CHANGE ORDER #1 LANZO CONSTRUCTION (S-958)

Resolution approving Change Order No. 1 to Contract No. S-958 between Miami-Dade County and Lanzo Construction Co., Florida for the D2-C2 project: proposed 16-inch, 12-inch, and 8-inch DI water main and 10-inch and 8-inch DI gravity sewer along NW 22nd Avenue from NW 79th Street to NW 90th Street and an 8-inch DI force main along NW 87th Street. The change order grants a 1,000-calendar day time extension and increases the contract amount by $5,411,816.28, bringing the total from $7,253,128.25 to $12,664,944.53. It also includes a credit for concrete manhole substitution and replenishes the contingency allowance. The resolution was adopted by the Board of County Commissioners on 7/21/2026. The project is in Commission District 2, represented by Commissioner Marleine Bastien, who is the Prime Sponsor. The project extends wastewater infrastructure and replaces undersized water mains, with approximately 9,246 linear feet of sanitary sewer mains and 9,851 linear feet of ductile iron water main service lines. The change order addresses differing subsurface conditions ($4,680,600.00, 908-day extension), duct bank conflicts ($167,731.70, 92-day extension), contingency replenishment ($595,409.58), and concrete manhole substitution savings ($31,925.00). The Substantial Completion Date is revised from May 21, 2024 to February 15, 2027, and the Final Completion Date from June 20, 2024 to March 17, 2027. The original contract was awarded on November 22, 2021, ratified by the Board on March 15, 2022 via Resolution No. R-259-22, with a Notice to Proceed issued on June 1, 2022. The project originated from Resolution No. R-597-13 and is part of the Connect 2 Protect Program. The SBE-Con goal is recommended to be removed from the project. No public comment or stakeholder sentiment is stated in the document.

Board:
Board of County Commissioners
Date:
2026-07-21
Type:
Resolution
Decision:
Adopted
Address:
NW 22nd Avenue from NW 79th Street to NW 90th Street, and NW 87th Street
Applicant:
Miami-Dade County Water & Sewer Department; Contractor: Lanzo Construction Co., Florida

CHANGE ORDER #1 LANZO CONSTRUCTION (S-958)

Miami-Dade County Board of County Commissioners is approving Change Order No. 1 to Contract No. S-958 with Lanzo Construction Co., Florida. This change order grants a 1,000-calendar day time extension and increases the contract amount by $5,411,816.28, bringing the total contract award to $12,664,944.53. The project involves proposed 16-inch, 12-inch, and 8-inch DI water main and 10-inch and 8-inch DI gravity sewer along NW 22nd Avenue from NW 79th Street to NW 90th Street, and an 8-inch DI force main along NW 87th Street. The increase is due to differing subsurface conditions requiring larger trenching and additional restoration, as well as unforeseen conflicts with communication and electrical duct banks. Funds will be used from the Building Better Communities General Obligation Bond Program. The original contract was awarded on November 22, 2021, and ratified on March 15, 2022. The revised substantial completion date is February 15, 2027, and the final completion date is March 17, 2027. The Infrastructure, Innovation & Technology Committee forwarded this item to the Board with a favorable recommendation.

Board:
Board of County Commissioners
Date:
2026-07-21
Type:
Resolution
Decision:
Approved (Change Order No. 1 approved)
Address:
NW 22nd Avenue from NW 79th Street to NW 90th Street and along NW 87th Street
Applicant:
Lanzo Construction Co., Florida

CHANGE ORDER #1 LANZO CONSTRUCTION (S-958)

Miami-Dade County Board of County Commissioners is considering Change Order #1 for Contract S-958 with Lanzo Construction Co., Florida. This change order approves a 1,000-calendar day time extension and increases the contract amount by $5,411,816.28, bringing the total contract value to $12,664,944.53. The project involves installing 16-inch, 12-inch, and 8-inch DI water mains and 10-inch and 8-inch DI gravity sewers along NW 22nd Avenue from NW 79th Street to NW 90th Street, and an 8-inch DI force main along NW 87th Street. The increase in cost and time is attributed to unforeseen subsurface conditions requiring extensive roadway restoration, and conflicts with existing communication and electrical duct banks. Funds will be utilized from the Building Better Communities General Obligation Bond Program. The Infrastructure, Innovation & Technology Committee forwarded this item to the Board with a favorable recommendation. The original contract was awarded on November 22, 2021, and ratified on March 15, 2022. The revised substantial completion date is February 15, 2027, and the final completion date is March 17, 2027.

Board:
Board of County Commissioners
Date:
2026-07-21
Type:
Resolution
Decision:
Forwarded to BCC with a favorable recommendation by Infrastructure, Innovation & Technology Committee; pending Board of County Commissioners approval.
Address:
NW 22nd Avenue from NW 79th Street to NW 90th Street and NW 87th Street
Applicant:
Lanzo Construction Co., Florida

CHANGE ORDER #1 LANZO CONSTRUCTION (S-958)

Miami-Dade County Board of County Commissioners (BCC) is considering Change Order #1 for Contract S-958 with Lanzo Construction Co., Florida. This change order significantly increases the contract amount by $5,411,816.28, bringing the total to $12,664,944.53, and extends the project timeline by 1,000 calendar days. The project involves installing 16-inch, 12-inch, and 8-inch DI water mains and 10-inch and 8-inch DI gravity sewers along NW 22nd Avenue from NW 79th Street to NW 90th Street, and an 8-inch DI force main along NW 87th Street. The increase is attributed to unforeseen subsurface conditions requiring extensive roadway restoration, conflicts with communication and electrical duct banks, and replenishment of the contingency allowance. A credit was applied for the substitution of concrete manholes for fiberglass. Funding is from the Building Better Communities General Obligation Bond (GOB) Program Project No. 17 and other WASD sources. The original contract was awarded in November 2021 for $7,253,128.25 with a 750-day duration. The revised substantial completion date is February 15, 2027, and final completion is March 17, 2027. The Infrastructure, Innovation & Technology Committee forwarded this item to the BCC with a favorable recommendation.

Board:
Board of County Commissioners
Date:
2026-07-21
Type:
Resolution
Decision:
Before the Board (pending final action)
Address:
NW 22nd Avenue from NW 79th Street to NW 90th Street, and along NW 87th Street
Applicant:
Lanzo Construction Co., Florida

CHANGE ORDER #1 LANZO CONSTRUCTION (S-958)

Resolution approving Change Order No. 1 to Contract No. S-958 between Miami-Dade County and Lanzo Construction Co., Florida for the D2-C2 project, which includes a 16-inch, 12-inch, and 8-inch DI water main and 10-inch and 8-inch DI gravity sewer along NW 22nd Avenue from NW 79th Street to NW 90th Street and an 8-inch DI force main along NW 87th Street. The change order grants a time extension of 1,000 calendar days and increases the contract amount by $5,411,816.28, bringing the total contract award from $7,253,128.25 to $12,664,944.53. It authorizes the use of funds from the Building Better Communities General Obligation Bond (GOB) Program Project No. 17-Countrywide Water and Sewer System Enhancements to pay in part for the extension of wastewater services along NW 22nd Avenue. The change order addresses differing subsurface conditions, duct bank conflicts, and includes a credit for concrete manhole substitution. The decision was adopted on 7/21/2026. The project extends critical wastewater infrastructure and replaces undersized water mains serving industrial and commercial properties along NW 22nd Avenue, with approximately 9,246 linear feet of sanitary sewer mains and 9,851 LF of ductile iron water main service lines. The original contract was awarded on November 22, 2021, ratified by the Board on March 15, 2022 via Resolution No. R-259-22, with a Notice to Proceed issued on June 1, 2022. The Substantial Completion Date is revised from May 21, 2024 to February 15, 2027, and the Final Completion Date from June 20, 2024 to March 17, 2027. The project is located in Commission District 2, represented by Commissioner Marleine Bastien, who is the Prime Sponsor. The Infrastructure, Innovation & Technology Committee forwarded it to the Board with a favorable recommendation on 6/10/2026. The cost breakdown includes $4,680,600.00 for differing sub-surface conditions with a 908-calendar day extension, $595,409.58 for contingency replenishment, $167,731.70 for duct bank conflicts with a 92-calendar day extension, and a $31,925.00 savings for concrete manhole substitution. The contract had an 8 percent SBE-Goods goal and an 18 percent SBE-Con goal; the SBE-Con goal is recommended to be removed. No public comment or stakeholder sentiment is stated in the document.

Board:
Board of County Commissioners
Date:
2026-07-21
Type:
Resolution
Decision:
Adopted
Address:
NW 22nd Avenue from NW 79th Street to NW 90th Street, and NW 87th Street
Applicant:
Lanzo Construction Co., Florida (Contractor); Miami-Dade County Water and Sewer Department (Requester)

CHANGE ORDER #1 LANZO CONSTRUCTION (S-958)

Resolution approving Change Order No. 1 to Contract No. S-958 between Miami-Dade County and Lanzo Construction Co., Florida for the D2-C2 project: proposed 16-inch, 12-inch, and 8-inch DI water main and 10-inch and 8-inch DI gravity sewer along NW 22nd Avenue from NW 79th Street to NW 90th Street and an 8-inch DI force main along NW 87th Street. The change order grants a 1,000-calendar day time extension and increases the contract amount by $5,411,816.28, bringing the total contract award from $7,253,128.25 to $12,664,944.53. It authorizes use of funds from the Building Better Communities General Obligation Bond (GOB) Program Project No. 17-Countywide Water and Sewer System Enhancements to pay in part for the extension of wastewater services along NW 22nd Avenue. The change order addresses differing subsurface conditions, duct bank conflicts, contingency replenishment, and a concrete manhole substitution credit. The resolution was adopted by the Board of County Commissioners on 7/21/2026. The project is located in Commission District 2, represented by Commissioner Marleine Bastien, who is the Prime Sponsor. The project will extend critical wastewater infrastructure and replace undersized water mains serving industrial and commercial properties along NW 22nd Avenue. The improvements include installation of approximately 9,246 linear feet of sanitary sewer mains and 9,851 LF of ductile iron water main service lines. The project originated from Resolution No. R-597-13, which directed development of a plan to extend sanitary sewer service to commercial and industrial parcels within the Miami-Dade Green Technology Corridor (GTC), leading to the Connect 2 Protect Program. The original contract was awarded on November 22, 2021, ratified by the Board on March 15, 2022 via Resolution No. R-259-22, with a total award of $7,253,128.25, a duration of 750 calendar days, and a Contingency Time Allowance of 75 days. The Notice to Proceed was issued on June 1, 2022, establishing May 21, 2024 as the Substantial Completion Date and June 20, 2024 as the Final Completion Date. After this change order, the Substantial Completion Date is revised to February 15, 2027, and the Final Completion Date to March 17, 2027. The change order includes $4,680,600.00 for differing sub-surface conditions with a 908-calendar day extension, $595,409.58 for contingency replenishment, $167,731.70 for duct bank conflicts with a 92-calendar day extension, and a $31,925.00 credit for concrete manhole substitution. The contract was awarded with an 8 percent Small Business Enterprise Goods goal and an 18 percent SBE Construction goal. The SBE-Con goal is recommended to be removed from the project due to restrictive funding and fixed budget. No public comment or stakeholder sentiment is stated in the document.

Board:
Board of County Commissioners
Date:
2026-07-21
Type:
Resolution
Decision:
Adopted
Address:
NW 22nd Avenue from NW 79th Street to NW 90th Street, and NW 87th Street
Applicant:
Miami-Dade County Water & Sewer Department; Contractor: Lanzo Construction Co., Florida

CHANGE ORDER #1 LANZO CONSTRUCTION (S-958)

Miami-Dade County Board of County Commissioners adopted Resolution R-645-26 (File Number 260948) approving Change Order No. 1 to Contract No. S-958 with Lanzo Construction Co., Florida. The change order increases the contract amount by $5,411,816.28, from $7,253,128.25 to $12,664,944.53, and grants a 1,000-calendar day non-compensable time extension. The project involves installation of 16-inch, 12-inch, and 8-inch DI water main and 10-inch and 8-inch DI gravity sewer along NW 22nd Avenue from NW 79th Street to NW 90th Street, and an 8-inch DI force main along NW 87th Street. The change order addresses differing subsurface conditions, duct bank conflicts, concrete manhole substitution, and contingency replenishment. The Substantial Completion Date is revised from May 21, 2024 to February 15, 2027, and the Final Completion Date from June 20, 2024 to March 17, 2027. Funding sources include WASD Revenue Bonds, Water Connection Charges, BBC GOB Financing, and Florida DEP Grant. The Infrastructure, Innovation & Technology Committee forwarded the item with a favorable recommendation on June 10, 2026, and the Board adopted it on July 21, 2026.

