CHANGE ORDER #1 TO MCM (S-16094)

Resolution R-537-26, adopted by the Miami-Dade Board of County Commissioners on 6/16/2026, ratifies Change Order No. 1 to Contract No. S-16094 between Miami-Dade County and Magnum Construction Management, LLC for the Central District Wastewater Treatment Plant (CDWWTP) New Materials Management Building and Storage Areas. The change order grants a 51-day non-compensable time extension, revising the Substantial Completion date from March 21, 2026 to May 11, 2026 and the Final Completion date from April 20, 2026 to June 10, 2026. The project includes a 3,525 square foot building with office space, warehousing, receiving areas, a second-floor storage area, and two outdoor storage canopies. The contract award was $28,095,287.50 with a Contingency Allowance of $1,987,250.00. The project is located at WASD's CDWWTP in Commission District 7. No public comment or stakeholder sentiment is stated in the document.

Board:
Board of County Commissioners
Date:
2026-06-16
Type:
Resolution
Decision:
Adopted
Applicant:
Miami-Dade County Water & Sewer Department; Contractor: Magnum Construction Management, LLC

CHANGE ORDER #1 TO MCM (S-16094)

Miami-Dade County Board of County Commissioners ratified Change Order No. 1 to Contract No. S-16094 for the construction of the Central District Wastewater Treatment Plant (CDWWTP) New Materials Management Building and Storage Areas. The change order grants a 51-day non-compensable time extension due to permitting delays, revising the Substantial Completion date from March 21, 2026, to May 11, 2026, and the Final Completion date from April 20, 2026, to June 10, 2026. The project involves earthwork, paving, grading, pile foundation, roofing, HVAC, plumbing, fire pumps, electrical systems, and network infrastructure, aiming for LEED Silver Certification. This upgrade is part of Miami-Dade Water and Sewer Department's (WASD) Capital Improvement Program to enhance resilience against sea level rise and extreme weather. The original contract award was $28,095,287.50. No small business enterprise measures are included.

Board:
Board of County Commissioners
Date:
2026-06-16
Type:
Resolution
Decision:
Adopted (Resolution Ratifying Change Order No. 1)
Address:
Central District Wastewater Treatment Plant (CDWWTP)
Applicant:
Miami-Dade Water and Sewer Department (WASD) / Magnum Construction Management, LLC

CHANGE ORDER #1 TO MCM (S-16094)

Miami-Dade County Board of County Commissioners ratified Change Order No. 1 to Contract No. S-16094 with Magnum Construction Management, LLC. This change order grants a 51-day non-compensable time extension for the construction of the Central District Wastewater Treatment Plant (CDWWTP) New Materials Management Building and Storage Areas. The extension is due to delays in obtaining a Class VI Permit. The project involves earthwork, paving, grading, a pile foundation system, structural roofing, HVAC, plumbing, fire pumps, electrical manholes, duct banks, switchgear, fiber patch panels, and a MIS Network Switch Cabinet. The new facility will be 3,525 square feet and is designed to meet sea level rise guidelines and LEED Silver Certification. The original contract award was $28,095,287.50. The Substantial Completion date is extended from March 21, 2026, to May 11, 2026, and the Final Completion date from April 20, 2026, to June 10, 2026. There is no additional fiscal impact to the County. The project is located at Miami-Dade Water and Sewer Department's CDWWTP.

