grants a 426-calendar day compensable time extension, extending the Substantial Completion Date from June 6, 2023 to August 5, 2024 and the Final Completion Date from August 5, 2023 to October 4, 2024. The project is approximately 10,000 linear feet of 60-inch Prestressed Concrete Cylinder Pipe (PCCP) Force Main. The change order addresses utility conflicts, required roadway repairs, tree mitigation, pipe interconnection, failures of asbestos cement pipe water mains, and utility conflicts with Florida Power & Light. The project has been successfully completed and this change order serves as final contract closeout. The resolution was adopted by the Board of County Commissioners on July 21, 2026. No public comment or stakeholder sentiment is stated in the document.

Board:
Board of County Commissioners
Date:
2026-07-21
Type:
Resolution
Decision:
Adopted
Address:
NW 162 Street from NW 6 Avenue to NE 8 Avenue
Applicant:
Miami-Dade Water and Sewer Department; Ric-Man International, Inc. (Contractor)

CHANGE ORDER #1 WITH RIC-MAN INTERNATIONAL S-945

Miami-Dade County Board of County Commissioners (BCC) is ratifying Change Order #1 to Contract #S-945 with Ric-Man International, Inc. for the construction of a 60-inch Force Main (NL-1A) (West Segment). This change order increases the total contract amount by $1,662,315.17 and grants a 426-calendar day time extension. The project involved approximately 10,000 linear feet of pipe along NW 162 Street from NW 6 Avenue to NE 8 Avenue. Reasons for the change order include utility conflicts, required roadway repairs, tree mitigation, pipe interconnection complexities, failures of existing asbestos cement pipe water mains, and permitting issues. The project has been successfully completed. The original contract was awarded on January 7, 2021, and ratified by the BCC on April 20, 2021. The total contract value will increase from $19,314,785.95 to $20,977,101.12. The change order was funded through WASD Revenue Bonds.

Board:
Board of County Commissioners
Date:
2026-07-21
Type:
Resolution
Decision:
Resolution ratifying action by the County Mayor or County Mayor’s designee approving Change Order No. 1
Address:
NW 162 Street from NW 6 Avenue to NE 8 Avenue
Applicant:
Ric-Man International, Inc.

CHANGE ORDER #1 WITH RIC-MAN INTERNATIONAL S-945

Miami-Dade County Board of County Commissioners is ratifying Change Order No. 1 to Contract No. S-945 with Ric-Man International, Inc. for the construction of a 60-inch Force Main (NL-1A) (West Segment). This change order increases the total contract amount by $1,662,315.17 and grants a 426-calendar day time extension. The project involved approximately 10,000 linear feet of 60-inch Prestressed Concrete Cylinder Pipe (PCCP) Force Main along NW 162 Street from NW 6 Avenue to NE 8 Avenue. The increase in cost is attributed to various construction challenges including utility conflicts, roadway repairs, tree mitigation, failures of existing asbestos cement pipe water mains, and unforeseen site conditions. The project has been successfully completed. The original contract was awarded on January 7, 2021, and ratified by the Board on April 20, 2021. The change order extends the substantial completion date from June 6, 2023, to August 5, 2024, and the final completion date from August 5, 2023, to October 4, 2024. The total contract value is increased from $19,314,785.95 to $20,977,101.12. The project is part of Miami-Dade Water and Sewer Department's Capital Improvement Program.

Board:
Board of County Commissioners
Date:
2026-07-21
Type:
Resolution
Decision:
Resolution ratifying action by the County Mayor or County Mayor’s designee, specifically approval of Change Order No. 1
Address:
NW 162 Street from NW 6 Avenue to NE 8 Avenue
Applicant:
Ric-Man International, Inc.

CHANGE ORDER #1 WITH RIC-MAN INTERNATIONAL S-945

Resolution ratifying Change Order No. 1 to Contract No. S-945 between Miami-Dade County and Ric-Man International, Inc. for construction of a 60-inch Force Main (NL-1A) (West Segment) along NW 162 Street from NW 6 Avenue to NE 8 Avenue. The change order increases the contract amount by $1,662,315.17 and grants a 426-calendar day compensable time extension, extending the Substantial Completion Date from June 6, 2023 to August 5, 2024 and the Final Completion Date from August 5, 2023 to October 4, 2024. The project has been successfully completed and this change order serves as final contract closeout. The project is approximately 10,000 linear feet of 60-inch Prestressed Concrete Cylinder Pipe (PCCP) Force Main. The additional fiscal impact increases the total contract value from $19,314,785.95 to $20,977,101.12. Funded through WASD Revenue Bonds Sold and Future WASD Revenue Bonds. The project is in WASD's Fiscal Year 2025-26 Adopted Budget and Multi-Year Capital Plan under North District Force Main Network- Infrastructure Improvements, Program #9652101, Volume #3, Page #107. The contract was awarded on January 7, 2021 and ratified by the Board on April 20, 2021 via Resolution No. R-343-21. The change order addresses conditions encountered during construction including utility conflicts, required roadway repairs, and tree mitigation. It includes costs for pipe interconnection ($687,529.39), tree mitigation coordination and permitting ($394,260.99), failures of asbestos cement pipe water mains ($345,757.80), utility conflicts ($198,596.92), road repairs ($6,541.35), and compensable time ($806,677.86). The change order includes a Value Engineering credit of $56,150.00 and reallocation of $720,899.14 in unused contract funds. The interconnection between the 60-inch force main and the existing 72-inch pipeline has not been completed and will be performed under a separate contract. The project is in Commission District 4, represented by Commissioner Micky Steinberg.

Board:
Board of County Commissioners
Date:
2026-07-21
Type:
Resolution
Decision:
Adopted
Address:
NW 162 Street from NW 6 Avenue to NE 8 Avenue
Applicant:
Miami-Dade County Water & Sewer Department; Contractor: Ric-Man International, Inc.

CHANGE ORDER #1 WITH RIC-MAN INTERNATIONAL S-945

Resolution ratifying Change Order No. 1 to Contract No. S-945 between Miami-Dade County and Ric-Man International, Inc. for construction of a 60-inch Force Main (NL-1A) (West Segment) along NW 162 Street from NW 6 Avenue to NE 8 Avenue. The change order increases the contract amount by $1,662,315.17 and grants a 426-calendar day compensable time extension, extending the Substantial Completion Date from June 6, 2023 to August 5, 2024 and the Final Completion Date from August 5, 2023 to October 4, 2024. The project is approximately 10,000 linear feet of 60-inch Prestressed Concrete Cylinder Pipe (PCCP) Force Main. The total contract value increases from $19,314,785.95 to $20,977,101.12. The project has been successfully completed and this change order serves as final contract closeout. The resolution was adopted by the Board of County Commissioners on July 21, 2026. The project is in Commission District 4, represented by Commissioner Micky Steinberg. The contract was awarded on January 7, 2021 and ratified by the Board on April 20, 2021 via Resolution No. R-343-21. The change order addresses utility conflicts, required roadway repairs, tree mitigation, pipe interconnection, failures of asbestos cement pipe water mains, and utility conflicts with Florida Power & Light. The change order includes a total of $2,439,364.31 in additional costs, offset by a $56,150.00 Value Engineering credit and reallocation of $720,899.14 in unused contract funds. The change order is funded through WASD Revenue Bonds Sold and Future WASD Revenue Bonds. The project is in WASD's Fiscal Year 2025-26 Adopted Budget and Multi-Year Capital Plan under North District Force Main Network- Infrastructure Improvements, Program #9652101, Volume #3, Page #107. The interconnection between the 60-inch force main and the existing 72-inch pipeline has not been completed and will be performed under a separate contract. The change order includes a compensable time extension of 426 calendar days at a rate of $1,893.61 per day. The change order includes costs for pipe interconnection ($687,529.39), tree mitigation ($394,260.99), failures of asbestos cement pipe water mains ($345,757.80), utility conflicts ($198,596.92), and road repairs ($6,541.35). The Small Business Enterprise participation includes SBE-Con firms paid $1,212,276, SBE-Goods firms paid $441,097, and SBE-Services firms paid $172,034. The Strategic Procurement Department reviewed the contract for compliance with Resolution No. R-1001-15 on March 18, 2026.

Board:
Board of County Commissioners
Date:
2026-07-21
Type:
Resolution
Decision:
Adopted
Address:
NW 162 Street from NW 6 Avenue to NE 8 Avenue
Applicant:
Miami-Dade Water and Sewer Department (WASD); Contractor: Ric-Man International, Inc.

CHANGE ORDER #1 WITH RIC-MAN INTERNATIONAL S-945

Miami-Dade County Board of County Commissioners is ratifying Change Order No. 1 to Contract No. S-945 with Ric-Man International, Inc. for the construction of a 60-inch Force Main (NL-1A) (West Segment). This change order increases the total contract amount by $1,662,315.17 and grants a 426-calendar day time extension. The project involved approximately 10,000 linear feet of pipe along NW 162 Street from NW 6 Avenue to NE 8 Avenue. The increase in cost is attributed to various construction challenges including utility conflicts, roadway repairs, tree mitigation, failures of existing asbestos cement pipe water mains, and unforeseen site conditions. The project has been successfully completed. The original contract was awarded on January 7, 2021, and ratified by the Board on April 20, 2021. The change order extends the substantial completion date to August 5, 2024, and the final completion date to October 4, 2024.

Board:
Board of County Commissioners
Date:
2026-07-21
Type:
Resolution
Decision:
Resolution ratifying action by the County Mayor or County Mayor’s designee approving Change Order No. 1
Address:
NW 162 Street from NW 6 Avenue to NE 8 Avenue
Applicant:
Ric-Man International, Inc.