Board:
Board of County Commissioners
Date:
2026-07-21
Type:
Resolution
Decision:
Adopted
Address:
NW 22nd Avenue from NW 79th Street to NW 90th Street, and NW 87th Street, Miami-Dade County, Florida
Applicant:
Miami-Dade County Water and Sewer Department; Contractor: Lanzo Construction Co., Florida

CHANGE ORDER #1 LANZO CONSTRUCTION (S-958)

Miami-Dade County Board of County Commissioners is considering Change Order #1 for Contract S-958 with Lanzo Construction Co., Florida. This change order approves a 1,000-calendar day time extension and increases the contract amount by $5,411,816.28, bringing the total contract value to $12,664,944.53. The project involves installing 16-inch, 12-inch, and 8-inch DI water mains and 10-inch and 8-inch DI gravity sewers along NW 22nd Avenue from NW 79th Street to NW 90th Street, and an 8-inch DI force main along NW 87th Street. The increase is due to unforeseen subsurface conditions requiring extensive roadway restoration and conflicts with communication and electrical duct banks. Funds will be utilized from the Building Better Communities General Obligation Bond Program. The Infrastructure, Innovation & Technology Committee forwarded this item to the Board with a favorable recommendation. The original contract was awarded on November 22, 2021, and ratified on March 15, 2022. The revised substantial completion date is February 15, 2027, and the final completion date is March 17, 2027.

Board:
Board of County Commissioners
Date:
2026-07-21
Type:
Resolution
Decision:
Forwarded to BCC with a favorable recommendation by the Infrastructure, Innovation & Technology Committee; pending Board of County Commissioners approval
Address:
NW 22nd Avenue from NW 79th Street to NW 90th Street and NW 87th Street
Applicant:
Lanzo Construction Co., Florida

CHANGE ORDER #1 LANZO CONSTRUCTION (S-958)

Resolution approving Change Order No. 1 to Contract No. S-958 between Miami-Dade County and Lanzo Construction Co., Florida for the D2-C2 project: proposed 16-inch, 12-inch, and 8-inch DI water main and 10-inch and 8-inch DI gravity sewer along NW 22nd Avenue from NW 79th Street to NW 90th Street and an 8-inch DI force main along NW 87th Street. The change order grants a 1,000-calendar day time extension and increases the contract amount by $5,411,816.28, bringing the total from $7,253,128.25 to $12,664,944.53. The change order is driven by differing subsurface conditions (unstable sandy soils) requiring larger trenching and additional roadway restoration ($4,680,600.00, 908-day extension), duct bank conflicts requiring realignment of the gravity sewer main ($167,731.70, 92-day extension), replenishment of the Contingency Allowance ($595,409.58), and a credit for substituting concrete manholes for fiberglass ($31,925.00 savings). The project extends critical wastewater infrastructure and replaces undersized water mains serving industrial and commercial properties. The Substantial Completion Date is revised from May 21, 2024 to February 15, 2027, and the Final Completion Date from June 20, 2024 to March 17, 2027. The Infrastructure, Innovation & Technology Committee forwarded it to the BCC with a favorable recommendation on 6/10/2026. Agenda date is 7/21/2026. The project is in Commission District 2, represented by Commissioner Marleine Bastien, who is the Prime Sponsor. The project originated from Resolution No. R-597-13 to extend sanitary sewer service to the Miami-Dade Green Technology Corridor (GTC) under the Connect 2 Protect Program. Funding sources include WASD Revenue Bonds Sold, Water Connection Charges, Future WASD Revenue Bonds, BBC GOB Financing, and Florida Department of Environmental Protection Grant. The SBE-Con goal is recommended to be removed because SBE-Con firms were unable to perform at original bid prices and the Contractor could not secure substitutes; the Contractor will self-perform that portion. No public comment or stakeholder sentiment is stated in the document.

Board:
Board of County Commissioners
Date:
2026-07-21
Type:
Resolution
Decision:
Forwarded to BCC with a favorable recommendation by the Infrastructure, Innovation & Technology Committee on 6/10/2026; final Board action pending (agenda date 7/21/2026)
Address:
NW 22nd Avenue from NW 79th Street to NW 90th Street, and NW 87th Street (for the 8-inch DI force main)
Applicant:
Miami-Dade County Water & Sewer Department; Contractor: Lanzo Construction Co., Florida

CHANGE ORDER #1 LANZO CONSTRUCTION (S-958)

Resolution approving Change Order No. 1 to Contract No. S-958 between Miami-Dade County and Lanzo Construction Co., Florida for the D2-C2 project, which includes proposed 16-inch, 12-inch, and 8-inch DI water main and 10-inch and 8-inch DI gravity sewer along NW 22nd Avenue from NW 79th Street to NW 90th Street and an 8-inch DI force main along NW 87th Street. The change order grants a time extension of 1,000 calendar days and increases the contract amount by $5,411,816.28, bringing the total contract award from $7,253,128.25 to $12,664,944.53. The change order is driven by differing subsurface conditions, unforeseen duct bank conflicts, and includes a credit for concrete manhole substitution and replenishment of the contingency allowance. The project extends critical wastewater infrastructure and replaces undersized water mains serving industrial and commercial properties. The Board adopted the resolution on July 21, 2026. The project was forwarded to the Board with a favorable recommendation from the Infrastructure, Innovation & Technology Committee on June 10, 2026. The contract was originally awarded on November 22, 2021 and ratified by the Board on March 15, 2022 via Resolution No. R-259-22. The Notice to Proceed was issued June 1, 2022. The Substantial Completion Date will be revised from May 21, 2024 to February 15, 2027, and the Final Completion Date from June 20, 2024 to March 17, 2027. The project is located in Commission District 2, represented by Commissioner Marleine Bastien, who is the Prime Sponsor. The project originated from Resolution No. R-597-13, which directed the development of a plan to extend sanitary sewer service to commercial and industrial parcels within the Miami-Dade Green Technology Corridor (GTC). The Miami-Dade Water and Sewer Department created the Connect 2 Protect Program to expand access to sanitary sewer service for properties reliant on septic systems. The additional fiscal impact is funded out of WASD Revenue Bonds Sold, Water Connection Charges, Future WASD Revenue Bonds, BBC GOB Financing, and Florida Department of Environmental Protection Grant. There is no impact to the General Fund. The project is in WASD's Fiscal Year 2025-2026 Adopted Budget and Multi-Year Capital Plan under Water Reset Program - Small Diameter Water Mains Replacement, Program #2000000072, Volume #3, Page #123 and Commercial and Industrial Corridors - Extension of Sewer System (Connect to Protect), Program #967090, Volume #3, Page #103. The Contract was awarded with an eight percent Small Business Enterprise - Goods (SBE-Goods) goal and an 18 percent SBE - Construction (SBE-Con) goal. The Prime Contractor has exceeded the SBE-Goods goal. The SBE-Con goal was to be met through the performance of poured concrete foundation and structure work, and highway street and bridge construction work. After award, the SBE-Con firms reported they were unable to perform at their original bid prices. The Contractor solicited bids from SBE-Con firms to substitute and submitted documentation indicating it was unable to secure a substitute SBE-Con firm. WASD is recommending the SBE-Con goal be removed from the Project due to the restrictive nature of the Project funding and the fixed budget available. WASD indicated the Contractor will be self-performing this portion of the work and the SBE-Con measure is no longer applicable. Based on the justifications provided, the Project is in compliance. The change order includes a cost of $4,680,600.00 and a 908-calendar day non-compensable time extension for differing sub-surface conditions, a contingency replenishment of $595,409.58, a cost of $167,731.70 and a 92-calendar day non-compensable time extension for duct bank conflicts, and a contract savings of $31,925.00 for concrete manhole substitution. The project includes installation of approximately 9,246 linear feet of sanitary sewer mains and 9,851 LF of ductile iron water main service lines. WASD's Deputy Director of Planning, Regulatory Compliance and Capital Infrastructure, Marisela Aranguiz-Cueto, P.E., will oversee implementation. The County Attorney was assigned on May 21, 2026, with Sarah E. Davis assigned on May 26, 2026. Roy Coley was assigned on May 20, 2026. The item was introduced on May 20, 2026. The agenda date was July 21, 2026, with agenda item number 8O2. The resolution is R-645-26. The file number is 260948. The status is Adopted. The final action was on July 21, 2026. The cost is not stated as a single total, but the change order increase is $5,411,816.28. The requester is the Water & Sewer Department. The document does not state any public comment or stakeholder sentiment.

Board:
Board of County Commissioners
Date:
2026-07-21
Type:
Resolution
Decision:
Adopted
Address:
NW 22nd Avenue from NW 79th Street to NW 90th Street and NW 87th Street
Applicant:
Lanzo Construction Co., Florida

CHANGE ORDER #1 LANZO CONSTRUCTION (S-958)

Miami-Dade County Board of County Commissioners is approving Change Order No. 1 to Contract No. S-958 with Lanzo Construction Co., Florida. This change order grants a 1,000-calendar day time extension and increases the contract amount by $5,411,816.28, bringing the total contract award to $12,664,944.53. The project involves the installation of 16-inch, 12-inch, and 8-inch DI water main and 10-inch and 8-inch DI gravity sewer along NW 22nd Avenue from NW 79th Street to NW 90th Street, and an 8-inch DI force main along NW 87th Street. The increase is due to differing subsurface conditions requiring larger trenching and additional restoration, and unforeseen conflicts with communication and electrical duct banks. Funds will be used from the Building Better Communities General Obligation Bond Program. The original contract was awarded on November 22, 2021, for $7,253,128.25. The Infrastructure, Innovation & Technology Committee forwarded this item to the Board with a favorable recommendation.

Board:
Board of County Commissioners
Date:
2026-07-21
Type:
Resolution
Decision:
Approved (Change Order No. 1)
Address:
NW 22nd Avenue from NW 79th Street to NW 90th Street and along NW 87th Street
Applicant:
Lanzo Construction Co., Florida

CHANGE ORDER #1 LANZO CONSTRUCTION (S-958)

Miami-Dade County is approving Change Order No. 1 to Contract No. S-958 with Lanzo Construction Co., Florida, for the D2-C2 project. This change order grants a 1,000-calendar day time extension and increases the contract amount by $5,411,816.28, bringing the total contract award to $12,664,944.53. The project involves installing 16-inch, 12-inch, and 8-inch DI water mains and 10-inch and 8-inch DI gravity sewers along NW 22nd Avenue from NW 79th Street to NW 90th Street, and an 8-inch DI force main along NW 87th Street. The increase in cost and time is attributed to differing subsurface conditions requiring larger trenching and additional restoration, as well as unforeseen conflicts with communication and electrical duct banks. Funds for the wastewater service extension will come in part from the Building Better Communities General Obligation Bond Program Project No. 17. The Infrastructure, Innovation & Technology Committee forwarded this item to the Board of County Commissioners with a favorable recommendation.

Board:
Board of County Commissioners
Date:
2026-07-21
Type:
Resolution
Decision:
Approved (Change Order No. 1)
Address:
NW 22nd Avenue from NW 79th Street to NW 90th Street and NW 87th Street
Applicant:
Lanzo Construction Co., Florida

CHANGE ORDER #1 LANZO CONSTRUCTION (S-958)

Miami-Dade County Board of County Commissioners is considering Change Order #1 for Contract S-958 with Lanzo Construction Co., Florida. This change order approves a 1,000-calendar day time extension and increases the contract amount by $5,411,816.28, bringing the total contract value to $12,664,944.53. The project involves installing 16-inch, 12-inch, and 8-inch DI water mains and 10-inch and 8-inch DI gravity sewers along NW 22nd Avenue from NW 79th Street to NW 90th Street, and an 8-inch DI force main along NW 87th Street. The increase in cost and time is attributed to unforeseen subsurface conditions requiring extensive roadway restoration, and conflicts with existing communication and electrical duct banks. Funds will be utilized from the Building Better Communities General Obligation Bond Program. The Infrastructure, Innovation & Technology Committee forwarded this item to the Board with a favorable recommendation. The original contract was awarded on November 22, 2021, and ratified on March 15, 2022. The revised substantial completion date is February 15, 2027, and the final completion date is March 17, 2027.

