REVISED MEMORANDUM OF AGREEMENT WITH PROPERTY APPRAISER

This legislative item concerns a revised Memorandum of Agreement (MOA) between Miami-Dade County's Housing and Community Development Department (HCD) and the Property Appraiser of Miami-Dade County (PAMDC). The revision aims to clarify and expand the categories of documents and information HCD will provide to PAMDC, specifically regarding Housing Choice Voucher (HCV) program participants and landlords, for property assessment and compliance purposes. The original MOA was authorized by Resolution No. R-38-26 on January 21, 2026. This new resolution seeks to amend R-38-26 to approve the revised agreement. Key revisions include updated provisions for required documentation, timelines, transmission formats, and a revised hold harmless and indemnification section. The agreement also incorporates legal opinions and HUD directives. The item has a countywide impact and no fiscal impact.

Board:
Board of County Commissioners
Date:
2026-07-21
Type:
Resolution
Decision:
Forwarded to BCC with a favorable recommendation by the Housing Committee; pending Board of County Commissioners (BCC) action.
Applicant:
Miami-Dade County Housing and Community Development Department (HCD) and Property Appraiser of Miami-Dade County (PAMDC)

REVISED MEMORANDUM OF AGREEMENT WITH PROPERTY APPRAISER

Miami-Dade County Board of County Commissioners is considering a resolution to amend Resolution No. R-38-26. This amendment will approve and authorize the County Mayor or designee to execute a Revised Memorandum of Agreement (MOA) between the Housing and Community Development Department (HCD) and the Property Appraiser of Miami-Dade County (PAMDC). The MOA facilitates the sharing of Housing Choice Voucher (HCV) program participant addresses and landlord information for property assessment and compliance purposes. Revisions clarify and expand the categories of documents and information HCD will provide to PAMDC, specify documentation, timelines, and transmission formats, and revise the hold harmless and indemnification section. The Revised Agreement incorporates legal opinions from HUD's Office of General Counsel and relevant HUD directives. The original MOA was approved on January 21, 2026, via Resolution No. R-38-26.

Board:
Board of County Commissioners
Date:
2026-07-21
Type:
Resolution
Decision:
Forwarded to BCC with a favorable recommendation by Housing Committee
Applicant:
Housing and Community Development (HCD) and Property Appraiser of Miami-Dade County (PAMDC)

S-930B - DANIEL O'CONNELL'S SONS

Miami-Dade County Board of County Commissioners is considering ratification of Change Order No. 1 to Contract No. S-930B. This change order, between Miami-Dade County and Daniel O'Connell's Sons, Inc., grants a 622-day non-compensable time extension for the construction of ST-2D-B South District Wastewater Treatment Plant (SDWWTP) Substations 5/6 and 15/16. The project aims to increase the plant's average daily flow capacity and peak flow capacity. The time extension is due to delays in electrical equipment fabrication and delivery caused by supply chain issues, and required shutdowns for installing new voltage feeders. The original contract award was $21,805,340.00. The Substantial Completion Date is extended from June 10, 2023, to February 21, 2025, and the Final Completion Date from July 22, 2023, to April 4, 2025. There is no additional fiscal impact. The contract had SBE-Construction and SBE-Goods goals.

Board:
Board of County Commissioners
Date:
2026-07-21
Type:
Resolution
Decision:
In Draft (Resolution ratifying action)
Address:
South District Wastewater Treatment Plant (SDWWTP)
Applicant:
Daniel O'Connell's Sons, Inc.