CHANGE ORDER #1 WITH RIC-MAN INTERNATIONAL S-945

Resolution ratifying Change Order No. 1 to Contract No. S-945 between Miami-Dade County and Ric-Man International, Inc. for construction of a 60-inch Force Main (NL-1A) (West Segment) along NW 162 Street from NW 6 Avenue to NE 8 Avenue. The change order increases the contract amount by $1,662,315.17 and grants a 426-calendar day compensable time extension, extending the Substantial Completion Date from June 6, 2023 to August 5, 2024 and the Final Completion Date from August 5, 2023 to October 4, 2024. The project has been successfully completed and this change order serves as final contract closeout. The project is approximately 10,000 linear feet of 60-inch Prestressed Concrete Cylinder Pipe (PCCP) Force Main. The change order addresses utility conflicts, required roadway repairs, tree mitigation, pipe interconnection, failures of asbestos cement pipe water mains, and other conditions. The total contract value increases from $19,314,785.95 to $20,977,101.12. The resolution was adopted by the Board of County Commissioners on July 21, 2026. The project is in Commission District 4, represented by Commissioner Micky Steinberg. The contract was awarded on January 7, 2021 and ratified by the Board on April 20, 2021 via Resolution No. R-343-21. The change order includes $2,439,364.31 in additional costs, offset by a $56,150.00 Value Engineering credit and reallocation of $720,899.14 in unused contract funds. The compensable time extension is based on a rate of $1,893.61 per day. The pipe interconnection to an existing 72-inch ductile iron pipe at the intersection of NW 6th Avenue and NW 159th Street has not been completed and will be performed under a separate contract. The project required permits from the Department of Regulatory and Economic Resources (RER) due to tree canopies and root systems, including removal and replacement of more than 115 trees. The contractor encountered failures of existing asbestos cement pipe water mains. The contractor encountered two conflicts with Florida Power & Light (FPL) utilities. Additional roadway restoration was required in areas of NW 6th Avenue, North Miami Avenue, and NE 162nd Street. The contract was awarded with a 4.73 percent Small Business Enterprise (SBE) Construction goal, a 0.56 percent SBE Goods goal, and a 0.45 percent SBE Services goal. Upon approval, SBE participation will be satisfied with SBE-Con firms paid $1,212,276; SBE-Goods firms paid $441,097; and SBE-Services firms paid $172,034. No public comment or stakeholder sentiment is stated in the document.

Board:
Board of County Commissioners
Date:
2026-07-21
Type:
Resolution
Decision:
Adopted
Address:
NW 162 Street from NW 6 Avenue to NE 8 Avenue
Applicant:
Miami-Dade County Water & Sewer Department; Contractor: Ric-Man International, Inc.

CHANGE ORDER #1 WITH RIC-MAN INTERNATIONAL S-945

Resolution ratifying Change Order No. 1 to Contract No. S-945 between Miami-Dade County and Ric-Man International, Inc. for construction of a 60-inch Force Main (NL-1A) (West Segment) along NW 162 Street from NW 6 Avenue to NE 8 Avenue. The change order increases the contract amount by $1,662,315.17 and grants a 426-calendar day compensable time extension, extending the Substantial Completion Date from June 6, 2023 to August 5, 2024 and the Final Completion Date from August 5, 2023 to October 4, 2024. The project is approximately 10,000 linear feet of 60-inch Prestressed Concrete Cylinder Pipe (PCCP) Force Main. The change order addresses utility conflicts, required roadway repairs, tree mitigation, pipe interconnection, failures of asbestos cement pipe water mains, and utility conflicts with Florida Power & Light. The project has been successfully completed and this change order serves as final contract closeout. The resolution was adopted by the Board of County Commissioners on July 21, 2026. The contract was awarded on January 7, 2021, and ratified by the Board on April 20, 2021, via Resolution No. R-343-21. The original contract amount was $19,314,785.95, and the total contract value after this change order is $20,977,101.12. The project is in Commission District 4, represented by Commissioner Micky Steinberg. The fiscal impact is funded through WASD Revenue Bonds Sold and Future WASD Revenue Bonds. The project is in WASD's Fiscal Year 2025-26 Adopted Budget and Multi-Year Capital Plan under North District Force Main Network- Infrastructure Improvements, Program #9652101, Volume #3, Page #107. The change order includes $2,439,364.31 in additional costs, offset by a $56,150.00 Value Engineering credit and reallocation of $720,899.14 in unused Contract funds. The compensable time extension is based on a rate of $1,893.61 per day. The change order includes costs for pipe interconnection ($687,529.39), tree mitigation ($394,260.99), failures of asbestos cement pipe water mains ($345,757.80), utility conflicts ($198,596.92), and road repairs ($6,541.35). The Small Business Enterprise goals were 4.73 percent SBE-Con, 0.56 percent SBE-Goods, and 0.45 percent SBE-Services. Upon approval, SBE-Con firms will have been paid $1,212,276; SBE-Goods firms $441,097; and SBE-Services firms $172,034. The Strategic Procurement Department reviewed the contract for compliance with Resolution No. R-1001-15 on March 18, 2026. No public comment or stakeholder sentiment is stated in the document.

Board:
Board of County Commissioners
Date:
2026-07-21
Type:
Resolution
Decision:
Adopted
Address:
NW 162 Street from NW 6 Avenue to NE 8 Avenue
Applicant:
Miami-Dade County Water and Sewer Department; Contractor: Ric-Man International, Inc.

CHANGE ORDER #1 WITH RIC-MAN INTERNATIONAL S-945

Resolution ratifying Change Order No. 1 to Contract No. S-945 between Miami-Dade County and Ric-Man International, Inc. for construction of a 60-inch Force Main (NL-1A) (West Segment) along NW 162 Street from NW 6 Avenue to NE 8 Avenue. The change order increases the contract amount by $1,662,315.17 and grants a 426-calendar day compensable time extension, extending the Substantial Completion Date from June 6, 2023 to August 5, 2024 and the Final Completion Date from August 5, 2023 to October 4, 2024. The project has been successfully completed and this change order serves as final contract closeout. The project is approximately 10,000 linear feet of 60-inch Prestressed Concrete Cylinder Pipe (PCCP) Force Main. The change order addresses utility conflicts, required roadway repairs, tree mitigation, pipe interconnection, failures of asbestos cement pipe water mains, and utility conflicts with Florida Power & Light. The contract was awarded on January 7, 2021, and ratified by the Board on April 20, 2021, via Resolution No. R-343-21. The total contract award amount was $19,314,785.95, which included a Contingency Allowance of $1,682,724.42, and a Contract duration of 548 calendar days with a Contingency Time Allowance of 55 days. The change order includes a total amount of $2,439,364.31 in additional costs, partially offset by a $56,150.00 Value Engineering credit and the reallocation of $720,899.14 in previously unused Contract funds. The additional fiscal impact increases the total Contract value from $19,314,785.95 to $20,977,101.12. Funded through WASD Revenue Bonds Sold and Future WASD Revenue Bonds. No impact to the General Fund. The project is in WASD's Fiscal Year 2025-26 Adopted Budget and Multi-Year Capital Plan under North District Force Main Network- Infrastructure Improvements, Program #9652101, Volume #3, Page #107. The project is located in Commission District 4, represented by Commissioner Micky Steinberg. The decision was adopted on July 21, 2026. The document does not state any public comment or stakeholder sentiment.

Board:
Board of County Commissioners
Date:
2026-07-21
Type:
Resolution
Decision:
Adopted
Address:
NW 162 Street from NW 6 Avenue to NE 8 Avenue
Applicant:
Miami-Dade County Water & Sewer Department; Contractor: Ric-Man International, Inc.