Board:
Board of County Commissioners
Date:
2026-07-21
Type:
Resolution
Decision:
Pending Board of County Commissioners approval
Address:
NW 22nd Avenue from NW 79th Street to NW 90th Street and NW 87th Street
Applicant:
Lanzo Construction Co., Florida

CHANGE ORDER #1 LANZO CONSTRUCTION (S-958)

Resolution approving Change Order No. 1 to Contract No. S-958 between Miami-Dade County and Lanzo Construction Co., Florida for the D2-C2 project: proposed 16-inch, 12-inch, and 8-inch DI water main and 10-inch and 8-inch DI gravity sewer along NW 22nd Avenue from NW 79th Street to NW 90th Street, and an 8-inch DI force main along NW 87th Street. The change order grants a 1,000-calendar day time extension and increases the contract amount by $5,411,816.28, bringing the total from $7,253,128.25 to $12,664,944.53. It authorizes use of funds from the Building Better Communities General Obligation Bond (GOB) Program Project No. 17-Countrywide Water and Sewer System Enhancements to pay in part for the extension of wastewater services along NW 22nd Avenue. The change order addresses differing subsurface conditions, duct bank conflicts, contingency replenishment, and a credit for concrete manhole substitution. The resolution was adopted by the Board of County Commissioners on 7/21/2026, after being forwarded with a favorable recommendation from the Infrastructure, Innovation & Technology Committee on 6/10/2026. The project is in Commission District 2, represented by Commissioner Marleine Bastien, who is the Prime Sponsor. The project originated from Resolution No. R-597-13 and the Connect 2 Protect Program. The contract was originally awarded on November 22, 2021, ratified by the Board on March 15, 2022 via Resolution No. R-259-22, with a Notice to Proceed issued on June 1, 2022. The Substantial Completion Date is revised from May 21, 2024 to February 15, 2027, and the Final Completion Date from June 20, 2024 to March 17, 2027. The project includes approximately 9,246 linear feet of sanitary sewer mains and 9,851 LF of ductile iron water main service lines. The change order includes $4,680,600.00 for differing subsurface conditions with a 908-calendar day extension, $595,409.58 for contingency replenishment, $167,731.70 for duct bank conflicts with a 92-calendar day extension, and a $31,925.00 credit for concrete manhole substitution. The contract had an 8 percent SBE-Goods goal and an 18 percent SBE-Con goal; the SBE-Con goal is recommended to be removed. No public comment or stakeholder sentiment is stated in the document.

Board:
Board of County Commissioners
Date:
2026-07-21
Type:
Resolution
Decision:
Adopted
Address:
NW 22nd Avenue from NW 79th Street to NW 90th Street, and NW 87th Street
Applicant:
Lanzo Construction Co., Florida

CHANGE ORDER #1 LANZO CONSTRUCTION (S-958)

Resolution approving Change Order No. 1 to Contract No. S-958 between Miami-Dade County and Lanzo Construction Co., Florida for the D2-C2 project: proposed 16-inch, 12-inch, and 8-inch DI water main and 10-inch and 8-inch DI gravity sewer along NW 22nd Avenue from NW 79th Street to NW 90th Street and an 8-inch DI force main along NW 87th Street. The change order grants a 1,000-calendar day time extension and increases the contract amount by $5,411,816.28, bringing the total from $7,253,128.25 to $12,664,944.53. It also includes a credit for concrete manhole substitution and replenishes the Contingency Allowance. The resolution authorizes use of funds from the Building Better Communities General Obligation Bond (GOB) Program Project No. 17-Countrywide Water and Sewer System Enhancements to pay in part for the extension of wastewater services along NW 22nd Avenue. The change order addresses differing subsurface conditions, duct bank conflicts, and roadway restoration. The project is located in Commission District 2. The Board of County Commissioners adopted the resolution on 7/21/2026. The Infrastructure, Innovation & Technology Committee forwarded it with a favorable recommendation on 6/10/2026. The contract was originally awarded on November 22, 2021 and ratified by the Board on March 15, 2022 via Resolution No. R-259-22. The Notice to Proceed was issued on June 1, 2022. Substantial Completion Date revised from May 21, 2024 to February 15, 2027; Final Completion Date revised from June 20, 2024 to March 17, 2027. The project includes approximately 9,246 linear feet of sanitary sewer mains and 9,851 LF of ductile iron water main service lines. The project originated from Resolution No. R-597-13 and is part of the Connect 2 Protect Program. The SBE-Con goal is recommended to be removed. No public comment or stakeholder sentiment is stated in the document.

Board:
Board of County Commissioners
Date:
2026-07-21
Type:
Resolution
Decision:
Adopted
Address:
NW 22nd Avenue from NW 79th Street to NW 90th Street and NW 87th Street
Applicant:
Miami-Dade County Water & Sewer Department; Contractor: Lanzo Construction Co., Florida

CHANGE ORDER #1 LANZO CONSTRUCTION (S-958)

Resolution approving Change Order No. 1 to Contract No. S-958 between Miami-Dade County and Lanzo Construction Co., Florida for the D2-C2 project: proposed 16-inch, 12-inch, and 8-inch DI water main and 10-inch and 8-inch DI gravity sewer along NW 22nd Avenue from NW 79th Street to NW 90th Street, and an 8-inch DI force main along NW 87th Street. The change order grants a 1,000-calendar day non-compensable time extension and increases the contract amount by $5,411,816.28, bringing the total from $7,253,128.25 to $12,664,944.53. It also includes a credit for concrete manhole substitution and replenishes the Contingency Allowance. The project extends wastewater infrastructure and replaces undersized water mains, with approximately 9,246 linear feet of sanitary sewer mains and 9,851 LF of ductile iron water main service lines. The change order addresses differing subsurface conditions, duct bank conflicts, and includes a contingency replenishment. The resolution was adopted by the Board of County Commissioners on 7/21/2026. The project is in Commission District 2, represented by Commissioner Marleine Bastien, who is the Prime Sponsor. The project originated from Resolution No. R-597-13 and is part of the Connect 2 Protect Program. The contract was originally awarded on November 22, 2021, ratified by the Board on March 15, 2022 via Resolution No. R-259-22, with a Notice to Proceed issued on June 1, 2022. The Substantial Completion Date is revised from May 21, 2024 to February 15, 2027, and the Final Completion Date from June 20, 2024 to March 17, 2027. The additional fiscal impact is funded by WASD Revenue Bonds Sold, Water Connection Charges, Future WASD Revenue Bonds, BBC GOB Financing, and Florida Department of Environmental Protection Grant. The SBE-Con goal is recommended to be removed from the project. No public comment or stakeholder sentiment is stated in the document.

Board:
Board of County Commissioners
Date:
2026-07-21
Type:
Resolution
Decision:
Adopted
Address:
NW 22nd Avenue from NW 79th Street to NW 90th Street, and NW 87th Street
Applicant:
Miami-Dade County Water & Sewer Department; Contractor: Lanzo Construction Co., Florida

CHANGE ORDER #1 LANZO CONSTRUCTION (S-958)

Miami-Dade County Board of County Commissioners approved Change Order No. 1 to Contract No. S-958 with Lanzo Construction Co., Florida. This change order grants a 1,000-calendar day time extension and increases the contract amount by $5,411,816.28, bringing the total contract award to $12,664,944.53. The project involves the installation of 16-inch, 12-inch, and 8-inch DI water main and 10-inch and 8-inch DI gravity sewer along NW 22nd Avenue from NW 79th Street to NW 90th Street, and an 8-inch DI force main along NW 87th Street. The increase is due to differing subsurface conditions requiring larger trenching and additional restoration, and unforeseen conflicts with communication and electrical duct banks. Funds will be used from the Building Better Communities General Obligation Bond (GOB) Program Project No. 17. The original contract was awarded on November 22, 2021, for $7,253,128.25 with a 750-day duration. The revised substantial completion date is February 15, 2027, and the final completion date is March 17, 2027. Public comment is not stated in the document.

Board:
Board of County Commissioners
Date:
2026-07-21
Type:
Resolution
Decision:
Approved
Address:
NW 22nd Avenue from NW 79th Street to NW 90th Street and NW 87th Street
Applicant:
Lanzo Construction Co., Florida

CHANGE ORDER #1 LANZO CONSTRUCTION (S-958)

Miami-Dade County Board of County Commissioners adopted Resolution R-645-26 (File Number 260948) approving Change Order No. 1 to Contract No. S-958 with Lanzo Construction Co., Florida. The change order increases the contract amount by $5,411,816.28, from $7,253,128.25 to $12,664,944.53, and grants a 1,000-calendar day non-compensable time extension. The project involves installation of 16-inch, 12-inch, and 8-inch ductile iron water main and 10-inch and 8-inch ductile iron gravity sewer along NW 22nd Avenue from NW 79th Street to NW 90th Street, and an 8-inch ductile iron force main along NW 87th Street. The change order addresses differing subsurface conditions, duct bank conflicts, concrete manhole substitution, and contingency replenishment. The project is funded in part by the Building Better Communities General Obligation Bond Program Project No. 17. The Infrastructure, Innovation & Technology Committee forwarded it with a favorable recommendation on June 10, 2026, and the Board adopted it on July 21, 2026.

Board:
Board of County Commissioners
Date:
2026-07-21
Type:
Resolution
Decision:
Adopted
Address:
NW 22nd Avenue from NW 79th Street to NW 90th Street, and NW 87th Street
Applicant:
Lanzo Construction Co., Florida

CHANGE ORDER #1 LANZO CONSTRUCTION (S-958)

Miami-Dade County Board of County Commissioners adopted Resolution R-645-26 (File Number 260948) approving Change Order No. 1 to Contract No. S-958 with Lanzo Construction Co., Florida. The change order increases the contract amount by $5,411,816.28, from $7,253,128.25 to $12,664,944.53, and grants a 1,000-calendar day non-compensable time extension. The project involves a 16-inch, 12-inch, and 8-inch DI water main and 10-inch and 8-inch DI gravity sewer along NW 22nd Avenue from NW 79th Street to NW 90th Street, and an 8-inch DI force main along NW 87th Street. The change order addresses differing subsurface conditions, duct bank conflicts, and includes a concrete manhole substitution credit. The Substantial Completion Date is revised from May 21, 2024 to February 15, 2027, and the Final Completion Date from June 20, 2024 to March 17, 2027. The project is funded in part by the Building Better Communities General Obligation Bond (GOB) Program Project No. 17-Countrywide Water and Sewer System Enhancements. The Infrastructure, Innovation & Technology Committee forwarded it with a favorable recommendation on June 10, 2026, and the Board adopted it on July 21, 2026.

Board:
Board of County Commissioners
Date:
2026-07-21
Type:
Resolution
Decision:
Adopted
Address:
NW 22nd Avenue from NW 79th Street to NW 90th Street, and NW 87th Street
Applicant:
Miami-Dade County Water & Sewer Department; Contractor: Lanzo Construction Co., Florida

CHANGE ORDER #1 LANZO CONSTRUCTION (S-958)

Resolution approving Change Order No. 1 to Contract No. S-958 between Miami-Dade County and Lanzo Construction Co., Florida for the D2-C2 project, which includes a 16-inch, 12-inch, and 8-inch DI water main and 10-inch and 8-inch DI gravity sewer along NW 22nd Avenue from NW 79th Street to NW 90th Street and an 8-inch DI force main along NW 87th Street. The change order grants a time extension of 1,000 calendar days and increases the contract amount by $5,411,816.28, bringing the total contract award from $7,253,128.25 to $12,664,944.53. It also authorizes the use of funds from the Building Better Communities General Obligation Bond (GOB) Program Project No. 17-Countrywide Water and Sewer System Enhancements to pay in part for the extension of wastewater services along NW 22nd Avenue, and authorizes the County Mayor or designee to execute Change Order No. 1. The change order addresses differing subsurface conditions, duct bank conflicts, and includes a credit for concrete manhole substitution. The project was approved by the Board via Resolution No. R-259-22 and originated from Resolution No. R-597-13, which directed the development of a plan to extend sanitary sewer service to the Miami-Dade Green Technology Corridor (GTC). The project includes approximately 9,246 linear feet of sanitary sewer mains and 9,851 LF of ductile iron water main service lines. The change order was adopted by the Board of County Commissioners on 7/21/2026, after being forwarded with a favorable recommendation from the Infrastructure, Innovation & Technology Committee on 6/10/2026. The contract was awarded on November 22, 2021, ratified by the Board on March 15, 2022, and the Notice to Proceed was issued on June 1, 2022. The Substantial Completion Date is revised from May 21, 2024 to February 15, 2027, and the Final Completion Date from June 20, 2024 to March 17, 2027. The additional fiscal impact is funded out of WASD Revenue Bonds Sold, Water Connection Charges, Future WASD Revenue Bonds, BBC GOB Financing, and Florida Department of Environmental Protection Grant. The SBE-Con goal is recommended to be removed from the project. No public comment or stakeholder sentiment is stated in the document.