S-930B - DANIEL O'CONNELL'S SONS

Miami-Dade Board of County Commissioners is considering ratification of Change Order No. 1 to Contract No. S-930B between Miami-Dade County and Daniel O'Connell's Sons, Inc. This change order grants a 622-day non-compensable time extension for the construction of ST-2D-B South District Wastewater Treatment Plant (SDWWTP) Substations 5/6 and 15/16. The extension is due to delays in electrical equipment fabrication and delivery caused by supply chain issues, and required shutdowns for installing new voltage feeders. The project aims to increase the SDWWTP's treatment capacity. The original contract award was $21,805,340.00. The Substantial Completion Date will be extended from June 10, 2023, to February 21, 2025, and the Final Completion Date from July 22, 2023, to April 4, 2025. There is no additional fiscal impact. Small Business Enterprise measures from the original contract are not applicable to this time extension change order.

Board:
Board of County Commissioners
Date:
2026-07-21
Type:
Resolution
Decision:
Pending BCC Assignment (for ratification of Change Order No. 1)
Address:
South District Wastewater Treatment Plant (SDWWTP) Substations 5/6 and 15/16
Applicant:
Daniel O'Connell's Sons, Inc.

S-930B - DANIEL O'CONNELL'S SONS

Miami-Dade County Board of County Commissioners is considering ratification of Change Order No. 1 to Contract No. S-930B with Daniel O'Connell's Sons, Inc. This change order grants a 622-day non-compensable time extension for the construction of ST-2D-B South District Wastewater Treatment Plant (SDWWTP) Substations 5/6 and 15/16. The delays are attributed to extended fabrication and delivery of electrical equipment due to supply chain issues and required shutdowns for installing new voltage feeders. The project aims to increase the SDWWTP's treatment capacity. The original contract award was $21,805,340.00. The change order has no additional fiscal impact. Public comment is not stated.

Board:
Board of County Commissioners
Date:
2026-07-21
Type:
Resolution
Decision:
Pending BCC Assignment (Resolution in Draft)
Address:
South District Wastewater Treatment Plant (SDWWTP)
Applicant:
Daniel O'Connell's Sons, Inc.

S-930B - DANIEL O'CONNELL'S SONS

Miami-Dade County Board of County Commissioners is considering ratification of Change Order No. 1 to Contract No. S-930B with Daniel O'Connell's Sons, Inc. This change order grants a 622-day non-compensable time extension for the construction of ST-2D-B South District Wastewater Treatment Plant (SDWWTP) Substations 5/6 and 15/16. The project aims to increase the plant's average daily flow capacity and peak flow capacity. The time extension is due to delays in electrical equipment fabrication and delivery caused by supply chain issues, and operational shutdown sequencing required for installing new voltage feeders. The original contract award was $21,805,340.00. The Substantial Completion Date is extended from June 10, 2023, to February 21, 2025, and the Final Completion Date from July 22, 2023, to April 4, 2025. No additional fiscal impact is stated.

Board:
Board of County Commissioners
Date:
2026-07-21
Type:
Resolution
Decision:
In Draft (Resolution ratifying action)
Applicant:
Daniel O'Connell's Sons, Inc.

S-930B - DANIEL O'CONNELL'S SONS

Miami-Dade County Board of County Commissioners is considering ratification of Change Order No. 1 to Contract No. S-930B between Miami-Dade County and Daniel O'Connell's Sons, Inc. This change order grants a 622-day non-compensable time extension for the construction of ST-2D-B South District Wastewater Treatment Plant (SDWWTP) Substations 5/6 and 15/16. The delays are attributed to extended fabrication and delivery of electrical equipment due to supply chain issues and required shutdowns for installing new voltage feeders. The project aims to increase the SDWWTP's capacity. The original contract award was $21,805,340.00. The Substantial Completion Date will be extended from June 10, 2023, to February 21, 2025, and the Final Completion Date from July 22, 2023, to April 4, 2025. There is no additional fiscal impact. The contract had SBE-Construction and SBE-Goods goals, but Resolution R-525-17 exempts this time extension from certain compliance requirements.

Board:
Board of County Commissioners
Date:
2026-07-21
Type:
Resolution
Decision:
Pending BCC Assignment (for ratification of Change Order No. 1)
Address:
South District Wastewater Treatment Plant (SDWWTP)
Applicant:
Daniel O'Connell's Sons, Inc.