CHANGE ORDER #1 WITH RIC-MAN INTERNATIONAL S-945

Resolution ratifying Change Order No. 1 to Contract No. S-945 between Miami-Dade County and Ric-Man International, Inc. for construction of a 60-inch Force Main (NL-1A) (West Segment) along NW 162 Street from NW 6 Avenue to NE 8 Avenue. The change order increases the contract amount by $1,662,315.17 and grants a 426-calendar day compensable time extension, extending the Substantial Completion Date from June 6, 2023 to August 5, 2024 and the Final Completion Date from August 5, 2023 to October 4, 2024. The project is approximately 10,000 linear feet of 60-inch Prestressed Concrete Cylinder Pipe (PCCP) Force Main. The change order addresses utility conflicts, required roadway repairs, tree mitigation, pipe interconnection, failures of asbestos cement pipe water mains, and utility conflicts with Florida Power & Light. The total contract value increases from $19,314,785.95 to $20,977,101.12. The resolution was adopted by the Board of County Commissioners on July 21, 2026. The project has been successfully completed and this change order serves as final contract closeout. The project is in Commission District 4, represented by Commissioner Micky Steinberg. The contract was awarded on January 7, 2021 and ratified by the Board on April 20, 2021 via Resolution No. R-343-21. The project is part of WASD's $8.6 billion Capital Improvement Program. The change order includes $2,439,364.31 in additional costs, offset by a $56,150.00 Value Engineering credit and reallocation of $720,899.14 in unused Contract funds. The compensable time extension is based on a rate of $1,893.61 per day. The change order includes costs for pipe interconnection ($687,529.39), tree mitigation ($394,260.99), failures of asbestos cement pipe water mains ($345,757.80), utility conflicts ($198,596.92), and road repairs ($6,541.35). The interconnection between the 60-inch force main and the existing 72-inch pipeline has not been completed and will be performed under a separate contract. The project required permits from the Department of Regulatory and Economic Resources due to tree canopies and root systems, including removal and replacement of more than 115 trees. The Contractor encountered failures of existing asbestos cement pipe water mains during installation. The Contractor encountered two conflicts with Florida Power & Light utilities. The Contractor removed deteriorated asphalt and repaved an affected area due to a latent drainage issue. The Strategic Procurement Department reviewed the Contract for compliance with Resolution No. R-1001-15 on March 18, 2026. The Contract was awarded with a 4.73 percent Small Business Enterprise Construction goal, a 0.56 percent SBE Goods goal, and a 0.45 percent SBE Services goal. Upon approval, SBE Construction firms will have been paid $1,212,276; SBE Goods firms will have been paid $441,097; and SBE Services firms will have paid $172,034. The change order will be funded through WASD Revenue Bonds Sold and Future WASD Revenue Bonds. There is no impact to the General Fund. The project is in WASD's Fiscal Year 2025-26 Adopted Budget and Multi-Year Capital Plan under North District Force Main Network Infrastructure Improvements, Program #9652101, Volume #3, Page #107. WASD's Deputy Director of Planning, Regulatory Compliance and Capital Infrastructure, Marisela Aranguiz-Cueto, P.E., will oversee implementation. The resolution was introduced on June 30, 2026. The requester is the Water & Sewer Department. The County Attorney was assigned on July 1, 2026. Roy Coley assigned the item on June 30, 2026. The Office of Agenda Coordination assigned the item on June 30, 2026. The Board of County Commissioners adopted the resolution on July 21, 2026. The report was prepared by Sarah E. Davis. The item has 15 pages. The resolution was sponsored by no one. No registered lobbyist is listed. The resolution has no sunset provision. The effective date and expiration date are not stated. The resolution ratifies action by the County Mayor or County Mayor's designee pursuant to Section 2-8.2.12 of the Code of Miami-Dade County, Florida. The Contract was awarded pursuant to WASD's Acceleration Ordinance, which delegates authority to execute change orders that do not exceed ten percent of the base contract amount, subject to ratification by the Board. The change order includes a total amount of $2,439,364.31 in additional costs, partially offset by a $56,150.00 Value Engineering credit and reallocation of $720,899.14 in previously unused Contract funds. The unused funds include $223,221.60 in base Contract funds, $494,850.69 from Dedicated Allowances for permitting and off-duty police services, and $2,826.85 from the Contingency Allowance. The Value Engineering credit relates to the Contractor proposing standard short pipe sections in lieu of closures, eliminating the need for two closures and three double-spigot adapters. The total cost savings associated with the closures and double-spigot adapters amounted to $112,300.00, of which $56,150.00 is credited to WASD and $56,150.00 is paid to the Contractor. The Contractor experienced multiple delays attributable to permitting issues, late design responses, revised requirements, and differing site conditions beyond the Contractor's control. The Contract documents required the new 60-inch force main to connect to an existing 72-inch ductile iron pipe at the intersection of NW 6th Avenue and NW 159th Street. Field conditions were found to differ from those reflected in the design drawings. The cost associated with the relocation of a 16-inch water main belonging to the City of North Miami Beach as well as the exploratory excavation was $171,443.06. The Contractor incurred $516,086.33 in costs associated with planning and attempting the connection. The existing 72-inch pipeline could not be taken out of service without disrupting wastewater conveyance for the service area. The Contractor will be paid $687,529.39 for its efforts. The Project required permits from the Department of Regulatory and Economic Resources due to tree canopies and root systems located along the pipeline installation corridor. Permit requirements included an arborist study, tree risk assessments, preparation of a landscape plan, and the removal and replacement of more than 115 trees. The Contractor will be paid $394,260.99 for the work associated with the RER permits. The Contractor encountered failures of existing asbestos cement pipe during installation of the 60-inch force main along NE and NW 162nd Street and the surrounding areas. Six separate failures occurred, which resulted in production delays, installation interruptions, flooded trenches that required emergency site cleanup, coordination with NMB crews for repairs, safety hazards due to trench instability and underground voids, and repeated remobilizations and traffic control adjustments. The Contractor will be paid $345,757.80 for this work. During installation of the sheet pile on NW 161st Street, the Contractor encountered utilities and site conditions not shown on the design plans. The Contractor relocated the existing conduits. The cost associated with this work is $46,309.59. During installation of the 60-inch force main along the Project corridor, the Contractor encountered underground utilities that had not been identified despite the submission of 811 Sunshine locate tickets and completion of field verification efforts. Attempts to obtain as-built drawings from FPL were unsuccessful. The total cost associated with these efforts is $152,287.33. Additional roadway restoration was required following installation of the 60-inch force main due to deteriorated roadway conditions in the areas of NW 6th Avenue, North Miami Avenue, and NE 162nd Street. The Contractor removed the deteriorated asphalt and repaved the affected area. The Contractor will be compensated $6,541.35 for this roadway work. The document does not state any public comment or stakeholder sentiment.

Board:
Board of County Commissioners
Date:
2026-07-21
Type:
Resolution
Decision:
Adopted
Address:
NW 162 Street from NW 6 Avenue to NE 8 Avenue
Applicant:
Miami-Dade County Water and Sewer Department; Contractor: Ric-Man International, Inc.

CHANGE ORDER #1 WITH RIC-MAN INTERNATIONAL S-945

Miami-Dade County Board of County Commissioners is ratifying Change Order No. 1 to Contract No. S-945 with Ric-Man International, Inc. for the construction of a 60-inch Force Main (NL-1A) (West Segment). This change order increases the total contract amount by $1,662,315.17 and grants a 426-calendar day time extension. The project involved installing approximately 10,000 linear feet of 60-inch Prestressed Concrete Cylinder Pipe (PCCP) Force Main along NW 162 Street from NW 6 Avenue to NE 8 Avenue. The additional costs are attributed to utility conflicts, required roadway repairs, tree mitigation, failures of existing asbestos cement pipe water mains, and delays from late design revisions and differing site conditions. The project is part of Miami-Dade Water and Sewer Department's Capital Improvement Program. The change order was approved by the County Mayor or designee and is presented for ratification by the Board. The project has since been successfully completed and this change order serves as the final contract closeout. Small Business Enterprise (SBE) goals for the contract are stated to be satisfied upon approval of this change order.

Board:
Board of County Commissioners
Date:
2026-07-21
Type:
Resolution
Decision:
Ratification of Change Order No. 1 recommended
Address:
NW 162 Street from NW 6 Avenue to NE 8 Avenue
Applicant:
Ric-Man International, Inc.

CHANGE ORDER #1 WITH RIC-MAN INTERNATIONAL S-945

Resolution ratifying Change Order No. 1 to Contract No. S-945 between Miami-Dade County and Ric-Man International, Inc. for construction of a 60-inch Force Main (NL-1A) (West Segment) along NW 162 Street from NW 6 Avenue to NE 8 Avenue. The change order increases the contract amount by $1,662,315.17 and grants a 426-calendar day compensable time extension, extending the Substantial Completion Date from June 6, 2023 to August 5, 2024 and the Final Completion Date from August 5, 2023 to October 4, 2024. The project has been successfully completed and this change order serves as final contract closeout. The project is approximately 10,000 linear feet of 60-inch Prestressed Concrete Cylinder Pipe (PCCP) Force Main. The change order addresses utility conflicts, required roadway repairs, tree mitigation, pipe interconnection, failures of asbestos cement pipe water mains, and utility conflicts with Florida Power & Light. The total contract value increases from $19,314,785.95 to $20,977,101.12. The decision was Adopted on 7/21/2026. Public comment sentiment is not stated.

Board:
Board of County Commissioners
Date:
2026-07-21
Type:
Resolution
Decision:
Adopted
Address:
NW 162 Street from NW 6 Avenue to NE 8 Avenue
Applicant:
Miami-Dade Water and Sewer Department; Contractor: Ric-Man International, Inc.

CHANGE ORDER #1 WITH RIC-MAN INTERNATIONAL S-945

Resolution ratifying Change Order No. 1 to Contract No. S-945 between Miami-Dade County and Ric-Man International, Inc. for construction of a 60-inch Force Main (NL-1A) (West Segment) along NW 162 Street from NW 6 Avenue to NE 8 Avenue. The change order increases the contract amount by $1,662,315.17 and grants a 426-calendar day compensable time extension, extending the Substantial Completion Date from June 6, 2023 to August 5, 2024 and the Final Completion Date from August 5, 2023 to October 4, 2024. The project has been successfully completed and this change order serves as final contract closeout. The project is approximately 10,000 linear feet of 60-inch Prestressed Concrete Cylinder Pipe (PCCP) Force Main. The change order addresses utility conflicts, required roadway repairs, tree mitigation, pipe interconnection, failures of asbestos cement pipe water mains, and utility conflicts with Florida Power & Light. The total contract value increases from $19,314,785.95 to $20,977,101.12. The project is in Commission District 4. The contract was awarded on January 7, 2021 and ratified by the Board on April 20, 2021 via Resolution No. R-343-21. The change order was adopted by the Board of County Commissioners on July 21, 2026. No public comment or stakeholder sentiment is stated in the document.

Board:
Board of County Commissioners
Date:
2026-07-21
Type:
Resolution
Decision:
Adopted
Address:
NW 162 Street from NW 6 Avenue to NE 8 Avenue
Applicant:
Miami-Dade Water and Sewer Department (WASD); Contractor: Ric-Man International, Inc.

CHANGE ORDER #1 WITH RIC-MAN INTERNATIONAL S-945

Miami-Dade County Board of County Commissioners is ratifying Change Order #1 to Contract S-945 with Ric-Man International, Inc. for the construction of a 60-inch Force Main (NL-1A) (West Segment). This change order increases the total contract amount by $1,662,315.17 and grants a 426-calendar day time extension. The project involved approximately 10,000 linear feet of 60-inch Prestressed Concrete Cylinder Pipe along NW 162 Street from NW 6 Avenue to NE 8 Avenue. The increase in cost is attributed to utility conflicts, required roadway repairs, tree mitigation, failures of existing asbestos cement pipe water mains, and unforeseen site conditions. The project has since been successfully completed. The original contract was awarded on January 7, 2021, and ratified by the Board on April 20, 2021. The extended substantial completion date is August 5, 2024, and the final completion date is October 4, 2024.

Board:
Board of County Commissioners
Date:
2026-07-21
Type:
Resolution
Decision:
Ratified (Change Order #1 approved)
Address:
NW 162 Street from NW 6 Avenue to NE 8 Avenue
Applicant:
Ric-Man International, Inc.