Board:
Board of County Commissioners
Date:
2026-06-16
Type:
Resolution
Decision:
Adopted (Resolution Ratifying Change Order No. 1)
Address:
Central District Wastewater Treatment Plant (CDWWTP)
Applicant:
Magnum Construction Management, LLC

CHANGE ORDER #1 TO MCM (S-16094)

Miami-Dade County Board of County Commissioners ratified Change Order No. 1 to Contract No. S-16094 for the construction of the Central District Wastewater Treatment Plant (CDWWTP) New Materials Management Building and Storage Areas. The change order grants a 51-day non-compensable time extension due to permitting delays, revising the Substantial Completion date from March 21, 2026, to May 11, 2026, and the Final Completion date from April 20, 2026, to June 10, 2026. The project involves earthwork, paving, grading, a pile foundation system, structural roofing, HVAC, plumbing, fire pumps, electrical manholes, duct banks, switchgear, fiber patch panels, and a MIS Network Switch Cabinet. The facility is designed to meet sea level rise guidelines, improve storage capacity, and support sustainability goals, aiming for LEED Silver Certification. This upgrade also facilitates the demolition of an existing storage building to make way for a new LEED Silver Certified Electrical Distribution Building No. 3. The original contract award was $28,095,287.50 with a contingency of $1,987,250.00. No small business enterprise measures, workforce, or responsible wage and benefits requirements are associated with this project.

Board:
Board of County Commissioners
Date:
2026-06-16
Type:
Resolution
Decision:
Adopted (Resolution Ratifying Change Order No. 1)
Address:
Central District Wastewater Treatment Plant (CDWWTP)
Applicant:
Magnum Construction Management, LLC

CHANGE ORDER #1 TO MCM (S-16094)

Miami-Dade County Board of County Commissioners ratified Change Order No. 1 to Contract No. S-16094 for the construction of the Central District Wastewater Treatment Plant (CDWWTP) New Materials Management Building and Storage Areas. The change order grants a 51-day non-compensable time extension due to permitting delays. The project involves replacing an existing storage building and warehouse to meet sea level rise guidelines and expanding space for materials management. This upgrade is part of the County's Capital Improvement Program to enhance infrastructure resilience against storm surges, flooding, and sea level rise. The new facility will enable the demolition of the existing building to make way for a new LEED Silver Certified Electrical Distribution Building No. 3. The original contract award was $28,095,287.50. The change order revises the Substantial Completion date from March 21, 2026, to May 11, 2026, and the Final Completion date from April 20, 2026, to June 10, 2026. No small business enterprise measures, workforce, or responsible wage and benefits requirements are associated with this project.

Board:
Board of County Commissioners
Date:
2026-06-16
Type:
Resolution
Decision:
Adopted (Resolution Ratifying Change Order No. 1)
Address:
Central District Wastewater Treatment Plant (CDWWTP)
Applicant:
Miami-Dade Water and Sewer Department (WASD) / Magnum Construction Management, LLC

CHANGE ORDER #1 TO MCM (S-16094)

Miami-Dade County Board of County Commissioners ratified Change Order No. 1 to Contract No. S-16094 with Magnum Construction Management, LLC. This change order grants a 51-day non-compensable time extension for the construction of the Central District Wastewater Treatment Plant (CDWWTP) New Materials Management Building and Storage Areas. The extension is due to delays in obtaining a Class VI Permit. The project involves earthwork, paving, grading, a pile foundation system, structural roofing, HVAC, plumbing, fire pumps, electrical manholes, duct banks, switchgear, fiber patch panels, and a MIS Network Switch Cabinet. The new facility will be 3,525 square feet and is designed to meet sea level rise guidelines and LEED Silver Certification. The original contract award was $28,095,287.50. The Substantial Completion date is extended from March 21, 2026, to May 11, 2026, and the Final Completion date from April 20, 2026, to June 10, 2026. There are no small business enterprise measures, workforce, or responsible wage and benefits requirements for this project. No public comment was stated in the document.

