Browse Miami-Dade County civic records
Every published record for Miami-Dade County, newest first. Filter by board, year, or industry to jump straight to the records you want, and page through to reach the full archive.
15,165 records
S-930B - DANIEL O'CONNELL'S SONS
This legislative item concerns Miami-Dade County's Water and Sewer Department's Consent Decree and Capital Improvement Programs Acceleration Ordinance. It seeks ratification of Change Order No. 1 to Contract No. S-930B between Miami-Dade County and Daniel O'Connell's Sons, Inc. The change order grants a 622-day non-compensable time extension for the construction of ST-2D-B South District Wastewater Treatment Plant (SDWWTP) Substations 5/6 and 15/16. The delays are attributed to extended fabrication and delivery of electrical equipment due to supply chain issues and required shutdowns for installing new voltage feeders. The project aims to increase the SDWWTP's average daily flow capacity and peak flow capacity. The original contract award was $21,805,340.00. The Substantial Completion Date is extended from June 10, 2023, to February 21, 2025, and the Final Completion Date from July 22, 2023, to April 4, 2025. The contract had SBE-Construction and SBE-Goods goals.
- Board:
- Board of County Commissioners
- Date:
- 2026-07-21
- Type:
- Resolution
- Decision:
- Resolution ratifying action by the County Mayor or County Mayor’s designee, specifically approval of Change Order No. 1.
- Address:
- South District Wastewater Treatment Plant (SDWWTP)
- Applicant:
- Daniel O'Connell's Sons, Inc.
S-930B - DANIEL O'CONNELL'S SONS
Miami-Dade County Board of County Commissioners is considering ratification of Change Order No. 1 to Contract No. S-930B between Miami-Dade County and Daniel O'Connell's Sons, Inc. This change order grants a 622-day non-compensable time extension for the construction of ST-2D-B South District Wastewater Treatment Plant (SDWWTP) Substations 5/6 and 15/16. The extension is due to extended fabrication and delivery delays of electrical equipment (415 days) and required shutdowns for new voltage feeder installation (207 days). The project aims to increase the SDWWTP's average daily flow capacity and peak flow capacity. The original contract award was $21,805,340.00. The Substantial Completion Date is extended from June 10, 2023, to February 21, 2025, and the Final Completion Date from July 22, 2023, to April 4, 2025. There is no additional fiscal impact. The contract had SBE-Construction and SBE-Goods goals, but Resolution R-525-17 exempts this time extension from compliance review.
- Board:
- Board of County Commissioners
- Date:
- 2026-07-21
- Type:
- Resolution
- Decision:
- In Draft (pending BCC Assignment for ratification)
- Address:
- South District Wastewater Treatment Plant (SDWWTP)
- Applicant:
- Daniel O'Connell's Sons, Inc.
S-930B - DANIEL O'CONNELL'S SONS
Miami-Dade County Board of County Commissioners is considering ratification of Change Order No. 1 to Contract No. S-930B between Miami-Dade County and Daniel O'Connell's Sons, Inc. This change order grants a 622-day non-compensable time extension for the construction of ST-2D-B South District Wastewater Treatment Plant (SDWWTP) Substations 5/6 and 15/16. The project aims to increase the plant's average daily flow capacity and peak flow capacity. The time extension is due to delays in electrical equipment fabrication and delivery caused by supply chain issues, and required shutdowns for installing new voltage feeders. The original contract award was $21,805,340.00. The Substantial Completion Date is extended from June 10, 2023, to February 21, 2025, and the Final Completion Date from July 22, 2023, to April 4, 2025. There is no additional fiscal impact. The contract had SBE-Construction and SBE-Goods goals.
- Board:
- Board of County Commissioners
- Date:
- 2026-07-21
- Type:
- Resolution
- Decision:
- In Draft (Resolution ratifying action)
- Address:
- South District Wastewater Treatment Plant (SDWWTP)
- Applicant:
- Daniel O'Connell's Sons, Inc.