CHANGE ORDER #1 WITH RIC-MAN INTERNATIONAL S-945

This legislative item concerns Change Order #1 for Contract S-945 between Miami-Dade County and Ric-Man International, Inc. for the construction of a 60-inch Force Main (NL-1A) (West Segment). The change order increases the total contract amount by $1,662,315.17 and grants a 426-calendar day time extension. The project involved constructing approximately 10,000 linear feet of 60-inch Prestressed Concrete Cylinder Pipe (PCCP) Force Main along NW 162 Street from NW 6 Avenue to NE 8 Avenue. The additional costs are attributed to utility conflicts, roadway repairs, tree mitigation, failures of existing asbestos cement pipe water mains, and delays from late design revisions and differing site conditions. The project has been successfully completed. The Board of County Commissioners is being asked to ratify this action. Public comment is not stated in this document.

Board:
Board of County Commissioners
Date:
2026-07-21
Type:
Resolution
Decision:
Recommended for ratification
Address:
NW 162 Street from NW 6 Avenue to NE 8 Avenue
Applicant:
Ric-Man International, Inc.

CHANGE ORDER #1 WITH RIC-MAN INTERNATIONAL S-945

Resolution adopted on 7/21/2026 ratifying Change Order No. 1 to Contract No. S-945 between Miami-Dade County and Ric-Man International, Inc. for construction of a 60-inch force main (NL-1A) (West Segment) along NW 162 Street from NW 6 Avenue to NE 8 Avenue. The change order increases the contract amount by $1,662,315.17 and grants a 426-calendar day compensable time extension, extending the Substantial Completion Date from June 6, 2023 to August 5, 2024 and the Final Completion Date from August 5, 2023 to October 4, 2024. The project is approximately 10,000 linear feet of 60-inch Prestressed Concrete Cylinder Pipe (PCCP) Force Main. The project has been successfully completed and this change order serves as final contract closeout. Additional costs include $687,529.39 for pipe interconnection, $394,260.99 for tree mitigation, $345,757.80 for failures of asbestos cement pipe water mains, $198,596.92 for utility conflicts, and $6,541.35 for road repairs. The contract was awarded on January 7, 2021 and ratified by the Board on April 20, 2021 via Resolution No. R-343-21. The total contract value increases from $19,314,785.95 to $20,977,101.12. Funded through WASD Revenue Bonds Sold and Future WASD Revenue Bonds. No public comment sentiment is stated in the document.

Board:
Board of County Commissioners
Date:
2026-07-21
Type:
Resolution
Decision:
Adopted
Address:
NW 162 Street from NW 6 Avenue to NE 8 Avenue
Applicant:
Miami-Dade County Water and Sewer Department; Contractor: Ric-Man International, Inc.

CHANGE ORDER #1 WITH RIC-MAN INTERNATIONAL S-945

Resolution ratifying Change Order No. 1 to Contract No. S-945 between Miami-Dade County and Ric-Man International, Inc. for construction of a 60-inch Force Main (NL-1A) (West Segment) along NW 162 Street from NW 6 Avenue to NE 8 Avenue. The change order increases the contract amount by $1,662,315.17 and grants a 426-calendar day compensable time extension, extending the Substantial Completion Date from June 6, 2023 to August 5, 2024 and the Final Completion Date from August 5, 2023 to October 4, 2024. The project has been successfully completed and this change order serves as final contract closeout. The project is approximately 10,000 linear feet of 60-inch Prestressed Concrete Cylinder Pipe (PCCP) Force Main. The change order addresses utility conflicts, required roadway repairs, tree mitigation, pipe interconnection, failures of asbestos cement pipe water mains, and other conditions. The total contract value increases from $19,314,785.95 to $20,977,101.12. The contract was awarded on January 7, 2021 and ratified by the Board on April 20, 2021 via Resolution No. R-343-21. The action was adopted by the Board of County Commissioners on July 21, 2026. The project is in Commission District 4, represented by Commissioner Micky Steinberg. The interconnection between the 60-inch force main and the existing 72-inch pipeline has not been completed and will be performed under a separate contract. The change order includes costs for tree mitigation and permitting ($394,260.99), failures of asbestos cement pipe water mains ($345,757.80), utility conflicts with Florida Power & Light ($198,596.92), road repairs ($6,541.35), and compensable time ($806,677.86). The change order also includes a Value Engineering credit of $56,150.00 and reallocation of $720,899.14 in unused contract funds. Public comment sentiment is not stated.

Board:
Board of County Commissioners
Date:
2026-07-21
Type:
Resolution
Decision:
Adopted
Address:
NW 162 Street from NW 6 Avenue to NE 8 Avenue
Applicant:
Miami-Dade County Water and Sewer Department; Ric-Man International, Inc. (Contractor)

CHANGE ORDER #1 WITH RIC-MAN INTERNATIONAL S-945

Miami-Dade County Board of County Commissioners is ratifying Change Order No. 1 to Contract No. S-945 with Ric-Man International, Inc. for the construction of a 60-inch Force Main (NL-1A) (West Segment). This change order increases the total contract amount by $1,662,315.17 and grants a 426-calendar day time extension. The project involved approximately 10,000 linear feet of pipe along NW 162 Street from NW 6 Avenue to NE 8 Avenue. The additional costs are attributed to utility conflicts, roadway repairs, tree mitigation, failures of existing asbestos cement pipe water mains, and pipe interconnection complexities. The project is part of Miami-Dade Water and Sewer Department's Capital Improvement Program. The change order extends the substantial completion date to August 5, 2024, and the final completion date to October 4, 2024. The project has since been successfully completed. The document also details value engineering savings and reallocation of unused contract funds to offset the increase. Small Business Enterprise (SBE) measures are noted as being satisfied upon contract completion.

Board:
Board of County Commissioners
Date:
2026-07-21
Type:
Resolution
Decision:
Resolution ratifying action by the County Mayor or County Mayor’s designee approving Change Order No. 1
Address:
NW 162 Street from NW 6 Avenue to NE 8 Avenue
Applicant:
Ric-Man International, Inc.

CHANGE ORDER #1 WITH RIC-MAN INTERNATIONAL S-945

Miami-Dade County Board of County Commissioners is ratifying Change Order #1 to Contract S-945 with Ric-Man International, Inc. for the construction of a 60-inch Force Main (NL-1A) (West Segment). This change order increases the total contract amount by $1,662,315.17 and grants a 426-calendar day time extension. The project involved approximately 10,000 linear feet of 60-inch Prestressed Concrete Cylinder Pipe (PCCP) Force Main. Reasons for the change order include utility conflicts, required roadway repairs, tree mitigation, failures of existing asbestos cement pipe water mains, and differing site conditions. The project has since been successfully completed. The Board is expected to ratify this change order on July 21, 2026. Public comment is not stated in this document.

Board:
Board of County Commissioners
Date:
2026-07-21
Type:
Resolution
Decision:
Recommended for ratification
Address:
NW 162 Street from NW 6 Avenue to NE 8 Avenue
Applicant:
Ric-Man International, Inc.

CHANGE ORDER #1 WITH RIC-MAN INTERNATIONAL S-945

Miami-Dade County Board of County Commissioners is ratifying Change Order No. 1 to Contract No. S-945 with Ric-Man International, Inc. for the construction of a 60-inch Force Main (NL-1A) (West Segment). This change order increases the total contract amount by $1,662,315.17 and grants a 426-calendar day time extension. The project involved approximately 10,000 linear feet of 60-inch Prestressed Concrete Cylinder Pipe (PCCP) Force Main along NW 162 Street from NW 6 Avenue to NE 8 Avenue. The increase in cost is attributed to utility conflicts, required roadway repairs, tree mitigation, failures of existing asbestos cement pipe water mains, and unforeseen site conditions. The project has been successfully completed. The original contract was awarded on January 7, 2021, and ratified by the Board on April 20, 2021. The change order extends the substantial completion date to August 5, 2024, and the final completion date to October 4, 2024.

Board:
Board of County Commissioners
Date:
2026-07-21
Type:
Resolution
Decision:
Resolution ratifying action by the County Mayor or County Mayor’s designee
Address:
NW 162 Street from NW 6 Avenue to NE 8 Avenue
Applicant:
Ric-Man International, Inc.