Board:
Board of County Commissioners
Date:
2026-07-21
Type:
Resolution
Decision:
Adopted
Address:
NW 22nd Avenue from NW 79th Street to NW 90th Street, and NW 87th Street
Applicant:
Lanzo Construction Co., Florida

CHANGE ORDER #1 LANZO CONSTRUCTION (S-958)

Resolution approving Change Order No. 1 to Contract No. S-958 between Miami-Dade County and Lanzo Construction Co., Florida for the D2-C2 project, which includes a 16-inch, 12-inch, and 8-inch DI water main and 10-inch and 8-inch DI gravity sewer along NW 22nd Avenue from NW 79th Street to NW 90th Street and an 8-inch DI force main along NW 87th Street. The change order grants a time extension of 1,000 calendar days and increases the contract amount by $5,411,816.28, bringing the total contract award from $7,253,128.25 to $12,664,944.53. It also authorizes the use of funds from the Building Better Communities General Obligation Bond (GOB) Program Project No. 17-Countywide Water and Sewer System Enhancements to pay in part for the extension of wastewater services along NW 22nd Avenue. The change order addresses differing subsurface conditions, duct bank conflicts, and includes a credit for concrete manhole substitution. The decision was adopted on 7/21/2026. The project is located in Commission District 2, represented by Commissioner Marleine Bastien. The project originated from Resolution No. R-597-13 to extend sanitary sewer service to commercial and industrial parcels within the Miami-Dade Green Technology Corridor (GTC), and is part of the Connect 2 Protect Program. The project includes approximately 9,246 linear feet of sanitary sewer mains and 9,851 LF of ductile iron water main service lines. The original contract was awarded on November 22, 2021, ratified by the Board on March 15, 2022 via Resolution No. R-259-22, with a total award of $7,253,128.25 and a duration of 750 calendar days. The Notice to Proceed was issued on June 1, 2022, with a Substantial Completion Date of May 21, 2024 and Final Completion Date of June 20, 2024. After the change order, the Substantial Completion Date is revised to February 15, 2027 and the Final Completion Date to March 17, 2027. The change order includes $4,680,600.00 for differing sub-surface conditions with a 908-calendar day extension, $595,409.58 for contingency replenishment, $167,731.70 for duct bank conflicts with a 92-calendar day extension, and a $31,925.00 savings for concrete manhole substitution. The SBE-Con goal is recommended to be removed from the project. The additional fiscal impact is funded out of WASD Revenue Bonds Sold, Water Connection Charges, and Future WASD Revenue Bonds, BBC GOB Financing, and Florida Department of Environmental Protection Grant. There is no impact to the General Fund. The project is in WASD's Fiscal Year 2025-2026 Adopted Budget and Multi-Year Capital Plan under Water Reset Program - Small Diameter Water Mains Replacement, Program #2000000072, Volume #3, Page #123 and Commercial and Industrial Corridors - Extension of Sewer System (Connect to Protect), Program #967090, Volume #3, Page #103. The Infrastructure, Innovation & Technology Committee forwarded the item to the BCC with a favorable recommendation on 6/10/2026.

Board:
Board of County Commissioners
Date:
2026-07-21
Type:
Resolution
Decision:
Adopted
Address:
NW 22nd Avenue from NW 79th Street to NW 90th Street and NW 87th Street
Applicant:
Lanzo Construction Co., Florida

CHANGE ORDER #1 LANZO CONSTRUCTION (S-958)

Miami-Dade County Board of County Commissioners is approving Change Order No. 1 to Contract No. S-958 with Lanzo Construction Co., Florida. This change order grants a 1,000-calendar day time extension and increases the contract amount by $5,411,816.28, bringing the total contract award to $12,664,944.53. The project involves installing 16-inch, 12-inch, and 8-inch DI water main and 10-inch and 8-inch DI gravity sewer along NW 22nd Avenue from NW 79th Street to NW 90th Street, and an 8-inch DI force main along NW 87th Street. The increase is due to differing subsurface conditions requiring larger trenching and additional restoration, as well as unforeseen conflicts with communication and electrical duct banks. Funds will be used from the Building Better Communities General Obligation Bond Program. The Infrastructure, Innovation & Technology Committee forwarded this item to the Board with a favorable recommendation.

Board:
Board of County Commissioners
Date:
2026-07-21
Type:
Resolution
Decision:
Approved (Change Order No. 1 approved)
Address:
NW 22nd Avenue from NW 79th Street to NW 90th Street and along NW 87th Street
Applicant:
Lanzo Construction Co., Florida

CHANGE ORDER #1 LANZO CONSTRUCTION (S-958)

Miami-Dade County Board of County Commissioners is considering Change Order #1 for Contract S-958 with Lanzo Construction Co., Florida. This change order approves a 1,000-calendar day time extension and increases the contract amount by $5,411,816.28, bringing the total contract value to $12,664,944.53. The project involves installing 16-inch, 12-inch, and 8-inch DI water mains and 10-inch and 8-inch DI gravity sewers along NW 22nd Avenue from NW 79th Street to NW 90th Street, and an 8-inch DI force main along NW 87th Street. The increase in cost and time is attributed to unforeseen subsurface conditions requiring extensive roadway restoration, and conflicts with existing communication and electrical duct banks. Funds for the wastewater service extension will be sourced from the Building Better Communities General Obligation Bond Program. The Infrastructure, Innovation & Technology Committee forwarded this item to the Board with a favorable recommendation. The original contract was awarded on November 22, 2021, and ratified on March 15, 2022. The revised substantial completion date is February 15, 2027, and the final completion date is March 17, 2027.

Board:
Board of County Commissioners
Date:
2026-07-21
Type:
Resolution
Decision:
Pending Board of County Commissioners approval (recommended favorable by Infrastructure, Innovation & Technology Committee)
Address:
NW 22nd Avenue from NW 79th Street to NW 90th Street and NW 87th Street
Applicant:
Lanzo Construction Co., Florida

CHANGE ORDER #1 LANZO CONSTRUCTION (S-958)

Miami-Dade County Board of County Commissioners adopted Resolution R-645-26 (File Number 260948) approving Change Order No. 1 to Contract No. S-958 with Lanzo Construction Co., Florida. The change order increases the contract amount by $5,411,816.28, from $7,253,128.25 to $12,664,944.53, and grants a 1,000-calendar day non-compensable time extension. The project involves a 16-inch, 12-inch, and 8-inch DI water main and 10-inch and 8-inch DI gravity sewer along NW 22nd Avenue from NW 79th Street to NW 90th Street, and an 8-inch DI force main along NW 87th Street. The change order addresses differing subsurface conditions, duct bank conflicts, concrete manhole substitution, and replenishes the contingency allowance. The Substantial Completion Date is revised from May 21, 2024 to February 15, 2027, and the Final Completion Date from June 20, 2024 to March 17, 2027. The project is funded in part by the Building Better Communities General Obligation Bond (GOB) Program Project No. 17. The Board authorized the County Mayor or designee to execute the change order. The item was forwarded to the Board with a favorable recommendation by the Infrastructure, Innovation & Technology Committee on June 10, 2026, and adopted by the Board on July 21, 2026.

Board:
Board of County Commissioners
Date:
2026-07-21
Type:
Resolution
Decision:
Adopted
Address:
NW 22nd Avenue from NW 79th Street to NW 90th Street, and NW 87th Street
Applicant:
Miami-Dade County Water and Sewer Department; Contractor: Lanzo Construction Co., Florida

CHANGE ORDER #1 LANZO CONSTRUCTION (S-958)

Miami-Dade County Board of County Commissioners adopted Resolution R-645-26 approving Change Order No. 1 to Contract No. S-958 with Lanzo Construction Co., Florida for the D2-C2 project: proposed 16-inch, 12-inch, and 8-inch DI water main and 10-inch and 8-inch DI gravity sewer along NW 22nd Avenue from NW 79th Street to NW 90th Street, and an 8-inch DI force main along NW 87th Street. The change order increases the contract amount by $5,411,816.28, from $7,253,128.25 to $12,664,944.53, and grants a 1,000-calendar day non-compensable time extension, revising the Substantial Completion Date from May 21, 2024 to February 15, 2027, and the Final Completion Date from June 20, 2024 to March 17, 2027. The change order covers $4,680,600.00 for differing subsurface conditions, $167,731.70 for duct bank conflicts, $595,409.58 for contingency replenishment, and a $31,925.00 credit for concrete manhole substitution. The project is funded in part by the Building Better Communities General Obligation Bond Program Project No. 17. The Board authorized the County Mayor or designee to execute the change order. The project was forwarded with a favorable recommendation by the Infrastructure, Innovation & Technology Committee on June 10, 2026, and adopted by the Board on July 21, 2026. The project is in Commission District 2, represented by Commissioner Marleine Bastien, who is the Prime Sponsor. The project extends wastewater infrastructure and replaces undersized water mains in the Miami-Dade Green Technology Corridor, with approximately 9,246 linear feet of sanitary sewer mains and 9,851 linear feet of ductile iron water main service lines. The original contract was awarded November 22, 2021, ratified by Resolution No. R-259-22 on March 15, 2022, with a duration of 750 calendar days and a contingency time allowance of 75 days; Notice to Proceed was issued June 1, 2022. The SBE-Con goal is recommended to be removed from the project; the SBE-Goods goal was exceeded. No public comment or stakeholder sentiment is stated in the document.

Board:
Board of County Commissioners
Date:
2026-07-21
Type:
Resolution
Decision:
Adopted
Address:
NW 22nd Avenue from NW 79th Street to NW 90th Street, and NW 87th Street
Applicant:
Miami-Dade County Water and Sewer Department; Contractor: Lanzo Construction Co., Florida

CHANGE ORDER #1 LANZO CONSTRUCTION (S-958)

Resolution approving Change Order No. 1 to Contract No. S-958 between Miami-Dade County and Lanzo Construction Co., Florida for the D2-C2 project, which includes a 16-inch, 12-inch, and 8-inch DI water main and 10-inch and 8-inch DI gravity sewer along NW 22nd Avenue from NW 79th Street to NW 90th Street and an 8-inch DI force main along NW 87th Street. The change order grants a 1,000-calendar day time extension and increases the contract amount by $5,411,816.28, bringing the total from $7,253,128.25 to $12,664,944.53. It also authorizes use of funds from the Building Better Communities General Obligation Bond (GOB) Program Project No. 17-Countrywide Water and Sewer System Enhancements to pay in part for the extension of wastewater services. The change order addresses differing subsurface conditions, duct bank conflicts, concrete manhole substitution, and replenishes the Contingency Allowance. The Board of County Commissioners adopted the resolution on 7/21/2026. The project was approved via Resolution No. R-259-22 and originated from Resolution No. R-597-13. The project extends wastewater infrastructure and replaces undersized water mains, including approximately 9,246 linear feet of sanitary sewer mains and 9,851 LF of ductile iron water main service lines. The project is located in Commission District 2, represented by Commissioner Marleine Bastien. The contract was awarded on November 22, 2021, ratified on March 15, 2022, and the Notice to Proceed was issued on June 1, 2022. The Substantial Completion Date is revised from May 21, 2024 to February 15, 2027, and the Final Completion Date from June 20, 2024 to March 17, 2027. The change order includes $4,680,600.00 for differing subsurface conditions with a 908-calendar day extension, $595,409.58 for contingency replenishment, $167,731.70 for duct bank conflicts with a 92-calendar day extension, and a $31,925.00 credit for concrete manhole substitution. The contract had an 8 percent SBE-Goods goal and an 18 percent SBE-Con goal; the SBE-Con goal is recommended to be removed. No public comment or stakeholder sentiment is stated in the document.

Board:
Board of County Commissioners
Date:
2026-07-21
Type:
Resolution
Decision:
Adopted
Address:
NW 22nd Avenue from NW 79th Street to NW 90th Street and NW 87th Street
Applicant:
Miami-Dade County Water & Sewer Department; Contractor: Lanzo Construction Co., Florida

CHANGE ORDER #1 LANZO CONSTRUCTION (S-958)

Resolution approving Change Order No. 1 to Contract No. S-958 between Miami-Dade County and Lanzo Construction Co., Florida for the D2-C2 project: proposed 16-inch, 12-inch, and 8-inch DI water main and 10-inch and 8-inch DI gravity sewer along NW 22nd Avenue from NW 79th Street to NW 90th Street, and an 8-inch DI force main along NW 87th Street. The change order grants a time extension of 1,000 calendar days and increases the contract amount by $5,411,816.28, bringing the total contract award from $7,253,128.25 to $12,664,944.53. It authorizes use of funds from the Building Better Communities General Obligation Bond (GOB) Program Project No. 17-Countywide Water and Sewer System Enhancements to pay in part for the extension of wastewater services along NW 22nd Avenue, and authorizes the County Mayor or designee to execute Change Order No. 1. The change order addresses differing subsurface conditions, duct bank conflicts, concrete manhole substitution credit, and replenishes the Contingency Allowance. The project extends critical wastewater infrastructure and replaces undersized water mains serving industrial and commercial properties along NW 22nd Avenue. The project originated from Resolution No. R-597-13 and the Connect 2 Protect Program. The contract was awarded November 22, 2021, ratified by the Board on March 15, 2022 via Resolution No. R-259-22, with a Notice to Proceed issued June 1, 2022. Substantial Completion Date revised from May 21, 2024 to February 15, 2027, and Final Completion Date revised from June 20, 2024 to March 17, 2027. The additional fiscal impact is funded out of WASD Revenue Bonds Sold, Water Connection Charges, Future WASD Revenue Bonds, BBC GOB Financing, and Florida Department of Environmental Protection Grant. The SBE-Con goal is recommended to be removed from the project. The resolution was adopted by the Board of County Commissioners on July 21, 2026, after being forwarded with a favorable recommendation from the Infrastructure, Innovation & Technology Committee on June 10, 2026. Prime Sponsor is Marleine Bastien. The project is located in Commission District 2.