S-930B - DANIEL O'CONNELL'S SONS
Miami-Dade County Board of County Commissioners is considering ratification of Change Order No. 1 to Contract No. S-930B between Miami-Dade County and Daniel O'Connell's Sons, Inc. This change order grants a 622-day non-compensable time extension for the construction of ST-2D-B South District Wastewater Treatment Plant (SDWWTP) Substations 5/6 and 15/16. The project aims to increase the plant's average annual daily flow capacity and peak flow capacity. The time extension is due to delays in electrical equipment fabrication and delivery caused by supply chain issues, and required shutdowns for installing new voltage feeders. The original contract award was $21,805,340.00. The Substantial Completion Date is extended from June 10, 2023, to February 21, 2025, and the Final Completion Date from July 22, 2023, to April 4, 2025. There is no additional fiscal impact to the County. The project is located at the South District Wastewater Treatment Plant.
- Board:
- Board of County Commissioners
- Date:
- 2026-07-21
- Type:
- Resolution
- Decision:
- In Draft (Resolution ratifying action)
- Address:
- South District Wastewater Treatment Plant (SDWWTP)
- Applicant:
- Daniel O'Connell's Sons, Inc.
S-930B - DANIEL O'CONNELL'S SONS
Miami-Dade County Board of County Commissioners is considering ratification of Change Order No. 1 to Contract No. S-930B between Miami-Dade County and Daniel O'Connell's Sons, Inc. This change order grants a 622-day non-compensable time extension for the construction of ST-2D-B South District Wastewater Treatment Plant (SDWWTP) Substations 5/6 and 15/16. The project involves constructing two new electrical substations, installing new electrical equipment duct banks, and associated infrastructure to redistribute electrical loads. The delays are attributed to extended fabrication and delivery of electrical equipment due to supply chain issues and operational shutdown sequencing for installing new low voltage feeders. The project aims to increase the SDWWTP's average daily treatment capacity from 112.5 MGD to 131 MGD and peak flow capacity from 285 MGD to 305 MGD. The change order extends the Substantial Completion Date from June 10, 2023, to February 21, 2025, and the Final Completion Date from July 22, 2023, to April 4, 2025. The original contract award was $21,805,340.00.
- Board:
- Board of County Commissioners
- Date:
- 2026-07-21
- Type:
- Resolution
- Decision:
- Pending BCC Assignment (Resolution in Draft)
- Address:
- South District Wastewater Treatment Plant (SDWWTP)
- Applicant:
- Daniel O'Connell's Sons, Inc.
S-930B - DANIEL O'CONNELL'S SONS
Miami-Dade County Board of County Commissioners is considering ratification of Change Order No. 1 to Contract No. S-930B between Miami-Dade County and Daniel O'Connell's Sons, Inc. for the ST-2D-B South District Wastewater Treatment Plant (SDWWTP) Substations 5/6 and 15/16 project. This change order grants a 622-day non-compensable time extension due to delays in electrical equipment fabrication and delivery, and required shutdowns for installation. The project aims to increase the SDWWTP's average daily flow capacity from 112.5 to 131 million gallons per day and peak flow capacity from 285 to 305 MGD. The original contract award was $21,805,340.00. The change order extends the Substantial Completion Date from June 10, 2023, to February 21, 2025, and the Final Completion Date from July 22, 2023, to April 4, 2025. The project involves constructing two new electrical substations, installing new electrical equipment duct banks, and associated infrastructure. The change order has no additional fiscal impact. The contract had SBE-Construction and SBE-Goods goals, but these are not applicable to this time extension change order.
- Board:
- Board of County Commissioners
- Date:
- 2026-07-21
- Type:
- Resolution
- Decision:
- Resolution ratifying action by the County Mayor or County Mayor’s designee related to approval of Change Order No. 1
- Applicant:
- Daniel O'Connell's Sons, Inc.