Board:
Board of County Commissioners
Date:
2026-06-16
Type:
Resolution
Decision:
Adopted (Resolution Ratifying Change Order No. 1)
Address:
Central District Wastewater Treatment Plant (CDWWTP)
Applicant:
Magnum Construction Management, LLC

CHANGE ORDER #1 TO MCM (S-16094)

Miami-Dade County Board of County Commissioners ratified Change Order No. 1 to Contract No. S-16094 for the construction of the Central District Wastewater Treatment Plant (CDWWTP) New Materials Management Building and Storage Areas. The change order grants a 51-day non-compensable time extension to Magnum Construction Management, LLC, revising the Substantial Completion date from March 21, 2026, to May 11, 2026, and the Final Completion date from April 20, 2026, to June 10, 2026. The extension is due to delays in obtaining a Class VI Permit, attributed to the specialized design and environmental sensitivity of the coastal location. The project involves a 3,525 square foot building with office space, warehousing, receiving areas, outdoor storage canopies, earthwork, paving, grading, pile foundation, roofing, HVAC, plumbing, fire pumps, electrical systems, and network infrastructure. The project aims to enhance operational resilience, improve storage, and support sustainability goals, including LEED Silver Certification. The relocation of this building will allow for the demolition of an existing facility to make way for a new Electrical Distribution Building No. 3. There is no fiscal impact to the county. The contract was originally awarded on October 3, 2024, for $28,095,287.50, with a contingency allowance of $1,987,250.00.

Board:
Board of County Commissioners
Date:
2026-06-16
Type:
Resolution
Decision:
Adopted (Resolution Ratifying Change Order No. 1)
Address:
Central District Wastewater Treatment Plant (CDWWTP)
Applicant:
Magnum Construction Management, LLC

CHANGE ORDER #1 TO MCM (S-16094)

Resolution R-537-26, File Number 260991, adopted by the Miami-Dade Board of County Commissioners on 6/16/2026, ratifies Change Order No. 1 to Contract No. S-16094 between Miami-Dade County and Magnum Construction Management, LLC for the Central District Wastewater Treatment Plant (CDWWTP) New Materials Management Building and Storage Areas. The change order grants a 51-day non-compensable time extension, revising the Substantial Completion date from March 21, 2026 to May 11, 2026 and the Final Completion date from April 20, 2026 to June 10, 2026. The project includes a 3,525 square foot building with office space, warehousing, receiving areas, second-floor storage, and two outdoor storage canopies. The contract was awarded on October 3, 2024, with a total award of $28,095,287.50 and a Contingency Allowance of $1,987,250.00. The Notice to Proceed was issued on January 20, 2025. A Stop Work Order was issued on March 3, 2025 due to a delay in obtaining the Class VI Permit, lifted on April 18, 2025, and the contractor remobilized on April 23, 2025. The project is located at WASD's CDWWTP in Commission District 7. No public comment or stakeholder sentiment is stated in the document.

Board:
Board of County Commissioners
Date:
2026-06-16
Type:
Resolution
Decision:
Adopted
Applicant:
Miami-Dade County Water & Sewer Department; Contractor: Magnum Construction Management, LLC

CHANGE ORDER #1 TO MCM (S-16094)

Miami-Dade County Board of County Commissioners ratified Change Order No. 1 to Contract No. S-16094 for the construction of the Central District Wastewater Treatment Plant (CDWWTP) New Materials Management Building and Storage Areas. The change order grants a 51-day non-compensable time extension due to permitting delays, revising the Substantial Completion date to May 11, 2026, and the Final Completion date to June 10, 2026. The project involves earthwork, paving, grading, a pile foundation system, structural roofing, HVAC, plumbing, fire pumps, electrical manholes, duct banks, switchgear, fiber patch panels, and a MIS Network Switch Cabinet. The new facility will be 3,525 square feet and is designed to meet sea level rise guidelines and LEED Silver Certification. This upgrade is part of Miami-Dade Water and Sewer Department's $8.6 billion Capital Improvement Program to enhance infrastructure resilience. No public comment was stated in the document.