Board:
Board of County Commissioners
Date:
2026-07-21
Type:
Resolution
Decision:
Adopted
Address:
NW 22nd Avenue from NW 79th Street to NW 90th Street, and NW 87th Street
Applicant:
Lanzo Construction Co., Florida (Contractor); Miami-Dade County (Owner); Water & Sewer Department (Requester)

CHANGE ORDER #1 LANZO CONSTRUCTION (S-958)

Miami-Dade County Board of County Commissioners is approving Change Order No. 1 to Contract No. S-958 with Lanzo Construction Co., Florida. This change order grants a 1,000-calendar day time extension and increases the contract amount by $5,411,816.28, bringing the total contract award to $12,664,944.53. The project involves the installation of 16-inch, 12-inch, and 8-inch DI water main and 10-inch and 8-inch DI gravity sewer along NW 22nd Avenue from NW 79th Street to NW 90th Street, and an 8-inch DI force main along NW 87th Street. The increase is due to differing subsurface conditions requiring larger trenching and additional restoration, and unforeseen conflicts with communication and electrical duct banks. Funds will be used from the Building Better Communities General Obligation Bond Program. The original contract was awarded on November 22, 2021, for $7,253,128.25 with a 750-day duration. The Infrastructure, Innovation & Technology Committee forwarded this item to the Board with a favorable recommendation.

Board:
Board of County Commissioners
Date:
2026-07-21
Type:
Resolution
Decision:
Approved (Change Order No. 1)
Address:
NW 22nd Avenue from NW 79th Street to NW 90th Street and along NW 87th Street
Applicant:
Lanzo Construction Co., Florida

CHANGE ORDER #1 LANZO CONSTRUCTION (S-958)

Miami-Dade County Board of County Commissioners is considering Change Order #1 for Contract S-958 with Lanzo Construction Co., Florida. This change order approves a 1,000-calendar day time extension and increases the contract amount by $5,411,816.28, bringing the total contract value to $12,664,944.53. The project involves installing 16-inch, 12-inch, and 8-inch DI water mains and 10-inch and 8-inch DI gravity sewers along NW 22nd Avenue from NW 79th Street to NW 90th Street, and an 8-inch DI force main along NW 87th Street. The increase in cost and time is attributed to unforeseen subsurface conditions requiring extensive roadway restoration, and conflicts with existing communication and electrical duct banks. Funds will be utilized from the Building Better Communities General Obligation Bond Program. The Infrastructure, Innovation & Technology Committee forwarded this item to the Board with a favorable recommendation.

Board:
Board of County Commissioners
Date:
2026-07-21
Type:
Resolution
Decision:
Forwarded to BCC with a favorable recommendation by Infrastructure, Innovation & Technology Committee; pending Board of County Commissioners approval.
Address:
NW 22nd Avenue from NW 79th Street to NW 90th Street and NW 87th Street
Applicant:
Lanzo Construction Co., Florida

CHANGE ORDER #1 LANZO CONSTRUCTION (S-958)

Miami-Dade County Board of County Commissioners is considering Change Order #1 for Contract S-958 with Lanzo Construction Co., Florida. This change order approves a 1,000-calendar day time extension and increases the contract amount by $5,411,816.28, bringing the total contract value to $12,664,944.53. The project involves installing 16-inch, 12-inch, and 8-inch DI water mains and 10-inch and 8-inch DI gravity sewers along NW 22nd Avenue from NW 79th Street to NW 90th Street, and an 8-inch DI force main along NW 87th Street. The increase in cost and time is attributed to unforeseen subsurface conditions requiring extensive roadway restoration, and conflicts with existing communication and electrical duct banks. Funds for the wastewater service extension will be sourced from the Building Better Communities General Obligation Bond (GOB) Program Project No. 17. The Infrastructure, Innovation & Technology Committee forwarded this item to the Board with a favorable recommendation. The original contract was awarded on November 22, 2021, and ratified on March 15, 2022. The revised substantial completion date is February 15, 2027, and the final completion date is March 17, 2027.

Board:
Board of County Commissioners
Date:
2026-07-21
Type:
Resolution
Decision:
Forwarded to BCC with a favorable recommendation by Infrastructure, Innovation & Technology Committee; pending Board of County Commissioners approval
Address:
NW 22nd Avenue from NW 79th Street to NW 90th Street and NW 87th Street
Applicant:
Lanzo Construction Co., Florida

CHANGE ORDER #1 LANZO CONSTRUCTION (S-958)

Resolution approving Change Order No. 1 to Contract No. S-958 between Miami-Dade County and Lanzo Construction Co., Florida for the D2-C2 project, which includes proposed 16-inch, 12-inch, and 8-inch DI water main and 10-inch and 8-inch DI gravity sewer along NW 22nd Avenue from NW 79th Street to NW 90th Street and an 8-inch DI force main along NW 87th Street. The change order grants a time extension of 1,000 calendar days and increases the contract amount by $5,411,816.28, bringing the total contract award from $7,253,128.25 to $12,664,944.53. The resolution was adopted on 7/21/2026. The change order is driven by differing subsurface conditions, duct bank conflicts, and includes a credit for concrete manhole substitution and replenishes the contingency allowance. The project is funded in part by the Building Better Communities General Obligation Bond (GOB) Program Project No. 17-Countrywide Water and Sewer System Enhancements. The project extends wastewater infrastructure and replaces undersized water mains in the Miami-Dade Green Technology Corridor. The contract was originally awarded on November 22, 2021, ratified by the Board on March 15, 2022 via Resolution No. R-259-22, with a Notice to Proceed issued on June 1, 2022. Substantial Completion Date revised from May 21, 2024 to February 15, 2027, and Final Completion Date revised from June 20, 2024 to March 17, 2027. The project is located in Commission District 2, represented by Commissioner Marleine Bastien, who is the Prime Sponsor. The Infrastructure, Innovation & Technology Committee forwarded the item to the Board of County Commissioners with a favorable recommendation on 6/10/2026. The resolution was introduced on 5/20/2026. The County Attorney was assigned on 5/21/2026. The final action was on 7/21/2026. The document does not state any public comment or stakeholder sentiment.

Board:
Board of County Commissioners
Date:
2026-07-21
Type:
Resolution
Decision:
Adopted
Address:
NW 22nd Avenue from NW 79th Street to NW 90th Street, and NW 87th Street
Applicant:
Lanzo Construction Co., Florida

CHANGE ORDER #1 LANZO CONSTRUCTION (S-958)

Miami-Dade County Board of County Commissioners adopted Resolution R-645-26 approving Change Order No. 1 to Contract No. S-958 with Lanzo Construction Co., Florida for the D2-C2 project: proposed 16-inch, 12-inch, and 8-inch DI water main and 10-inch and 8-inch DI gravity sewer along NW 22nd Avenue from NW 79th Street to NW 90th Street and an 8-inch DI force main along NW 87th Street. The change order increases the contract amount by $5,411,816.28 from $7,253,128.25 to $12,664,944.53 and grants a 1,000-calendar day non-compensable time extension. The project extends critical wastewater infrastructure and replaces undersized water mains serving industrial and commercial properties. The change order addresses differing subsurface conditions ($4,680,600.00, 908-day extension), duct bank conflicts ($167,731.70, 92-day extension), replenishes the Contingency Allowance ($595,409.58), and includes a credit of $31,925.00 for concrete manhole substitution. The project is funded in part by the Building Better Communities General Obligation Bond (GOB) Program Project No. 17-Countywid Water and Sewer System Enhancements. The contract was awarded November 22, 2021, ratified March 15, 2022 via Resolution R-259-22, Notice to Proceed issued June 1, 2022. Substantial Completion Date revised from May 21, 2024 to February 15, 2027; Final Completion Date revised from June 20, 2024 to March 17, 2027. The Infrastructure, Innovation & Technology Committee forwarded the item with a favorable recommendation on June 10, 2026; the Board adopted it on July 21, 2026. The project is in Commission District 2, represented by Commissioner Marleine Bastien, who is the Prime Sponsor. The SBE-Con goal is recommended to be removed from the project because SBE-Con firms reported they were unable to perform at their original bid prices and no substitute SBE-Con firm could be secured; the Contractor will self-perform this portion of the work.

Board:
Board of County Commissioners
Date:
2026-07-21
Type:
Resolution
Decision:
Adopted
Address:
NW 22nd Avenue from NW 79th Street to NW 90th Street and NW 87th Street
Applicant:
Miami-Dade County Water & Sewer Department; Contractor: Lanzo Construction Co., Florida

CHANGE ORDER #1 LANZO CONSTRUCTION (S-958)

Miami-Dade County Board of County Commissioners adopted Resolution R-645-26 approving Change Order No. 1 to Contract No. S-958 with Lanzo Construction Co., Florida for the D2-C2 project: proposed 16-inch, 12-inch, and 8-inch DI water main and 10-inch and 8-inch DI gravity sewer along NW 22nd Avenue from NW 79th Street to NW 90th Street, and an 8-inch DI force main along NW 87th Street. The change order increases the contract amount by $5,411,816.28, from $7,253,128.25 to $12,664,944.53, and grants a 1,000-calendar day non-compensable time extension. The project includes approximately 9,246 linear feet of sanitary sewer mains and 9,851 linear feet of ductile iron water main service lines. The change order addresses differing subsurface conditions ($4,680,600.00, 908-day extension), duct bank conflicts ($167,731.70, 92-day extension), contingency replenishment ($595,409.58), and a concrete manhole substitution credit of $31,925.00. The project is funded in part by the Building Better Communities General Obligation Bond Program Project No. 17. The contract was originally awarded November 22, 2021, ratified March 15, 2022 via Resolution R-259-22, with Notice to Proceed issued June 1, 2022. Substantial Completion Date revised from May 21, 2024 to February 15, 2027; Final Completion Date revised from June 20, 2024 to March 17, 2027. The Infrastructure, Innovation & Technology Committee forwarded the item with a favorable recommendation on June 10, 2026; the Board adopted it on July 21, 2026. The project is in Commission District 2, represented by Commissioner Marleine Bastien, who is the Prime Sponsor. The project originated from Resolution R-597-13 and is part of the Connect 2 Protect Program to extend sanitary sewer service to commercial and industrial parcels in the Miami-Dade Green Technology Corridor. The SBE-Con goal is recommended to be removed because SBE-Con firms were unable to perform at original bid prices and no substitute was secured; the contractor will self-perform that work. No public comment or stakeholder sentiment is stated in the document.

Board:
Board of County Commissioners
Date:
2026-07-21
Type:
Resolution
Decision:
Adopted
Address:
NW 22nd Avenue from NW 79th Street to NW 90th Street, and NW 87th Street
Applicant:
Miami-Dade County Water and Sewer Department; Contractor: Lanzo Construction Co., Florida

CHANGE ORDER #1 LANZO CONSTRUCTION (S-958)

Miami-Dade County Board of County Commissioners is considering Change Order #1 for Contract S-958 with Lanzo Construction Co., Florida. This change order grants a 1,000-calendar day time extension and increases the contract amount by $5,411,816.28, bringing the total contract value to $12,664,944.53. The project involves installing 16-inch, 12-inch, and 8-inch DI water mains and 10-inch and 8-inch DI gravity sewers along NW 22nd Avenue from NW 79th Street to NW 90th Street, and an 8-inch DI force main along NW 87th Street. The increase is due to unforeseen subsurface conditions requiring extensive roadway restoration and conflicts with communication and electrical duct banks. Funds will be utilized from the Building Better Communities General Obligation Bond Program. The Infrastructure, Innovation & Technology Committee forwarded this item to the Board with a favorable recommendation.