S-930B - DANIEL O'CONNELL'S SONS
Miami-Dade County Board of County Commissioners is considering ratification of Change Order No. 1 to Contract No. S-930B between Miami-Dade County and Daniel O'Connell's Sons, Inc. This change order grants a 622-day non-compensable time extension for the construction of ST-2D-B South District Wastewater Treatment Plant (SDWWTP) Substations 5/6 and 15/16. The project involves constructing two new electrical substations, installing new electrical equipment, duct banks, and associated infrastructure to redistribute electrical loads, and includes demolition and replacement of existing electrical components. The delays are attributed to extended fabrication and delivery times for electrical equipment due to supply chain issues and operational shutdown sequencing constraints for installing new low voltage feeders. The project aims to increase the SDWWTP's permitted average annual daily flow from 112.5 to 131 MGD and peak flow capacity from 285 to 305 MGD, enhancing facility hardening for continuous operation during severe weather. The original contract award was $21,805,340.00. The change order has no additional fiscal impact. The Small Business Enterprise (SBE) goals for the original contract were 11.85% for Construction and 1% for Goods.
- Board:
- Board of County Commissioners
- Date:
- 2026-07-21
- Type:
- Resolution
- Decision:
- Pending BCC Assignment
- Address:
- South District Wastewater Treatment Plant (SDWWTP)
- Applicant:
- Daniel O'Connell's Sons, Inc.
SAME DAY PERMIT PROGRAM
Miami-Dade County is creating a Same-Day Permitting Program for certain residential projects. The program, to be implemented by the County Mayor or designee, will expedite permits for minor projects like fences (under 6 feet), gates, stairs, railings, driveways, pavers, trusses, pools, windows, doors, shutters, skylights, garage doors, roofing/re-roofing, kitchen/bathroom remodels, interior/partial demolition, prefabricated sheds, minor non-structural repairs, and mechanical, electrical, and plumbing repairs. Projects requiring structural review, those in historic districts, with open code enforcement cases, or to legalize violations are excluded. Applicants must submit documents electronically before a meeting for same-day review and potential approval. The County Mayor will report on the program's progress every six months. If delays are department-caused, permit fees may be reduced by 10% per business day. The ordinance was introduced on 7/14/2026 and is scheduled for Board of County Commissioners (BCC) action on 7/21/2026.
- Board:
- Board of County Commissioners
- Date:
- 2026-07-21
- Type:
- Ordinance
- Decision:
- Pending BCC Assignment (introduced, forwarded to BCC with favorable recommendation with committee amendments)
- Applicant:
- Miami-Dade County Board of County Commissioners (requester: NONE, sponsor: Anthony Rodriguez)
SAME DAY PERMIT PROGRAM
Miami-Dade County is creating a Same-Day Permitting Program for certain minor residential projects. The program aims to streamline the permit application process for eligible projects such as fences (under six feet), gates, stairs, driveways, pools, windows, doors, roofing, kitchen/bathroom remodels, interior demolition, sheds, minor non-structural repairs, and MEP repairs. Projects requiring structural review, those in historic districts, with open code cases, or legalizing violations are excluded. Applicants will submit documents electronically for potential same-day review and approval. The County Mayor or designee will implement the program and provide six-month progress reports. Fee reductions may apply if delays are department-caused. The ordinance was introduced on July 14, 2026, and was before the Board on July 21, 2026.
- Board:
- Board of County Commissioners
- Date:
- 2026-07-21
- Type:
- Ordinance
- Decision:
- Ordinance creating program, status is 'Before the Board' as of July 21, 2026.
- Applicant:
- County Mayor or County Mayor's designee (to develop and implement)
SAME DAY PERMIT PROGRAM
Miami-Dade County is creating a Same-Day Permitting Program for certain minor residential projects. The program aims to expedite the permit process for eligible applications, including fences (under 6 feet), gates, stairs, railings, driveways, pavers, trusses, pools, windows, doors, shutters, skylights, garage doors, roofing/re-roofing, kitchen/bathroom remodels, interior/partial demolition, prefabricated sheds, minor non-structural repairs, and mechanical, electrical, and plumbing repairs. Projects requiring structural review, those in historic districts, with open code enforcement cases, or to legalize violations are ineligible. Applicants must submit documents electronically prior to a meeting for same-day review and potential approval. The County Mayor or designee will implement the program and provide six-month reports on its effectiveness. Permit fees may be reduced if delays are caused by the reviewing department. The ordinance was introduced on 7/14/2026 and scheduled for an agenda on 7/21/2026.