CHANGE ORDER #1 WITH RIC-MAN INTERNATIONAL S-945

Resolution ratified Change Order No. 1 to Contract No. S-945 between Miami-Dade County and Ric-Man International, Inc. for construction of a 60-inch Force Main (NL-1A) (West Segment) along NW 162 Street from NW 6 Avenue to NE 8 Avenue. The change order increases the contract amount by $1,662,315.17 and grants a 426-calendar day compensable time extension, extending the Substantial Completion Date from June 6, 2023 to August 5, 2024 and the Final Completion Date from August 5, 2023 to October 4, 2024. The project has been successfully completed and this change order serves as final contract closeout. The project is approximately 10,000 linear feet of 60-inch Prestressed Concrete Cylinder Pipe (PCCP) Force Main. The change order addresses utility conflicts, required roadway repairs, tree mitigation, pipe interconnection, failures of asbestos cement pipe water mains, and utility conflicts with Florida Power & Light. The contract was awarded on January 7, 2021, and ratified by the Board on April 20, 2021, via Resolution No. R-343-21. The total contract award amount was $19,314,785.95, which included a Contingency Allowance of $1,682,724.42. The additional fiscal impact increases the total contract value from $19,314,785.95 to $20,977,101.12. The project is funded through WASD Revenue Bonds Sold and Future WASD Revenue Bonds. The project is in WASD's Fiscal Year 2025-26 Adopted Budget and Multi-Year Capital Plan under North District Force Main Network- Infrastructure Improvements, Program #9652101, Volume #3, Page #107. The project is located in Commission District 4, represented by Commissioner Micky Steinberg. The change order includes a total amount of $2,439,364.31 in additional costs, partially offset by a $56,150.00 Value Engineering credit and the reallocation of $720,899.14 in previously unused Contract funds. The change order includes compensable time of $806,677.86, pipe interconnection of $687,529.39, tree mitigation coordination and permitting of $394,260.99, failures of asbestos cement pipe water mains of $345,757.80, utility conflicts of $198,596.92, and road repairs of $6,541.35. The interconnection between the 60-inch force main and the existing 72-inch pipeline has not been completed and will be performed under a separate competitively solicited contract. The project required permits from the Department of Regulatory and Economic Resources (RER) due to tree canopies and root systems, including removal and replacement of more than 115 trees. The Contractor encountered failures of existing asbestos cement pipe (ACP) during installation, resulting in six separate failures. The Contractor encountered two conflicts with Florida Power & Light (FPL) utilities. The Contractor removed deteriorated asphalt and repaved an affected area due to a latent drainage issue. The Contract was awarded with a 4.73 percent Small Business Enterprise (SBE) Construction goal, a 0.56 percent SBE Goods goal, and a 0.45 percent SBE Services goal. Upon approval of Change Order No. 1, SBE participation will be satisfied: SBE-Con firms paid $1,212,276; SBE-Goods firms paid $441,097; SBE-Services firms paid $172,034. The Strategic Procurement Department reviewed the Contract for compliance with Resolution No. R-1001-15 on March 18, 2026. The resolution was adopted by the Board of County Commissioners on July 21, 2026. The item was introduced on June 30, 2026. The file number is 261211. The reference is R-643-26. The requester is the Water & Sewer Department. The agenda item number is 8O3. The County Attorney assigned Sarah E. Davis on July 1, 2026. Roy Coley assigned the item on June 30, 2026. The report is from WASD - Sarah E. Davis - no sponsor - Attachments: A-C - item has 15 pages. The Deputy Mayor is Roy Coley. The Mayor is Daniella Levine Cava. The Chairman is Anthony Rodriguez. WASD's Deputy Director of Planning, Regulatory Compliance and Capital Infrastructure, Marisela Aranguiz-Cueto, P.E., will oversee implementation. The compensable delay rate is $1,893.61 per day. The contract duration was 548 calendar days with a Contingency Time Allowance of 55 days. The change order includes a total amount of $2,439,364.31 in additional costs, partially offset by a $56,150.00 Value Engineering credit and the reallocation of $720,899.14 in previously unused Contract funds. The unused funds include $223,221.60 in base Contract funds, $494,850.69 from Dedicated Allowances for permitting and off-duty police services, and $2,826.85 from the Contingency Allowance. The Value Engineering credit relates to the Contractor proposing standard short pipe sections in lieu of closures, eliminating the need for two closures and three double-spigot adapters. The total cost savings associated with the closures and double-spigot adapters amounted to $112,300.00, of which $56,150.00 is credited to WASD and $56,150.00 is paid to the Contractor. The pipe interconnection cost includes $171,443.06 for relocation of a 16-inch water main belonging to the City of North Miami Beach and exploratory excavation, and $516,086.33 in costs for planning and attempting the connection. The tree mitigation cost includes an arborist study, tree risk assessments, preparation of a landscape plan, and removal and replacement of more than 115 trees. The utility conflict with sheet pile installation on NW 161st Street cost $46,309.59. The unmarked underground utilities cost $152,287.33. The road repairs cost $6,541.35. The project is part of WASD's $8.6 billion Capital Improvement Program. The project is a key component in addressing aging infrastructure and reducing operating pressures. The contract was awarded pursuant to Section 2-8.2.12 of the Code of Miami-Dade County, Florida (WASD's Acceleration Ordinance), which delegates authority to the County Mayor or County Mayor's designee to execute change orders that do not exceed ten percent of the base contract amount, subject to ratification by the Board. The resolution ratifies the action of the County Mayor or County Mayor's designee. The project has since been successfully completed. The change order will serve as the final Contract closeout. The document does not state any public comment or stakeholder sentiment. The document does not state an exact street address, parcel, or folio number. The document does not state a zoning or use change. The document does not state a business opportunity for contractors or trades beyond the change order itself.

Board:
Board of County Commissioners
Date:
2026-07-21
Type:
Resolution
Decision:
Adopted
Address:
NW 162 Street from NW 6 Avenue to NE 8 Avenue
Applicant:
Miami-Dade County Water and Sewer Department; Contractor: Ric-Man International, Inc.

CHANGE ORDER #1 WITH RIC-MAN INTERNATIONAL S-945

Resolution ratifying Change Order No. 1 to Contract No. S-945 between Miami-Dade County and Ric-Man International, Inc. for construction of a 60-inch Force Main (NL-1A) (West Segment) along NW 162 Street from NW 6 Avenue to NE 8 Avenue. The change order increases the contract amount by $1,662,315.17 and grants a 426-calendar day compensable time extension, extending the Substantial Completion Date from June 6, 2023 to August 5, 2024 and the Final Completion Date from August 5, 2023 to October 4, 2024. The project has been successfully completed and this change order serves as final contract closeout. The project is approximately 10,000 linear feet of 60-inch Prestressed Concrete Cylinder Pipe (PCCP) Force Main. The change order addresses utility conflicts, required roadway repairs, tree mitigation, pipe interconnection, failures of asbestos cement pipe water mains, and utility conflicts with Florida Power & Light. The total contract value increases from $19,314,785.95 to $20,977,101.12. The contract was awarded on January 7, 2021 and ratified by the Board on April 20, 2021 via Resolution No. R-343-21. The change order was adopted by the Board of County Commissioners on July 21, 2026. The project is in Commission District 4, represented by Commissioner Micky Steinberg. The interconnection between the 60-inch force main and the existing 72-inch pipeline has not been completed and will be performed under a separate contract. The document does not state any public comment or stakeholder sentiment.

Board:
Board of County Commissioners
Date:
2026-07-21
Type:
Resolution
Decision:
Adopted
Address:
NW 162 Street from NW 6 Avenue to NE 8 Avenue
Applicant:
Miami-Dade Water and Sewer Department; Contractor: Ric-Man International, Inc.

CHANGE ORDER #1 WITH RIC-MAN INTERNATIONAL S-945

Resolution ratifying Change Order No. 1 to Contract No. S-945 between Miami-Dade County and Ric-Man International, Inc. for construction of a 60-inch Force Main (NL-1A) (West Segment) along NW 162 Street from NW 6 Avenue to NE 8 Avenue. The change order increases the contract amount by $1,662,315.17 and grants a 426-calendar day compensable time extension. The project was successfully completed. The Board of County Commissioners adopted the resolution on 7/21/2026. The project is approximately 10,000 linear feet of 60-inch Prestressed Concrete Cylinder Pipe (PCCP) Force Main. The total contract value increases from $19,314,785.95 to $20,977,101.12. The change order addresses utility conflicts, required roadway repairs, and tree mitigation. The project is in Commission District 4. The contract was awarded on January 7, 2021, and ratified by the Board on April 20, 2021, via Resolution No. R-343-21. The change order extends the Substantial Completion Date from June 6, 2023 to August 5, 2024 and the Final Completion Date from August 5, 2023 to October 4, 2024. The change order includes $2,439,364.31 in additional costs, offset by a $56,150.00 Value Engineering credit and reallocation of $720,899.14 in unused Contract funds. The change order includes compensable time of $806,677.86, pipe interconnection of $687,529.39, tree mitigation of $394,260.99, failures of asbestos cement pipe water mains of $345,757.80, utility conflicts of $198,596.92, and road repairs of $6,541.35. The interconnection between the 60-inch force main and the existing 72-inch pipeline has not been completed and will be performed under a separate contract. The project required permits from the Department of Regulatory and Economic Resources (RER) due to tree canopies and root systems, including removal and replacement of more than 115 trees. The Contractor encountered failures of existing asbestos cement pipe (ACP) water mains, resulting in six separate failures. The Contractor encountered two conflicts with Florida Power & Light (FPL) utilities. The Contractor encountered a latent drainage issue affecting the roadway. The Strategic Procurement Department (SPD) reviewed the Contract for compliance with Resolution No. R-1001-15 on March 18, 2026. The Contract was awarded with a 4.73 percent Small Business Enterprise (SBE) Construction goal, a 0.56 percent SBE Goods goal, and a 0.45 percent SBE Services goal. Upon approval of Change Order No. 1, SBE participation will be satisfied with SBE-Con firms paid $1,212,276; SBE-Goods firms paid $441,097; and SBE-Services firms paid $172,034. No public comment sentiment is stated in the document.

Board:
Board of County Commissioners
Date:
2026-07-21
Type:
Resolution
Decision:
Adopted
Address:
NW 162 Street from NW 6 Avenue to NE 8 Avenue
Applicant:
Miami-Dade County Water & Sewer Department; Contractor: Ric-Man International, Inc.

CHANGE ORDER #1 WITH RIC-MAN INTERNATIONAL S-945

Resolution ratifying Change Order No. 1 to Contract No. S-945 between Miami-Dade County and Ric-Man International, Inc. for construction of a 60-inch Force Main (NL-1A) (West Segment) along NW 162 Street from NW 6 Avenue to NE 8 Avenue. The change order increases the contract amount by $1,662,315.17 and grants a 426-calendar day compensable time extension, extending the Substantial Completion Date from June 6, 2023 to August 5, 2024 and the Final Completion Date from August 5, 2023 to October 4, 2024. The project has been successfully completed and this change order serves as final contract closeout. The project is approximately 10,000 linear feet of 60-inch Prestressed Concrete Cylinder Pipe (PCCP) Force Main. The change order addresses utility conflicts, required roadway repairs, tree mitigation, pipe interconnection, failures of asbestos cement pipe water mains, and other conditions. The total contract value increases from $19,314,785.95 to $20,977,101.12. The decision was Adopted on 7/21/2026. No public comment or stakeholder sentiment is stated in the document.

Board:
Board of County Commissioners
Date:
2026-07-21
Type:
Resolution
Decision:
Adopted
Address:
NW 162 Street from NW 6 Avenue to NE 8 Avenue
Applicant:
Miami-Dade County Water & Sewer Department; Contractor: Ric-Man International, Inc.