Board:
Board of County Commissioners
Date:
2026-07-21
Type:
Resolution
Decision:
Forwarded to BCC with a favorable recommendation (Infrastructure, Innovation & Technology Committee); Pending BCC Assignment (Board of County Commissioners)
Address:
NW 22nd Avenue from NW 79th Street to NW 90th Street, and NW 87th Street
Applicant:
Lanzo Construction Co., Florida

CHANGE ORDER #1 LANZO CONSTRUCTION (S-958)

Resolution approving Change Order No. 1 to Contract No. S-958 between Miami-Dade County and Lanzo Construction Co., Florida for the D2-C2 project: proposed 16-inch, 12-inch, and 8-inch DI water main and 10-inch and 8-inch DI gravity sewer along NW 22nd Avenue from NW 79th Street to NW 90th Street, and an 8-inch DI force main along NW 87th Street. The change order grants a 1,000-calendar day time extension and increases the contract amount by $5,411,816.28, bringing the total from $7,253,128.25 to $12,664,944.53. It also includes a credit for concrete manhole substitution and replenishes the Contingency Allowance. The resolution was adopted by the Board of County Commissioners on 7/21/2026. The project extends wastewater infrastructure and replaces undersized water mains, with approximately 9,246 linear feet of sanitary sewer mains and 9,851 LF of ductile iron water main service lines. The change order addresses differing subsurface conditions, duct bank conflicts, and includes a contingency replenishment. The project is in Commission District 2, represented by Commissioner Marleine Bastien, who is the Prime Sponsor. The project originated from Resolution No. R-597-13 and is part of the Connect 2 Protect Program. The contract was originally awarded on November 22, 2021, ratified by the Board on March 15, 2022 via Resolution No. R-259-22, with a Notice to Proceed issued on June 1, 2022. The Substantial Completion Date is revised from May 21, 2024 to February 15, 2027, and the Final Completion Date from June 20, 2024 to March 17, 2027. The change order includes $4,680,600.00 for differing subsurface conditions with a 908-calendar day extension, $595,409.58 for contingency replenishment, $167,731.70 for duct bank conflicts with a 92-calendar day extension, and a $31,925.00 savings for concrete manhole substitution. The SBE-Con goal is recommended to be removed from the project. The Infrastructure, Innovation & Technology Committee forwarded it to the BCC with a favorable recommendation on 6/10/2026.

Board:
Board of County Commissioners
Date:
2026-07-21
Type:
Resolution
Decision:
Adopted
Address:
NW 22nd Avenue from NW 79th Street to NW 90th Street, and NW 87th Street
Applicant:
Lanzo Construction Co., Florida

CHANGE ORDER #1 LANZO CONSTRUCTION (S-958)

Resolution approving Change Order No. 1 to Contract No. S-958 between Miami-Dade County and Lanzo Construction Co., Florida for the D2-C2 project: proposed 16-inch, 12-inch, and 8-inch DI water main and 10-inch and 8-inch DI gravity sewer along NW 22nd Avenue from NW 79th Street to NW 90th Street and an 8-inch DI force main along NW 87th Street. The change order grants a time extension of 1,000 calendar days and increases the contract amount by $5,411,816.28, bringing the total contract award from $7,253,128.25 to $12,664,944.53. It authorizes the use of funds from the Building Better Communities General Obligation Bond (GOB) Program Project No. 17-Countrywide Water and Sewer System Enhancements to pay in part for the extension of wastewater services along NW 22nd Avenue. The change order is driven by differing subsurface conditions (larger trenching requirements, additional restoration, unforeseen conflicts with communication and electrical duct banks), includes a credit for concrete manhole substitution, and replenishes the contract's Contingency Allowance. The project extends critical wastewater infrastructure and replaces undersized water mains serving industrial and commercial properties. The contract was awarded on November 22, 2021, ratified by the Board on March 15, 2022 via Resolution No. R-259-22, and the Notice to Proceed was issued on June 1, 2022. The Substantial Completion Date is revised from May 21, 2024 to February 15, 2027, and the Final Completion Date from June 20, 2024 to March 17, 2027. The Board of County Commissioners adopted the resolution on July 21, 2026. The Infrastructure, Innovation & Technology Committee forwarded it with a favorable recommendation on June 10, 2026. The project is in Commission District 2, represented by Commissioner Marleine Bastien, who is the Prime Sponsor. The project originated from Resolution No. R-597-13, which directed the development of a plan to extend sanitary sewer service to commercial and industrial parcels within the Miami-Dade Green Technology Corridor (GTC), leading to the Connect 2 Protect Program. The project includes approximately 9,246 linear feet of sanitary sewer mains and 9,851 LF of ductile iron water main service lines. The change order includes $4,680,600.00 for differing subsurface conditions (908-day extension), $595,409.58 for contingency replenishment, $167,731.70 for duct bank conflicts (92-day extension), and a $31,925.00 credit for concrete manhole substitution. The SBE-Con goal is recommended to be removed from the project. No public comment or stakeholder sentiment is stated in the document.

Board:
Board of County Commissioners
Date:
2026-07-21
Type:
Resolution
Decision:
Adopted
Address:
NW 22nd Avenue from NW 79th Street to NW 90th Street; 8-inch DI force main along NW 87th Street
Applicant:
Miami-Dade County Water & Sewer Department; Contractor: Lanzo Construction Co., Florida

CHANGE ORDER #1 LANZO CONSTRUCTION (S-958)

Miami-Dade County Board of County Commissioners is approving Change Order No. 1 to Contract No. S-958 with Lanzo Construction Co., Florida. This change order grants a 1,000-calendar day time extension and increases the contract amount by $5,411,816.28, bringing the total contract award to $12,664,944.53. The project involves proposed 16-inch, 12-inch, and 8-inch DI water main and 10-inch and 8-inch DI gravity sewer along NW 22nd Avenue from NW 79th Street to NW 90th Street, and an 8-inch DI force main along NW 87th Street. The increase is due to differing subsurface conditions requiring larger trenching and additional restoration, as well as unforeseen conflicts with communication and electrical duct banks. Funds will be used from the Building Better Communities General Obligation Bond Program Project No. 17. The Infrastructure, Innovation & Technology Committee forwarded this item to the Board with a favorable recommendation.

Board:
Board of County Commissioners
Date:
2026-07-21
Type:
Resolution
Decision:
Approved (Change Order No. 1 approved)
Address:
NW 22nd Avenue from NW 79th Street to NW 90th Street and along NW 87th Street
Applicant:
Lanzo Construction Co., Florida

CHANGE ORDER #1 LANZO CONSTRUCTION (S-958)

Miami-Dade County Board of County Commissioners is considering Change Order #1 for Contract S-958 with Lanzo Construction Co., Florida. This change order approves a 1,000-calendar day time extension and increases the contract amount by $5,411,816.28, bringing the total contract value to $12,664,944.53. The project involves installing 16-inch, 12-inch, and 8-inch DI water mains and 10-inch and 8-inch DI gravity sewers along NW 22nd Avenue from NW 79th Street to NW 90th Street, and an 8-inch DI force main along NW 87th Street. The increase in cost and time is attributed to unforeseen subsurface conditions requiring extensive roadway restoration, and conflicts with existing communication and electrical duct banks. Funds will be utilized from the Building Better Communities General Obligation Bond Program. The Infrastructure, Innovation & Technology Committee forwarded this item to the Board with a favorable recommendation. The original contract was awarded on November 22, 2021, and ratified on March 15, 2022.

Board:
Board of County Commissioners
Date:
2026-07-21
Type:
Resolution
Decision:
Pending Board of County Commissioners approval
Address:
NW 22nd Avenue from NW 79th Street to NW 90th Street and NW 87th Street
Applicant:
Lanzo Construction Co., Florida

CHANGE ORDER #1 LANZO CONSTRUCTION (S-958)

Resolution approving Change Order No. 1 to Contract No. S-958 between Miami-Dade County and Lanzo Construction Co., Florida for the D2-C2 project: proposed 16-inch, 12-inch, and 8-inch DI water main and 10-inch and 8-inch DI gravity sewer along NW 22nd Avenue from NW 79th Street to NW 90th Street, and an 8-inch DI force main along NW 87th Street. The change order grants a 1,000-calendar day time extension and increases the contract amount by $5,411,816.28, bringing the total from $7,253,128.25 to $12,664,944.53. It also includes a credit for concrete manhole substitution and replenishes the contingency allowance. The resolution was adopted by the Board of County Commissioners on 7/21/2026. The project is located in Commission District 2, represented by Commissioner Marleine Bastien, who is the Prime Sponsor. The project extends wastewater infrastructure and replaces undersized water mains serving industrial and commercial properties along NW 22nd Avenue. The change order addresses differing subsurface conditions, duct bank conflicts, and includes a contingency replenishment. The project originated from Resolution No. R-597-13 and is part of the Connect 2 Protect Program. The contract was originally awarded on November 22, 2021, ratified by the Board on March 15, 2022 via Resolution No. R-259-22, with a Notice to Proceed issued on June 1, 2022. The Substantial Completion Date is revised from May 21, 2024 to February 15, 2027, and the Final Completion Date from June 20, 2024 to March 17, 2027. The additional fiscal impact is funded by WASD Revenue Bonds Sold, Water Connection Charges, Future WASD Revenue Bonds, BBC GOB Financing, and Florida Department of Environmental Protection Grant. The SBE-Con goal is recommended to be removed from the project. No public comment or stakeholder sentiment is stated in the document.

Board:
Board of County Commissioners
Date:
2026-07-21
Type:
Resolution
Decision:
Adopted
Address:
NW 22nd Avenue from NW 79th Street to NW 90th Street, and NW 87th Street
Applicant:
Lanzo Construction Co., Florida

CHANGE ORDER #1 LANZO CONSTRUCTION (S-958)

Resolution approving Change Order No. 1 to Contract No. S-958 between Miami-Dade County and Lanzo Construction Co., Florida for the D2-C2 project: proposed 16-inch, 12-inch, and 8-inch DI water main and 10-inch and 8-inch DI gravity sewer along NW 22nd Avenue from NW 79th Street to NW 90th Street, and an 8-inch DI force main along NW 87th Street. The change order grants a 1,000-calendar day time extension and increases the contract amount by $5,411,816.28, bringing the total from $7,253,128.25 to $12,664,944.53. It also includes a credit for concrete manhole substitution and replenishes the contract's Contingency Allowance. The resolution authorizes the County Mayor or designee to execute Change Order No. 1 and use funds from the Building Better Communities General Obligation Bond (GOB) Program Project No. 17-Countywide Water and Sewer System Enhancements to pay in part for the extension of wastewater services. The change order addresses differing subsurface conditions (cost $4,680,600.00, 908-day extension), duct bank conflicts (cost $167,731.70, 92-day extension), contingency replenishment ($595,409.58), and concrete manhole substitution savings ($31,925.00). The project extends critical wastewater infrastructure and replaces undersized water mains serving industrial and commercial properties along NW 22nd Avenue. The project originated from Resolution No. R-597-13 and is part of the Connect 2 Protect Program. The contract was awarded on November 22, 2021, ratified by the Board on March 15, 2022 via Resolution No. R-259-22, with a Notice to Proceed issued on June 1, 2022. The Substantial Completion Date is revised from May 21, 2024 to February 15, 2027, and the Final Completion Date from June 20, 2024 to March 17, 2027. The resolution was adopted by the Board of County Commissioners on July 21, 2026, after being forwarded with a favorable recommendation from the Infrastructure, Innovation & Technology Committee on June 10, 2026. The project is located in Commission District 2, represented by Commissioner Marleine Bastien, who is the Prime Sponsor. The fiscal impact is funded out of WASD Revenue Bonds Sold, Water Connection Charges, Future WASD Revenue Bonds, BBC GOB Financing, and Florida Department of Environmental Protection Grant. The project is in WASD's Fiscal Year 2025-2026 Adopted Budget under Water Reset Program - Small Diameter Water Mains Replacement, Program #2000000072, Volume #3, Page #123 and Commercial and Industrial Corridors - Extension of Sewer System (Connect to Protect), Program #967090, Volume #3, Page #103. The contract was awarded with an 8 percent SBE-Goods goal and an 18 percent SBE-Con goal. The SBE-Goods goal was exceeded. The SBE-Con goal is recommended to be removed from the project because SBE-Con firms reported they were unable to perform at their original bid prices, and the Contractor was unable to secure a substitute SBE-Con firm. WASD indicated the Contractor will self-perform this portion of the work. The document does not state any public comment or stakeholder sentiment.

Board:
Board of County Commissioners
Date:
2026-07-21
Type:
Resolution
Decision:
Adopted
Address:
NW 22nd Avenue from NW 79th Street to NW 90th Street, and NW 87th Street
Applicant:
Miami-Dade County Water and Sewer Department (WASD); Contractor: Lanzo Construction Co., Florida

CHANGE ORDER #1 LANZO CONSTRUCTION (S-958)

Resolution approving Change Order No. 1 to Contract No. S-958 between Miami-Dade County and Lanzo Construction Co., Florida for the D2-C2 project, which includes proposed 16-inch, 12-inch, and 8-inch DI water main and 10-inch and 8-inch DI gravity sewer along NW 22nd Avenue from NW 79th Street to NW 90th Street, and an 8-inch DI force main along NW 87th Street. The change order grants a time extension of 1,000 calendar days and increases the contract amount by $5,411,816.28, bringing the total contract award from $7,253,128.25 to $12,664,944.53. The change order is due to differing subsurface conditions, unforeseen conflicts with communication and electrical duct banks, and includes a credit for concrete manhole substitution and replenishes the contingency allowance. The resolution authorizes the County Mayor or designee to execute the change order and use funds from the Building Better Communities General Obligation Bond (GOB) Program Project No. 17. The project was approved by the Board via Resolution No. R-259-22 and originated from Resolution No. R-597-13, which directed a plan to extend sanitary sewer service to commercial and industrial parcels in the Miami-Dade Green Technology Corridor (GTC). The project includes approximately 9,246 linear feet of sanitary sewer mains and 9,851 LF of ductile iron water main service lines. The contract was awarded on November 22, 2021, ratified on March 15, 2022, and the Notice to Proceed was issued on June 1, 2022. The Substantial Completion Date is revised from May 21, 2024 to February 15, 2027, and the Final Completion Date from June 20, 2024 to March 17, 2027. The change order includes $4,680,600.00 for differing sub-surface conditions with a 908-calendar day extension, $595,409.58 for contingency replenishment, $167,731.70 for duct bank conflicts with a 92-calendar day extension, and a $31,925.00 savings for concrete manhole substitution. The contract had an 8 percent SBE-Goods goal and an 18 percent SBE-Con goal; the SBE-Con goal is recommended to be removed. The final action was adopted on July 21, 2026.