- Board:
- Board of County Commissioners
- Date:
- 2026-07-21
- Type:
- Ordinance
- Decision:
- Pending BCC Assignment (introduced, forwarded to BCC with favorable recommendation with committee amendments)
- Applicant:
- County Mayor or County Mayor's designee (to develop and implement)
SAME DAY PERMIT PROGRAM
Miami-Dade County is establishing a Same-Day Permitting Program for certain residential projects. The program aims to streamline the permit application process for minor construction. Eligible projects include fences (under six feet), gates, stairs, railings, driveways, pavers, trusses, pools, windows, doors, shutters, skylights, garage doors, roofing/re-roofing, kitchen/bathroom remodels, interior/partial demolition, prefabricated sheds, minor non-structural repairs, and mechanical, electrical, and plumbing repair permits. Projects requiring structural review, those in historic districts, with open code enforcement cases, or to legalize existing violations are not eligible. Applicants must submit documents electronically prior to a meeting for same-day review and potential approval. The County Mayor or designee will implement the program and submit bi-annual reports on its effectiveness. Permit fees may be reduced if delays are caused by the reviewing department. The ordinance was introduced on 7/14/2026 and is scheduled for an agenda on 7/21/2026.
- Board:
- Board of County Commissioners
- Date:
- 2026-07-21
- Type:
- Ordinance
- Decision:
- Before the Board (scheduled for agenda on 7/21/2026)
- Applicant:
- County Mayor or County Mayor's Designee (to develop and implement)
SAME DAY PERMIT PROGRAM
Miami-Dade County is creating a Same-Day Permitting Program for certain minor residential projects. The program aims to expedite the permit process for eligible applications, including fences (under 6 feet), gates, stairs, railings, driveways, pavers, trusses, pools, windows, doors, shutters, skylights, garage doors, roofing/re-roofing, kitchen/bathroom remodels, interior/partial demolition, prefabricated sheds, minor non-structural repairs, and mechanical, electrical, and plumbing repairs. Projects requiring structural review, those in historic districts, with open code enforcement cases, or to legalize existing violations are ineligible. Applicants must submit documents electronically prior to a meeting for same-day review and potential approval. The County Mayor or designee will report on the program's progress every six months. If delays are due to the reviewing department, permit fees may be reduced by 10 percent per business day. The ordinance was introduced on 7/14/2026 and is scheduled for an agenda on 7/21/2026.
- Board:
- Board of County Commissioners
- Date:
- 2026-07-21
- Type:
- Ordinance
- Decision:
- Pending BCC Assignment (as of 7/14/2026), Forwarded to BCC with a favorable recommendation with committee amendments (as of 7/13/2026)
- Applicant:
- County Mayor or County Mayor's designee (to develop and implement)
SAME DAY PERMIT PROGRAM
Miami-Dade County is establishing a Same-Day Permitting Program for certain minor residential projects. The program aims to streamline the permit application process for homeowners. Eligible projects include fences (under 6 feet), gates, stairs, railings, driveways, pavers, trusses, pools, windows, doors, shutters, skylights, garage doors, roofing/re-roofing, kitchen/bathroom remodels, interior/partial demolition, prefabricated sheds, minor non-structural repairs, and mechanical, electrical, and plumbing repair permits. Projects requiring structural review, those in historic districts, with open code enforcement cases, or to legalize existing violations are not eligible. Applicants must submit documents electronically prior to a meeting for same-day review and potential approval. The County Mayor or designee will report on the program's progress every six months. Permit fees may be reduced if delays are caused by the reviewing department. The ordinance was introduced on 7/14/2026 and is scheduled for an agenda on 7/21/2026.