S-930B - DANIEL O'CONNELL'S SONS

Miami-Dade Board of County Commissioners (BCC) is set to ratify Change Order No. 1 to Contract No. S-930B between Miami-Dade County and Daniel O'Connell's Sons, Inc. This change order grants a 622-day non-compensable time extension for the construction of ST-2D-B South District Wastewater Treatment Plant (SDWWTP) Substations 5/6 and 15/16. The extension is due to extended fabrication and delivery delays of electrical equipment (415 days) and required shutdowns for installing new voltage feeders (207 days). The project aims to increase the SDWWTP's average daily flow capacity from 112.5 to 131 MGD and peak flow capacity from 285 to 305 MGD. The original contract award was $21,805,340.00. The Substantial Completion Date is extended from June 10, 2023, to February 21, 2025, and the Final Completion Date from July 22, 2023, to April 4, 2025. There is no additional fiscal impact. Small Business Enterprise (SBE) goals were met on the original contract, and Resolution R-525-17 exempts this time-extension-only change order from certain SBE compliance review requirements.

Board:
Board of County Commissioners
Date:
2026-07-21
Type:
Resolution
Decision:
Pending BCC Assignment (Resolution in Draft)
Address:
South District Wastewater Treatment Plant (SDWWTP) Substations 5/6 and 15/16
Applicant:
Daniel O'Connell's Sons, Inc.

S-930B - DANIEL O'CONNELL'S SONS

Miami-Dade County Board of County Commissioners is considering ratification of Change Order No. 1 to Contract No. S-930B between Miami-Dade County and Daniel O'Connell's Sons, Inc. This change order grants a 622-day non-compensable time extension for the construction of ST-2D-B South District Wastewater Treatment Plant (SDWWTP) Substations 5/6 and 15/16. The project aims to increase the plant's average daily flow capacity and peak flow capacity. The time extension is due to delays in electrical equipment fabrication and delivery caused by supply chain issues, and required shutdowns for installing new voltage feeders. The original contract award was $21,805,340.00. The Substantial Completion Date will be extended from June 10, 2023, to February 21, 2025, and the Final Completion Date from July 22, 2023, to April 4, 2025. There is no additional fiscal impact to the County.

Board:
Board of County Commissioners
Date:
2026-07-21
Type:
Resolution
Decision:
In Draft (pending ratification)
Address:
South District Wastewater Treatment Plant (SDWWTP)
Applicant:
Daniel O'Connell's Sons, Inc.

S-930B - DANIEL O'CONNELL'S SONS

Miami-Dade County Board of County Commissioners is considering ratification of Change Order No. 1 to Contract No. S-930B between Miami-Dade County and Daniel O'Connell's Sons, Inc. This change order grants a 622-day non-compensable time extension for the construction of ST-2D-B South District Wastewater Treatment Plant (SDWWTP) Substations 5/6 and 15/16. The delays are attributed to extended fabrication and delivery of electrical equipment due to supply chain issues and required shutdowns for installing new voltage feeders. The project aims to increase the SDWWTP's average daily flow capacity and peak flow capacity. The original contract award was $21,805,340.00. The Substantial Completion Date is extended from June 10, 2023, to February 21, 2025, and the Final Completion Date from July 22, 2023, to April 4, 2025. There is no additional fiscal impact. Small Business Enterprise measures were applied to the original contract but do not apply to this time extension change order.

Board:
Board of County Commissioners
Date:
2026-07-21
Type:
Resolution
Decision:
Resolution ratifying action by the County Mayor or County Mayor’s designee; approval of Change Order No. 1
Address:
South District Wastewater Treatment Plant (SDWWTP)
Applicant:
Daniel O'Connell's Sons, Inc.