Board:
Board of County Commissioners
Date:
2026-07-21
Type:
Resolution
Decision:
Adopted
Address:
NW 22nd Avenue from NW 79th Street to NW 90th Street, and NW 87th Street
Applicant:
Lanzo Construction Co., Florida

CHANGE ORDER #1 LANZO CONSTRUCTION (S-958)

Resolution approving Change Order No. 1 to Contract No. S-958 between Miami-Dade County and Lanzo Construction Co., Florida for the D2-C2 project: proposed 16-inch, 12-inch, and 8-inch DI water main and 10-inch and 8-inch DI gravity sewer along NW 22nd Avenue from NW 79th Street to NW 90th Street, and an 8-inch DI force main along NW 87th Street. The change order grants a 1,000-calendar day non-compensable time extension and increases the contract amount by $5,411,816.28, bringing the total from $7,253,128.25 to $12,664,944.53. It also includes a credit for concrete manhole substitution and replenishes the contingency allowance. The project extends wastewater infrastructure and replaces undersized water mains, with approximately 9,246 linear feet of sanitary sewer mains and 9,851 LF of ductile iron water main service lines. The change order addresses differing subsurface conditions, duct bank conflicts, and includes a contingency replenishment. The resolution was adopted by the Board of County Commissioners on 7/21/2026, after being forwarded with a favorable recommendation from the Infrastructure, Innovation & Technology Committee on 6/10/2026. The project is in Commission District 2, represented by Commissioner Marleine Bastien, who is the Prime Sponsor. The contract was originally awarded on November 22, 2021, ratified by the Board on March 15, 2022 via Resolution No. R-259-22, with a Notice to Proceed issued on June 1, 2022. The Substantial Completion Date is revised from May 21, 2024 to February 15, 2027, and the Final Completion Date from June 20, 2024 to March 17, 2027. Funding sources include WASD Revenue Bonds Sold, Water Connection Charges, Future WASD Revenue Bonds, BBC GOB Financing, and Florida Department of Environmental Protection Grant. The project originated from Resolution No. R-597-13 and is part of the Connect 2 Protect Program. The SBE-Con goal is recommended to be removed from the project. No public comment or stakeholder sentiment is stated in the document.

Board:
Board of County Commissioners
Date:
2026-07-21
Type:
Resolution
Decision:
Adopted
Address:
NW 22nd Avenue from NW 79th Street to NW 90th Street, and NW 87th Street
Applicant:
Lanzo Construction Co., Florida

CHANGE ORDER #1 LANZO CONSTRUCTION (S-958)

Resolution approving Change Order No. 1 to Contract No. S-958 between Miami-Dade County and Lanzo Construction Co., Florida for the D2-C2 project, which includes proposed 16-inch, 12-inch, and 8-inch DI water main and 10-inch and 8-inch DI gravity sewer along NW 22nd Avenue from NW 79th Street to NW 90th Street and an 8-inch DI force main along NW 87th Street. The change order grants a time extension of 1,000 calendar days and increases the contract amount by $5,411,816.28, bringing the total contract award from $7,253,128.25 to $12,664,944.53. It also authorizes the use of funds from the Building Better Communities General Obligation Bond (GOB) Program Project No. 17-Countrywide Water and Sewer System Enhancements to pay in part for the extension of wastewater services along NW 22nd Avenue, and authorizes the County Mayor or designee to execute Change Order No. 1. The change order is driven by differing subsurface conditions (cost $4,680,600.00, 908-day extension), duct bank conflicts (cost $167,731.70, 92-day extension), contingency replenishment ($595,409.58), and a credit for concrete manhole substitution ($31,925.00). The contract was awarded on November 22, 2021, ratified by the Board on March 15, 2022 via Resolution No. R-259-22, with a Notice to Proceed issued on June 1, 2022. The Substantial Completion Date is revised from May 21, 2024 to February 15, 2027, and the Final Completion Date from June 20, 2024 to March 17, 2027. The resolution was adopted by the Board of County Commissioners on July 21, 2026, after being forwarded with a favorable recommendation from the Infrastructure, Innovation & Technology Committee on June 10, 2026. The project is located in Commission District 2, represented by Commissioner Marleine Bastien, who is the Prime Sponsor. The project will extend critical wastewater infrastructure and replace undersized water mains serving industrial and commercial properties along NW 22nd Avenue, with approximately 9,246 linear feet of sanitary sewer mains and 9,851 LF of ductile iron water main service lines. The project originated from Resolution No. R-597-13, which directed the development of a plan to extend sanitary sewer service to commercial and industrial parcels within the Miami-Dade Green Technology Corridor (GTC), leading to the Connect 2 Protect Program. The additional fiscal impact is funded out of WASD Revenue Bonds Sold, Water Connection Charges, Future WASD Revenue Bonds, BBC GOB Financing, and Florida Department of Environmental Protection Grant. The contract had an 8 percent SBE-Goods goal and an 18 percent SBE-Con goal; the SBE-Goods goal was exceeded, but the SBE-Con goal is recommended to be removed due to the restrictive nature of the Project funding and fixed budget, with the Contractor self-performing that portion of the work. No public comment or stakeholder sentiment is stated in the document.

Board:
Board of County Commissioners
Date:
2026-07-21
Type:
Resolution
Decision:
Adopted
Address:
NW 22nd Avenue from NW 79th Street to NW 90th Street, and NW 87th Street
Applicant:
Miami-Dade County Water & Sewer Department; Contractor: Lanzo Construction Co., Florida

CHANGE ORDER #1 LANZO CONSTRUCTION (S-958)

Resolution approving Change Order No. 1 to Contract No. S-958 between Miami-Dade County and Lanzo Construction Co., Florida for the D2-C2 project, which includes proposed 16-inch, 12-inch, and 8-inch DI water main and 10-inch and 8-inch DI gravity sewer along NW 22nd Avenue from NW 79th Street to NW 90th Street and an 8-inch DI force main along NW 87th Street. The change order grants a time extension of 1,000 calendar days and increases the contract amount by $5,411,816.28, bringing the total contract award from $7,253,128.25 to $12,664,944.53. The resolution authorizes the use of funds from the Building Better Communities General Obligation Bond (GOB) Program Project No. 17-Countrywide Water and Sewer System Enhancements to pay in part for the extension of wastewater services along NW 22nd Avenue, and authorizes the County Mayor or designee to execute Change Order No. 1. The change order addresses differing subsurface conditions resulting in larger trenching requirements and additional restoration ($4,680,600.00, 908-day extension), unforeseen conflicts with communication and electrical duct banks ($167,731.70, 92-day extension), replenishes the Contract's Contingency Allowance ($595,409.58), and includes a credit for substituting concrete manholes for fiberglass ($31,925.00 savings). The project was approved via Resolution No. R-259-22 and originated from Resolution No. R-597-13, which directed the development of a plan to extend sanitary sewer service to commercial and industrial parcels within the Miami-Dade Green Technology Corridor (GTC). The project includes installation of approximately 9,246 linear feet of sanitary sewer mains and 9,851 LF of ductile iron water main service lines. The contract was awarded on November 22, 2021, ratified by the Board on March 15, 2022, with a Notice to Proceed issued on June 1, 2022. The Substantial Completion Date will be revised from May 21, 2024 to February 15, 2027, and the Final Completion Date from June 20, 2024 to March 17, 2027. The resolution was adopted by the Board of County Commissioners on July 21, 2026, after being forwarded with a favorable recommendation from the Infrastructure, Innovation & Technology Committee on June 10, 2026. The project is located in Commission District 2, represented by Commissioner Marleine Bastien, who is the Prime Sponsor. The fiscal impact is funded out of WASD Revenue Bonds Sold, Water Connection Charges, Future WASD Revenue Bonds, BBC GOB Financing, and Florida Department of Environmental Protection Grant, with no impact to the General Fund. The project is in WASD's Fiscal Year 2025-2026 Adopted Budget under Water Reset Program - Small Diameter Water Mains Replacement, Program #2000000072, Volume #3, Page #123 and Commercial and Industrial Corridors - Extension of Sewer System (Connect to Protect), Program #967090, Volume #3, Page #103. The contract was awarded with an 8 percent Small Business Enterprise (SBE) - Goods goal and an 18 percent SBE - Construction (SBE-Con) goal. The SBE-Con goal is recommended to be removed from the project due to the restrictive nature of the project funding and fixed budget, and because the Contractor will be self-performing this portion of the work. No public comment or stakeholder sentiment is stated in the document.

Board:
Board of County Commissioners
Date:
2026-07-21
Type:
Resolution
Decision:
Adopted
Address:
NW 22nd Avenue from NW 79th Street to NW 90th Street, and NW 87th Street
Applicant:
Lanzo Construction Co., Florida

CHANGE ORDER #1 LANZO CONSTRUCTION (S-958)

Miami-Dade County Board of County Commissioners is considering Change Order #1 for Contract S-958 with Lanzo Construction Co., Florida. This change order grants a 1,000-calendar day time extension and increases the contract amount by $5,411,816.28, bringing the total contract value to $12,664,944.53. The project involves installing 16-inch, 12-inch, and 8-inch DI water mains and 10-inch and 8-inch DI gravity sewers along NW 22nd Avenue from NW 79th Street to NW 90th Street, and an 8-inch DI force main along NW 87th Street. The increase is due to unforeseen subsurface conditions requiring extensive roadway restoration and conflicts with communication and electrical duct banks. Funds will be utilized from the Building Better Communities General Obligation Bond Program. The Infrastructure, Innovation & Technology Committee forwarded this item to the Board with a favorable recommendation.

Board:
Board of County Commissioners
Date:
2026-07-21
Type:
Resolution
Decision:
Forwarded to BCC with a favorable recommendation by Infrastructure, Innovation & Technology Committee; pending Board of County Commissioners decision.
Address:
NW 22nd Avenue from NW 79th Street to NW 90th Street, and NW 87th Street
Applicant:
Lanzo Construction Co., Florida

CHANGE ORDER #1 LANZO CONSTRUCTION (S-958)