CHANGE ORDER #1 WITH RIC-MAN INTERNATIONAL S-945

Resolution R-643-26, File Number 261211, adopted by the Miami-Dade Board of County Commissioners on 7/21/2026, ratifies Change Order No. 1 to Contract No. S-945 with Ric-Man International, Inc. for construction of a 60-inch Force Main (NL-1A) (West Segment) along NW 162 Street from NW 6 Avenue to NE 8 Avenue. The change order increases the contract amount by $1,662,315.17, from $19,314,785.95 to $20,977,101.12, and grants a 426-calendar day compensable time extension, extending the Substantial Completion Date from June 6, 2023 to August 5, 2024 and the Final Completion Date from August 5, 2023 to October 4, 2024. The project is approximately 10,000 linear feet of 60-inch Prestressed Concrete Cylinder Pipe (PCCP) Force Main. The project has been successfully completed and this change order serves as final contract closeout. The change order addresses utility conflicts, required roadway repairs, tree mitigation, pipe interconnection, failures of asbestos cement pipe water mains, and other conditions. The project is in Commission District 4, represented by Commissioner Micky Steinberg. The contract was awarded on January 7, 2021 and ratified by the Board on April 20, 2021 via Resolution No. R-343-21. The additional fiscal impact is funded through WASD Revenue Bonds Sold and Future WASD Revenue Bonds. The project is in WASD's Fiscal Year 2025-26 Adopted Budget and Multi-Year Capital Plan under North District Force Main Network- Infrastructure Improvements, Program #9652101, Volume #3, Page #107. The interconnection between the 60-inch force main and the existing 72-inch pipeline has not been completed and will be performed under a separate contract. The change order includes $2,439,364.31 in additional costs, offset by a $56,150.00 Value Engineering credit and reallocation of $720,899.14 in unused Contract funds. The change order includes a compensable time extension of 426 calendar days at a rate of $1,893.61 per day, totaling $806,677.86. The document does not state any public comment or stakeholder sentiment.

Board:
Board of County Commissioners
Date:
2026-07-21
Type:
Resolution
Decision:
Adopted
Address:
NW 162 Street from NW 6 Avenue to NE 8 Avenue
Applicant:
Miami-Dade Water and Sewer Department (WASD); Contractor: Ric-Man International, Inc.

CHANGE ORDER #1 WITH RIC-MAN INTERNATIONAL S-945

Resolution R-643-26, File Number 261211, adopted by the Miami-Dade Board of County Commissioners on 7/21/2026, ratifies Change Order No. 1 to Contract No. S-945 with Ric-Man International, Inc. for construction of a 60-inch Force Main (NL-1A) (West Segment) along NW 162 Street from NW 6 Avenue to NE 8 Avenue. The change order increases the contract amount by $1,662,315.17, from $19,314,785.95 to $20,977,101.12, and grants a 426-calendar day compensable time extension, extending the Substantial Completion Date from June 6, 2023 to August 5, 2024 and the Final Completion Date from August 5, 2023 to October 4, 2024. The project is approximately 10,000 linear feet of 60-inch Prestressed Concrete Cylinder Pipe (PCCP) Force Main. The project has been successfully completed and this change order serves as final contract closeout. The change order addresses utility conflicts, required roadway repairs, tree mitigation, pipe interconnection, failures of asbestos cement pipe water mains, and other conditions. The project is in Commission District 4, represented by Commissioner Micky Steinberg. The contract was awarded on January 7, 2021, and ratified by the Board on April 20, 2021, via Resolution No. R-343-21. The additional fiscal impact is funded through WASD Revenue Bonds Sold and Future WASD Revenue Bonds. The project is in WASD's Fiscal Year 2025-26 Adopted Budget and Multi-Year Capital Plan under North District Force Main Network- Infrastructure Improvements, Program #9652101, Volume #3, Page #107. The document does not state any public comment or stakeholder sentiment.

Board:
Board of County Commissioners
Date:
2026-07-21
Type:
Resolution
Decision:
Adopted
Address:
NW 162 Street from NW 6 Avenue to NE 8 Avenue
Applicant:
Miami-Dade Water and Sewer Department (WASD); Contractor: Ric-Man International, Inc.

CHANGE ORDER #1 WITH RIC-MAN INTERNATIONAL S-945

Miami-Dade County Board of County Commissioners is ratifying Change Order No. 1 to Contract No. S-945 with Ric-Man International, Inc. for the construction of a 60-inch Force Main (NL-1A) (West Segment). This change order increases the total contract amount by $1,662,315.17 and grants a 426-calendar day time extension. The project involved approximately 10,000 linear feet of pipe along NW 162 Street from NW 6 Avenue to NE 8 Avenue. The increase in cost is attributed to utility conflicts, roadway repairs, tree mitigation, failures of existing asbestos cement pipe water mains, and unforeseen site conditions. The project has been successfully completed. The original contract was awarded on January 7, 2021, and ratified by the Board on April 20, 2021. The change order extends the substantial completion date to August 5, 2024, and the final completion date to October 4, 2024.

Board:
Board of County Commissioners
Date:
2026-07-21
Type:
Resolution
Decision:
Resolution ratifying Change Order No. 1
Address:
NW 162 Street from NW 6 Avenue to NE 8 Avenue
Applicant:
Ric-Man International, Inc.

CHANGE ORDER #1 WITH RIC-MAN INTERNATIONAL S-945

Resolution ratifying Change Order No. 1 to Contract No. S-945 between Miami-Dade County and Ric-Man International, Inc. for construction of a 60-inch Force Main (NL-1A) (West Segment) along NW 162 Street from NW 6 Avenue to NE 8 Avenue. The change order increases the contract amount by $1,662,315.17 and grants a 426-calendar day compensable time extension, extending the Substantial Completion Date from June 6, 2023 to August 5, 2024 and the Final Completion Date from August 5, 2023 to October 4, 2024. The project has been successfully completed and this change order serves as final contract closeout. The project is approximately 10,000 linear feet of 60-inch Prestressed Concrete Cylinder Pipe (PCCP) Force Main. The change order addresses utility conflicts, required roadway repairs, tree mitigation, pipe interconnection, failures of asbestos cement pipe water mains, and utility conflicts with Florida Power & Light. The total contract value increases from $19,314,785.95 to $20,977,101.12. The project is in Commission District 4, represented by Commissioner Micky Steinberg. The contract was awarded on January 7, 2021 and ratified by the Board on April 20, 2021 via Resolution No. R-343-21. The change order was adopted on July 21, 2026. The interconnection between the 60-inch force main and the existing 72-inch pipeline has not been completed and will be performed under a separate contract. The document does not state any public comment or stakeholder sentiment.

Board:
Board of County Commissioners
Date:
2026-07-21
Type:
Resolution
Decision:
Adopted
Address:
NW 162 Street from NW 6 Avenue to NE 8 Avenue
Applicant:
Miami-Dade County Water and Sewer Department; Contractor: Ric-Man International, Inc.

CHANGE ORDER #1 WITH RIC-MAN INTERNATIONAL S-945

Resolution R-643-26, File Number 261211, adopted by the Miami-Dade Board of County Commissioners on 7/21/2026, ratifies Change Order No. 1 to Contract No. S-945 with Ric-Man International, Inc. for construction of a 60-inch Force Main (NL-1A) (West Segment) along NW 162 Street from NW 6 Avenue to NE 8 Avenue. The change order increases the contract amount by $1,662,315.17 (from $19,314,785.95 to $20,977,101.12) and grants a 426-calendar day compensable time extension, extending the Substantial Completion Date from June 6, 2023 to August 5, 2024 and the Final Completion Date from August 5, 2023 to October 4, 2024. The project is approximately 10,000 linear feet of 60-inch Prestressed Concrete Cylinder Pipe (PCCP) Force Main. The project has been successfully completed and this change order serves as final contract closeout. The project is in Commission District 4, represented by Commissioner Micky Steinberg. The change order addresses utility conflicts, required roadway repairs, tree mitigation, pipe interconnection, failures of asbestos cement pipe water mains, and utility conflicts with Florida Power & Light. The contract was awarded on January 7, 2021 and ratified by the Board on April 20, 2021 via Resolution No. R-343-21. The total contract award amount was $19,314,785.95. The project is funded through WASD Revenue Bonds Sold and Future WASD Revenue Bonds. The project is in WASD's Fiscal Year 2025-26 Adopted Budget and Multi-Year Capital Plan under North District Force Main Network- Infrastructure Improvements, Program #9652101, Volume #3, Page #107. The interconnection between the 60-inch force main and the existing 72-inch pipeline has not been completed and will be performed under a separate contract. The document does not state any public comment or stakeholder sentiment.

Board:
Board of County Commissioners
Date:
2026-07-21
Type:
Resolution
Decision:
Adopted
Address:
NW 162 Street from NW 6 Avenue to NE 8 Avenue
Applicant:
Miami-Dade County Water and Sewer Department; Contractor: Ric-Man International, Inc.

CHANGE ORDER #1 WITH RIC-MAN INTERNATIONAL S-945

Resolution ratifying Change Order No. 1 to Contract No. S-945 between Miami-Dade County and Ric-Man International, Inc. for construction of a 60-inch Force Main (NL-1A) (West Segment) along NW 162 Street from NW 6 Avenue to NE 8 Avenue. Change Order No. 1 increases the Contract amount by $1,662,315.17 and grants a 426-calendar day compensable time extension, extending the Substantial Completion Date from June 6, 2023 to August 5, 2024 and the Final Completion Date from August 5, 2023 to October 4, 2024. The Project has been successfully completed and this Change Order serves as final Contract closeout. The Project is approximately 10,000 linear feet of 60-inch Prestressed Concrete Cylinder Pipe (PCCP) Force Main. The total Contract value increases from $19,314,785.95 to $20,977,101.12. Funded through WASD Revenue Bonds Sold and Future WASD Revenue Bonds. No impact to the General Fund. The Project is in WASD's Fiscal Year 2025-26 Adopted Budget and Multi-Year Capital Plan under North District Force Main Network- Infrastructure Improvements, Program #9652101, Volume #3, Page #107. The Contract was awarded on January 7, 2021 and ratified by the Board on April 20, 2021 via Resolution No. R-343-21. Change Order No. 1 addresses utility conflicts, required roadway repairs, and tree mitigation. It includes $2,439,364.31 in additional costs, offset by a $56,150.00 Value Engineering credit and reallocation of $720,899.14 in unused Contract funds. The compensable time extension of 426 calendar days is at a rate of $1,893.61 per day. The Project is in Commission District 4, represented by Commissioner Micky Steinberg. The Board adopted the resolution on July 21, 2026.