S-930B - DANIEL O'CONNELL'S SONS

Miami-Dade County Board of County Commissioners is considering ratification of Change Order No. 1 to Contract No. S-930B between Miami-Dade County and Daniel O'Connell's Sons, Inc. This change order grants a 622-day non-compensable time extension for the construction of ST-2D-B South District Wastewater Treatment Plant (SDWWTP) Substations 5/6 and 15/16. The project aims to increase the plant's average annual daily flow capacity and peak flow capacity. The time extension is due to delays in electrical equipment fabrication and delivery caused by supply chain issues, and operational shutdown sequencing constraints for installing new voltage feeders. The original contract award was $21,805,340.00. The Substantial Completion Date will be extended from June 10, 2023, to February 21, 2025, and the Final Completion Date from July 22, 2023, to April 4, 2025. There is no additional fiscal impact to the County. The contract had SBE-Construction and SBE-Goods goals, but these do not apply to this time extension change order.

Board:
Board of County Commissioners
Date:
2026-07-21
Type:
Resolution
Decision:
In Draft
Applicant:
Daniel O'Connell's Sons, Inc.

S-930B - DANIEL O'CONNELL'S SONS

Miami-Dade County Board of County Commissioners is set to ratify Change Order No. 1 to Contract No. S-930B with Daniel O'Connell's Sons, Inc. This change order grants a 622-day non-compensable time extension for the construction of ST-2D-B South District Wastewater Treatment Plant (SDWWTP) Substations 5/6 and 15/16. The project aims to increase the plant's average daily flow capacity from 112.5 to 131 million gallons per day and peak flow capacity from 285 to 305 MGD. The delays are attributed to extended fabrication and delivery of electrical equipment due to supply chain issues and required shutdowns for installing new voltage feeders. The original contract award was $21,805,340.00. The Substantial Completion Date is extended from June 10, 2023, to February 21, 2025, and the Final Completion Date from July 22, 2023, to April 4, 2025. The contract had SBE-Construction and SBE-Goods goals, but Resolution R-525-17 exempts this time extension from compliance review.

Board:
Board of County Commissioners
Date:
2026-07-21
Type:
Resolution
Decision:
Resolution ratifying action by the County Mayor or County Mayor’s designee approving Change Order No. 1
Address:
South District Wastewater Treatment Plant (SDWWTP)
Applicant:
Daniel O'Connell's Sons, Inc.

S-930B - DANIEL O'CONNELL'S SONS

Miami-Dade County Board of County Commissioners is considering ratification of Change Order No. 1 to Contract No. S-930B between Miami-Dade County and Daniel O'Connell's Sons, Inc. for the ST-2D-B South District Wastewater Treatment Plant (SDWWTP) Substations 5/6 and 15/16 project. This change order grants a 622-day non-compensable time extension due to delays in electrical equipment fabrication and delivery caused by supply chain issues, and required shutdowns for installing new voltage feeders. The project aims to increase the SDWWTP's average daily flow capacity and peak flow capacity. The change order extends the Substantial Completion Date from June 10, 2023, to February 21, 2025, and the Final Completion Date from July 22, 2023, to April 4, 2025. There is no additional fiscal impact. The original contract award was $21,805,340.00.

Board:
Board of County Commissioners
Date:
2026-07-21
Type:
Resolution
Decision:
In Draft (Resolution ratifying action)
Address:
South District Wastewater Treatment Plant (SDWWTP)
Applicant:
Daniel O'Connell's Sons, Inc.

S-930B - DANIEL O'CONNELL'S SONS

Miami-Dade Board of County Commissioners is considering ratification of Change Order No. 1 to Contract No. S-930B between Miami-Dade County and Daniel O'Connell's Sons, Inc. This change order grants a 622-day non-compensable time extension for the construction of ST-2D-B South District Wastewater Treatment Plant (SDWWTP) Substations 5/6 and 15/16. The delays are attributed to extended fabrication and delivery of electrical equipment due to supply chain issues and required shutdowns for installing new voltage feeders. The project aims to increase the SDWWTP's treatment capacity. The original contract award was $21,805,340.00. The Substantial Completion Date is extended from June 10, 2023, to February 21, 2025, and the Final Completion Date from July 22, 2023, to April 4, 2025. There is no additional fiscal impact. Small Business Enterprise measures from the original contract are not applicable to this time extension change order.