Resolution approving Change Order No. 1 to Contract No. S-958 between Miami-Dade County and Lanzo Construction Co., Florida for the D2-C2 project: proposed 16-inch, 12-inch, and 8-inch DI water main and 10-inch and 8-inch DI gravity sewer along NW 22nd Avenue from NW 79th Street to NW 90th Street and an 8-inch DI force main along NW 87th Street. The change order grants a time extension of 1,000 calendar days and increases the contract amount by $5,411,816.28, bringing the total contract award from $7,253,128.25 to $12,664,944.53. It authorizes use of funds from the Building Better Communities General Obligation Bond (GOB) Program Project No. 17-Countrywide Water and Sewer System Enhancements to pay in part for the extension of wastewater services along NW 22nd Avenue. The change order addresses differing subsurface conditions, duct bank conflicts, concrete manhole substitution, and replenishes the contingency allowance. The Board of County Commissioners adopted the resolution on 7/21/2026. The Infrastructure, Innovation & Technology Committee forwarded it with a favorable recommendation on 6/10/2026. The project was awarded on November 22, 2021, ratified by the Board on March 15, 2022 via Resolution No. R-259-22, and the Notice to Proceed was issued on June 1, 2022. The Substantial Completion Date is revised from May 21, 2024 to February 15, 2027, and the Final Completion Date from June 20, 2024 to March 17, 2027. The project is located in Commission District 2, represented by Commissioner Marleine Bastien, who is the Prime Sponsor. The project extends critical wastewater infrastructure and replaces undersized water mains serving industrial and commercial properties along NW 22nd Avenue. The improvements include installation of approximately 9,246 linear feet of sanitary sewer mains and 9,851 LF of ductile iron water main service lines. The project originated from Resolution No. R-597-13, which directed the County Mayor to develop a plan to extend sanitary sewer service to commercial and industrial parcels within the Miami-Dade Green Technology Corridor (GTC). The Water and Sewer Department created the Connect 2 Protect Program to expand access to reliable sanitary sewer service for properties currently reliant on septic systems. The change order includes $4,680,600.00 for differing subsurface conditions with a 908-calendar day time extension, $595,409.58 for contingency replenishment, $167,731.70 for duct bank conflicts with a 92-calendar day time extension, and a $31,925.00 credit for concrete manhole substitution. The contract was awarded with an 8 percent Small Business Enterprise (SBE) Goods goal and an 18 percent SBE Construction goal. The SBE-Con goal is recommended to be removed from the project. The additional fiscal impact is funded out of WASD Revenue Bonds Sold, Water Connection Charges, Future WASD Revenue Bonds, BBC GOB Financing, and Florida Department of Environmental Protection Grant. There is no impact to the General Fund. The project is in WASD's Fiscal Year 2025-2026 Adopted Budget and Multi-Year Capital Plan under Water Reset Program - Small Diameter Water Mains Replacement, Program #2000000072, Volume #3, Page #123 and Commercial and Industrial Corridors - Extension of Sewer System (Connect to Protect), Program #967090, Volume #3, Page #103. WASD's Deputy Director of Planning, Regulatory Compliance and Capital Infrastructure, Marisela Aranguiz-Cueto, P.E., will oversee implementation. The County Attorney assigned Sarah E. Davis on 5/21/2026. Roy Coley was assigned on 5/20/2026. The Office of Agenda Coordination was assigned on 5/20/2026. The resolution was introduced on 5/20/2026. The agenda date was 7/21/2026, agenda item number 8O2. The final action was 7/21/2026. The status is Adopted. The file number is 260948. The reference is R-645-26. The file type is Resolution. The requester is the Water & Sewer Department. The cost is not stated. The effective date is not stated. The expiration date is not stated. The registered lobbyist is none listed. The sunset provision is no. The legislative history shows the Board of County Commissioners adopted the item on 7/21/2026 with a pass. The Infrastructure, Innovation & Technology Committee forwarded it to the BCC with a favorable recommendation on 6/10/2026. The County Attorney was assigned on 5/21/2026. ROY COLEY was assigned on 5/20/2026. The Office of Agenda Coordination was assigned on 5/20/2026. The report notes: WASD - Commissioner Bastien Sponsor - pending June cmte - County attorney Sarah E Davis - attachments: exhibits A-C - PGS 13. The document does not state any public comment or stakeholder sentiment.

Board:
Board of County Commissioners
Date:
2026-07-21
Type:
Resolution
Decision:
Adopted
Address:
NW 22nd Avenue from NW 79th Street to NW 90th Street and NW 87th Street
Applicant:
Miami-Dade County Water & Sewer Department; Contractor: Lanzo Construction Co., Florida

CHANGE ORDER #1 LANZO CONSTRUCTION (S-958)

Miami-Dade County Board of County Commissioners adopted Resolution R-645-26 (File Number 260948) approving Change Order No. 1 to Contract No. S-958 with Lanzo Construction Co., Florida. The project is D2-C2, proposed 16-inch, 12-inch, and 8-inch DI water main and 10-inch and 8-inch DI gravity sewer along NW 22nd Avenue from NW 79th Street to NW 90th Street, and an 8-inch DI force main along NW 87th Street. The change order increases the contract amount by $5,411,816.28, from $7,253,128.25 to $12,664,944.53, and grants a 1,000-calendar day non-compensable time extension. The change order addresses differing subsurface conditions ($4,680,600.00, 908-day extension), duct bank conflicts ($167,731.70, 92-day extension), contingency replenishment ($595,409.58), and a credit for concrete manhole substitution ($31,925.00 savings). The project extends critical wastewater infrastructure and replaces undersized water mains serving industrial and commercial properties. The project is funded in part by the Building Better Communities General Obligation Bond (GOB) Program Project No. 17-Countywide Water and Sewer System Enhancements. The contract was awarded on November 22, 2021, ratified by Resolution No. R-259-22 on March 15, 2022, with Notice to Proceed issued June 1, 2022. Substantial Completion Date revised from May 21, 2024 to February 15, 2027, and Final Completion Date revised from June 20, 2024 to March 17, 2027. The Infrastructure, Innovation & Technology Committee forwarded it with a favorable recommendation on June 10, 2026, and the Board adopted it on July 21, 2026. The SBE-Con goal is recommended to be removed from the project because SBE-Con firms were unable to perform at original bid prices and no substitute was secured; the contractor will self-perform that portion. No public comment or stakeholder sentiment is stated in the document.

Board:
Board of County Commissioners
Date:
2026-07-21
Type:
Resolution
Decision:
Adopted
Address:
NW 22nd Avenue from NW 79th Street to NW 90th Street, and NW 87th Street, Miami-Dade County, Florida
Applicant:
Miami-Dade County Water & Sewer Department; Contractor: Lanzo Construction Co., Florida

CHANGE ORDER #1 WITH RIC-MAN INTERNATIONAL S-945

Miami-Dade County Board of County Commissioners is ratifying Change Order No. 1 to Contract No. S-945 with Ric-Man International, Inc. for the construction of a 60-inch Force Main (NL-1A) (West Segment). This change order increases the total contract amount by $1,662,315.17 and grants a 426-calendar day time extension. The project involved approximately 10,000 linear feet of 60-inch Prestressed Concrete Cylinder Pipe (PCCP) Force Main along NW 162nd Street from NW 6th Avenue to NE 8th Avenue. The increase in cost is attributed to utility conflicts, required roadway repairs, tree mitigation, failures of existing asbestos cement pipe water mains, and unforeseen site conditions. The project has been successfully completed. The original contract was awarded on January 7, 2021, and ratified by the Board on April 20, 2021. The change order extends the substantial completion date to August 5, 2024, and the final completion date to October 4, 2024. The project is part of Miami-Dade Water and Sewer Department's Capital Improvement Program. Small Business Enterprise (SBE) goals for the contract are expected to be satisfied upon approval of this change order.

Board:
Board of County Commissioners
Date:
2026-07-21
Type:
Resolution
Decision:
Resolution ratifying action by the County Mayor or County Mayor’s designee, specifically approval of Change Order No. 1
Address:
NW 162 Street from NW 6 Avenue to NE 8 Avenue
Applicant:
Ric-Man International, Inc.

CHANGE ORDER #1 WITH RIC-MAN INTERNATIONAL S-945

Resolution R-643-26, File Number 261211, adopted by the Miami-Dade Board of County Commissioners on 7/21/2026, ratifies Change Order No. 1 to Contract No. S-945 between Miami-Dade County and Ric-Man International, Inc. for construction of a 60-inch Force Main (NL-1A) (West Segment) along NW 162 Street from NW 6 Avenue to NE 8 Avenue. The change order increases the contract amount by $1,662,315.17, from $19,314,785.95 to $20,977,101.12, and grants a 426-calendar day compensable time extension, extending the Substantial Completion Date from June 6, 2023 to August 5, 2024 and the Final Completion Date from August 5, 2023 to October 4, 2024. The project has been successfully completed and this change order serves as final contract closeout. The project is approximately 10,000 linear feet of 60-inch Prestressed Concrete Cylinder Pipe (PCCP) Force Main. The change order addresses utility conflicts, required roadway repairs, tree mitigation, pipe interconnection, failures of asbestos cement pipe water mains, and other conditions. The project is located in Commission District 4, represented by Commissioner Micky Steinberg. The contract was awarded on January 7, 2021, and ratified by the Board on April 20, 2021, via Resolution No. R-343-21. The original contract amount was $19,314,785.95 with a contingency allowance of $1,682,724.42 and a contract duration of 548 calendar days with a contingency time allowance of 55 days. The change order includes $2,439,364.31 in additional costs, offset by a $56,150.00 Value Engineering credit and reallocation of $720,899.14 in unused contract funds. The additional fiscal impact is funded through WASD Revenue Bonds Sold and Future WASD Revenue Bonds. The project is in WASD's Fiscal Year 2025-26 Adopted Budget and Multi-Year Capital Plan under North District Force Main Network- Infrastructure Improvements, Program #9652101, Volume #3, Page #107. The change order includes a compensable time extension of 426 calendar days at a rate of $1,893.61 per day, totaling $806,677.86. The change order also includes costs for pipe interconnection ($687,529.39), tree mitigation coordination and permitting ($394,260.99), failures of asbestos cement pipe water mains ($345,757.80), utility conflicts ($198,596.92), and road repairs ($6,541.35). The interconnection between the 60-inch force main and the existing 72-inch pipeline has not been completed and will be performed under a separate contract. The contract was awarded with a 4.73 percent Small Business Enterprise (SBE) Construction goal, a 0.56 percent SBE Goods goal, and a 0.45 percent SBE Services goal. Upon approval, SBE participation will be satisfied with SBE-Con firms paid $1,212,276, SBE-Goods firms paid $441,097, and SBE-Services firms paid $172,034. The Strategic Procurement Department reviewed the contract for compliance with Resolution No. R-1001-15 on March 18, 2026. The resolution was introduced on 6/30/2026, requested by the Water & Sewer Department, and the final action was on 7/21/2026. The County Attorney assigned Sarah E. Davis on 7/1/2026. The report was from WASD - Sarah E. Davis, no sponsor, with attachments A-C, item has 15 pages. The resolution was adopted by the Board of County Commissioners on 7/21/2026 as agenda item 8O3. The Mayor is Daniella Levine Cava. The Deputy Mayor is Roy Coley. The staff recommendation is to ratify the change order. The change order will be overseen by WASD's Deputy Director of Planning, Regulatory Compliance and Capital Infrastructure, Marisela Aranguiz-Cueto, P.E. The project is part of WASD's $8.6 billion Capital Improvement Program. The contract was awarded pursuant to Section 2-8.2.12 of the Code of Miami-Dade County, Florida (WASD's Acceleration Ordinance). The change order includes a compensable time extension due to delays from permitting issues, late design responses, revised requirements, and differing site conditions. The change order includes costs for relocation of a 16-inch water main belonging to the City of North Miami Beach and exploratory excavation ($171,443.06) and costs incurred by the Contractor for planning and attempting the connection ($516,086.33). The change order includes costs for tree mitigation due to permits from the Department of Regulatory and Economic Resources (RER) requiring an arborist study, tree risk assessments, preparation of a landscape plan, and removal and replacement of more than 115 trees. The change order includes costs for six separate failures of existing asbestos cement pipe (ACP) water mains. The change order includes costs for two conflicts with Florida Power & Light (FPL) utilities: sheet pile installation conflict ($46,309.59) and unmarked underground utilities ($152,287.33). The change order includes costs for roadway restoration due to deteriorated roadway conditions in the areas of NW 6th Avenue, North Miami Avenue, and NE 162nd Street. The document does not state any public comment or stakeholder sentiment.

Board:
Board of County Commissioners
Date:
2026-07-21
Type:
Resolution
Decision:
Adopted
Address:
NW 162 Street from NW 6 Avenue to NE 8 Avenue
Applicant:
Miami-Dade County Water and Sewer Department (WASD); Contractor: Ric-Man International, Inc.

CHANGE ORDER #1 WITH RIC-MAN INTERNATIONAL S-945

Resolution ratifying Change Order No. 1 to Contract No. S-945 between Miami-Dade County and Ric-Man International, Inc. for construction of a 60-inch Force Main (NL-1A) (West Segment) along NW 162 Street from NW 6 Avenue to NE 8 Avenue. The change order increases the contract amount by $1,662,315.17 and grants a 426-calendar day compensable time extension. Adopted by the Board of County Commissioners on 7/21/2026. The project is approximately 10,000 linear feet of 60-inch Prestressed Concrete Cylinder Pipe (PCCP) Force Main. The project has been successfully completed and this change order serves as final contract closeout. The contract was awarded on January 7, 2021, and ratified by the Board on April 20, 2021, via Resolution No. R-343-21. The total contract award amount was not to exceed $19,314,785.95. Change Order No. 1 increases the total contract value to $20,977,101.12. The change order addresses utility conflicts, required roadway repairs, tree mitigation, pipe interconnection, failures of asbestos cement pipe water mains, and utility conflicts with Florida Power & Light. The project is in Commission District 4, represented by Commissioner Micky Steinberg. The project is funded through WASD Revenue Bonds Sold and Future WASD Revenue Bonds. No public comment or stakeholder sentiment is stated in the document.

Board:
Board of County Commissioners
Date:
2026-07-21
Type:
Resolution
Decision:
Adopted
Address:
NW 162 Street from NW 6 Avenue to NE 8 Avenue
Applicant:
Miami-Dade Water and Sewer Department (WASD); Contractor: Ric-Man International, Inc.

See the actual businesses behind these numbers

Get the real filings, with addresses and officers, backed by a 14-day money-back guarantee.

Create your account