- Board:
- Board of County Commissioners
- Date:
- 2026-07-21
- Type:
- Ordinance
- Decision:
- Before the Board (Ordinance introduced, awaiting final action)
- Applicant:
- County Mayor or County Mayor's Designee (to develop and implement)
SAME DAY PERMIT PROGRAM
Miami-Dade County is creating a Same-Day Permitting Program for certain minor residential projects. The program aims to streamline the permit application process for homeowners. Eligible projects include fences up to six feet, gates, stairs, railings, driveways, pavers, trusses, pools, windows, doors, shutters, skylights, garage doors, roofing/re-roofing, kitchen/bathroom remodels, interior/partial demolition, prefabricated sheds, minor non-structural repairs, and mechanical, electrical, and plumbing repair permits. Projects requiring structural review, those in historic districts, with open code enforcement cases, or to legalize existing violations are not eligible. Applicants must submit documents electronically prior to a meeting for same-day review and potential approval. The County Mayor or designee will implement the program and provide six-month reports on its effectiveness. Permit fees may be reduced if delays are caused by the reviewing department. The ordinance was introduced on 7/14/2026 and is scheduled for final action on 7/21/2026.
- Board:
- Board of County Commissioners
- Date:
- 2026-07-21
- Type:
- Ordinance
- Decision:
- Before the Board (scheduled for final action)
- Applicant:
- Miami-Dade County Mayor or County Mayor's Designee
SAME DAY PERMIT PROGRAM
Miami-Dade County is creating a Same-Day Permitting Program for certain minor residential projects. The program, to be implemented by the County Mayor or designee, will allow for same-day review and approval of eligible permit applications, including those for fences (under six feet), gates, stairs, railings, driveways, pavers, trusses, pools, windows, doors, shutters, skylights, garage doors, roofing/re-roofing, kitchen/bathroom remodels, interior/partial demolition, prefabricated sheds, minor non-structural repairs, and mechanical, electrical, and plumbing repairs. Projects requiring structural review, those in historic districts, with open code enforcement cases, or to legalize existing violations are excluded. Applicants must submit documents electronically prior to a meeting for review. The County Mayor will provide semi-annual reports on the program's performance. If delays are due to the reviewing department, permit fees may be reduced by 10 percent per business day. The ordinance was introduced on 7/14/2026 and is scheduled for an agenda on 7/21/2026.
- Board:
- Board of County Commissioners
- Date:
- 2026-07-21
- Type:
- Ordinance
- Decision:
- Pending BCC Assignment (as of 7/14/2026), with a favorable recommendation from Policy Council with committee amendments following public hearing.
- Applicant:
- County Mayor or County Mayor's designee (to develop and implement)
SAME DAY PERMIT PROGRAM
Miami-Dade County has adopted an ordinance creating a Same-Day Permitting Program for certain residential projects. This program requires the County Mayor or designee to develop and implement a process for expedited permit reviews and approvals for minor residential construction. Eligible projects include fences up to six feet, gates, stairs, railings, driveways, pavers, trusses, pools, windows, doors, shutters, skylights, garage doors, roofing/re-roofing, kitchen/bathroom remodels, interior/partial demolition, prefabricated sheds, minor non-structural repairs, and mechanical, electrical, and plumbing repair permits. Projects requiring structural review, those in historic districts, with open code enforcement cases, or to legalize existing violations are not eligible. Applicants must submit documents electronically prior to a meeting for same-day review and potential approval. The program also mandates six-month reports on application numbers, approvals, and reasons for delays. If delays are due to the reviewing department, permit fees may be reduced by 10 percent per business day. The ordinance was introduced on July 14, 2026, and adopted on July 21, 2026. It becomes effective ten days after enactment.
- Board:
- Board of County Commissioners
- Date:
- 2026-07-21
- Type:
- Ordinance
- Decision:
- Adopted
- Applicant:
- County Mayor or County Mayor's designee (to develop and implement the program)
SAME DAY PERMIT PROGRAM
Miami-Dade County is creating a Same-Day Permitting Program for certain minor residential projects. The program requires the County Mayor or designee to develop and implement it, with reports every six months. Eligible projects include fences (under 6 feet), gates, stairs, railings, driveways, pavers, trusses, pools, windows, doors, shutters, skylights, garage doors, roofing/re-roofing, kitchen/bathroom remodels, interior/partial demolition, prefabricated sheds, minor non-structural repairs, and mechanical, electrical, and plumbing repair permits. Projects requiring structural review, in historic districts, with open code enforcement cases, or to legalize existing violations are not eligible. Applicants must submit documents electronically before a meeting for same-day review and potential approval. If delays are due to the reviewing department, permit fees will be reduced by 10% per business day. The ordinance was introduced on 7/14/2026 and forwarded to the Board of County Commissioners (BCC) with a favorable recommendation on 7/13/2026, with an agenda date of 7/21/2026.