Board:
Board of County Commissioners
Date:
2026-06-16
Type:
Resolution
Decision:
Adopted (Resolution Ratifying Change Order No. 1)
Address:
Central District Wastewater Treatment Plant (CDWWTP)
Applicant:
Magnum Construction Management, LLC

CLAUDE PEPPER TOWER PUBLIC HOUSING SITE

Miami-Dade County Board of County Commissioners adopted a resolution to declare county-owned property surplus and authorize its conveyance to the City of Miami for $10.00. The property, totaling approximately 560 square feet, is located at the southwest corner of NW 7th Avenue/US-441 and NW 18th Terrace, and the northeast corner of NW 8th Avenue and NW 18th Street. This conveyance is for a right-of-way dedication related to the Claude Pepper Tower public housing site redevelopment project, which will include approximately 628 mixed-income units replacing existing public housing. The conveyance is a condition for obtaining building permits for the project.

Board:
Board of County Commissioners
Date:
2026-06-16
Type:
Resolution
Decision:
Adopted
Address:
750 NW 18th Terrace, Miami, FL
Applicant:
RUDG, LLC (developer for Claude Pepper Tower project), City of Miami (recipient of conveyance)

CLAUDE PEPPER TOWER PUBLIC HOUSING SITE

Miami-Dade County Board of County Commissioners adopted a resolution to declare county-owned property surplus and authorize its conveyance to the City of Miami for $10.00. This property, located at the southwest corner of NW 7th Avenue/US-441 and NW 18th Terrace, and the northeast corner of NW 8th Avenue and NW 18th Street, is intended for a right-of-way dedication related to the Claude Pepper Tower public housing site redevelopment. The redevelopment project, undertaken by RUDG, LLC, will consist of approximately 628 mixed-income units, replacing existing public housing units. The conveyance is a condition for obtaining building permits for the Claude Pepper project, as required by City of Miami code for street intersection radius dedications. The property will revert to the County if the public use is discontinued.

Board:
Board of County Commissioners
Date:
2026-06-16
Type:
Resolution
Decision:
Adopted
Address:
750 NW 18th Terrance, Miami, FL
Applicant:
Housing and Community Development (Requester), RUDG, LLC (Developer for Claude Pepper Tower Project)

CLAUDE PEPPER TOWER PUBLIC HOUSING SITE

Miami-Dade County Board of County Commissioners adopted a resolution to declare county-owned property surplus and authorize its conveyance to the City of Miami for $10.00. The property, located at the southwest corner of NW 7th Avenue/US-441 and NW 18th Terrace, and the northeast corner of NW 8th Avenue and NW 18th Street, is intended for a right-of-way dedication related to the Claude Pepper Tower public housing project redevelopment. The project, undertaken by RUDG, LLC, will consist of approximately 628 mixed-income units, replacing existing public housing units. The conveyance is a condition for obtaining building permits from the City of Miami, which requires a 25-foot radius dedication at street intersections. The total area conveyed is approximately 560 square feet, comprising two parcels: 442 square feet and 118 square feet. The property is encumbered by a declaration of trust in favor of HUD, but this conveyance is exempt from federal regulations. The County retains a reversionary interest if the property is no longer used as a right-of-way.

Board:
Board of County Commissioners
Date:
2026-06-16
Type:
Resolution
Decision:
Adopted
Address:
750 NW 18th Terrace, Miami, FL
Applicant:
RUDG, LLC (developer for Claude Pepper Tower project); City of Miami (recipient of conveyance)

CLAUDE PEPPER TOWER PUBLIC HOUSING SITE

Miami-Dade County Board of County Commissioners adopted a resolution to declare county-owned property surplus and authorize its conveyance to the City of Miami for $10.00. This conveyance is for a right-of-way dedication related to the Claude Pepper Tower public housing site redevelopment. The property consists of two parcels: one at the southwest corner of NW 7th Avenue/US-441 and NW 18th Terrace (442 sq ft) and another at the northeast corner of NW 8th Avenue and NW 18th Street (118 sq ft), totaling approximately 560 sq ft. The redevelopment of the Claude Pepper Tower project, managed by RUDG, LLC, will result in approximately 628 mixed-income units, replacing 166 existing public housing units. The City of Miami requires this right-of-way dedication as a condition for issuing building permits for the project. The property will revert to the County if the public use is discontinued.