Board:
Board of County Commissioners
Date:
2026-07-21
Type:
Resolution
Decision:
Pending BCC Assignment (Resolution in Draft)
Address:
South District Wastewater Treatment Plant (SDWWTP)
Applicant:
Daniel O'Connell's Sons, Inc.

S-930B - DANIEL O'CONNELL'S SONS

Miami-Dade County Board of County Commissioners is considering ratification of Change Order No. 1 to Contract No. S-930B between Miami-Dade County and Daniel O'Connell's Sons, Inc. for the ST-2D-B South District Wastewater Treatment Plant (SDWWTP) Substations 5/6 and 15/16 project. The change order grants a 622-day non-compensable time extension due to fabrication and delivery delays of electrical equipment and required shutdowns for installation. The project aims to increase the SDWWTP's average daily flow capacity from 112.5 to 131 MGD and peak flow capacity from 285 to 305 MGD. The original contract award was $21,805,340.00. The Substantial Completion Date will be extended from June 10, 2023, to February 21, 2025, and the Final Completion Date from July 22, 2023, to April 4, 2025. The change order has no additional fiscal impact. Small Business Enterprise (SBE) goals were applied to the original contract, but Resolution No. R-525-17 exempts this time extension from SBE compliance review.

Board:
Board of County Commissioners
Date:
2026-07-21
Type:
Resolution
Decision:
In Draft (Pending BCC Assignment for ratification)
Address:
South District Wastewater Treatment Plant (SDWWTP) Substations 5/6 and 15/16
Applicant:
Daniel O'Connell's Sons, Inc.

S-930B - DANIEL O'CONNELL'S SONS

Miami-Dade County Board of County Commissioners is considering ratification of Change Order No. 1 to Contract No. S-930B between Miami-Dade County and Daniel O'Connell's Sons, Inc. This change order grants a 622-day non-compensable time extension for the construction of ST-2D-B South District Wastewater Treatment Plant (SDWWTP) Substations 5/6 and 15/16. The delays are attributed to extended fabrication and delivery of electrical equipment due to supply chain issues and required shutdowns for installing new voltage feeders. The project aims to increase the SDWWTP's capacity. The original contract award was $21,805,340.00. The Substantial Completion Date will be extended from June 10, 2023, to February 21, 2025, and the Final Completion Date from July 22, 2023, to April 4, 2025. There is no additional fiscal impact. Small Business Enterprise measures were applied to the original contract.

Board:
Board of County Commissioners
Date:
2026-07-21
Type:
Resolution
Decision:
Pending BCC Assignment (for ratification of Change Order No. 1)
Address:
South District Wastewater Treatment Plant (SDWWTP)
Applicant:
Daniel O'Connell's Sons, Inc.

S-930B - DANIEL O'CONNELL'S SONS

Miami-Dade County Board of County Commissioners ratified Change Order No. 1 to Contract No. S-930B between Miami-Dade County and Daniel O'Connell's Sons, Inc. This change order grants a 622-day non-compensable time extension for the construction of ST-2D-B South District Wastewater Treatment Plant (SDWWTP) Substations 5/6 and 15/16. The original contract award was $21,805,340.00. The project aims to increase the SDWWTP's permitted average annual daily flow from 112.5 to 131 MGD and peak flow capacity from 285 to 305 MGD. The time extension is due to extended fabrication and delivery delays of electrical equipment (415 days) caused by supply chain issues and required shutdowns for installing new voltage feeders (207 days). The Substantial Completion Date is extended from June 10, 2023, to February 21, 2025, and the Final Completion Date from July 22, 2023, to April 4, 2025. The contract had SBE-Construction and SBE-Goods goals, but Resolution R-525-17 exempted this time extension from compliance review. No public comment was stated.