- Board:
- Board of County Commissioners
- Date:
- 2026-07-21
- Type:
- Ordinance
- Decision:
- Pending BCC Assignment / Forwarded to BCC with a favorable recommendation
- Applicant:
- Miami-Dade County
SAME DAY PERMIT PROGRAM
Miami-Dade County is creating a Same-Day Permitting Program for certain residential projects. The program, to be implemented by the County Mayor or designee, will allow for same-day review and approval of eligible permit applications, including those for fences (under 6 feet), gates, stairs, railings, driveways, pavers, trusses, pools, windows, doors, shutters, skylights, garage doors, roofing/re-roofing, kitchen/bathroom remodels, interior/partial demolition, prefabricated sheds, minor non-structural repairs, and mechanical, electrical, and plumbing repairs. Projects requiring structural review, those in historic districts, with open code enforcement cases, or to legalize violations are not eligible. Applicants must submit documents electronically prior to a meeting. The County Mayor will provide semi-annual reports on the program's performance. If delays are due to the reviewing department, permit fees may be reduced by 10 percent per business day. The ordinance was forwarded to the Board of County Commissioners (BCC) with a favorable recommendation with committee amendments following a public hearing.
- Board:
- Board of County Commissioners
- Date:
- 2026-07-21
- Type:
- Ordinance
- Decision:
- Forwarded to BCC with a favorable recommendation with committee amendments; Status: Before the Board (Pending BCC Assignment)
- Applicant:
- County Mayor or County Mayor's designee (to develop and implement)
SAME DAY PERMIT PROGRAM
Miami-Dade County is creating a Same-Day Permitting Program for certain minor residential projects. The program aims to streamline the permit application process for homeowners. Eligible projects include fences up to six feet, gates, stairs, railings, driveways, pavers, trusses, pools, windows, doors, shutters, skylights, garage doors, roofing/re-roofing, kitchen/bathroom remodels, interior/partial demolition, prefabricated sheds, minor non-structural repairs, and mechanical, electrical, and plumbing repair permits. Projects requiring structural review, located in historic districts, with open code enforcement cases, or to legalize existing violations are not eligible. Applicants must submit documents electronically prior to a meeting for same-day review and potential approval. The County Mayor or designee will report on the program's progress every six months. If delays are due to the reviewing department, permit fees may be reduced by 10% per business day.
- Board:
- Board of County Commissioners
- Date:
- 2026-07-21
- Type:
- Ordinance
- Decision:
- Pending BCC Assignment (Ordinance introduced and forwarded to BCC)
- Applicant:
- Miami-Dade County Mayor or County Mayor's Designee
SAME DAY PERMIT PROGRAM
Miami-Dade County is establishing a Same-Day Permitting Program for certain minor residential projects. The program aims to streamline the permit application process for homeowners. Eligible projects include fences (under 6 feet), gates, stairs, railings, driveways, pavers, trusses, pools, windows, doors, shutters, skylights, garage doors, roofing/re-roofing, kitchen/bathroom remodels, interior/partial demolition, prefabricated sheds, minor non-structural repairs, and mechanical, electrical, and plumbing repair permits. Projects requiring structural review, those in historic districts, with open code enforcement cases, or to legalize existing violations are not eligible. Applicants must submit documents electronically prior to a meeting for same-day review and potential approval. The County Mayor or designee will implement the program and provide six-month reports on its effectiveness. Permit fees may be reduced if delays are caused by the reviewing department. The ordinance was introduced on 7/14/2026 and is scheduled for an agenda on 7/21/2026.
- Board:
- Board of County Commissioners
- Date:
- 2026-07-21
- Type:
- Ordinance
- Decision:
- Before the Board (Ordinance introduced, pending final action)
- Applicant:
- County Mayor or County Mayor's designee (to develop and implement)
See the actual businesses behind these numbers
Get the real filings, with addresses and officers, free for 7 days. No credit card required.
Start your free trial