Board:
Board of County Commissioners
Date:
2026-07-21
Type:
Resolution
Decision:
Adopted
Address:
NW 162 Street from NW 6 Avenue to NE 8 Avenue
Applicant:
Miami-Dade County Water and Sewer Department; Contractor: Ric-Man International, Inc.

CHANGE ORDER #1 WITH RIC-MAN INTERNATIONAL S-945

Miami-Dade County Board of County Commissioners is ratifying Change Order No. 1 to Contract No. S-945 with Ric-Man International, Inc. for the construction of a 60-inch Force Main (NL-1A) (West Segment). This change order increases the total contract amount by $1,662,315.17 and grants a 426-calendar day time extension. The project involved installing approximately 10,000 linear feet of 60-inch Prestressed Concrete Cylinder Pipe (PCCP) Force Main along NW 162 Street from NW 6 Avenue to NE 8 Avenue. The additional costs are attributed to utility conflicts, required roadway repairs, tree mitigation, failures of existing asbestos cement pipe water mains, and delays from late design revisions and differing site conditions. The project has been successfully completed, and this change order serves as the final contract closeout. The original contract was awarded on January 7, 2021, and ratified by the Board on April 20, 2021. The total contract value increased from $19,314,785.95 to $20,977,101.12. The change order was funded through WASD Revenue Bonds Sold and Future WASD Revenue Bonds. Small Business Enterprise (SBE) goals for the contract are noted as satisfied upon approval of this change order.

Board:
Board of County Commissioners
Date:
2026-07-21
Type:
Resolution
Decision:
Ratified (Change Order No. 1 approved)
Address:
NW 162 Street from NW 6 Avenue to NE 8 Avenue
Applicant:
Ric-Man International, Inc.

CHANGE ORDER #1 WITH RIC-MAN INTERNATIONAL S-945

Miami-Dade County Board of County Commissioners is ratifying Change Order No. 1 to Contract No. S-945 with Ric-Man International, Inc. for the construction of a 60-inch Force Main (NL-1A) (West Segment). This change order increases the total contract amount by $1,662,315.17 and grants a 426-calendar day time extension. The project involved constructing approximately 10,000 linear feet of 60-inch Prestressed Concrete Cylinder Pipe (PCCP) Force Main along NW 162 Street from NW 6 Avenue to NE 8 Avenue. The additional costs are attributed to utility conflicts, required roadway repairs, tree mitigation, failures of existing asbestos cement pipe water mains, and delays from late design revisions and differing site conditions. The project has been successfully completed. The original contract was awarded on January 7, 2021, and ratified by the Board on April 20, 2021. The change order extends the Substantial Completion Date from June 6, 2023, to August 5, 2024, and the Final Completion Date from August 5, 2023, to October 4, 2024. The total contract value increased from $19,314,785.95 to $20,977,101.12. The change order also addresses a value engineering credit of $56,150.00 and reallocates $720,899.14 in unused contract funds. Small Business Enterprise (SBE) goals for the contract are noted as satisfied upon approval of this change order.

Board:
Board of County Commissioners
Date:
2026-07-21
Type:
Resolution
Decision:
Ratified (Change Order No. 1 approved)
Address:
NW 162 Street from NW 6 Avenue to NE 8 Avenue
Applicant:
Ric-Man International, Inc.

CHANGE ORDER #1 WITH RIC-MAN INTERNATIONAL S-945

Resolution ratifying Change Order No. 1 to Contract No. S-945 between Miami-Dade County and Ric-Man International, Inc. for construction of a 60-inch force main (NL-1A) (West Segment) along NW 162 Street from NW 6 Avenue to NE 8 Avenue. The change order increases the contract amount by $1,662,315.17 and grants a 426-calendar day compensable time extension, extending the Substantial Completion Date from June 6, 2023 to August 5, 2024 and the Final Completion Date from August 5, 2023 to October 4, 2024. The project has been successfully completed and this change order serves as final contract closeout. The project is approximately 10,000 linear feet of 60-inch Prestressed Concrete Cylinder Pipe (PCCP) Force Main. The change order addresses utility conflicts, required roadway repairs, tree mitigation, pipe interconnection, failures of asbestos cement pipe water mains, and utility conflicts with Florida Power & Light. The contract was awarded on January 7, 2021, and ratified by the Board on April 20, 2021, via Resolution No. R-343-21. The total contract award amount was $19,314,785.95, which included a Contingency Allowance of $1,682,724.42, and a Contract duration of 548 calendar days with a Contingency Time Allowance of 55 days. The change order includes a total amount of $2,439,364.31 in additional costs, partially offset by a $56,150.00 Value Engineering credit and the reallocation of $720,899.14 in previously unused Contract funds. The additional fiscal impact is an increase of $1,662,315.17, increasing the total Contract value from $19,314,785.95 to $20,977,101.12. Funded through WASD Revenue Bonds Sold and Future WASD Revenue Bonds. No impact to the General Fund. The Project is in WASD's Fiscal Year 2025-26 Adopted Budget and Multi-Year Capital Plan under North District Force Main Network- Infrastructure Improvements, Program #9652101, Volume #3, Page #107. The decision was adopted on 7/21/2026. The project is located in Commission District 4, represented by Commissioner Micky Steinberg. The interconnection between the 60-inch force main and the existing 72-inch pipeline has not been completed to date and will be performed under a separate competitively solicited contract. The Contractor will be paid $687,529.39 for its efforts. The change order includes $806,677.86 for compensable time, $687,529.39 for pipe interconnection, $394,260.99 for tree mitigation coordination and permitting, $345,757.80 for failures of asbestos cement pipe water mains, $198,596.92 for utility conflicts, and $6,541.35 for road repairs. The Small Business Enterprise (SBE) participation required by Contract completion will be satisfied: SBE-Con firms paid $1,212,276; SBE-Goods firms paid $441,097; SBE-Services firms paid $172,034.

Board:
Board of County Commissioners
Date:
2026-07-21
Type:
Resolution
Decision:
Adopted
Address:
NW 162 Street from NW 6 Avenue to NE 8 Avenue
Applicant:
Miami-Dade County Water & Sewer Department; Contractor: Ric-Man International, Inc.

CHANGE ORDER #1 WITH RIC-MAN INTERNATIONAL S-945

Miami-Dade County Board of County Commissioners is ratifying Change Order #1 to Contract #S-945 with Ric-Man International, Inc. for the construction of a 60-inch force main (NL-1A) (West Segment). This change order increases the total contract amount by $1,662,315.17 and grants a 426-calendar day time extension. The project involved approximately 10,000 linear feet of 60-inch Prestressed Concrete Cylinder Pipe along NW 162 Street from NW 6 Avenue to NE 8 Avenue. The increase in cost is attributed to utility conflicts, required roadway repairs, tree mitigation, failures of existing asbestos cement pipe water mains, and unforeseen site conditions. The project has been successfully completed, and this change order serves as the final contract closeout. The original contract was awarded on January 7, 2021, and ratified by the Board on April 20, 2021.

Board:
Board of County Commissioners
Date:
2026-07-21
Type:
Resolution
Decision:
Resolution ratifying action by the County Mayor or County Mayor’s designee approving Change Order No. 1
Address:
NW 162 Street from NW 6 Avenue to NE 8 Avenue
Applicant:
Ric-Man International, Inc.

CHANGE ORDER #1 WITH RIC-MAN INTERNATIONAL S-945

Miami-Dade County Board of County Commissioners is ratifying Change Order #1 to Contract S-945 with Ric-Man International, Inc. for the construction of a 60-inch Force Main (NL-1A) (West Segment). This change order increases the total contract amount by $1,662,315.17 and grants a 426-calendar day time extension. The project involved approximately 10,000 linear feet of 60-inch Prestressed Concrete Cylinder Pipe (PCCP) Force Main along NW 162 Street from NW 6 Avenue to NE 8 Avenue. The increase in cost is attributed to utility conflicts, required roadway repairs, tree mitigation, failures of existing asbestos cement pipe water mains, and unforeseen site conditions. The project has since been successfully completed. The Board is expected to ratify this change order on July 21, 2026.

Board:
Board of County Commissioners
Date:
2026-07-21
Type:
Resolution
Decision:
Recommended for ratification
Address:
NW 162 Street from NW 6 Avenue to NE 8 Avenue
Applicant:
Ric-Man International, Inc.