Board:
Board of County Commissioners
Date:
2026-06-16
Type:
Resolution
Decision:
Adopted
Address:
750 NW 18th Terrace, Miami, FL
Applicant:
Housing and Community Development (Requester), RUDG, LLC (Developer for Claude Pepper Tower Project), City of Miami (Recipient)

CLAUDE PEPPER TOWER PUBLIC HOUSING SITE

Miami-Dade County Board of County Commissioners adopted a resolution to declare county-owned property surplus and authorize its conveyance to the City of Miami for $10.00. The property, totaling approximately 560 square feet, is located at the southwest corner of NW 7th Avenue/US-441 and NW 18th Terrace, and the northeast corner of NW 8th Avenue and NW 18th Street. This conveyance is for a right-of-way dedication related to the Claude Pepper Tower public housing site redevelopment project, which will include approximately 628 mixed-income units replacing existing public housing units. The conveyance is a condition for obtaining building permits for the redevelopment.

Board:
Board of County Commissioners
Date:
2026-06-16
Type:
Resolution
Decision:
Adopted
Address:
750 NW 18th Terrace, Miami, FL
Applicant:
RUDG, LLC (developer for Claude Pepper Tower project), City of Miami (recipient of conveyance)

CLAUDE PEPPER TOWER PUBLIC HOUSING SITE

Miami-Dade County Board of County Commissioners adopted a resolution to declare county-owned property surplus and authorize its conveyance to the City of Miami for $10.00. This property is intended for a right-of-way dedication related to the Claude Pepper Tower public housing site redevelopment. The conveyance is a condition for obtaining building permits for the project. The property consists of two parcels: one at the southwest corner of NW 7th Avenue/US-441 and NW 18th Terrace, and another at the northeast corner of NW 8th Avenue and NW 18th Street. The redevelopment of the Claude Pepper Tower site involves approximately 628 mixed-income units, replacing existing public housing units.

Board:
Board of County Commissioners
Date:
2026-06-16
Type:
Resolution
Decision:
Adopted
Address:
750 NW 18th Terrance, Miami, FL
Applicant:
Housing and Community Development (Requester), RUDG, LLC (Developer)

CLAUDE PEPPER TOWER PUBLIC HOUSING SITE

Miami-Dade County Board of County Commissioners adopted Resolution R-534-26, declaring approximately 560 square feet of county-owned property as surplus and authorizing its conveyance to the City of Miami for $10.00. This conveyance is for a right-of-way dedication related to the Claude Pepper Tower public housing site redevelopment. The property is located at the southwest corner of NW 7th Avenue/US-441 and NW 18th Terrace, and the northeast corner of NW 8th Avenue and NW 18th Street. The redevelopment project, managed by RUDG, LLC, will consist of approximately 628 mixed-income units, replacing 166 existing public housing units. The conveyance is a condition for obtaining building permits, as required by City of Miami code for street intersection radius dedications. The property will revert to the County if the public use is discontinued.

Board:
Board of County Commissioners
Date:
2026-06-16
Type:
Resolution
Decision:
Adopted
Address:
750 NW 18th Terrace, Miami, FL
Applicant:
Housing and Community Development (Requester), RUDG, LLC (Developer)

CLAUDE PEPPER TOWER PUBLIC HOUSING SITE

Miami-Dade County Board of County Commissioners adopted a resolution to declare county-owned property surplus and authorize its conveyance to the City of Miami for $10.00. The property consists of two parcels: one at the southwest corner of NW 7th Avenue/US-441 and NW 18th Terrace, and another at the northeast corner of NW 8th Avenue and NW 18th Street. This conveyance is for a right-of-way dedication related to the Claude Pepper Tower public housing site redevelopment project. The project, managed by RUDG, LLC, will replace existing public housing units with approximately 628 mixed-income units. The conveyance is a condition for obtaining building permits from the City of Miami, which requires a 25-foot radius at street intersections for right-of-way dedication. The property is not needed for county purposes and is intended to promote community interest and welfare. The deed includes a reversionary interest for the county if the public use is discontinued. No public comment was stated in the document.