Board:
Board of County Commissioners
Date:
2026-07-21
Type:
Resolution
Decision:
Adopted
Applicant:
Daniel O'Connell's Sons, Inc.

S-930B - DANIEL O'CONNELL'S SONS

Miami-Dade County Board of County Commissioners is considering ratification of Change Order No. 1 to Contract No. S-930B between Miami-Dade County and Daniel O'Connell's Sons, Inc. This change order grants a 622-day non-compensable time extension for the construction of ST-2D-B South District Wastewater Treatment Plant (SDWWTP) Substations 5/6 and 15/16. The delays are attributed to extended fabrication and delivery of electrical equipment due to supply chain issues and required shutdowns for installing new voltage feeders. The project aims to increase the SDWWTP's treatment capacity. The original contract award was $21,805,340.00. The Substantial Completion Date will be extended from June 10, 2023, to February 21, 2025, and the Final Completion Date from July 22, 2023, to April 4, 2025. There is no additional fiscal impact. Small Business Enterprise (SBE) goals were met on the original contract, and the exemption for non-compensatory time extensions applies.

Board:
Board of County Commissioners
Date:
2026-07-21
Type:
Resolution
Decision:
Pending BCC Assignment (Resolution in Draft)
Address:
South District Wastewater Treatment Plant (SDWWTP)
Applicant:
Daniel O'Connell's Sons, Inc.

S-930B - DANIEL O'CONNELL'S SONS

Miami-Dade County Board of County Commissioners is considering ratification of Change Order No. 1 to Contract No. S-930B between Miami-Dade County and Daniel O'Connell's Sons, Inc. This change order grants a 622-day non-compensable time extension for the construction of ST-2D-B South District Wastewater Treatment Plant (SDWWTP) Substations 5/6 and 15/16. The project aims to increase the plant's average annual daily flow capacity and peak flow capacity. The time extension is due to delays in electrical equipment fabrication and delivery caused by supply chain issues, and required shutdowns for installing new voltage feeders. The original contract award was $21,805,340.00. The Substantial Completion Date is extended from June 10, 2023, to February 21, 2025, and the Final Completion Date from July 22, 2023, to April 4, 2025. There is no additional fiscal impact.

Board:
Board of County Commissioners
Date:
2026-07-21
Type:
Resolution
Decision:
In Draft (Resolution ratifying action)
Address:
South District Wastewater Treatment Plant (SDWWTP)
Applicant:
Daniel O'Connell's Sons, Inc.

S-930B - DANIEL O'CONNELL'S SONS

This legislative item concerns Miami-Dade County's Water and Sewer Department's Consent Decree and Capital Improvement Programs Acceleration Ordinance. It seeks ratification of Change Order No. 1 to Contract No. S-930B between Miami-Dade County and Daniel O'Connell's Sons, Inc. This change order grants a 622-day non-compensable time extension for the construction of ST-2D-B South District Wastewater Treatment Plant (SDWWTP) Substations 5/6 and 15/16. The extension is due to delays in electrical equipment fabrication and delivery caused by supply chain issues, and required shutdowns for installing new voltage feeders. The project aims to increase the SDWWTP's average daily flow capacity and peak flow capacity. The change order extends the Substantial Completion Date from June 10, 2023, to February 21, 2025, and the Final Completion Date from July 22, 2023, to April 4, 2025. The original contract award was $21,805,340.00.

Board:
Board of County Commissioners
Date:
2026-07-21
Type:
Resolution
Decision:
Pending BCC Assignment (Resolution in Draft)
Address:
South District Wastewater Treatment Plant (SDWWTP)
Applicant:
Daniel O'Connell's Sons, Inc.

See the actual businesses behind these numbers

Get the real filings, with addresses and officers, free for 7 days. No credit card required.

Start your free trial