CHANGE ORDER #1 WITH RIC-MAN INTERNATIONAL S-945

Resolution ratifying Change Order No. 1 to Contract No. S-945 between Miami-Dade County and Ric-Man International, Inc. for construction of a 60-inch Force Main (NL-1A) (West Segment) along NW 162 Street from NW 6 Avenue to NE 8 Avenue. The change order increases the contract amount by $1,662,315.17 and grants a 426-calendar day compensable time extension, extending the Substantial Completion Date from June 6, 2023 to August 5, 2024 and the Final Completion Date from August 5, 2023 to October 4, 2024. The project has been successfully completed and this change order serves as final contract closeout. The project is approximately 10,000 linear feet of 60-inch Prestressed Concrete Cylinder Pipe (PCCP) Force Main. The change order addresses utility conflicts, required roadway repairs, tree mitigation, pipe interconnection, failures of asbestos cement pipe water mains, and utility conflicts with Florida Power & Light. The total contract value increases from $19,314,785.95 to $20,977,101.12. The resolution was adopted by the Board of County Commissioners on July 21, 2026. The project is located in Commission District 4, represented by Commissioner Micky Steinberg. The contract was awarded on January 7, 2021 and ratified by the Board on April 20, 2021 via Resolution No. R-343-21. The original contract award amount was $19,314,785.95 with a contingency allowance of $1,682,724.42 and a contract duration of 548 calendar days with a contingency time allowance of 55 days. The change order includes $2,439,364.31 in additional costs, offset by a $56,150.00 Value Engineering credit and reallocation of $720,899.14 in unused contract funds. The compensable time extension is 426 calendar days at a rate of $1,893.61 per day. The pipe interconnection cost is $687,529.39, tree mitigation coordination and permitting is $394,260.99, failures of asbestos cement pipe water mains is $345,757.80, utility conflicts are $198,596.92, and road repairs are $6,541.35. The project is funded through WASD Revenue Bonds Sold and Future WASD Revenue Bonds. The project is in WASD's Fiscal Year 2025-26 Adopted Budget and Multi-Year Capital Plan under North District Force Main Network- Infrastructure Improvements, Program #9652101, Volume #3, Page #107. The interconnection between the 60-inch force main and the existing 72-inch pipeline has not been completed and will be performed under a separate competitively solicited contract. The contractor proposed a value engineering change to use standard short pipe sections in lieu of closures, eliminating the need for two closures and three double-spigot adapters, with total cost savings of $112,300.00, of which $56,150.00 is credited to WASD. The unused contract funds include $223,221.60 in base contract funds, $494,850.69 from Dedicated Allowances for permitting and off-duty police services, and $2,826.85 from the Contingency Allowance. The contract was awarded with a 4.73 percent Small Business Enterprise (SBE) Construction goal, a 0.56 percent SBE Goods goal, and a 0.45 percent SBE Services goal. Upon approval, SBE-Con firms will have been paid $1,212,276; SBE-Goods firms will have been paid $441,097; and SBE-Services firms will have paid $172,034. The Strategic Procurement Department reviewed the contract for compliance with Resolution No. R-1001-15 on March 18, 2026.

Board:
Board of County Commissioners
Date:
2026-07-21
Type:
Resolution
Decision:
Adopted
Address:
NW 162 Street from NW 6 Avenue to NE 8 Avenue
Applicant:
Miami-Dade County Water and Sewer Department; Contractor: Ric-Man International, Inc.

CHANGE ORDER #1 WITH RIC-MAN INTERNATIONAL S-945

Miami-Dade County Board of County Commissioners is set to ratify Change Order No. 1 to Contract No. S-945 with Ric-Man International, Inc. for the construction of a 60-inch Force Main (NL-1A) (West Segment). This change order increases the total contract amount by $1,662,315.17 and grants a 426-calendar day time extension. The project involved approximately 10,000 linear feet of 60-inch Prestressed Concrete Cylinder Pipe (PCCP) Force Main along NW 162 Street from NW 6 Avenue to NE 8 Avenue. The increase in cost is attributed to various construction challenges including utility conflicts, required roadway repairs, tree mitigation, failures of existing asbestos cement pipe water mains, and unforeseen site conditions. The project has been successfully completed, and this change order serves as the final contract closeout. The original contract was awarded on January 7, 2021, and ratified by the Board on April 20, 2021. The change order extends the substantial completion date from June 6, 2023, to August 5, 2024, and the final completion date from August 5, 2023, to October 4, 2024. The project is part of Miami-Dade Water and Sewer Department's Capital Improvement Program.

Board:
Board of County Commissioners
Date:
2026-07-21
Type:
Resolution
Decision:
Recommended for ratification
Address:
NW 162 Street from NW 6 Avenue to NE 8 Avenue
Applicant:
Ric-Man International, Inc.

CHANGE ORDER #1 WITH RIC-MAN INTERNATIONAL S-945

Resolution ratifying Change Order No. 1 to Contract No. S-945 between Miami-Dade County and Ric-Man International, Inc. for construction of a 60-inch Force Main (NL-1A) (West Segment) along NW 162 Street from NW 6 Avenue to NE 8 Avenue. The change order increases the contract amount by $1,662,315.17 and grants a 426-calendar day compensable time extension. The project is approximately 10,000 linear feet of 60-inch Prestressed Concrete Cylinder Pipe (PCCP) Force Main. The change order was adopted by the Board of County Commissioners on 7/21/2026. The project has been successfully completed and this change order serves as final contract closeout. The change order addresses utility conflicts, roadway repairs, tree mitigation, pipe interconnection, asbestos cement pipe water main failures, and utility conflicts with Florida Power & Light. The contract was awarded on January 7, 2021 and ratified by the Board on April 20, 2021 via Resolution No. R-343-21. The total contract value increases from $19,314,785.95 to $20,977,101.12. The project is in Commission District 4, represented by Commissioner Micky Steinberg. The project is funded through WASD Revenue Bonds. The change order includes a compensable time extension of 426 calendar days at a rate of $1,893.61 per day. The change order includes $687,529.39 for pipe interconnection, $394,260.99 for tree mitigation, $345,757.80 for asbestos cement pipe failures, $198,596.92 for utility conflicts, and $6,541.35 for road repairs. The change order includes a $56,150.00 Value Engineering credit and reallocation of $720,899.14 in unused contract funds. The project is part of WASD's $8.6 billion Capital Improvement Program. The change order was reviewed for Small Business Enterprise compliance on March 18, 2026. No public comment or stakeholder sentiment is stated in the document.

Board:
Board of County Commissioners
Date:
2026-07-21
Type:
Resolution
Decision:
Adopted
Address:
NW 162 Street from NW 6 Avenue to NE 8 Avenue
Applicant:
Miami-Dade County Water & Sewer Department; Contractor: Ric-Man International, Inc.

CHANGE ORDER #1 WITH RIC-MAN INTERNATIONAL S-945

Resolution ratifying Change Order No. 1 to Contract No. S-945 between Miami-Dade County and Ric-Man International, Inc. for construction of a 60-inch Force Main (NL-1A) (West Segment) along NW 162 Street from NW 6 Avenue to NE 8 Avenue. The change order increases the contract amount by $1,662,315.17 and grants a 426-calendar day compensable time extension, extending the Substantial Completion Date from June 6, 2023 to August 5, 2024 and the Final Completion Date from August 5, 2023 to October 4, 2024. The project has been successfully completed and this change order serves as final contract closeout. The project is approximately 10,000 linear feet of 60-inch Prestressed Concrete Cylinder Pipe (PCCP) Force Main. The change order addresses utility conflicts, required roadway repairs, tree mitigation, pipe interconnection, failures of asbestos cement pipe water mains, and utility conflicts with Florida Power & Light. The contract was awarded on January 7, 2021, and ratified by the Board on April 20, 2021, via Resolution No. R-343-21. The total contract award amount was $19,314,785.95, increasing to $20,977,101.12. The additional fiscal impact is funded through WASD Revenue Bonds Sold and Future WASD Revenue Bonds. The project is in Commission District 4, represented by Commissioner Micky Steinberg. The resolution was adopted by the Board of County Commissioners on July 21, 2026.

Board:
Board of County Commissioners
Date:
2026-07-21
Type:
Resolution
Decision:
Adopted
Address:
NW 162 Street from NW 6 Avenue to NE 8 Avenue
Applicant:
Miami-Dade Water and Sewer Department; Ric-Man International, Inc. (Contractor)

CHANGE ORDER #1 WITH RIC-MAN INTERNATIONAL S-945

Resolution ratifying Change Order No. 1 to Contract No. S-945 between Miami-Dade County and Ric-Man International, Inc. for construction of a 60-inch Force Main (NL-1A) (West Segment) along NW 162 Street from NW 6 Avenue to NE 8 Avenue. The change order increases the contract amount by $1,662,315.17 and grants a 426-calendar day compensable time extension, extending the Substantial Completion Date from June 6, 2023 to August 5, 2024 and the Final Completion Date from August 5, 2023 to October 4, 2024. The project has been successfully completed and this change order serves as final contract closeout. The project is approximately 10,000 linear feet of 60-inch Prestressed Concrete Cylinder Pipe (PCCP) Force Main. The change order addresses utility conflicts, required roadway repairs, tree mitigation, pipe interconnection, failures of asbestos cement pipe water mains, and utility conflicts with Florida Power & Light. The total contract value increases from $19,314,785.95 to $20,977,101.12. The contract was awarded on January 7, 2021, and ratified by the Board on April 20, 2021, via Resolution No. R-343-21. The resolution was adopted by the Board of County Commissioners on July 21, 2026. The project is in Commission District 4, represented by Commissioner Micky Steinberg. The project is part of WASD's $8.6 billion Capital Improvement Program. The change order is funded through WASD Revenue Bonds Sold and Future WASD Revenue Bonds. The project is in WASD's Fiscal Year 2025-26 Adopted Budget and Multi-Year Capital Plan under North District Force Main Network- Infrastructure Improvements, Program #9652101, Volume #3, Page #107. The change order includes a total amount of $2,439,364.31 in additional costs, partially offset by a $56,150.00 Value Engineering credit and reallocation of $720,899.14 in previously unused Contract funds. The compensable time extension is 426 calendar days at a rate of $1,893.61 per day, totaling $806,677.86. The pipe interconnection cost is $687,529.39. Tree mitigation coordination and permitting cost is $394,260.99. Failures of asbestos cement pipe water mains cost is $345,757.80. Utility conflicts cost is $198,596.92. Road repairs cost is $6,541.35. The Small Business Enterprise goals are 4.73 percent SBE-Construction, 0.56 percent SBE-Goods, and 0.45 percent SBE-Services. SBE-Con firms will have been paid $1,212,276; SBE-Goods firms will have been paid $441,097; and SBE-Services firms will have paid $172,034. The Strategic Procurement Department reviewed the Contract for compliance with Resolution No. R-1001-15 on March 18, 2026.

Board:
Board of County Commissioners
Date:
2026-07-21
Type:
Resolution
Decision:
Adopted
Address:
NW 162 Street from NW 6 Avenue to NE 8 Avenue
Applicant:
Miami-Dade County Water & Sewer Department; Contractor: Ric-Man International, Inc.