Board:
Board of County Commissioners
Date:
2026-06-16
Type:
Resolution
Decision:
Adopted
Address:
750 NW 18th Terrace, Miami, FL
Applicant:
RUDG, LLC (developer for Claude Pepper Tower project); City of Miami (recipient of conveyance)

CLAUDE PEPPER TOWER PUBLIC HOUSING SITE

Miami-Dade County Board of County Commissioners adopted a resolution to declare county-owned property surplus and authorize its conveyance to the City of Miami for $10.00. The property consists of two parcels: one at the southwest corner of NW 7th Avenue/US-441 and NW 18th Terrace (442 sq ft) and another at the northeast corner of NW 8th Avenue and NW 18th Street (118 sq ft). This conveyance is for a right-of-way dedication related to the Claude Pepper Tower public housing site redevelopment project, located at 750 NW 18th Terrace. The redevelopment project, undertaken by RUDG, LLC, will consist of approximately 628 mixed-income units, replacing existing public housing units. The conveyance is a condition for obtaining building permits from the City of Miami, which requires a 25-foot radius at street intersections for right-of-way dedication. The property is not needed for county purposes and is deemed to promote community interest and welfare. The County retains a reversionary interest, meaning the property will revert to the County if the public use is discontinued.

Board:
Board of County Commissioners
Date:
2026-06-16
Type:
Resolution
Decision:
Adopted
Address:
750 NW 18th Terrace, Miami, FL
Applicant:
RUDG, LLC (developer for Claude Pepper Tower project); City of Miami (recipient of conveyance)

CLAUDE PEPPER TOWER PUBLIC HOUSING SITE

Miami-Dade County Board of County Commissioners adopted a resolution to declare county-owned property surplus and authorize its conveyance to the City of Miami for $10.00. This conveyance is for a right-of-way dedication related to the Claude Pepper Tower public housing site redevelopment. The property consists of two parcels: one on the southwest corner of NW 7th Avenue/US-441 and NW 18th Terrace, and another on the northeast corner of NW 8th Avenue and NW 18th Street. The redevelopment of the Claude Pepper Tower site, managed by RUDG, LLC, will result in approximately 628 mixed-income units, replacing existing public housing units. The conveyance is a condition for obtaining building permits for the project, as required by City of Miami code for street intersection radius dedications.

Board:
Board of County Commissioners
Date:
2026-06-16
Type:
Resolution
Decision:
Adopted
Address:
750 NW 18th Terrance, Miami, FL
Applicant:
Housing and Community Development (Requester), RUDG, LLC (Developer)

CLAUDE PEPPER TOWER PUBLIC HOUSING SITE

Miami-Dade County Board of County Commissioners adopted Resolution R-534-26 on June 16, 2026, authorizing the conveyance of two parcels of county-owned property totaling approximately 560 square feet to the City of Miami for $10.00. This conveyance is for a right-of-way dedication related to the redevelopment of the Claude Pepper Tower Public Housing Site. The property is located at the southwest corner of NW 7th Avenue/US-441 and NW 18th Terrace, and the northeast corner of NW 8th Avenue and NW 18th Street. The developer, RUDG, LLC, requires this dedication to obtain building permits for the Claude Pepper project, which will consist of approximately 628 mixed-income units, replacing 166 existing public housing units. The conveyance is subject to a restriction that the property be used as a right-of-way by the City, with a reversionary interest to the County if the public use is discontinued.

Board:
Board of County Commissioners
Date:
2026-06-16
Type:
Resolution
Decision:
Adopted
Address:
750 NW 18th Terrace, Miami, FL
Applicant:
Housing and Community Development (Requester), RUDG, LLC (Developer)

See the actual businesses behind these numbers

Get the real filings, with addresses and officers, free for 7 days. No credit card required.

Start your free trial